ML20126A542

From kanterella
Jump to navigation Jump to search
Forwards Schedule of Region IV Meetings W/Utils Re Alcohol & Drug Abuse & Production of Repts on Meetings.First Rept Encl
ML20126A542
Person / Time
Site: Cooper, Arkansas Nuclear, Waterford, Comanche Peak, Fort Calhoun, 05000000, Fort Saint Vrain
Issue date: 03/24/1983
From: Check P, Checks P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20125E231 List:
References
FOIA-84-827 NUDOCS 8506130381
Download: ML20126A542 (2)


Text

r dd f **

re 68, UNITED STATES

/

j d.

4 p"

NUCLEAR REGULATORY COMMISSION N "" A '

REGION IV b

8 811 RYAN PLAZA DRIVE. sulTE 1000

] [

,8 ARLINGTON, TEXAS 78011 4

2 4 NAR 1983 b

S~-

MEMORANDUM FOR:

Richard C. DeYoung, Director, Office of Inspection and Enforcement FROM:

Paul S. Check, Deputy Regional Administrator, Region IV

SUBJECT:

RIV SURVEY OF UTILITIES ON THE MATTER OF DRUG AND ALCOHOL ABUSE is the schedule for RIV meetings with key utility personnel regarding alcohol and drug abuse and for the production of reports on these meetings. is the first of the reports, the one for LP&L.

f4 Paul S. Check, Deputy

(

Regional Administrator

f

Enclosures:

as stated cc:

J. T. Collins J. Gagliardo k _-

L. C bb sp-ssz 5t/-313 59 %E 6f?

m46 gg-+#

$!!r7!$"*2""

31%

we 1

~

V

,0-f, h

ENCLOSURE 1 SCHEDULE Facility (licensee)

Meetino RIV Report to IE Waterford (LP&L)

March 3 March 24 Ft. Calhoun (OPPD)

March 21 April 4 4

Cooper (NPPD)

March 2T.

April 4 ANO (AP&L)

March 10 April 5 Fort St. Vrain (PSC)

April 12 April 25 Comanche Peak (TUGCO)

April 14 April 25 e,

4 1

9 h

32.8 ws