Proposed TS for OL License Change 198,extending TS Surveillances for TS 4.3.1.1.1,Table 4.3-1,TS 4.3.1.1.3, Table 3.3-2,TS 4.3.2.1.1,Table 4.3-2 & TS 4.3.2.1.3,Table 3.3-5 for Reactor Trip Sys,Esfas & Channel Calibr
ML20118A286
Person / Time
Site: Beaver Valley
Issue date: 08/18/1992
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML20118A284 List:
References
NUDOCS 9208280019
Download: ML20118A286 (5)


Text

. - -

ATTACHMEliT C Beaver Valley Power Station; Unit flo. 1 Proposed Operating License Change 110. 198 TYPED PhGES a setsow&bdmettuM4 -

A dinah v %.. ac..

.1 Operating License typed pages:

5 6

1 a

9208280019 920910 PDR ADOCK 05000334 p

PDR j

a

i f

I ATTACHMENT D t

i Beaver Valley Power Station, Unit No. 1 j

Proposed Operating License Changc No-198 j

EXTENDED TECHNICAL SPECIFICATION SURVEILLANCES i

"T ay. Q w ~. W nbs ei p i M D S 4 h... f #.~ +*

N

(

l Technical-Specification - 4.3.1.3.1 Table 4.3-1 ~

Due 2/27/93 Reactor Trip System Instrumentation -

Channel Calibration and Functional Test i

j Technical Specification - 4.3.1.1.3 Table 3.3-2 Due 3/30/93 g

Reactor Trip System Instrumentation -

l Response Times I

j Technical Specification - 4.3.2.1.1 Table 4.3-2 Due 3/2/93 Engineered Safety Feature Actuation System Instrumentation -

Channel Calibration and Functional Test Technical Specification - 4.3.2.1.3 Table 3.3-5 Due 3/2/93-j' Engineered Safety Feature Actuation System Instrumentation -

j Response Times t

l Technical Specification - 4.3.3.1 Table 4.3-3 Due 3/4/93 4

Radiation Moi.'xoring Instrumentation -

i Channel Calibration Technical Specification - 4.3.3.3.1 Table 4.3-4 Due 3/11/93 l

Seismic Monitoring Instrumentation -

l Channel Calibracion I

j Technical Specification - 4.3.3.5 Table 4.3-6 Due 3/3/93 l

Remote Shutdown Instrumentation -

}

Channe' Calibration l

Technical specification - 4.3.3.8 Table 4.3-7 Due 3/9/93 Accident Monitoring Instrumentation -

Channel Calibration Technical Specification - 4.4.9.3.1.b Due 3/11/93 f

Overpressure Protection System -

l Channel Calibrat.on Technical Specification - 4.4.11.1.b Due 3/9/93 q

PORV operability - Channel Calibration l

Technical Specification - 4.5.1.2.b

- Due 3/12/93 l

Accumulator Operability - Channel' Calibration i

l Technical Specificatica - 4.6.3.1.2.e Due 3/8/93 Containment Isolation Valves - Uneck Valve 4

i Lift Test Technical Specification - 0.7.13.1.b Due 4/21/93:

Auxiliary River Water System Test 4

k' 4

t

. m w

-4~r

,-y v, -, -..., - ~,,

,y,--.,4r-,c..,,v,ryy..-,

1 j

' ATTACHMENT D (continued)

Beaver Valley Power Station, Unit No. 1 i

, Prol osed Operating License ( nange No. 198 4,

t l

Technical Specification - 4.8.1.1.1.b and 4.8.1.2 Due 3/10/93 Emergency Switchgear Operation and Diesel Generator Auto Load Tests i

Technical Specification - 4.8.1.1.2.b Due 4/26/93 i

Diesel Generator Test and Inspection Technical Specification - 4.8.2.3.2 Due 3/6/93 l

DC Distribution - Battery Cell Conditions and Charger Capacity i

l Technical Specification - 4.8.2.4.2 Due 3/6/93 DC Distribution - Battery and Charger Service i

Testing i

i i

l l

i l

i t

I l-i l

i 1

l iI.

I I

  • DPR-66 FACILITY OPERATING LICENSE

] LEAVER Vr% LEY POWER - STATION, UPIT NO. 1 (b)

Procedures for monitoring, and (c)

Provisions for maintenance of sampling and analysis equipment.

(8)

Eackun Methqd_for Determinina Suhnpolina Marcin Duquesne Light Company shall implement a progran which will ensure the capability to accurately monitor the Reactor Coolant System subcooling margin.

This program shall include the following:

(a)

Training of-personnel, and (b)

Procedures for monitoring, u

(9)

Surveillance Interval Extension The performance interval for those surveillance requirements identified in the licensee's request for surveillance interval extension dated August 18, 1992, shall be extended to 24 months to coincide with the Cycle-9 refueling outage.

D.

The Licensee shall fully implement and maintain in effect all pro isions of the following Commission approved documents, including enendments and changes made pursuant to the autno. ty of 10CFR 50.54(p).

These approved documents consist cf information withheld from _public' disclosure pursuant-to 10CFR 2 P s(d):

(1)

" Beaver Valley 1Swer

Station, Unit No.

2,-Physical Security Plan,"

Revision 1, dated October 31, 1977. as supplemented by-Revision 2,

dated May 15, 1978',

Revision 3, dated February 21, 1979.

(2)

The NRC approved Safeguards Contingency Plan as transmitted by letter of March 22, 1980.

(3)

" Beaver Valley Power Station Guard Training and Qualification Plan,"

submitted by letter, dated August 16,-

1979, as revised by: letter -dated September 26, 1980.

This Plan shall be-fully implemented in accordance-with 10CFR 73.55(b) (4), within 60 days of this-approval by the-Commission.

All security personnel. shall be qualified within two years of this approval.

5 N

b*

e 1

l

' DPR-66 FACILITY OPERATItIG LICE!ISE BEAVER VALLEY POWER.HI RION. UHJ1,No. 1 E.

All work and activities in connection with this project i

shall be performed pursuant to. the-provisions of the commonwealth of Pennsylvania Clean Streams Acts of June 24,

1913, as
amended, and of-June 22,.1937, as amended, and in accordance with all permits issued by the Department of Environmental Resources of-the Commonwealth of Pennsylvania.

F.

This amended license is effective as of the date of issuance and shall expire at midnight on January 29, 2016.

s 3.

This license amendment is effective as of the date of issuance, to be implemanted within

  • days of insuance.

i t

r l

l t

t 6

i

_ _____d