Similar Documents at Salem |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0261998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 1.With 990115 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr ML18106A9831998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 2.With 981214 Ltr ML18106A9801998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 1.With 981214 Ltr ML18106A9641998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 2. with 981112 Ltr ML18106A9631998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 1. with 981112 Ltr ML18106A9151998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With 981012 Ltr ML18106A9131998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With 981012 Ltr ML18106A8751998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With 980915 Ltr ML18106A8741998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Unit 1.With 980915 Ltr ML18106A8161998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 1. W/980817 Ltr ML18106A8151998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 2. W/980817 Ltr ML18106A7151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 2. W/980715 Ltr ML18106A7141998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 1. W/980715 Ltr ML18106A6541998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 1. W/980615 Ltr ML18106A6531998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 2. W/980615 Ltr ML18106A6121998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1.W/980515 Ltr ML18106A6111998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Unit 2. W/980515 Ltr ML18106A5561998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem,Unit 1. W/980415 Ltr ML18106A4591998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem Unit 2. W/980415 Ltr ML18106A3771998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1.W/980316 Ltr ML18106A3761998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2.W/980316 Ltr ML18106A3281998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 2. W/980217 Ltr ML18106A3271998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 1. W/980217 Ltr ML18106A2721997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem,Unit 2. W/980115 Ltr ML18106A2711997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem Generating Station,Unit 1.W/980115 Ltr ML18106A2081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 1. W/971212 Ltr ML18106A2071997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 2. W/971212 Ltr ML18102B6811997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ 971117 Ltr ML18102B6801997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ 971117 Ltr ML18102B6271997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Salem,Unit 2. W/971015 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
C ,
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-311 Unit Name Salem # 2 Date March 10,1985 Completed by J. P. Ronafalvy Telephone 609-935-6000 Extension 4455 >
Month February 1985 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0
-6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 13 0 0 15 0 31 0 16 0 Pg. 8,1-7 R1 i l
l
- M M *m susg, \\t
. , 1 l
f- *
( .
OPERATING DATA REPCRT Docket No. 50-311 Date March 10,1985 Telephone 935-6000 Completed by J. P. Ronafalvy Extension 4455 i Operating Status
- 1. Unit Name Salem No. 2 Notes
- 2. Reporting Period February 1985
! 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) 1170
- 5. Design Electrical Rating (Net MWe) IITS
- 6. Maximum Dependable Capacity (Gross MWe)1149
- 7. Maximum Dependable Capacity (Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A'
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 672 1416 29641
- 12. No. of Hrs. Reactor was Critical 0 0 15094.6
- 13. Reactor Reserve Shutdown Hrs. 0 0 3533.6
- 14. Hours Generator On-Line 0 0 14612.1
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0 43727036
- 17. Gross Elec. Energy Generated j
(MWH) 0 0 14277650
- 18. Net Elec. Energy Generated (MWH) (2130) (4549) 13513287
- 19. Unit Service Factor 0 0 49.3
- 20. Unit Availability Factor 0 0 49.3
- 21. Unit Capacity Factor (using MDC Net) 0 ~
0 41.2
- 22. Unit Capacity Factor (using DER Net) 0 0 40.9
- 23. Unit Forced Outage Rate 100 100 39.9
- 24. Shutdowns ncheduled over next 6 months (type, date and duration of each)
N/A
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
4-1-85
- 26. Units in Test Status (Prior.to Commercial Operation):
Forecast Achieved Initial Criticality 6/30/80 8/2/80 I.nitial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2
UNIT SHUTDOWN AND POWER REDUCTIONS Dockat No. 50-311 ~
REPORT MONTH February 1985 Unit Name. Salem No.2 ,
Date March 10,1985 Completed by. J.P. Ronafalvy Telephone 609-935-6000-Extension- 4455 4
Method of Duration Shutting License. Cause and Corrective No. Date ~ Type Hours Reason Down Event System Component Action to 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence Stator Windings 1-14 F 672 A 4 - HA GENERA Terminals Bushing 85-012 ,
4 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 ;
F:. Forced A-Equipment Failure-explain 1-Manual Instructions. Salem as i S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source !
C-Refueling 3-Automatic Scram.. tion of Data I D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator. Training & Licensing Exam Previous Outage for Licensee <
' F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161) 1 4
I MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH FEBRUARY 1985 UNIT NAME: Salem 2 DATE: March 3, 1985 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/935-6000 X4455
- DC R NO . PRINCIPLE SYSTEM SUBJE CT 2ET-1071 Moisture Separator Monitor the temperature and Reheater pressure of the second reheater of the MSR No. 21E, 21W and 23W.
2EC-1307 4KV System Modify the acknowledgement circuit for the tripping alarm 74/T.
2EC-1465 TGA West Wall Panels Remove wall panels between Columns 18 and 24 and replace with removable steel facing.
2SC-0314 Service Water Modify service water pump motors to allow filling of oil reservoirs. (#24 Service Water Pump only) 2SC-1102 Ventilation for Install permanent ventilation Counting Room ducting to allow for control of the air conditioning air flow in the Counting Room.
