_ _ _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _.
ENCLOSURE 5 BRUtJSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NHC DOCKET NOS. 50 325 & 50 324 OPEHATING LICENSE NOS. OPR-71 & DPR 02 REQUEST FOR LICENSE AMENDMENTS TYPE A INTEGRATED LEAKAGE RATES 1
lEClitEALEl1CiflCATION PAGES UNIT 1 9
6 I
I
-t 9302050207 921229 PDR ADOCK 05000324 t
P_
POR
. ~
e CONTA!NHENT SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)
ACTION (Continued)
The leakage rate to less than or equal to 11.5 scf'per hour for any c.
one main steam line isciation valve, prior to increasing reactor coolant system temperature above 212'F.
SURVEILLANCE REQUIREMENTS 4.6.1.2 The primary containment leakage rates shall be demonstrated-st the following schedule and shall be determined in conformance with the criteria specified in Appendix J of 10 CFR 50s Three Type A Overall Integrated Containment Leakage Rate tests shall a.
be conducted at 40 + 10 month intervals during shutdown at P 49 psig, or P, 25 psig, during each 10 year service period.,,The g
third test of each set shall be conducted during the shutdown for the 10 year plant inservice inspection.-
V If any periodic Type A test fails to meet eitherOo.7 b.
L or o.7 o a
the test schedule for subsequent Type A tests shall be reviewed an approved by the Commission.
If two consecutive Type A tests fall to meet (0.7 L qr
.7 L, a Type A test shall be performed at each plani shutd,own for refueling or every 18 months, 3 L, or g
whichever urs first, until two consecutive Type A tests meet 0
.75 L, at which time the above test schedule may be resume.
N l
The accuracy of each Type A test shall be_ verified by a supplemental c.
test which _
1.
Confirms the accuracy of the test by verifying that the difference between the supplemental data and the Type A test data is within 0.25 L, or 0.25 L.
g 2.
Has duration sufficient to establish accurately the change in leakage rate between the Type A test-and the supplemental test.
3."
Requires,the quantity of gas injected into the_ containment or bled from the containment during the supplemental _ test to be equivalent to at least 25 percene of the total measured leakage rate-at-P,,-49 psig, or P, 25 psig.
g for4he as k nd-fest IeBlfB3e VDIU
- BRUNSWICK - UNIT 1 3/4 6-3 Amendment No. 136 i
... a
l ENCIOSUREO i
l BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50 325 & 50-324 OPERATING LICENSE NOS DPR 71 & DPR-02 REOUEST FOR LICENSE AMENDMENTS TYPE A INTEGRATED LEAKAGE RATES TECHNICAL SPECIFICATION PAGES UNIT 2 1
i 1
i 1
W 6
h
'w A
D b
4 3-I
(..
i, h
~ -- -
--v e
g p e,
+<w.
,, w w e.
.-w r-~~.-,+
,,wn-
--w ee
.e-+.,
,N ~ es - - r o s.- wr - >
--.~--u--
,- N-w-w--.
~~--- ---
CONTA!N_HENT SYSTEMS IdHITING CONDITION FOR OPERATION (Continued)
ACTION (Continued)
The leakage rate to less than or equal to 11.5 scf per hour for any c.
one main steam line isolation valve, prior to increwing reactor coolant system temperature above 212'F.
SURVEILLANCE REQUIREMENTS 4.6.1.2 The primary containment Icakage rates shall be demonstrated at the following schedule and shall be determined in conformance with the criteria specified in Appendix J of 10cFR50s Three Type A Overall Integrated Containment: Leakage Rate tests shall.
a.
be conducted at 40 1 10 month intervals during shutdown at P,,
49 peig, or P, 25 psig, during each 10 year service period.- The g
third test of each set shall be conducted during the shutdown for the 10 year plant inservice inspection.
b.
If any periodic Type A test fails to meet either @
L, o r (0
)L' t
the test schedule for subsequent Type A tests shall be reviewee and approv by the Commission. If two consecutive Type A tests fail to plant'"shutd,wn @for refueling or every 18 months c hichever ogeurs L, a Type A test shall be performed at each meet 7 L o g
o first, untti two consecutive Type A tests meet (0,.7 ) L, or (0.7$ L, at u
which time the above test schedule may be resumed.
T The accuracy of each Type A test shall be verl71ed by a supplemental
~
c.
test whicht 1.
Confirms the accuracy of the test by verifying that the difference between the supplemental data and the Type A test data is within 0.25 L, or 0.25 L.
g 2.
Has duration suf ficient to estabilsh accurately the change in leakege rate between the Type A test and the supplemental test.
3.
Requires the quantity of gas injected into the containment or bled from the containment during the supplemental test to be equivalent to at least 25 percent of.the total measured leakage at P,, 49 psig or P. 25 psig.
t Or he c3S fotanCf 66f fe.8!f0 V UG BRUNSWICK - UNIT 2 3/4 6-3 Amendment No. 166
-l
___g
..