r REVISED COPY OPERATLNG DATA REPORT DOCKET NO. _50-369 DATE 02-15-85 COMPLETED BY L A Reavis TELEPHONE 7nA_171-7567 OPERATING STATUS
- 1. Unit Name:
McGuire i Notes
- 2. Reporting Period: January 1-19Rs-32n,nry 11. tons
- 3. Licensed Thennal Power (MWt):
3411
' 4. Nameplate Rating (Gross MWe):
1305*
- 5. Design Electrical Rating (Net MWe): 1150
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1150 8.~ If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to.Date Cumulative 11.' Hours In Reporting Period 744.0 744.0 27 792.0
- 12. Number Of Hours Reactor Was Critical 707.2 707.2 18 870.8-
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 703.2 703.2 18 665.7
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2 356 943 2 356 943 49 161 243
. 17. Gross Electrical Energy Generated (MWH) 820 603 820 603 17 049 828
~
- 18. Net Electrical Energy Generated (MWH) 790 780 790 780 16 166 035
- 19. Unit Service Factor.
94.5 94.5 67.2 20.. Unit Availability Factor 94.5 94.5 67.2
- 21. Unit Capacity Factor (Using MDC Net) 92.4 92.4 49.3
- 22. Unit Capacity Factor (Using DER Net) 92.4 92.4 49.3
- 23. Unit Forced Outage Rate 5.5 5.5 15.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each t:
l25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 4
INITIAL ELECTRICITY COMMERCIA L OPERATION (9/77) 8503250367 850315 PDR ADOCK 05000369,
R PDR
=
1'A REVISED. COPY OPERATING DATA REPORT DOCKET NO.
50-370 DATE 02 o COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS
- 1. Unit Name:
McCuire 2 Notes
' 2. Reporting Period: - January 1, 1985-January 31, 1985 3.: Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305*-
- 5. Design Electrical Rating (Net MWe):
1150
' 6.' Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1150
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
S. Power Level To Which Restricted,If Any (Net MWe):
10.' Reasons For Restrictions,If Any:
I This Month Yr. to.Date Cumulative N
I1. Hours In Reporting Period 744.0 744.0 8 088.0
- 12. Number Of Hours Reactor Was Critical 595.0 595.0 6 733.1
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 594.9 594.9 6 686.0
- 15. Unit Reserve Shutdown Hours
-~~
- 16. Gross Thermal Energy Generated (MWH) 1 948 246 1 948 246 21 318 917 17.- Cross Electrical Energy Generated (MWH) 699 053 699 053 7 536 776
.18. Net Electrical Energy Generated (MWH) 671 521 671 521 7 229 321
- 19. Unit Service Factor 80.0 80.0 82.7
- 20. %i Awilability Factor 80 0 80.0 82.7
- 21. N D,mcity Factor (Using MDC Net) -
78.5 78.5' 75.9
- 22. Unit Capacity Factor (Using DER Net) 78.5 78.5 75.9
- 23. Unit Forced Outage Rate 0.0 0.0 14.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
-25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
I
- - - - - ~.. - - - - -
.-.--.,r.-
,,,y
,,5-,,..,--
y,
,,,.-,.....,.,,,,,,-wm-3-..n
_,,,--r
-, - --,,-., -,-