2EC-1963 Service Water Position No. 24 Service Water Motor (Allis Chalmers) ? has failed and is being replaced with a spare (GE) motor.
k MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH FEBRUARY 1985 UNIT NAME: Salem 2 DATE: March 10, 1985 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/339-4455 DCR NO. 10CFR 50.59 SAFETY EVALUATION 2 ET-10 71. Operating conditions for all MSR's covered by this test will not be changed. No unreviewed safety or environmental questions are involved.
2EC-1307 This DCR installs seismically qualified relays. This relay is similar to numerous other relays used for which all failure modes have been evaluated and found adequate.
No unreviewed safety or environmental questions are involved.
2 EC-14 65 The installation of supporting structural steel and metal wall panels will not affect any safety related system or building. The supporting structural steel and metal panels are designed to withstand transient dynamic loads of wind and earthquake. No unreviewed safety or environmental questions are involved.
2SC-0314 This change in the upper bearing oil fill piping will not affect the-operation of the motor. This will not involve any change to the FSAR or Tech. Specs. No unreviewed safety or, environmental questions are involved.
2SC-1102 This DCR better distributes airflow to assure the temp-sensitive sampling equipment within the Counting Room can function within their temp. tolerance range. No unreviewed safety or environmental questions are involved.
2EC-1963 This DCR replaces the No. 2 Service Water Pump Motor. The
~
replacement motor is of similar design. No unreviewed safety or environmental questions are involved.
3 PSE&G SALEM GENERATING STATION '
' SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 _
1 1
WO NO DEPT ' UNIT EQUIPMENT IDENTIFICATION 0099156199 SIC 2 2B DIESEL GENERATOR FAILURE DESCRIPTION: NO RPM INDICATION ON CONTROL PANEL
- CORRECTIVE ACTION: INSTALLED NEW SWITCH TACH.
0099121077 SMD 2 2B DIESEL TURBO AIR VALVE 1 FAILURE DESCRIPTION: IMPROPER OPERATION i CORRECTIVE ACTION': REPLACED SOLENOID VALVE 0099157510 SMD 2 21 BAT) PUMP FAILURE DESCRIPTION: PUMP SEAL IS BLOWN CORRECTIVE ACTION: REPLACED SEAL 85-01-24-013-3 SMD 2 ELECTR'ICAL PENETRATION #2-3 ,
i FAILURE DESCRIPTION: LEAK CORRECTIVE ACTIOT REPLACED BUSHINGS; RETAPED LEADS r /
0099161851 SMD 2 VALVE #22CV157 ,
t FAILURE DESCRIPTION: VALVE LEAKS AT BONNET CORRECTIVE ACTION: REPLACED DIAPHRAGM.
s a w-
SALEM UNIT 2 ,
WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 0099161869 SMD 2 VALVE NO. 21CV157 FAILURE DESCRIPTION: VALVE LEAKS FROM DIAPHRAGM CORRECTIVE ACTION: REPLACED GASKET AND BONNET 84-12-08033-5 SMD 2 VALVE ~ # 22SW3 04 FAILURE DESCRIPTION: LEAK AT WELD CORRECTIVE ACTION: INSTALLED NEW NIPPLE WITH A NEW FLANGE 85-02-21-059-9 SMD 2 #23 SW PUMP FAILURE DESCRIPTION: STRAINER RUNS CONSTANTLY WITH THE PUMP OUT OF SERVICE <
CORRECTIVE-ACTION: INSTALLED NEW PRESSURE CONTROLLER 85-01-31-059-0 SIC 2 2RllA FAILURE DESCRIPTION: CHANNEL SPIKING l CORRECTIVE ACTION: INSTALLED SN189 84-12-20-101-9 SMD 2 2SJ135 LIMITORQUE MOTOR-FAILURE DESCRIPTION: VALVE WOULD NOT STROKE FRCH CONSOLE CORRECTIVE ACTION: -REPLACED MOTOR-AND OVERLOADS
SALEM UNIT 2 WO NO DEPT UNIT .
