Monthly Operating Rept for Feb 1985
ML20099J556
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/28/1985
From: Ronafalvy J, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8503190755
Download: ML20099J556 (13)


Text

C ,

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-311 Unit Name Salem # 2 Date March 10,1985 Completed by J. P. Ronafalvy Telephone 609-935-6000 Extension 4455 >

Month February 1985 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0

-6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 13 0 0 15 0 31 0 16 0 Pg. 8,1-7 R1 i l

l

- M M *m susg, \\t

. , 1 l

f- *

( .

OPERATING DATA REPCRT Docket No. 50-311 Date March 10,1985 Telephone 935-6000 Completed by J. P. Ronafalvy Extension 4455 i Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period February 1985

! 3. Licensed Thermal Power (MWt) 3411

4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) IITS
6. Maximum Dependable Capacity (Gross MWe)1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A'
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period 672 1416 29641
12. No. of Hrs. Reactor was Critical 0 0 15094.6
13. Reactor Reserve Shutdown Hrs. 0 0 3533.6
14. Hours Generator On-Line 0 0 14612.1
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 43727036
17. Gross Elec. Energy Generated j

(MWH) 0 0 14277650

18. Net Elec. Energy Generated (MWH) (2130) (4549) 13513287
19. Unit Service Factor 0 0 49.3
20. Unit Availability Factor 0 0 49.3
21. Unit Capacity Factor (using MDC Net) 0 ~

0 41.2

22. Unit Capacity Factor (using DER Net) 0 0 40.9
23. Unit Forced Outage Rate 100 100 39.9
24. Shutdowns ncheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

4-1-85

26. Units in Test Status (Prior.to Commercial Operation):

Forecast Achieved Initial Criticality 6/30/80 8/2/80 I.nitial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2

UNIT SHUTDOWN AND POWER REDUCTIONS Dockat No. 50-311 ~

REPORT MONTH February 1985 Unit Name. Salem No.2 ,

Date March 10,1985 Completed by. J.P. Ronafalvy Telephone 609-935-6000-Extension- 4455 4

Method of Duration Shutting License. Cause and Corrective No. Date ~ Type Hours Reason Down Event System Component Action to 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence Stator Windings 1-14 F 672 A 4 - HA GENERA Terminals Bushing 85-012 ,

4 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1  ;

F:. Forced A-Equipment Failure-explain 1-Manual Instructions. Salem as i S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source  !

C-Refueling 3-Automatic Scram.. tion of Data I D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator. Training & Licensing Exam Previous Outage for Licensee <

' F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) 1 4

I MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH FEBRUARY 1985 UNIT NAME: Salem 2 DATE: March 3, 1985 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/935-6000 X4455

  • DC R NO . PRINCIPLE SYSTEM SUBJE CT 2ET-1071 Moisture Separator Monitor the temperature and Reheater pressure of the second reheater of the MSR No. 21E, 21W and 23W.

2EC-1307 4KV System Modify the acknowledgement circuit for the tripping alarm 74/T.

2EC-1465 TGA West Wall Panels Remove wall panels between Columns 18 and 24 and replace with removable steel facing.

2SC-0314 Service Water Modify service water pump motors to allow filling of oil reservoirs. (#24 Service Water Pump only) 2SC-1102 Ventilation for Install permanent ventilation Counting Room ducting to allow for control of the air conditioning air flow in the Counting Room.

2EC-1963 Service Water Position No. 24 Service Water Motor (Allis Chalmers) ? has failed and is being replaced with a spare (GE) motor.

  • Design Change Request

k MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH FEBRUARY 1985 UNIT NAME: Salem 2 DATE: March 10, 1985 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/339-4455 DCR NO. 10CFR 50.59 SAFETY EVALUATION 2 ET-10 71. Operating conditions for all MSR's covered by this test will not be changed. No unreviewed safety or environmental questions are involved.

2EC-1307 This DCR installs seismically qualified relays. This relay is similar to numerous other relays used for which all failure modes have been evaluated and found adequate.

No unreviewed safety or environmental questions are involved.

2 EC-14 65 The installation of supporting structural steel and metal wall panels will not affect any safety related system or building. The supporting structural steel and metal panels are designed to withstand transient dynamic loads of wind and earthquake. No unreviewed safety or environmental questions are involved.

2SC-0314 This change in the upper bearing oil fill piping will not affect the-operation of the motor. This will not involve any change to the FSAR or Tech. Specs. No unreviewed safety or, environmental questions are involved.

