a 0FERAllWB IATA FEPORT DOClEl ND 50-369 DATE Bucust 14. 1992 OPEFtTikG STATUS COMPLETED BY R.A. Willins TELEFHONE 704-382-5346,

1. Unit Names M:Guire 1 2.ReportingPeriod: July 1,1990-July 31,1992
3. Licensen Thersal reser (MWt):

3411

4. Nastplate Rating (Gross MWe):

13056 Notes INaseplate Pating

5. Design Elettrical Ratin0 (Net MWe):

1100 (0 rots MWel calculat a as

6. Marious Dependable Cap tity (Stoss MWe):

1171 1450.000 MA x.90 pcuer

7. Mktisus Dependable Capacity (Net MWe):

1:07 factu per Fage lit, p

9. If Chariges Occur in tapacity Fatirgs litees Wusber 3 Through 7) $1nce last NUktS-0020.

Report.GiveRasens:

9. Power Level To Whith Restricted, if Any (Net NWe):
10. F: eaten for Restrict 19ns, if anyt this Month Yr.-to-Date Cusulative
11. Hours in Reporting feriod 744.0 5i11.0 93503.0
12. Husber Of Hours Feactor Was Critical 702.0 3109.7 65183.2
13. Reactor Reserve Shutdewn Hours

--0--

--0--

--0--

14. Hours Senerator Dn-Line 696.6 3168.6 64449.5
15. Unit Peserve Shutdown Hours

--0--

--0-- -

16. Bruss Thereal Energy Generated (MWH) 2285B61 10330348 197316009
17. Gress Electrical Energy Banerated (MWH) 767939 3569193 67929018
19. ket Electrical Energy Genersted (MWH) 735609 3401663 6483?716
19. Unit Service Factor 93.9 62.0 68.9
20. Unit Availability Factor 93.9 62.0 69.9
21. Unit Capacity factor (using MDC Net) 87.6 59.0 60.E
22. Unit Capacity Factor (Using DER Net)

B3.8 56.4 SE.8

23. Unit Ferced Outage Rate 6.1 39.0 14.2 24, Shutdown Scheduled Over Nent 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At

.0f Report Period. Estisate' Date of Startupt

. 26. Units In Test Status (Prior to Coseercial Operation):

Forecast Achieved INiilAL CR111CAllTV INITIAL ELECTRIC 11Y COMERCIAL OPERAi!DN I

9200190154 920013 PDR ADOCK 05000369 R

PDR

DPEFA11NS LATA REf 0RT i

DOCiff ND 50-369 _

DNil McGuire 1 DATE Amat 14. 1992 C0XPLETED BY P,A,Will1m TELEPHONE 704-382-5346 MONTH __

hly. 1992 fg AVERADE dally F0WER LEVEL

[A1 AVERAGE MILY F0WER LEVEL (MWe-het)

(MWe-Net)

I 1113 17 1112 2

1110 IB IMB 3

1109 19 1102 4

1103 20 1099 5

1097 21 1097 6

1098 22 1094 7

1099 23 1094 8

1103 24 1093 9

1104 25 1f89 10 1101 26 379 11 10 %

27 0

12 1094 20 164 13 1102 29

$9 14 ILO3 30 969 15 1111 31

_to?6 16

!!09

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369

^

UNIT NAME nuuviar a DATE us / la / 'ez REPORT MONTH July 1992 COMPLtirc.u BY a.

u.

dinnund-TELEPHONE (iv4;-auz-32da (1) 2)

3

'(4)

.(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURPINCE o

4 92-7-26 F.

45.38 A

3 HH PUMPXX REACTOR TRIP DUE TO LOSS OF VACUUM ON FEEDWATER PUMP 11-P 92 7-28 f'

B HG XXXXXX HOLD FOR CHEMISTRY 12-P 92-7-28 F

B IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION 13-P 92-7-29 F-A HH PUMPXX FEEDWATER PUMP REPLACEMENT (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entn Sheets For Licenseo C-Refueling 3-hutomatic Scram Event Report (LER (NUREG-0161) )

D-Regulatory Restriction 4-Other (Explain)

File E-Operator Araining & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

DOCKET NO:

50 369 UNIT: McGuire 1 DATE:

8/13/92 NARfATIVE

SUMMARY

MONTH: July 1992 McGuire Unit 1 began the month of July operating at 100% full power.

The unit operated at or near 100% until 7/26 at 0852 when a reactor /

turbine trip ocurred. The unit tripped due to loss of vacuen on the

'B' feedwater pump.

The unit was placed on line on 7/28 at 0615.

During power escalation, the unit held at 30% power from 091f :o 1750 for chemistry.

The unit held at 39% power from 1850 to 2301 to perfor.n nuclear instrumentation calibrations.

The unit held at 58% power for feedwater pump coupling and alignment from 7/29 at 0135 to 7/30 0206.

The unit held at 88% power from 0522 to 0630 for thermal power output calculations.

The unit held e. 98% from 0954 to 1825 for nuclear instrumentation calibration. The unit reached 99.5% power at 1856. The unit continued to operate at 99.5% power @.

to over power delta temperature spiking problems. The unit started a power decrease on 7/31 at 0830 and held at-97.4% power from 0840 to 1125 for nuclear instrumentation calibration.

The unit was returned to 99.5% power at 1201.

