Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20095F5891995-12-12012 December 1995 Proposed Tech Specs Re Containment Sys ML20094D0611995-10-31031 October 1995 Proposed TS Page 6-18,deleting TS 6.9.2.d, Seismic Event Analysis ML20098C5181995-10-0202 October 1995 Proposed Tech Specs,Revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C4111995-09-29029 September 1995 Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks ML20098C1121995-09-29029 September 1995 Proposed TS 3.4.3 & Associated Bases,Modifying Lift Setting of Pressurizer Code Safety Valves to Greater than or Equal to 2,575 Psig,Corresponding to Lift Setting Tolerance of +3% of Nominal Lift Pressure 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] |
Text
____-___ _ - -
Docket Numbsr 50-346 License Number NPF-3 Serial Kamber 2101-Atttchment' Page 6 INSTRUMENTATION REMOTE SHUTDOWN INSTRUMENTATION t
LIMITING CONDITION FOR OPERATION J
[ 3 3.3.5.
0.0.;.: The remote shutdown monitoring instrumentation channels shown in Table 3.3-9 shall be OPERABLE with readouts displayed external to the co g rpeg. %
h A O<D- ,M%,./
. '3 f.O . 5 . 2.
_%FvciC MI w Y: MGur.3 i, 2 and J.
ACTION:
- a. With the number of OPERABLE remote shutdown monitoring channels less than redrtd by Table 3.3 9, either restore the inoperable channel to OPERABLE status within 30 days, or be in HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
L F
P[ C.
The provisions of Specification 3.0.4 are not applicable. i
(
- (
- 6. S ea AU.6) laseir ,
SURVEILLANCE REQUIREMENTS
" ,4. 3. % 5. -
4.0.0.5 ach remote shutdown monitoring instrumentation channel shall l
[ 7te demonstrated OPERABLE by performance of the CHANNEL CHECK and CHANNEL b (
b CALIBRAT . ION operations'at ,
__ - tne frequencies shown in Table 4.3-6.
J. 5. 3. 5 2. S.u. A'thc k ) fu1E ri-w ~'
DAVIS-BESSE, UNIT 1 3/4 3-43 9301050031 921223 .
PDR ADOCK 05000346 p PDR
)
- = . .. . . - - .. . .~ - - - -.. . . -.
I' .
' - . Docket Nu:bst 50-346-Licensa Nu2bar NPF-3 4 Ferial Nunbar 2101
- Attachment Page 7 ,
Insert for new Lc0 3.3.3.5.2 The control circuits and transfer switches required for a serious control room or cable spreading room fire shall be OPERABLE.
l Insert for new Action b I Vith one or more control circuits or transfer switches required for a serious control room or cable spreading room fire inoperable, restore 4 the inoperable circuit (s) or switch (es) to OPERABLE status within 30 days, or prepare and submit a Special Report to the Commission pursuant i to Specification 6.9.2 within the next 30 days outlining the action j taken, the cause of the inoperability, and the plans and schedule for i restoring the circuit (s) or switch (es) to OPERABLE status, 1
Insert for new SR 4.3.3.5.2
' At least once per 18 months, verify each control circuit and transfer.
~
- switch required for a serious control roc = or cable -spreading room fire
- is capable of performing the intended function.
k i
i
{
.I t
4 A
l i
4 4
i s
i 4
h
. _ . . . _ _ _ _ _ . _ . . _ . _ . __ . _ . . _ _ _ _ . _ _ _ _ _ _ . . . . . . . _ _ - _ . _ - . ~ . _ _ _ . . _ _ _ . _ _ _ _ _ _ _ _ . _ . _ _ _ . . _ . . . _ . _ _ _ . . . _ _ . . _ _ _ . _ _ . .