2SC-1102 This DCR better distributes airflow to assure the temp-sensitive sampling equipment within the Counting Room can function within their temp. tolerance range. No unreviewed safety or environmental questions are involved.

2EC-1963 This DCR replaces the No. 2 Service Water Pump Motor. The

~

replacement motor is of similar design. No unreviewed safety or environmental questions are involved.

  • Design Change Request l

3 PSE&G SALEM GENERATING STATION '

' SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 _

1 1

WO NO DEPT ' UNIT EQUIPMENT IDENTIFICATION 0099156199 SIC 2 2B DIESEL GENERATOR FAILURE DESCRIPTION: NO RPM INDICATION ON CONTROL PANEL

- CORRECTIVE ACTION: INSTALLED NEW SWITCH TACH.

0099121077 SMD 2 2B DIESEL TURBO AIR VALVE 1 FAILURE DESCRIPTION: IMPROPER OPERATION i CORRECTIVE ACTION': REPLACED SOLENOID VALVE 0099157510 SMD 2 21 BAT) PUMP FAILURE DESCRIPTION: PUMP SEAL IS BLOWN CORRECTIVE ACTION: REPLACED SEAL 85-01-24-013-3 SMD 2 ELECTR'ICAL PENETRATION #2-3 ,

i FAILURE DESCRIPTION: LEAK CORRECTIVE ACTIOT REPLACED BUSHINGS; RETAPED LEADS r /

0099161851 SMD 2 VALVE #22CV157 ,

t FAILURE DESCRIPTION: VALVE LEAKS AT BONNET CORRECTIVE ACTION: REPLACED DIAPHRAGM.

s a w-

SALEM UNIT 2 ,

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 0099161869 SMD 2 VALVE NO. 21CV157 FAILURE DESCRIPTION: VALVE LEAKS FROM DIAPHRAGM CORRECTIVE ACTION: REPLACED GASKET AND BONNET 84-12-08033-5 SMD 2 VALVE ~ # 22SW3 04 FAILURE DESCRIPTION: LEAK AT WELD CORRECTIVE ACTION: INSTALLED NEW NIPPLE WITH A NEW FLANGE 85-02-21-059-9 SMD 2 #23 SW PUMP FAILURE DESCRIPTION: STRAINER RUNS CONSTANTLY WITH THE PUMP OUT OF SERVICE <

CORRECTIVE-ACTION: INSTALLED NEW PRESSURE CONTROLLER 85-01-31-059-0 SIC 2 2RllA FAILURE DESCRIPTION: CHANNEL SPIKING l CORRECTIVE ACTION: INSTALLED SN189 84-12-20-101-9 SMD 2 2SJ135 LIMITORQUE MOTOR-FAILURE DESCRIPTION: VALVE WOULD NOT STROKE FRCH CONSOLE CORRECTIVE ACTION: -REPLACED MOTOR-AND OVERLOADS

SALEM UNIT 2 WO NO DEPT UNIT .

5 EQUIPMENT IDENTIFICATION 85-01-10-028-5 SMD 2 2B VITAL BUS FAILURE DESCRIPTION:

DEFECTIVE TRANSFER RELAY CORRECTIVE ACTION: REPLACED RELAY 0099156784 SMD 2 VALVE #21CA54 5 FAILURE DESCRIPTION:

VALVE BONNET BROKEN CORRECTIVE ACTION: REBUILT VALVE 0099128390 SMD 2

  1. 23 CC PUMP SEALS FAILURE DESCRIPTION: SEALS LEAK CORRECTIVE ACTION:

REPLACED MECHANICAL SEAL 0099127458 SMD 2

  1. 23 CHARGING PUMP FAILURE DESCRIPTION: SEAL LEAKAGE CORRECTIVE ACTION:

009902973 REPLACED SEAL ON PUMP HP SPEED PTNION SHAFT SMD 2 l VALVE #21SJ33 FAILURE DESCRIPTION:

INTERNAL BANGING WHEN OPENING CORRECTIVE ACTION:

l REPLACED VALVE STEM AND REPACKED VALVE

SALEM UNIT 2 ,

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 85-01-26-015-1 SMD. 2 22. BORIC ACID PUMP FAILURE-DESCRIPTION: SEAL LEAKAGE

~ CORRECTIVE ACTION: MACHINED GASKET SURFACE 0099156261

-SMD 2 22 BSD 4KV BREAKER FAILURE. DESCRIPTION: BREAKER WILL NOT RACK DOWN FULLY CORRECTIVE ACTION: REPAIRED INTERLOCK 0099118076 SMD 2 22 . AUX. FEED PUMP BREAKER FAILURE DESCRIPTION: FINGER CONTACTS ARE BENT AND THE BREAKER WON'T RACK CORRECTIVE ACTION: REPLACED BENT CONTACTS

'80991229-4 SIC 2 ERB RADIATION MONITOR FAILURE DESCRIPTION: RESPONSE TO SIGNAL OUT OF TOLERANCE CORRECTIVE ACTION: REPLACED FC PROM.