5 EQUIPMENT IDENTIFICATION 85-01-10-028-5 SMD 2 2B VITAL BUS FAILURE DESCRIPTION:
DEFECTIVE TRANSFER RELAY CORRECTIVE ACTION: REPLACED RELAY 0099156784 SMD 2 VALVE #21CA54 5 FAILURE DESCRIPTION:
VALVE BONNET BROKEN CORRECTIVE ACTION: REBUILT VALVE 0099128390 SMD 2
- 23 CC PUMP SEALS FAILURE DESCRIPTION: SEALS LEAK CORRECTIVE ACTION:
REPLACED MECHANICAL SEAL 0099127458 SMD 2
- 23 CHARGING PUMP FAILURE DESCRIPTION: SEAL LEAKAGE CORRECTIVE ACTION:
009902973 REPLACED SEAL ON PUMP HP SPEED PTNION SHAFT SMD 2 l VALVE #21SJ33 FAILURE DESCRIPTION:
INTERNAL BANGING WHEN OPENING CORRECTIVE ACTION:
l REPLACED VALVE STEM AND REPACKED VALVE
SALEM UNIT 2 ,
WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 85-01-26-015-1 SMD. 2 22. BORIC ACID PUMP FAILURE-DESCRIPTION: SEAL LEAKAGE
~ CORRECTIVE ACTION: MACHINED GASKET SURFACE 0099156261
-SMD 2 22 BSD 4KV BREAKER FAILURE. DESCRIPTION: BREAKER WILL NOT RACK DOWN FULLY CORRECTIVE ACTION: REPAIRED INTERLOCK 0099118076 SMD 2 22 . AUX. FEED PUMP BREAKER FAILURE DESCRIPTION: FINGER CONTACTS ARE BENT AND THE BREAKER WON'T RACK CORRECTIVE ACTION: REPLACED BENT CONTACTS
'80991229-4 SIC 2 ERB RADIATION MONITOR FAILURE DESCRIPTION: RESPONSE TO SIGNAL OUT OF TOLERANCE CORRECTIVE ACTION: REPLACED FC PROM.
0099104229 SIC 2 2R2 FAILURE DESCRIPTION: HI ALARM CORRECTIVE ACTION: INSTALLED NEW DETECTOR i
SALEM UNIT 2 ,
WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 948269 OD 2 2C EMERGENCY DIESEL GENERATOR FAILURE DESCRIPTION: FREQUENCY METER FAILED CORRECTIVE ACTION: REPLACED AMPLIFIER BOARD; TIGHTENED LOOSE CONNECTOR ON TRANSDUCER BOARD 4
k
+b
m SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT NO. 2 FEBRUARY 1985 '
SALEM UNIT NO. 2
~'
The period began with the second refueling / turbine outage in progress.
Mode-5 was entered on 2/2/85 at 2200 with the completion of tensioning
'the Reactor Vessel Head bolts. Main Generator replacement work
~
continues. Turbine work is continuing. Electrical and mechanical {
' modifications'are continuing for adaptation of the General Electric
-Generator.- The Main Generator rotor and Nos. 21 and 23 LP Rotors have *
- been set in place. Installation of all LP Turbines and LP Turbine inner and outer covers have been completed. Turbine alignment was completed. Main Generator alignment is in progress.- Cavity decontamination' work was initiated and completed. The bearings have been replaced on both ends of No. 21 Steam Generator Feedwater Pump.
Replacement of the Conoseals.has been completed. The Reactor Vessel Missile Shield has been installed. The lube oil coolers have been ,
replaced on Nos;.21 & 22 Charging Pumps and Nos. 21 &.22 Safety Injection Pumps. No. 22 Service Water Header outage was initiated and '
has been completed. The CVCS System flush and Charging / Safety
. Injection Full Flow Test was completed.' Reactor Coolant System fill and-vent is in progress. Phase A Containment Isolation Test has been completed. Phase B Containment Isolation Test is in progress. The replacement of "C" Battery was completed. Containment cleanup in preparation of Mode 4 operation is continuing. MSR work continues.
To date, all; internal welds have been repaired, the chevrons have been replaced and baffling has been installed. Remaining work on the MSR',s consists'of discharge strainer installation. The Boric Acid filter was replaced in support of the station on-going ALARA efforts. Type C
~
leak rate testing of Containment Isolation valves was completed. A total of one hundred and seventeen (117) valves were tested. The Unit No. 2' Outage remains on schedule.
REFUELING INFORMATION DOCKET NO.~: 50-311 COMPLETED BY: J. Ronafalvy UNIT NAME: Salem 2 DATE: March 10, 1985 TELEPHONE: 609/935-6000 EXTENSION: 4455 Month February 1985 ,
- 1. Refueling information has changed from last month:
YES X NO
- 2. Scheduled date for next refueling: September 6, 1986 (
- 3. Scheduled date-for restart following refueling: November 30, 1986
- 4. A) _ Will-Technical Specification changes or other license amendments be required?
YES' NO Not determined to date B) Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO' X If no, when is it scheduled? August 1986
- 5. Scheduled date(s) for submitting proposed licensing action:
August 1986 if required
- 6. Important licensing considerations associated with refueling:
NONE f 7. Number of Fuel Assemblies:
A) Incore 193
- B) In Spent Fuel Storage 140 l 8. Present licensed spent fuel storage
- capacity:- 1170
- 1 Future spent fuel storage capacity: 1170 l 4
9._ Date of last refueling that can be discharged
, to spent fuel pool assuming the present i licensed capacity: March 2003 8-1-7.R4 O
e 1
IOPSEG
. Public Service Electric and Gas Company P.O.. Box E Hancocks Bridge, New Jersey 08038
. Salem Generating Station March 10, 1985 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of February 1985 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours, 9 )
/
J. M. Zupko, Jr.
General Manager - Salem Operations JR:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King.of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosure 8-1-7.R4
/Y.S 1
\
The Energy People f 952189 (20M) 11-81 g 1.*- **