. t 2$$CE
%;'24 o, a L 5 *. -
TABLE 3.3-9 $z*2 REMOTE SHUTDOWN MONITORING INSTRLMENTATION 35E5 Y E E
'n' N 528
" MIEllRSE 3 @ da READOUT MEASUREMENT nem e d, $
INSTRUMENT LOCATION RANCE OPEeaar e d
- 1. Reactor Trip Breaker Indicattom (a) 480v F&DC CN. 2
~ OFIN-CLOSE (a) 1 (Trip Breaker A)
- Switchgear Roce i
(b) 480v E&DC CH. 1 (b) 1 (Trip Breaker 5) i i
Switchgear Room .
l i
(c) 480v F&DC CN. 2 (c) 1 (Trip Breaker C)
Switchgear Room (d) CRDC Cabinet Rees (d) I (Trip Breaker D) w 2. Reactor Ceolant Temperature - Not Leg Aux. Shut 4wn Fanel 1
L 520-420 *F 1 -
- 3. Reacter Coelant System Pressure Aum, Shutdown Fanel 0-3000 peig Q
- 4. Presouriser Level Amm. Shutdown Fame 1 0-320 inche immed i
- 5. Steam Generator Outlet Steen Fressure Aux. Shutdown Fame 1 0-1200 peig 1/eteam generator 7.
.t._ r.t.r m.e, .t.r t ._.e A . .-t- F , 0 2,0 . .
- g,.t.__r.t.r
, Centrol Red Foottise Switches Control Rod Drive 0, 25, 50. 7 rd !
& Control Cabinets.
O and 1001 d Systen Logic Cabinet #4 4
N 3 CD r
^
A e_
3 E res
- = EW i
l
INECE
% 7:12 e o .455%
h 5z# z y TABLE 4.3-6 35E$
- EST h REMOTE SBUTDOUN MONITORING INSTRUMENTATION SURVEILLANCR REQUIREMENTS "5"
? "zo 8%L h C8AMEL C8AMEL b$
INSTRUMENT CBECK CALIBRATION
]
- 1. -Reactor Trip Breaker Indication M N.A. .:
- 2. Reactor Coolant Temperature-Hot Legs M R
- 3. Reactor Coolant System Pressure M R
- 4. Pressurizer Level M R
L
- u. 6. Steam Generator Startup Range Level N R mM l
- 7. Control Rod Position Switches M N.A. O ay, I W "#3 C
13
[ -Ce s ~3 8 2::3
-@ ess
,8, z
? g SV N ancC m
e-
=
Mm ca: c2 i
i .
j Docket Number 50-346 j License Number NPP-3
. Serial Number 2101
= "'
i i
THIS PAGE PROVIDED j 3 /I. 1 NSTRUMENTATION 3ASES i
i l 2/4.3.2 MONITORING INSTRUMENTATION 3/a.2.2.1 2.ADIATION MONITORING INSTRUMENTAT!0ji
! The OPERABILITT of the radiation monitoring channels ensures that 1) the
! raaiation levels are continually measured in the areas served by tne
! individual channals and 2) the alara or automatic action is initiated when the
- racistion level trip setpoint is exceeded.
2/4.3.3.0 INCORE DETECTORS
! The OPERABILITT of the incore detectors ensures that the sessurements cotained j from use ci this system accurately represent the spatial neutron flux i districution of the reactor core. See Bases Figures 3-1 and 3-2 for examples l
of acceptable minimum incore detector arrangements.
i 3/4.3.3.3 SEISMIC INSULUMENTATION
} The OPERASILITT of the seismic instrumentation ensures that sufficiant capacility is available to promptly determine the ensaitude of a seismic event so tnat the response of those featuras important to safety may be evaluated, i
This capability is required to 9:rnit comparison of the measured response to
! that used in the design basis for the facility. This instrumentation is
' consistent with the recommendations of Regulatory Guide 1.12 " Instrumentation j for Eartaquakes," April 1974.
l 3/4.3.3.4 METEOROLOGICAL INSTRUNINTATION The OP3ARILITT of the meteorological instrumentation ensures that sufficient meteorological data is available for estinating potential radiation doses to j the public as a result of routine or accidental release of radioactive j saterials to the atmosphere. This capability is required to evaluate the need for initiating protective measures to protect the health and safety of the public. This instrumentation is consistent with the recoemendatioss of
- Regulatory Guida 1.23 "Onsite Meteorological Programs," February 1972.