0099104229 SIC 2 2R2 FAILURE DESCRIPTION: HI ALARM CORRECTIVE ACTION: INSTALLED NEW DETECTOR i

SALEM UNIT 2 ,

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 948269 OD 2 2C EMERGENCY DIESEL GENERATOR FAILURE DESCRIPTION: FREQUENCY METER FAILED CORRECTIVE ACTION: REPLACED AMPLIFIER BOARD; TIGHTENED LOOSE CONNECTOR ON TRANSDUCER BOARD 4

k

+b

m SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NO. 2 FEBRUARY 1985 '

SALEM UNIT NO. 2

~'

The period began with the second refueling / turbine outage in progress.

Mode-5 was entered on 2/2/85 at 2200 with the completion of tensioning

'the Reactor Vessel Head bolts. Main Generator replacement work

~

continues. Turbine work is continuing. Electrical and mechanical {

' modifications'are continuing for adaptation of the General Electric

-Generator.- The Main Generator rotor and Nos. 21 and 23 LP Rotors have *

been set in place. Installation of all LP Turbines and LP Turbine inner and outer covers have been completed. Turbine alignment was completed. Main Generator alignment is in progress.- Cavity decontamination' work was initiated and completed. The bearings have been replaced on both ends of No. 21 Steam Generator Feedwater Pump.

Replacement of the Conoseals.has been completed. The Reactor Vessel Missile Shield has been installed. The lube oil coolers have been ,

replaced on Nos;.21 & 22 Charging Pumps and Nos. 21 &.22 Safety Injection Pumps. No. 22 Service Water Header outage was initiated and '

has been completed. The CVCS System flush and Charging / Safety

. Injection Full Flow Test was completed.' Reactor Coolant System fill and-vent is in progress. Phase A Containment Isolation Test has been completed. Phase B Containment Isolation Test is in progress. The replacement of "C" Battery was completed. Containment cleanup in preparation of Mode 4 operation is continuing. MSR work continues.

To date, all; internal welds have been repaired, the chevrons have been replaced and baffling has been installed. Remaining work on the MSR',s consists'of discharge strainer installation. The Boric Acid filter was replaced in support of the station on-going ALARA efforts. Type C

~

leak rate testing of Containment Isolation valves was completed. A total of one hundred and seventeen (117) valves were tested. The Unit No. 2' Outage remains on schedule.

REFUELING INFORMATION DOCKET NO.~: 50-311 COMPLETED BY: J. Ronafalvy UNIT NAME: Salem 2 DATE: March 10, 1985 TELEPHONE: 609/935-6000 EXTENSION: 4455 Month February 1985 ,

1. Refueling information has changed from last month:

YES X NO

2. Scheduled date for next refueling: September 6, 1986 (
3. Scheduled date-for restart following refueling: November 30, 1986
4. A) _ Will-Technical Specification changes or other license amendments be required?

YES' NO Not determined to date B) Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO' X If no, when is it scheduled? August 1986

5. Scheduled date(s) for submitting proposed licensing action:

August 1986 if required

6. Important licensing considerations associated with refueling:

NONE f 7. Number of Fuel Assemblies:

A) Incore 193

B) In Spent Fuel Storage 140 l 8. Present licensed spent fuel storage
capacity:- 1170
1 Future spent fuel storage capacity: 1170 l 4

9._ Date of last refueling that can be discharged

, to spent fuel pool assuming the present i licensed capacity: March 2003 8-1-7.R4 O

e 1

IOPSEG

. Public Service Electric and Gas Company P.O.. Box E Hancocks Bridge, New Jersey 08038

. Salem Generating Station March 10, 1985 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of February 1985 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours, 9 )

/

J. M. Zupko, Jr.

General Manager - Salem Operations JR:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King.of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosure 8-1-7.R4