r REVISED COPY OPERATLNG DATA REPORT DOCKET NO. _50-369 DATE 02-15-85 COMPLETED BY L A Reavis TELEPHONE 7nA_171-7567 OPERATING STATUS

1. Unit Name:

McGuire i Notes

2. Reporting Period: January 1-19Rs-32n,nry 11. tons
3. Licensed Thennal Power (MWt):

3411

' 4. Nameplate Rating (Gross MWe):

1305*

5. Design Electrical Rating (Net MWe): 1150
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1150 8.~ If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr.-to.Date Cumulative 11.' Hours In Reporting Period 744.0 744.0 27 792.0

12. Number Of Hours Reactor Was Critical 707.2 707.2 18 870.8-
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 703.2 703.2 18 665.7
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 2 356 943 2 356 943 49 161 243

. 17. Gross Electrical Energy Generated (MWH) 820 603 820 603 17 049 828

~

18. Net Electrical Energy Generated (MWH) 790 780 790 780 16 166 035
19. Unit Service Factor.

94.5 94.5 67.2 20.. Unit Availability Factor 94.5 94.5 67.2

- 21. Unit Capacity Factor (Using MDC Net) 92.4 92.4 49.3

22. Unit Capacity Factor (Using DER Net) 92.4 92.4 49.3
23. Unit Forced Outage Rate 5.5 5.5 15.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each t:

l25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 4

INITIAL ELECTRICITY COMMERCIA L OPERATION (9/77) 8503250367 850315 PDR ADOCK 05000369,

R PDR

=

1'A REVISED. COPY OPERATING DATA REPORT DOCKET NO.

50-370 DATE 02 o COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name:

McCuire 2 Notes

' 2. Reporting Period: - January 1, 1985-January 31, 1985 3.: Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305*-

5. Design Electrical Rating (Net MWe):

1150

' 6.' Maximum Dependable Capacity (Gross MWe):

7. Maximum Dependable Capacity (Net MWe):

1150

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

S. Power Level To Which Restricted,If Any (Net MWe):

10.' Reasons For Restrictions,If Any:

I This Month Yr. to.Date Cumulative N

I1. Hours In Reporting Period 744.0 744.0 8 088.0

12. Number Of Hours Reactor Was Critical 595.0 595.0 6 733.1
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 594.9 594.9 6 686.0
15. Unit Reserve Shutdown Hours

-~~

16. Gross Thermal Energy Generated (MWH) 1 948 246 1 948 246 21 318 917 17.- Cross Electrical Energy Generated (MWH) 699 053 699 053 7 536 776

.18. Net Electrical Energy Generated (MWH) 671 521 671 521 7 229 321

19. Unit Service Factor 80.0 80.0 82.7
20. %i Awilability Factor 80 0 80.0 82.7
21. N D,mcity Factor (Using MDC Net) -

78.5 78.5' 75.9

22. Unit Capacity Factor (Using DER Net) 78.5 78.5 75.9
23. Unit Forced Outage Rate 0.0 0.0 14.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

-25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)