Text
- -. -
... - _. -. _. ~ ___.
._.- ~.
A "1 ? *
- n..
.a,
J' Dukelbu er Company
- e WilltntR McC4. tnt, JR Catau:ba Nudcar Generatimt thpartment lice hesident 4300 Concord Road (803)331140 Ottice i.
krk, SC29745 (803)331-35Far 1
DUKEPOWER i
-August 22, 1996.
}
U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555 3.
Subject:
Catawba Nuclear Station, Unit 2 I
Docket No. 50-414 Unit 2 1996 Refueling Outage 7 First Ten. Year Inspection Interval j
Special Report for Pressure Testing, Revision 0 i
i l
Please find attached Control Copy No. 3 of the subject report, which is assigned to the USNRC Document Control Desk.
This is J
a special. summary report for the remaining Pressure Test items i
that were completed prior to the end of the first ten year l'
inspection interval but were not included in the Inservice Inspection Outage 7 Report, Revision 0, dated 02/26/96.
i If there are any questions concerning this -report, please contact Kay Nicholson at (803) 831-3237.
t j
Sincerely, W. R. McCollum, Jr i
KEN \\U2EOC7S.ISI 1
Attachment xc: (Without Attachment)
S. D. Ebneter, Regional Administrator R. J.
Freudenberger, SRI P. S. Tam, ONRR g
9609040305 960822 PDR ADOCK O 4}4 ~
G amxim=were
3..
U.
S. Nuclear Regulatory Commission August 22, 1996 Page 2 i
bxc:(Without Attachment)
MS Kitlan KE Nicholson Date File JO Barbour -
EC07J l
AJ Hogge EC07J ELL EC050 NCMPA-1 NCEMC PMPA SREC Master File: CN-801.01 (With Attachment) j I
17 Pages FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules 1.
Owner: Duke Power Company,526 S. Church St.. Charlotte, NC 28201-1006 (Name and Address of Owner) 2.
Plant: Catawba Nuclear Station,4800 Concord Road, York, SC 29745 (Name and Address of Plant) 3.
Plant Unit: 2 4.
Owner Certificate of Authorization (if required) N_/A 5.
Commercial Service Date: 8/19/86
- 6. National Board Number for Unit 1Z3 7.
Components Inspected:
Component or Manufacturer or Manufacturer or State or National Appurtenance Installer Installer Serial Province No.
Board No.
No.
See Section 1.1 in the Attached Report 1
Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 /2 in. x 1
11 in., (2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
_. _ _ _ ~
l FORM NIS-1 (back)
O 8.
Examination Dates 11/30/95 to 06/25/96
- 9. Inspection Interval from 08/19/86 to 08/19/96
- 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. See attached report.
- 11. Abstract of Conditions Noted. See attached report.
- 12. Abstract of Corrective Measures Recommended and Taken. See attached report.
We certify that the statemer.ts made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI..
Date I
19b Signed Duke Power Co. By _
tM Owner Certificate of Authorization No. (if applicable)
N3 Expiration Date N/A CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of N 0-and employed by
'The HSBl&T Co. of have inspected the components described in this Owners 0 2 S.M and state that to the best of my Data Report during the period // -3 0- %
O to knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed j
or implied, conceming the examinations and corrective measures described in this Owners' Data j
Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this 1
inspection.
Date 19 9b
~
Mb M1 Commissions A/b 9)b rA Inspector's Signature National Board, State, Province and No.
'The Hartford Steam Boiler Inspection & Insurance Co.
200 Ashford Center North Suite 300 Atlanta Ga.,30338 r
O
.