Proposed Tech Specs Correcting ESF Tech Specs
ML20114A556
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/24/1985
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20114A539 List:
References
NUDOCS 8501280276
Download: ML20114A556 (5)


Text

_ _ _ _ _ _ _ _ - _.

n TABLE 3.3-3 (Cont'd) m ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION 5!r MINIMUM M

TOTAL NO.

CHANNELS CHANNELS APPLICABLE g

FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION M

5.

REACTOR BLDG. ISOLATION C2 a.

Manual Initiation 2

1 2

1, 2, 3, 4 13 q

b.

Reactor Bldg. Pressure High 3

2 2

1, 2, 3 9#

g c.

Automatic Actuation Logic 2

1 2

1, 2, 3, 4 10 Y'

d.

Deleted c

e.

RCS Pressure Low 3

2 2

1, 2, 3

  • 13 (HPI Isolation) f.

Automatic Actuation Logic 2

1 2

1, 2, 3, 4 10 (HPl Isolation) 8501280276 850124 PDR ADOCK 05000302 P

ppg

T

+

TABLE 3.3-4 (Continued) n Mj ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS 5!r-x FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES 2

5.

REACTOR BLDG. ISOLATION c

a.

ES Actuation "A" and "B" 3

[

1.

Manual Initiation Not Applicable Not Applicable 2.

Reactor Bldg. Pressure High f 4 psig f 4 psig 3.

Automatic Actuation Logic Not Applicable Not Applicable g

4.

Deleted i

Y 5.

RCS Pressure Low

[

(HPI Isolation) 21500 psig 21500 psig I

6.

Automatic Actuation Logic (HPI Isolation)

Not Applicable Not Applicable

TABLE 3.3-5 ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS l

1.

Manual a.

High Pressure Injection Not Applicable b.

Low Pressure Injection Not Applicable c.

Reactor Building Cooling Not Applicable d.

Reactor Building isolation Not Applicable e.

Reactor Building Spray Not Applicable f.

Reactor Building Purge Isolation Not Applicable g.

Steam Line Rupture Matrix 1.

Emergency Feedwater Actuation Not Applicable 2.

Feedwater Isolation Not Applicable 3.

Steam Line Isolation Not Applicable 1

2.

Reactor Building Pressure-High a.

High Pressure Injection 25*

b.

Low Pressure injection 25*

c.

Reactor Building Cooling 25*

d.

Reactor Building Isolation 60*

3.

Reactor Building Pressure High-High (with HPI signal) a.

Reactor Building Spray 56 4.

RCS Pressure Low a.

High Pressure injection 25*

b.

HPI Isolation 60*

5.

RCS Pressure Low-Low a.

High Pressure Injection 25*

b.

Low Pressure Injection 25*

i 6.

Low Steam Generator Pressure I

a.

Feedwater Isolation 34 b.

Steam Line Isolation 5

l l

CRYSTAL RIVER - UNIT 3 3/4 3-17

I

.'o TABLE 3.3-5 (Cont'd)

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 7.

Containment Radioactivity-High a.

Reactor Building Purge Isolation 15

  • 8.

Main Feedwater Pump Turbines A and B Control Oil Low a.

Emergency Feedwater Actuation Not Applicable 9.

OTSG A and B Level Low-Low a.

Emergency Feedwater Actuation Not Applicable t

i

  • Diesel Generator starting and sequence loading delays included.

Response time limit includes movement of valves and attainment of pump cr blower discharge pressure.

l CRYSTAL RIVER - UNIT 3 3/4 3-17a i

i

1 t

k TABLE 4.3-2 (ContM) i 4

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS i

t~

)

CHANNEL MODES IN WHICH m

CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE y

FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED i

C 1

2 I

4 5.

REACTOR BLDG. ISOLATION w

l a.

Manual Initiation N/A N/A R

5 or 6 b.

Reactor Bldg. Pressure

]

High 5

R M(2) 1, 2, 3 I

w I,

h c.

Automatic Actuation Logic N/A N/A M(IX3X5) 1, 2, 3, 4 o

l d.

Deleted I

i i

e.

RCS Pressure Low 5

R M

1, 2, 3 (HPI Isolation) f.

Automatic Actuation Logic N/A N/A M(IX3X5) 1, 2, 3, 4 (HPI Isolation) 1 I

1 1

1 i

f

-