Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20100L3581996-02-22022 February 1996 Proposed Tech Specs,Submitting Corrected Version of Plant Decommissioning TS Updated to Reflect All Approved Amends ML20082K2461995-04-14014 April 1995 Proposed Decommissioning Tech Specs Administrative Control 5.3.1,reflecting Organizational Changes That Impact Membership of Decommissioning Safety Review Committee ML17291B3261993-05-18018 May 1993 Proposed TS Section 2.2 Re Activated Graphite Blocks,Section 2.4 Re Channel Calibr & SR 3.2.1 Re Verification of Reactor Bldg Pressure & SR 3.2.2 Re Verification of Pressure Drop Across Each HEPA Filter ML20118B2141992-09-25025 September 1992 Proposed Decommissioning Tech Specs Replacing Radiation Safety with Nuclear Safety, Revising Applicability Requirements for Specs Dealing W/Reactor Bldg Confinement Integrity & Clarifying Items Re Unreviewed Safety Questions ML20096H1961992-05-19019 May 1992 Decommissioning TS Deleting Section 4.2.15 Re LCO 4.2.15 Covering Pcrv Cooling Water Sys Temps ML20095B0951992-04-14014 April 1992 Proposed Tech Specs Re Organization,Review & audit-administrative Controls ML20094L2831992-03-19019 March 1992 Proposed Tech Specs Re Controls & Limits Appropriate for Decommissioning ML20086C5301991-11-15015 November 1991 Proposed Tech Spec Limiting Condition for Operation 4.2.15 Re Pcrv Cooling Water Sys Temps ML20091D7631991-10-11011 October 1991 Proposed,Revised Limiting Condition for Operation 4.2.15 Re Prestressed Concrete Reactor Vessel Cooling Water Sys Temp ML20082L9311991-08-30030 August 1991 Proposed Tech Specs Re Decommissioning ML20066A3781990-12-21021 December 1990 Proposed Decommissioning Tech Specs Re Reactor Bldg Integrity,Reactor Bldg Ventilation Exhaust Sys,Radiation Monitoring Instrumentation & Pcrv Shielding Water Tritium Concentration ML20059L5891990-09-14014 September 1990 Proposed Tech Specs Changing Design Features Section 6.1 to Permit Removal of CRD & Orifice Assemblies from Core Regions Defueled in Support of Plant Closure Activities ML20042F3151990-04-26026 April 1990 Proposed Tech Specs Re Defueling ML20006B7921990-01-25025 January 1990 Proposed Tech Specs Re Administrative Title Changes to Section 7.1 ML19332F3561989-12-0404 December 1989 Proposed Tech Specs Re Limiting Condition for Operations 4.7.3, Fuel Storage Wells & 4.7.5, Instrumentation. ML19332E8901989-12-0404 December 1989 Proposed Tech Specs Re Reactivity Control & Control Rod Pair Position Requirements During Shutdown ML19332C8151989-11-21021 November 1989 Proposed Tech Specs Revising Items 2.D.(1) & 2.D.(4) Re Max Power Level & Early Shutdown,Respectively ML19324B6961989-10-30030 October 1989 Proposed Tech Specs Re Reactor Core & Reactivity Control ML19327B1321989-10-13013 October 1989 Proposed Tech Specs,Reflecting Deleted Limiting Conditions of Operations 4.1.2 Through 4.1.6,deleted Surveillance Requirements 5.1.1,5.1.2,5.1.3 & 5.1.5 & Newly Added Reactivity Control Section ML19351A3271989-10-13013 October 1989 Proposed Tech Specs 6.1 Re Defueling Phase Document Design Features ML20248G4731989-10-0101 October 1989 Proposed Tech Specs Re End of Operations ML20248G4461989-09-30030 September 1989 Proposed Tech Specs Re Chlorine Detection & Alarm Sys & Control Room Emergency Ventilation Sys ML20247G7811989-09-14014 September 1989 Proposed Tech Specs,Documenting Design Features for Defueling Phase of Operation ML20247L1721989-09-14014 September 1989 Proposed Tech Specs Re Reactivity Control ML20247J2371989-09-14014 September 1989 Proposed Tech Specs Re Fuel Handling & Storage ML20247G7341989-09-14014 September 1989 Proposed Tech Specs Deleting Fire Protection Limiting Condition of Operation & Surveillance Requirements from Tech Specs ML20246K9921989-07-14014 July 1989 Proposed Tech Specs Documenting Improvements to Battery Surveillance Procedures ML20246L0231989-07-14014 July 1989 Proposed Tech Specs,Rewording Basis for Limiting