INSERVICE INSPECTION SPECIAL REPORT FOR PRESSURE TESTING UNIT 2 CATAWBA 1996 REFUELING OUTAGE 7-1st TEN YEAR INSPECTION INTERVAL Location: 4800 Concord Road, York, South Carolina NRC Docket No. 50-414 National Board No.173 Commercial Service Date: August 19,1986 Owner: Duke Power Company pU 526 South Church Street Charlotte, N. C. 28201-1006 Revision 0 NOTE: This is a special summary reportfor the remaining Pressure Test items that were completed prior to the end of thefirst ten year inspection interval but not included in the Inservice inspection Outage 7 Report, Revision 0, Dated 02/26/96.
Prepared By:
%.Y.b u
Date 6/T1l'Xo Reviewed By:
,h 4/ h -
Date
[2 96 9 !l J Approved By:
N Date
'Q I I O
Conx"o.
3 Assioned ro nac oocusen1 couraot Controlled X
Uncontrc,:%d PD A
050 14 G
O "T" '"
'STRisuTiON CoovNo.
Assianed To Original J.O. Barbour 1
J.E. Cheny 2
R.C. Giles 3
NRC Document Control UNCONTROLLED DISTRIBUTION 4
C.A. Ireland (AIA, Atlanta, GA)
O I
1 i
i
- o i
1 TABLE OF CONTENTS 1
i l
Section Title Revision 1.
GeneralInformation 0
2.
Summary of Inservice Inspection Pressure Tests 0
Examinations To Complete First Ten Year inspection Interval Requirements.
3 3.
First Ten Year Interval Pressure Test inspection 0
Status 4.
Final inservice inspection Pressure Testing Plan To O
Complete First Ten Year inspection Interval 5
Results of Pressure Testing Examinations 0
6 Reportable Indications 0
0 7
Personnel, Equipment and Material Certifications 0
8 Corrective Action 0
9 Reference Documents 0
r O
1.0 GeneralInformation r
This is a special report that describes Duke Power Company's Catawba Nuclear Station Unit 2 Pressure Tests performed after Refueling Outage 7 but before the expiration of the first ten year Inservice Inspection Interval.
Included in this report are the final inservice Inspection Plan, the inspection i
results for each item, a summary for each category of examination and corrective action taken when unacceptable conditions were found.
1.1 Identification Numbers l
Manufacturer National item Manufacturer or Installer State or Board or Installer Serial No.
Province No.
No.
{
Refueling Water System Duke Power Co.
C-2FW N/A 141 Safety injection System Duke Power Co.
C-2N!
N/A 172 Containment Spray Duke Power Co.
C-2NS N/A 118 System Chemical and Volume Duke Power Co.
C-2NV N/A 170 Control System O
r O
Pressure Testing Summary Report Page1 Catawba Unit 2 Revision 0 Section 1 June 27,1996
I 1.2 Authorized Nuclear Inservice Insoector(s)
Name:
R. N. McGill Employer:
The Hartford Steam Boiler Inspection & Insurance Company Business Address: The Hartford Steam Boiler Inspection & Insurance Co.
200 Ashford Center North Suite 300 l
Atlanta, GA 30338 i
i 1
i i
i 1
)O e
1 i
1
)
i O
Pressure Testing Summary Report Page 2 Catawba Unit 2 -
Revision 0 Section 1 June 27,1996
i i
p 2.0 Summary of Inservice insoection Pressure Tests Examinations To Comolete First Ten Year Insoection Interval Reauirements v
The information shown below provides an abstract of ASME Section XI Class 2 Pressure Test items performed after Refueling Outage 7 but before the expiration of the first ten year Inservice Inspection Interval.
Examination Category C-H All Pressure Retalning Components j
Total Total Scheduled Exam!ntd Item Description During During Number Outage Outage f~
- $"GWs @ ;( gn
}
Pressure Vessels
~ "
q C07.010 Pressure Retaining 0
0 t
Components C07.020 Pressure Retaining
- 3
'3 Components A
i Piping W" y 1
e, A<
^
's l
C07.030 Pressure Retaining 0
0 Components C07.040 Pressure Retaining 9
9 4
Components O
yg, c am j.
Zhj[W kdYYA fyM ~%d[ c'1} * *~
b v ah 4
Pumps wm
' ' M
' *a C07.050 Pressure Retaining 0
0 Components l
C07.060 Pressure Retaining 1
1 Camponents Valves C07.070 Pressure Retaining Covered in Covered in l
Components C07.030 C07.030 C07.080 Pressure Retaining Covered in Covered in i
Components C07.040 C07.040 Totals 13 13 A detailed description of each examination listed in above is located in Section 4 of this i
report. Results of each examination are located in Section 5 of this report.
i
- Two of the three tanks were included in Request For Relief (95-04) for the i
Containment Valve injection Water System (NW). The station opted not to invoke Request For Relief (95-04) and decided to follow the ASME Code. Therefore, these 2
tanks are included as part of the summary.
