ML20118A283
| ML20118A283 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 08/18/1992 |
| From: | Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20118A284 | List: |
| References | |
| TAC-M84229, NUDOCS 9208280016 | |
| Download: ML20118A283 (1) | |
Text
-~
r
(
E a a ev Pme Sto'<m sr wy;ot FA :50 7 xa August 18, 1992
.n w
, s,v. w <
w,n. -
n n un U.
S.
Nuclear Regulatory Comnc.sion Attn:
Document Control Desk Hashir con, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Propocod Operating License Change Request No. 198 (TAC No. 84229)
Enclosed are the following:
1.
An application for amendment to the above license to incorporate a
temporary license condition that would extend certain technical specification 18-month surveillance intervals to coincide with the ninth refueling outage.
2.
Documents designated Attachment A,
B, C and D which set forth, respectively, the change in the operating license, the safety analysis (including the no significant hazards evaluation), the typed replacement operating license pages, and extended technical specification surveillances.
This change has been reviewed by the Onsite Safety Committee and Offsite Review Committee and was determined to be' safe based on the attached safety analysis.
The requested target date for approval of this proposed change is December 11, 1992.
Sincerely, j
I-L --
33.
D.
sieber
/l l
Y cc: Mr.
L.
W.
Rossbach, S r.. Resident Inspector J
Mr.
T.
T.
Martin, NRC Region I-Administrator Mr.
A.
W.
De Agazio, Project Manager Mr.
T.
M.
Gerusky, Director BRP/ DER Mr.
R. Janati, BRP/ DER M_.
M.
L. Bowling (VEPCO)
{ hl 9208280016 920010 PDR ADOCK 05000 34 e
(
-