Condition for Operation 4.2.2 Re Operable Circulator ML20244B3771989-06-0909 June 1989 Proposed Tech Specs Re Early Shutdown of Plant ML20245B3211989-04-14014 April 1989 Proposed Tech Specs Re Radiation Monitors & Noble Gas Monitors ML20155J6281988-10-14014 October 1988 Proposed Tech Specs Concerning Administrative Controls ML20155J6111988-10-14014 October 1988 Proposed Tech Specs Re Pcrv & Pcrv Penetration Overpressure Protection Surveillance ML20204E8171988-10-13013 October 1988 Proposed Tech Specs Re Linear channel-high Neutron Flux Trip Setpoints ML20207E1591988-08-0505 August 1988 Proposed Tech Specs Re Auxiliary Electric Sys Involving Proposed Change of Dc Batteries ML20155J7181988-06-14014 June 1988 Revised Draft Tech Specs 3/4.6.5.2,deleting Charcoal Filter Test Exceptions After Painting W/Low Solvent paints,6.5.1.2 & 6.2.3.3,reflecting Recent Util Reorganization & 3/4.7.1.5 & 3/4.7.1.6,requiring One Operable Valve Per Loop ML20151R8191988-04-20020 April 1988 Proposed Tech Specs,Deleting 10CFR51.5(b)2 ML20151S2471988-04-20020 April 1988 Proposed Tech Spec Pages 4.6-4 & 4.6-8,allowing Up to 5 Consecutive Days to Perform Equalizing Charge W/Station Battery ML20148N2751988-03-29029 March 1988 Proposed Tech Specs,Deleting Requirement to Monitor Ambient Temp in Instrument Penetrations Housing Flow Sensors for Dewpoint Moisture Monitoring Sys ML20149M2901988-02-0808 February 1988 Proposed Tech Spec Re Plant Protective Sys Trip Setpoint & Operating Requirements ML20149N0391988-02-0505 February 1988 Proposed Tech Specs Re Changes to Administrative Controls to Reflect Organizational Changes in Util & NRC ML20238C3481987-12-23023 December 1987 Proposed re-drafted Tech Specs,Upgrading Sections Re safety- Related Cooling Sys.Related Info Encl ML20236C6361987-10-15015 October 1987 Proposed Tech Specs,Deleting Fire Protection Limiting Conditions for Operation & Surveillance Requirements ML20235W8611987-10-0101 October 1987 Proposed Tech Specs,Clarifying Actions on Inoperable Halogen or Particulate Monitors & Conditions Requiring Weekly Gamma Spectral Analysis on Inservice Gas Waste Tank ML20235B0091987-08-28028 August 1987 Proposed Tech Specs Re Trip Setpoints & Operating Requirements ML20216H7301987-06-25025 June 1987 Proposed Tech Specs,Adding Definition of Calculated Bulk Core Temp & Core Average Inlet Temp for Determination of Core Temp ML20210B7081987-04-23023 April 1987 Proposed Tech Specs Re Surveillance & Calibr Requirements of Plant Protective Sys Parameters ML20206P3931987-04-0808 April 1987 Proposed Tech Specs,Revising 3/4.1.7, Reactivity Change W/Temp to Be Consistent W/Increased Values for Calculated Reactivity Worth of Reserve Shutdown Sys,Per Rev 4 to FSAR, Section 3.5.3.3 ML20207P9911987-01-15015 January 1987 Proposed Tech Specs,Requiring Both evaporator-economizer Superheater Sections & Both Reheater Sections to Be Available During Operation at Power as Min Number of HXs ML20207D2421986-12-23023 December 1986 Proposed Tech Specs Deleting Snubber Tables & Correcting Typos ML20212A0661986-12-19019 December 1986 Proposed Tech Specs Re Steam Line Rupture Detection/ Isolation Sys 1996-02-22
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20148U0111997-06-17017 June 1997 Confirmatory Survey of Group E Effluent Discharge Pathway Areas Fsv Nuclear Station Platteville,Co ML20133D7661996-09-16016 September 1996 Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project ML20129A4621996-09-11011 September 1996 Rev 0 to Fsv Decommissioning Project Final Survey Requirements for Liquid Effluent Pathway ML20100L3581996-02-22022 February 1996 Proposed Tech Specs,Submitting Corrected Version of Plant Decommissioning TS Updated to Reflect All Approved Amends ML20097C2601996-01-17017 January 1996 Confirmatory Survey Activities Plan for Fsv Nuclear Station PSC Platteville,Co ML20101F2091995-09-18018 September 1995 Issue 7 to DPP 5.4.2, Odcm ML20084B8801995-05-25025 