3 f) l Pressure Testing Summary Report Page1 Catawba Unit 2 Revision 0 l
Section 2 June 27,1996
4
!j' 3.0 First Ten Year Interval Pressure Test insoection Status The completion status of Pressure Test inspections required by the 1980 ASME Code,Section XI, including Addenda through Winter 1981, is summarized in this section. The requirements are listed by the ASME Section XI Examination i
Category as defined in Table IWB-2500-1 for Class 1 Inspections, in Table IWC-4 2500-1 for Class 2 Inspections.
Class 1 Inspections 3
Examination Inspections inspections Percentage iDeferral Cateaorv DescrIntion Reaulted Comoleted Comoleted Allowed
?
?
. B-E Pressure Retaining Partial 165 Welds 165 Welds 100 %
No I
Penetration Welds in Vessels l
B-P All Pressure Retaining Components System Leakage Test 120 120 100 %
No Components Components System Hydrostatic Test 20 20 100 %
Yes
(
Components Components Class 2 inspections Examination Inspections inspections Percentage ilDeferral Cateaorv Descriotion Reautred Comoleted Comoleted gi g All Pressure Retaining C-H Components System or Component 70 70 100 %
No Functional Test Components Components System Hydrostatic Test 95 95 100 %
Yes Components Components iDeferral of inspection to the end of the interval as allowed by ASME Section XI Tables IWB and IWC-2500-1.
iiDeferral of inspection to the end of the interval as allowed by ASME Section XI Tables lWB and IWC-2500-1.
i O
Pressure Testing Summary Report Page1 Catawba Unit 2 Revision 0 Section 3 June 27,1996
i 1
4.0 Final inservice Insoection Pressure Testina Plan To Comolete First Ten YearInsoection interval.
The final ISI Plan presented in this section lists all Pressure Test examinations credited for completing the inspection interval for Catawba Unit 2 The information shown below is a field description for the reporting format included in this section of the report:
Item No.
ASME Section XI Tables IWC-2500-1 (Class 2)
=
Drawing Detail Drawing of Inspection Boundary
=
Rev Revision of Detail Drawing
=
i Test Type of Pressure Test
=
FCA No.
Field Change Authorization Number (Plan
=
Addendum Number)
System Name Name of Pressure Retaining Component
=
Req. Insp Type of Visual Examination Required
=
Req. Proc Required Inspection Procedure
=
Comments General and/or Detail Description j
=
O i
l l
i O
Pressure Testing Summary Report Page 1 Catawba Unit 2 Revision 0 Section 4 June 27,1996
~
O O
O PAGE NO. 1 CATAMBA UNIT NURSER 2 - 1st INTERVAL 06/* ;/95 CLASS B (CA14'JRY C-B) REQUIREBENTS Flat OUTAGE NUBBER 7 REQ.
REQ.
ITEM NO.
DRANING REV TEST FCA NO.
SYSTEM Nham INSP PROC CrnamfTS C07.020.022 CN-2571-1.0 08 HYDRO CAT 2-0168 REFUEL STR WTRVT-2 QAL-15 Special EOC7 Summary Report Item TANK C07.020.025 CN-2569-1.0 09 HYDRO CAT 2-0168 C/VLV INJ W SRVT-2 QAL-15 Special EOC7 Summary Report Item CM 2A C07.020.026 CN-2569-1.0 09 HYDRO CAT 2-0168 C/VLV INJ W SRVT-2 QAL-15 Special EOC7 Summary Report Item CM 2B C07.040.007 CN-2554-1.2 08 HYDRO CAT 2-0168 NV SYSTEM VT-2 QAL-15 Special EOC7 Summary Report Item C07.040.008 CN-2554-1.3 07 HYDRO CAT 2-0168 NV SYSTEM VT-2 QAL-15 Special EOC7 Summary Report Item C07.040.011 CN-2554-1.6 07 HYDRO CAT 2-0185 NV SYSTEM VT-2 QAL-15 Special EOC7 Summary Report Item C07.040.015 CN-1556-1.0 07 HYDRO CAT 2-0168 NB SYSTEM VT-2 QAL-15 Special EOC7 Summary Report Item C07.040.024 CN-2562-1.2 11 HYDRO C7sT2-0185 NI SYSTEM V" -2 QAL-15 Special EOC7 Summary Report Item C07.040.025 CM-2562-1.3 05 HYDRO CAT 2-0185 NI SYSTEM VT-2 QAL-15 Special EOC7 Summary Report Item C07.040.027 CN-2563-1.0 09 HYDRO CAT 2-0185 NS SYSTEM VT-2 QAL--15 Special EOC7 Summary Report Item C07.040.0*17 CN-2570-1.0 07 HYDRO CAT 2-0168 KF SYSTEM VT-2 QAL-15 Special EOC7 Summary Report Item w
C07.040.038 CN-257.-i.0 08 HYDRO CAT 2-0185 FW SYSTEM VT-2 QAL-15 Special EOC7 Summary Report Item
O O
O PAGE NO. 2 CAThWBA tRIIT NIRGER 2 - 1st DffERVAL 06/25/96 CLASS B (C&TEGORY C-B) REQUIREKERITS FOR OUTAGE NUBBER 7 REQ.