3/4.3.3.5 REMOTE SEUTDOVN INSTRUNINTATION The OPERABILITT of the remote shutdown instrumentation ensures tnat sufficient cacao 111ty is available to permit snutdown and maintenance of 1
4 l DAVIS-BESSI. UNIT 1 3 3/4 3-2 A
v-*- - . - . - . _ m . . _ , . ,,,y 7 _,_ .,m_,,,,,-, . , , -. w..,.--- -, y -,,-
Docket Number 50-346
} Liconse Number NPF-3
] Ser4a1 Humber 2101 Attachment
, Page 11
! 3/4.3 INSTRUMENTATION 3ASES i
- EMOTE SHUTOOWN INSTRUMENTATION (Continued)
-0T STANDBY of the facility from locations outside of the control room.
This capability is required in the event control room habitability is lost c w<w s ftdMPT F! > AC t'ED 3/ D T3$6 N S E DENT ~M YOTORING INSTRUMENTATION j The OPERABILITY of the post-accident monitoring instrumentation ensures
- nat sufficient information is available on selected plant carameters to monitor and assess these varisoles following an accident. The containment aydrogen Analyzers, althougn they are considered part of the plant cost-accident monitoring instrumentation, have their OPERABILITY requirements located in Specification 3/4.6.4.1. Hydrogen Analyzers.
- 3/4.3.3.7 CHLORINE DETECTION SYSTEMS - Deleted 3/4.3.3.8 FIRE DETECTION INSTRUMENTATION Deleted d.
(
1 i
i i
4
~
- AVIS-BESSE, UNIT 1 3 3/4 3-3 Amencmen: %. 3,32.!Z)32,15f,157,14 w r .,~-,
r e v - ~
r
. - , I t ,
j- Docket Numb 2r 50-346
- ' License Number NPF-3 l -Serial Number 2101
- j. Attachment ;
~
- Page 12 l
4-I Insert for TS 3/4.3.3.5 Bases l
SR 4.3.3.5.2 verifies that each Remote Shutdown System transfer switch l and control circuit required for a serious control room or cable
! ' spreading room fire performs its intended function.- This verification - --
j is performed from the remote shutdown panel and-local;y, as- 1 i appropriate. This vill ensure that if the control room becomes.
I inaccessible, the unit can be safely shutdown from the remote shutdown j panel and the local. control stations.
i i
i l
1-i-
t I-1 I
l l
k 4-4 l
1 i
i l
1 i
I-
{.
i i
k 1
e f
~
i-5 0
i i'
d a
.u . . ._ __ .- _- - _ . ., . . - - - . - . . _ _ , . . _ . , . . _ . _ . _ , - - , . _ _ . . ,,,-,,, . - , - - . - , , _ , - . _ _ , ,
Docket Numbar 50-346 License Number NPF-3 Serial Number 2101' Attaghment Page 12 ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the U.S. Nuclear Regulatory Ccmission in accordance with 10 CFR 50.4 within the time period specified for eacn report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specifications:
- a. ECCS Actuation. Specifications 3.5.2 and 3.5.3.
- b. Inoperable Seismic Monitoring Instrumentation, Specification 3.3.3.3.
- c. Inoperable Meteorological Monitoring Instrumentation Specification 3.3.3.4.
- d. Seismic event analysis, Specification 4.3.3.3.2.
- e. Deleted 4 Deleted ~
's k 'd h k cl w.5e T l)
. 5.10 RECORD RETENTION 6.10.1 The following records shall be retained for at least five years:
- a. Records and logs of facility operation covering time interval at each power level.
- b. Records and logs of principal maintenance activities, inspections, repair and replacement of principal items of i equipment related to nuclear safety,
- c. All REPORTABLE EVENTS.
- d. Records of surveillance activities, inspections and calibrations required by these Technical Specifications.
- e. -Records of changes made to Operating Procedures.
- i. Records of radioactive shipments,
- g. Records of sealed source and fission detector leak tests and results.
- h. Records of annual physical inventory of all sealed source material of record.
t i
DAVIS-3 ESSE, UNIT 1 6-18 Amenoment No. ?,72,65,26,70E.735 MOD
- . , - y-w.- e ~ - 7-.; . ,. - - . _, . -
Docket Nunbar 50-346 License Number NPF-3 Serial Number 2101 Attachment Page 14 Insert for New 6.9.2.g
- g. Inoperable Remote Shutdown System control circuit (s) or transfer svitch(es) required for a serious control room or cable spreading room fire, Specification 3.3.3.5.2.
i i
1.
t