May 1995 Rev 1 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release ML20084B6881995-05-10010 May 1995 Issue 5 to Fire Protection Operability Requirements (Fpor) FPOR-7, Fire Extinguishers ML20082K2461995-04-14014 April 1995 Proposed Decommissioning Tech Specs Administrative Control 5.3.1,reflecting Organizational Changes That Impact Membership of Decommissioning Safety Review Committee ML20082T2151995-04-12012 April 1995 Issue 7 to Fire Protection Operability Requirements (Fpor) FPOR-12, Fire Detectors ML20082B9411995-03-17017 March 1995 Confirmatory Survey Plan for Repower Area,Fort St Vrain, Platteville,Co ML20082C0801995-03-16016 March 1995 Proposed Confirmatory Survey Plan for Repower Area,Fort St Vrain,Platteville,Co ML20082B9821995-03-15015 March 1995 Instrumentation Comparison Plan Between Orise & Fort St Vrain ML20086S2471995-02-0909 February 1995 Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20077C7171994-11-30030 November 1994 Issue 9 to FPOR-14, Fire Protection Operability Requirements ML20078C0641994-10-12012 October 1994 Revised Fire Protection Operability Requirements,Including Issue 21 to Depp Table of Contents,Issue 2 to FPOR-22 & Issue 3 to FPOR-23 ML20081J7951994-09-15015 September 1994 Issue 5 to DPP 5.4.2, Odcm ML20063M1551994-02-17017 February 1994 Rev 0 to Fsv Nuclear Station Decommissioning Project Final Survey Plan for Site Release ML20057A6151993-08-30030 August 1993 Issue 2 to FPOR-23, Fire Water Makeup Sys ML17291B3261993-05-18018 May 1993 Proposed TS Section 2.2 Re Activated Graphite Blocks,Section 2.4 Re Channel Calibr & SR 3.2.1 Re Verification of Reactor Bldg Pressure & SR 3.2.2 Re Verification of Pressure Drop Across Each HEPA Filter ML20118B2141992-09-25025 September 1992 Proposed Decommissioning Tech Specs Replacing Radiation Safety with Nuclear Safety, Revising Applicability Requirements for Specs Dealing W/Reactor Bldg Confinement Integrity & Clarifying Items Re Unreviewed Safety Questions ML20114D6871992-09-0101 September 1992 Tritium Leach Test on H-327 Graphite ML20096H1961992-05-19019 May 1992 Decommissioning TS Deleting Section 4.2.15 Re LCO 4.2.15 Covering Pcrv Cooling Water Sys Temps ML20095B0951992-04-14014 April 1992 Proposed Tech Specs Re Organization,Review & audit-administrative Controls ML20094L2831992-03-19019 March 1992 Proposed Tech Specs Re Controls & Limits Appropriate for Decommissioning ML20086C5301991-11-15015 November 1991 Proposed Tech Spec Limiting Condition for Operation 4.2.15 Re Pcrv Cooling Water Sys Temps ML20079M4261991-10-11011 October 1991 Revised Abnormal Operating Procedures,Reflecting Deletion of Issue 9 of EP Class ML20091D7631991-10-11011 October 1991 Proposed,Revised Limiting Condition for Operation 4.2.15 Re Prestressed Concrete Reactor Vessel Cooling Water Sys Temp ML20082L9311991-08-30030 August 1991 Proposed Tech Specs Re Decommissioning ML20082H8851991-08-16016 August 1991 Issue 2 to Abnormal Operating Procedure AOP-I-2, Chemical, Petroleum & Hazardous Waste Spill Response ML20091C4141991-08-0202 August 1991 Issue 58 to Abnormal Operating Procedure AOP-L, Loss of Instrument Air Header ML20024H3341991-05-10010 May 1991 Nonproprietary Rev 2 to FSV-P-SCP-100, Fort St Vrain Initial Radiological Site Characterization Program Program Description ML20072V5291991-04-12012 April 1991 Revised Defueling Emergency Response Plan,Including Section 1 Definitions,Section 2 Scope & Applicability,Section 3 Summary of Fsv Derp,Section 4 Emergency Classifications & Section 5 Emergency Organization ML20070V6871991-03-20020 March 1991 Issue 55 to Abnormal Operating Procedure AOP-R, Loss of Access to Control Room ML20072S0521991-03-15015 March 1991 Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 9 to CMIP-11, Classification of Emergency for McGuire Nuclear Station & Rev 11 to CMIP-12, Classification of Emergency for Oconee Nuclear Station ML20066J1171991-02-15015 February 1991 Issue 56 to Intro