ML20100A178
| ML20100A178 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 02/28/1985 |
| From: | Reavis J DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20100A175 | List: |
| References | |
| NUDOCS 8503250364 | |
| Download: ML20100A178 (11) | |
Text
1
~ *'
s OPERATING DATA REPORT DOCKET NO.
50-369_
DATE 01-15.85 8
COMPLETED BY
.L A _ Reavis TELEPHONE vnA_q72-7567
- OPERATING STATUS
- 1. Unit Name:
McGuire 1 Notes
- 2. Reporting Period: Fahrn ="y 1 - 1GR5-Fahruarv 28. 1985
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305*-
- 5. Design Electrical Rating (Net MWe): 1150 6.-' Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1150
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
Items 5 and 7 were changed to.1150 from 1180. The 1180 rating did not account for individual plant operational practices or the full spectrum of operating conditions.
. 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to-Date Cumulative 11.~ Hours In Reporting Period 672.0 1 416;O 28 464.0
- 12. Number Of Hours Reactor Was Critical 630.9 1 338.0 19 501.6
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 628.9 1 332.1 19 294.6
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2 088-791
- 17. Gross Electrical Energy Generated (MWH) 724 415 4 445 734 51 250 034 1 545 018 17 774 243
- 18. Net Electrical Energy Generated (MWH) 698 584 1 489 364 16 864 619
- 19. Unit Service Factor 9L6 94.1 67.8
- 20. Unit Availability Factor 93.6 94.1 67.8
. 21.' Unit Capacity Factor (Using MDC Net) -
90.4 91.5 50.3
. 22. Unit Capacity Factor (Using DER Net) 90.4 91.5 50.3
- 23. Unit Forced Outage Rate 6.4 5.9 15.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Refueling - April 2, 1985 - 8 Weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77) 8503250364 850315 P
PDR-ADOCK 05000369; R
pop.
,.w..g y
3.--,
y
-*--w-
- v-*'*7N#W
.'***"""F''#
a
.o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-369 UNIT Mer;nire 1~
DATE 03/15/85
)
COMPLETED BY J.A. Reavis
-. TELEPHONE 704-373-7567 j+
- MONTH" ' February, 1985
' DAY ~
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Ne t)
-- 1 ;
1 148 17 1 141 2-'
1 149 18 1 143
.3-1 150 19 1 145 4
1 111 20 1 134 5
601 21
-1 078
_6:
22-
-1 095
-7
- a97 23 1 103 8'
i ins 24.
I 101
.9.
I 1_23 25-1 102-
- 10 '
1 121 26 1 084
-11
'l 134 27 1 094' 12 1 151 28 1 093 13; l'149 29 w;,,
14-1 145 30
- 15
-1~144 31 16-
~1 144 p
4
'lNSTRUCTIONS'
- On this' format, IIst the average daily unit-power level in MWe-Net for each day in the-. reporting month. -Compute to the nearest whole megawatt.
a.
..a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME McGuire i DATE 3/15/85 REPORT MONTH February 1985 COMPLETED BY J.
A.
Reavis TELEPHONE 704-373-7567 i
B tg License y
Cause & Corrective c32 "c
v3E 8
No.
Date
%h 8
2g, Event
,5e, g
Action to 54 E
%5$
EE gi s
o-a:
x m c)
Report #
mu
-eo Prevent Recurrence 6-p 85-02-01 F
A HC llTEXCH Isolated a Main Condenser Waterbox to Check for Tube Leaks 7-p 85-02-04 F
B IA INSTRU Reset Flux Rate Trip Setpoints 8-p 85-02-05 F
B IA INSTRU Reset Flux Rate Trip Setpoints 2
85-02-05 F
43.10 11 3
ZZ ZZZZZZ Reactor Trip due to Undetermined Cause 9-p 85-02-07 F
B ZZ ZZZZZZ Hold for Secondary Chemistry 10-p 85-02-07 F
B IB INSTRU Excore Calibrations ll-p 85-02-08 F
A CH PUMPXX Feedwater Pump Controller Problems 12-p 85-02-08 F
A HH PUMPXX Lost Heater Drain Pump 13-p 85-02-11 F
A IIH PUMPXX Return Heater Drain Pump to Service 14-p 85-02-20 F
A HA GENERA Isolate Hydrogen Cooler due to Moisture in Generator Hydrogen 15-p 85-02-20 F
A HA GENERA Reduction to keep Generator Cold Gas Temperature within Tech Spec L
1 2
3 4
Reason:
Method:
Exhibit G - Instructions c
A-Equipment Failure (Explain) 1-Manual for Preparation of Data 3
e g
B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training f License !!xamination i
F-Administrative S
G-Operational Error (Explain)
Exhibit I - Same Source Il-Other (Explain)
' (O /771
'.{,.
- n DOCKET NO:
50-369 UNIT:
McGuire 1 DATE:
-3,f y 5,fg 5 NARRATIVE
SUMMARY
Month:
rahvisarv 1985 The unit reduced to 95% power on February 4, and February 5 to reset power range flux rate setpoints per the vendor. The unit tripped on February 5 due to an undetermined cause and then returned to service on February 7 following an extensive evaluation of the trip. The unit then operated at about 100% power until February 20, at which time the unit was reduced to approximately 95% power for the remainder of the month due to generator hydrogen problems.
~ MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name:
McGuire Unit 1 2.' Scheduled next refueling shutdown:
April 1985 3.