REQ.
C.c N0.
DRAWING REV TEST FCh NO.
SYSTEM Engg INSP PROC C00eWITS Ct,7. 060. 007 CN-2562-1.2 11 HYDRO CAT 2-0168 SAFETY INJ VT-2 QAL-15 Special EOC7 Summary Report Item PUMP 2B J
l 4
3 5.0 Results Of Pressure Testina Examination, The results of each examination shown in the final ISI Plan (Section 4 of this report) are included in this section. The completion date and status for each examination are shown in this section.
The information shown below is a field description for the reporting format included in this section of the report:
Item No.
ASME Section XI Tables IWC-2500-1 (Class 2)
=
Drawing Detail Drawing of inspection boundary
=
Examination Date Date of latest examination
=
Condition Partial-Part of component examined
=
1 Complete - All of component examined Status Clear
=
Recordable Reportable Comments General and/or Detail Description
=
O i
Pressure Testing Summary Report Pago1 Catawba Unit 2 Revision 0 Section 5 June 27,1996
O O
O PAGE NO. 1 CATAMBA UNIT NUISER 2 - 1st INTERVAL 06/25/96 CLASS B (CATEGORY C-E) RESULTS FOR OUTAGE NUISER 7 DATE LAST ITEN N0.
DRAWING EEAMINED CONDITION STATUS COISBNTS C07.020.022 CN-2571-1.0 05/23/96 COMPLETE CLEAR Special EOC7 Summary Report Item C07.020.025 CN-2569-1.0 10/25/95 COMPLETE CLEAR Special EOC7 Summary Report Item C07.020.026 CN-2569-1.0 10/25/95 COMPLETE CLEAR Special EOC7 Summary Report Item C07.040.007 CN-2554-1.2 05/07/96 COMPLETE CLEAR Special EOC7 Summary Report Item C07.040.008 CN-2554-1.3 04/15/96 COMPLETE CLEAR Special EOC7 Summary Report Item C07.040.011 CN-2554-1,6 05/14/96 COMPLETE CLEAR Special EOC7 Summary Report Item C07.040.015 CN-1556-1.0 04/15/96 COMPLETE CLEAR Special EOC7 Summary Report Item C07.040.024 CN-2562-1.2 02/13/96 COMPLETE CLEAR Special EOC7 Summary Report Item C07.040.025 CN-2562-1.3 04/04/96 COMPLETE CLEAR Special EOC7 Sumary Report Item C07.040.027 CN-2563-1.0 02/28/96 COMPLETE CLEAR Special EOC7 Summary Report Item C07.040.037 CN-2570-1.0 03/28/96 COMPLETm; CLEAR Special EOC7 Summary Report Item C07.040.038 CN-2571-1.0 05/23/96 COMPLETE CLEAR Special EOC7 Summary Report Item
~
- - ~. _. _..
I O
O O
AG No. 2 CATAMBk UNIT NOISER 2 - 1st INTERVAL 06/25/96 CLk3S B (CATEGORY C-B) RESULTS
[
FOR OUTAGE NUISER 7 DATE IAST ITEM NO.
DRANING EXAMINED CONDITIOIt STATUS CCteENTS
' C07 060.007 CN-2562-1.2 02/13/96 COMPLETE CLEAR Special EOC7 Sunnary Report Item m..
6.0 Reportable Indications O
None O
\\
l 1
1 lO Pressure Testing Summary Report Page 1 l
Ca*awba Unit 2 Revision 0 l
Section 6 June 27,1996 I
7.0 Personnel. Eautoment and Material Certifications All personnel who performed or evaluated the results of Inservice Inspection Pressure Test examinations from November 30, 1995 to June 25,1996 at Catawba 2 were certified in accordance with the requirements of the 1980 Edition of ASME Section XI with Addenda through Winter 1981. The appropriate certification records for each Duke Power Company inspector are on file at Catawba Nuclear Station or in the Corporate Offices in Charlotte, North Carolina.
Records of periodic calibration of Duke Power Company inspection equipment are on file at Catawba Nuclear Station or in the Corporate Offices in Charlotto, North Carolina.
O 1
Pressure Testing Summary Report Page1 Catawba Unit 2 Revision 0 Section 7 June 27,1996
i l
8.0 Corrective Action i
There are no reportable items that require action for this report.
i
.'t l
l i
O i
l 1
I l
l
)
)
l I
\\
O Pressure Testing Summary Report Page1 Catawba Unit 2 Revision 0 Section 8 June 27,1996
. - - - -. - - ~. -. - - -.,.
w 9.0 Reference Documents There are no reference documents that apply to the Inservice inspection Pressure Testing for this report.
1 i
i i
l i
i i
l i
O 1
)
a O
Pressure Testing Summary Report Page1 Catav ba Unit 2 Revision 0 Section 9 June 27,1996