Section of Abnormal Operating Procedure (Aop),Issue 58 of AOP-A,Issue 58 to AOP-B,Issue 56 of AOP D-1 & Issue 2 of RERP-TRANSPORTATION ML20066A3781990-12-21021 December 1990 Proposed Decommissioning Tech Specs Re Reactor Bldg Integrity,Reactor Bldg Ventilation Exhaust Sys,Radiation Monitoring Instrumentation & Pcrv Shielding Water Tritium Concentration ML20059L5891990-09-14014 September 1990 Proposed Tech Specs Changing Design Features Section 6.1 to Permit Removal of CRD & Orifice Assemblies from Core Regions Defueled in Support of Plant Closure Activities ML20058N1071990-08-10010 August 1990 Issue 56 to AOP-I, Discussion of Fire ML20042F3151990-04-26026 April 1990 Proposed Tech Specs Re Defueling ML20006B7921990-01-25025 January 1990 Proposed Tech Specs Re Administrative Title Changes to Section 7.1 ML19332E8901989-12-0404 December 1989 Proposed Tech Specs Re Reactivity Control & Control Rod Pair Position Requirements During Shutdown ML19332F3561989-12-0404 December 1989 Proposed Tech Specs Re Limiting Condition for Operations 4.7.3, Fuel Storage Wells & 4.7.5, Instrumentation. ML19332C8151989-11-21021 November 1989 Proposed Tech Specs Revising Items 2.D.(1) & 2.D.(4) Re Max Power Level & Early Shutdown,Respectively ML20064B2111989-11-0909 November 1989 Fort St Vrain Cycle 4 RT-500L Test Rept ML19324B6961989-10-30030 October 1989 Proposed Tech Specs Re Reactor Core & Reactivity Control ML19327B1321989-10-13013 October 1989 Proposed Tech Specs,Reflecting Deleted Limiting Conditions of Operations 4.1.2 Through 4.1.6,deleted Surveillance Requirements 5.1.1,5.1.2,5.1.3 & 5.1.5 & Newly Added Reactivity Control Section ML19351A3271989-10-13013 October 1989 Proposed Tech Specs 6.1 Re Defueling Phase Document Design Features ML20248G4731989-10-0101 October 1989 Proposed Tech Specs Re End of Operations ML20248G4461989-09-30030 September 1989 Proposed Tech Specs Re Chlorine Detection & Alarm Sys & Control Room Emergency Ventilation Sys 1997-06-17
[Table view] |
Text
-. . _ . - .. .
l i
I l
3 Attachment-2 Proposed Changes 4
d I-1 4
e 85 l011004768412ADOCK PDR 0%27
-eyg* +-- wy5--,,9 y,- 9--g y -,-w- wr--ww ,e--yy v. 9-#r-,u y
.- . Fort St. Vrain #1 Technical Specifications
. Amendment No.
Page 8.1-19 measurement system and not as an a posteriori (after the fact) limit for a particular measurement.
- 3) The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides: Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, and Xe-138 for gaseous emissions and Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141, and Ce-144 for particulate emissions. This list does not mean that only these nuclides are to be considered. Other gamma peaks that are identifiable, together with those of- the above nuclides, shall also be analyzed and reported in the Semi-annual Radioactive Effluent Release Report pursuant to Specification 7.5.1.e.
c) All liquid effluent releases from the radioactive liquid waste holdup system shall be continuously
-l monitored by two gamma activity monitors and their associated recorder. Equipment shall be operable to automatically terminate the release on high specific
~l- gamma activity or low cooling water blowdown flow and give a Control Room al' arm.
b _
r
. Fort St. Vrain #1 Technical Specifications
-. Amendment No.
Page 8.1-20 l d) If one or both of the two gamma activity monitors become inoperable, liquid effluent releases may continue, provided that prior to initiating the release, at least two technically qualified members of the facility staff independently verify the release rate calculations and discharge valve lineup. With one or more of the radioactive liquid effluent monitoring instruments inoperable, best efforts shall be exerted to return the instruments to operable status within thirty days, and if unsuccessful, the failure to correct the inoperability in a timely fashion shall be explained in the next Semi-annual Radioactive Effluent Release Report.
