MONTHYEARML20116G5511992-11-0202 November 1992 Forwards Application for Amend to License DPR-66,consisting of Proposed Change Request Number 202,revising Ts,To Allow Pool Capacity to Be Increased to 1,627 Storage Locations, Including Two Storage Cans for Defective Fuel Project stage: Request ML20127M7381993-01-25025 January 1993 Forwards Request for Addl Info Re 921102 Application for Amend to License,Changing TS to Allow Spent Fuel Pool Capacity to Be Increased to 1,627 Storage Locations Project stage: RAI ML20012G5371993-02-23023 February 1993 Responds to NRC 930125 Request for Addl Info Re 921102 TS Change Request 202 on Reracking of Spent Fuel Pool.Required Calculations Will Be Performed Using KENO-V.a & CASMO-3 Codes Project stage: Request ML20036C1731993-06-0808 June 1993 Forwards Request for Addl Info Re Proposed Change That Would Revise TS to Permit Increase in Spent Fuel Pool Capacity Project stage: RAI ML20045D6781993-06-24024 June 1993 Informs of Staff Need for Certain Info So Review of Proposal to Increase Spent Fuel Capacity for Facility,Can Continue Project stage: Approval ML20045E1691993-06-28028 June 1993 Provides Clarification of Concerns & Correction to Inaccuracy in Re Amend Proposal for Unit 1 Spent Fuel Pool Expansion Project stage: Approval ML20045H2491993-07-0909 July 1993 Forwards Response to 930608 Request for Addl Info Re Proposed TS Change Request 202,submitted Via Util .Encl Addresses NRC Concerns Re Seismic Analyses Performed to Rerack Spent Fuel Pool Project stage: Request ML20046C9621993-07-26026 July 1993 Forwards Request for Addl Info Re Licensee 921102 Application to Amend App a TS for Facility Project stage: RAI ML20056E3981993-08-16016 August 1993 Provides Response to Addl Info Request Re TS Change Request 202.Concerns Re Diver Operations & Rack Decontamination During Replacement of Spent Fuel Pool Storage Racks Discussed Project stage: Other ML20056E4021993-08-16016 August 1993 Provides Response to Addl Info Request Re TS Change Request 202.Concerns Re Heavy Loads & Thermal/ Hydraulic Parameters During Replacement of Spent Fuel Pool Storage Racks Discussed Project stage: Other ML20057A2221993-09-0303 September 1993 Provides Clarification of Info Submitted on 930816,which Responded to NRC 930713 Rai,In Response to N Wagner Request Re Control of Heavy Loads & Thermal/Hydraulic Parameters Associated W/Replacement of Spent Fuel Pool Storage Racks Project stage: Other ML20057B3431993-09-0808 September 1993 Clarifies Util Position Re Implementation of App a of Reg Guide 8.38, Radiological Precautions During Diving Operation During Planned Spent Fuel Pool Rerack Mod Project stage: Other 1993-06-08
[Table View] |
Text
_
._m d
Beaver Vahey Power Station Shippingport, PA 15077-0004 JOHN D. SIEDER (412) 393-5255 j
Senior Vece President and Fax (412) 643-8069 CNet Nuclear Officer j
Nuclear Power Division September 8, 1993
)
U.
S. Nuclear Regulatory Commission i
Attn:
Document Control Desk
]
Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Clarification of Diving Operations Spent Fuel Pool Rerack (TAC No. M84673)
This letter will clarify the. Duquesne Light Company position concerning implementation of Appendix A
of Regulatory Guide 8.38, j
" Radiological Precautions During Diving Operation,
during our planned Spent Fuel Pool rerack modification.
The guidance provided in Appendix A of Regulatory Guide 8.38 will be included in our site specific procedure for controlling radiological diving operations with the exception of Item 6.
Item 6 requires the use of a calibrated dosimeter that'provides an alarm to the diver while underwater.
The alternate method for satisfying this function includes:
1) utilization of calibrated remote indicating
)
instrumentation; and 2) continuous communications between the i
individual monitoring the remote indication and the diver in the water.
During a conference call held on September 2, 1993, members of the NRC staff concurred with the Duquesne Light Company alternate position.
It should be noted that diving operations are not planned to support the rerack effort.
Diving operations represent contingency planning only.
If you have any questions regarding this response, please contact Mr. Steve Sovick at (412) 393-5211.
Sincerely,
! o. 'SW cc: Mr. L.
W.
Rossbach, Sr. Resident Inspector Mr.
T. T. Martin, NRC Region I Administrator Mr. G.
E.
Edison, Project Manager ELECTRK UT1UTYof THE YEAR 20016,-9309210220 930908 h
l{D PDR ADOCK 05000334 3
P PDR dii i
i