Scheduled restart following refueling:
May 1985 4.
Will. refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
Yes If yes, what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Comnittee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:-
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
N/A 7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
91 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present
. licensed capacity:
DUKE POWER COMPANY Date:
March 15, 1985 Name of
Contact:
J. A. Reavis Phone: 704-373-7567 i
i I
b
OPERATLNG DATA REPORT DOCKET NO.
50-370 DATE 03-15-85 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567
- OPERATING STATUS
- 1. Unit Name:
McGuire 2 Notes
- 2. Reporting Period: February 1. 1985-Fahruary 28. 1985
- 3. Licensed Thermal Power (MWt): __3411
- 4. Nameplate Rating (Gross MWe):
1305*-
5 Design Electrical Rating (Net MWe).
1150
' 6. Maximum Dependable Capacity (Gross MWe):
.. Maximum Dependable Capacity (Net MWe):
1150 7
' 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Items 5 and 7 were changed to 1150 from 1180. The 1180 rating did not account for individual plant operational practices or the full spectrum of operating conditions.
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr to.Date Cumulative
- 11. Hours In Reporting Period 672.0 1 416.0 8 760.0 i:
- 12. Number Of Hours Reactor Was Critical 0.0 595.0 6 733.1
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line.
0.0 595.0 6 686.0
- 15., Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 948 246 21 318 917
- 17. Gross Electrical Energy Generated (MWH) 124 699 177 7 536 900
- 18. ' Net Electrical Energy Generated (MWH)
-3 811 667 710 7 225 510
- 19. Unit Service Factor 0.0 42.0 76.3
- 20. Unit Availability Factor 0.0 42.0 76.3 j
- 21. Unit Capacity Factor (Using MDC Net) 0.0 41.0 70.2
- 22. Unit Capacity Factor (Using DER Net) 0.0 41.0-70.2
- 23. Unit Forced Outage Rate 0.0 0.0 14.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
Currently Refueling
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: April 15, 1985 i
- 26. Units In Test Status IPrior to Commercial Operation):
Forecast A:hieved INITIA L CRITICALITY INITIAL ELECTRICITY
' COMMERCIA L OPERATION 4
(9/77)
- _ _, -, - _,. _ _ - - _. -~,_
c, :
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-370 UNIT McGuire 2 DATE 03/15/85 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567
-MONTH Februarv. 1985
.nAY-
' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 17
'l 18 6
3 19
-4 20 5
21
'6 22 7
23 8
24 9
25 10 26 11-27-
.12 -
28 13 29
- --- -30 15 31 16~
0-INSTRUCTIONS On.this format, list the average daily unit power level in MWe-Net for each day in'the reporting month. Compute to the nearest whole megawatt.
m--m-+
tw e y-p-g-gp,
--rywowe,.v-p-
g-+y-e._
w,
,p
=w--.
-g-m--.p9wsy S g.-ws yr
.-se, 9
-9.yy,-99 e.
.m-e-t-
y gy.-r.*'r
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
so_370 UNIT NAME uccuiro 2 DATE 3/is/as REPORT MONTH vowenary ions COMPLETED BY
- a. x. n avis TELEPHONE vo4_373_7ss7 "s.
O
'$ o,y License Cause & Corrective y
c32 "a
o." &
y Ns.
Date
%b jgc Event
&r Action to
~
o gu,>
y, 5S E
MS$
EE BE Prevent Recurrence F
o~
m zmo Report #
us u ou I
85-02-01 S
672.00 C 1
RC FUELXX End of Cycle 1 Refueling Outage l
\\
1 2
3 4
Reason:
Method:
Exhibit G - Instructions S
led A-Equipment Failure (Explain) 1-Manual for Preparation of Data l
l B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NLREG-0161)
E-Operator Training G License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
(4/77)
l
.' l
~r DOCKET NO:
50-370 UNIT:
McGuire 2 DATE:
3/15/85 NARRATIVE
SUMMARY
Month:
February 1985
-The unit is continuing its end of cycle 1 refueling outage including the replacement of moisture separator reheater tube bundles and a main generator inspection.
4
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name:
McGuire Unit 2
- 2. -Scheduled next refueling shutdown:
Currently Refueling 3.
Scheduled' restart following refueling:
4.
Will refueling or resumption of operation thereafter require a technical Yes specification change or other license amendment?
'If yes, what will these be?
Technical Soecification Revininn I
If no,
.as reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Impc : ant licensing considerations (new or different design or supplier, unre iewed design or performance analysis methods, significant changes in desi a or new operating procedures).
N/A t
0
- 7. ' Number of fuel assemblies (a) in the core:
(b) in the spent fuel pool:
253 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present
-licensed capacity:
August _ 1991 r
DUKE POWER COMPANY Date:
March 15, 1983 I
Name of
Contact:
J. A. Reavis Phone: 704-373-7567 1
i
. - _. _.. _. _, ~. _, _ _
c:
McGUIRE NUCLEAR STATION Monthly Operating Status Report
~
1.-
Personnel Exposure:
For'the month of January, no individual (s) exceeded 10 percent-of:their allowable annual radiation dose limit.
-2.
-The total station liquid release for January.has.been compared with the Technical Specifications maximum' annual dose commitment and was'less than -10 percent of this limit.
.The total ~ station gaseous release for January has been compared with.the Technical Specifications maximum annual-dose commitment and was less than'10-percent of this limit.
i_.