L If the recorder associated with the two gamma l- e) activity monitors becomes inoperable, liquid effluent releases 'may continue, provided the count rate of.each operable monitor is recorded at least once per four hours during actual releases.
Best efforts shall be exerted to return the recorder
'to operable status within thirty days, and if-unsuccessful, the failure to correct the inoperability in a timely fashion shall be explained in the next Semi-annual Radioactive Effluent Release Report.
l--
. Fort St. Vrain #1 Technical Specifications
., Amendment No.
Page 8.1-23 Specification ESR 8.1.2 - Radioactive Liquid Effluent, Surveillance Requirements a)- The level alarms and pump interlocks on the two liquid waste receiver tanks and monitoring tank shall be tested once per year.
b) The liquid effluent discharge blocking valve shall be functionally tested prior to each release or once a month, whichever is more frequent.
l c) The gamma activity monitors of the liquid effluent discharge line and the Gas Waste Compressor Cooling Water System, and the low cooling water blowdown flow switch shall be functionally tested quarterly.
l The liquid effluent gamma activity monitors shall be source checked prior to each release; channel checked during each release, and calibrated once per 18 months and following maintenance on the detector system. .The Gas Waste Compressor Cooling Water System Monitors shall be channel checked weekly, source checked monthly, and calibrated once per 18 months and following maintenance on the detector system.
l d) Flow rate monitors and gamma activity recorders shall be channel checked during each release, '
functionally tested quarterly, and calibrated once per 18 months.
NOTE: The channel functional test shall also demonstrate that Control Room alarm annunciation ; occurs if any of the following conditions exists:
- 1. Instrument indicates measured levels above the alarm setpoint.
4 Fort St. Vrain #1 Technical Specifications I Amendment No.
Page_8. 1-27 Specification ELCO 8.1.3 - Reactor Building Sump Effluent,
~
Limiting Conditions for Operation a) The discharge from the Reactor Building sump pumps shall be continuously sampled, filtered, and the flow limited to less than or equal to 10 gallons per minute when operated in the automatic mode. An analysis shall be performed as soon as practical on the samples as described in ELC0 8.1.2.b).
b) If effluent discharges from the Reactor Building sump at flow rates greater than 10 gallons per minute are to be made, two grab samples shall be taken and analyzed per ELC0 8.1.2.b) prior to the start of the discharge. During the discharge, the pump outlet shall be continuously sampled. An - analysis shall be performed as soon as practical on the sample per ELC0 8.1.2.b).
c) Effluent discharge from the Reactor Building sump shall not occur simultaneously with discharge from the radioactive liquid waste system.
d) All liquid effluent releases' from the Reactor Building sump shall be continuously nonitored by two gamma
- activity m3nitors and their associated recorder.
Equipment shall be operable to automatically terminate the release on high specific gamma activity or low cooling water blowdown flow.
o Fort St. Vrain #1 Technical Specifications
. Amendment No.
Page 8.1-28
-l e) If one or both of the two gamma activity monitors become inoperable, liquid effluent releases may continue, provided that grab samples are taken every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and analyzed for principal gamma emitters, I-131, and tritium. With one or more of the l radioactive liquid effluent gamma monitoring instruments inoperable, best efforts shall be exerted to return the instruments to operable status within thirty days and, if unsuccessful, the failure to correct the inoperability in a timely fashion shall be explained in the next Semi-annual Radioactive Effluent Release Report.
l f) .If the recorder associated with the two gamma activity monitors becomes inoperable, liquid effluent releases -may continue, provided the count
- rate of each operable monitor is ~ recorded at least once per four hours during actual releases.
.. Best efforts shall be exerted to return the recorder to operable status within thirty days, and if unsuccessful, the failure to correct the inoperability in a timely fashion shall be explained
~
in the next Semi-annual Radioactive Effluent Release Report.
g) If the blowdown flow measuring device becomes inoperable, liquid effluent releases may continue,.
F
. s
, e ATTACHMENT 3 SIGNIFICANT HAZARDS CONSIDERATIONS
=
. +
SIGNIFICANT HAZARDS CONSIDERATIONS ANALYSIS Since the proposed changes to the Fort St. Vrain-Technical Specifications serves only to enhance the clarity of which type of activity will be continuously monitored during liquid effluent releases, no significant safety hazard considerations are involved.
Based on the above, operation of Fort St. Vrain in accordance with the proposed changes will not; (1) involve a significant increase in the probability or consequences of an accident previously evaluated; (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.