The unit operated at 99.5% power for the remainder of the month due to over power delta temperature spiking problems.

Prepared by:

N. O. Simmons Telephone:

704 382-5263 l

1 1

I.

a h

~

I MONTilLY REFUELING INFORMATION REOUEST 1.

Facility name: McGuire, Unit 1 3.

Scheduled next refouling shutdown: _ March 1993 3.

Scheduled restart following refueling: May 1993 TiiE PROJECT MANAGER !!AS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CllANGE OR LICENSE AMENDMENT. TilEREFORE,

QUESTIONS 4 TilROUGH 6 WILL NO LONGER BE MAINTAINED IN TilIS REPORT.

4.

Will refueling or resumption of operation thereafter isquire a technical specification change or other license amendment?

1 If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (now or different design or

supplier, unreviewed design or performance analysis
methods, significant changes in design or new operating procedures).

7.

Ilumber of Fuel assemblics (a) in the core: 193 (b) in the spent fuel pool: 519 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:

August 13. 1992 Name of

Contact:

R.

A. Williams Phone:

704-382-5346

g.

4

-OPERAilNS DATA REPORT DOCKET NO

$0-370 DATE Auaust 14; 1992 OPERAflNB STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346

1. Unit Naael M'6uire 2 -

2.RepAtingPeriod: July 1,1992-July 31,1992

- 3. Licensed 1hersal Power (MWt):

3411

4. Naseplate Rating (Gross MWel:

13058 Notes aNaseplate Rating

5. Design Electrical Rating (Net MWe):

1100 (Bross MWe) calculated as

6. Mails 6a Dependable Capacity'(6ross MWels 1171 1450.000 MVA :.90 power
7. Marisua Dependable Capacity (Net MWe): 1 1129 factor per Page lit, 0, if Changes Occur in Capacity Ratlegs (lteas Number 3 Through il Since Last NURE6-0020.

Report. Give Reasons:

9. Power r evel in Which Restricted, If Any (Net MWa):_

- 10, Reason For Restrictions, If any -

This Month Yr.-to-Date Cuaulative

. 11. Hours In Reporting Period 744.0' 5til.0 73799.0

- 12. Wust:er Of Hours Reactor Was Critical' 744.0 2639.B 55841.2

- 13.-Reactor Reserve Shutdown Hours

---0--

~--0--

--0--

- 14. liours Benerator On-1ine 744.0 2585.6 54938.5

- 15. Unit Reserve Shutdo e Hours

--0--

--0--

--0--

16. Gross.ThermalEnergyGenerated(MWK) 2529061 8353174-179369604

' 17. Gross Electrical Energy Berc itt

_ MWH).

874B21 2919719 62749634

(

s Ib.' Net Electrital Energy Generated (MWII) 642206 2771776 60152105

19. Unit Service Factor 100.0:

50.6 74.4

20. Unit Availability Factor

-100.0 50.6 74.4-

[

-21;UnitCapacityCactor(UsingMDCNetl-100.3 48.0-71.2

22. Unit Capacity Factor (Using DER Nat)'

95.9 46.0 69.1 H

23. Unit Forced Outage Rate..

0.0 4.4 -

7.9 20.' Shutdown Scheduled Over Next 6 Months (Type, Date -and Duration'of Each):

1L d.-

25 -itSh'ut Data At End Of Report Perio.:. Estinated Date of Startup$

-. 26. Units in Test States (Pricr to Coaaarcial Operation): _

Forecast Achieved-INITIALCRITICALITY

-INITIAL ELECTRICITY COMMERCIAL DPERATION

'I{.

~.

l 1

(

OPEPATINS DATA REPORT D00:E! ND 50-370 Uhli McGuire L _

DATE Aucust 14. 1992 COMPLETED BY _,P 6 Willians 2

TELEPHONE 7'a 082-5346 MONTH July,1992 Q11 AVERAGE DAILY POWER LEVEL E.

,nSE DAILY POWER LEVEL (MWe-Nell (MWe-Met) 1 1144 17 1l99 E-1143 18 1133 3

1143 1-JJ.33 4

!!29 20 1129 5

1123 21 1129 6

ilh 22

!!21 7'

!!37 23 1127 8

1139 24 1129 9

1140 25 1123 10 1130 26 1125 11 1139 27 1126 12 1137 28 1119 13

!!30 29 1110 14 1136 30

!!!8 15 1141 31 1120 16 -

1130 l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-370 UNIT NAME ricaulxr.e DATE us/la/ve REPORT MONTH July 1992 COMPLETED BY a.

c.

dirmund -

TELEPHONE

(/uc)-auz-32t>a (1)

2) {3 _

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE

. PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S

(1)

(2)

(3)

(4)

F Forced Reason:-

Method:

Exhibit G - Instructions S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data 2-Manual Scram EntW Sneets For Licensee C-Refueling 3-Automatic Scram Eyent Report jLER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

G-Operator Error Exhibit I - Same Source H-Other

J, 4

'4.

UNIT: McLv. ire 2 DATE:

8/13/92 NARRATIVE

SUMMARY

MONTH: July 1992

. McGuire Unit 2 began the' month of July operating at 100% full power.

On 7/4 at 1815 the unit started a power decrease #nd held at 95% to investigate thermal power best estimate accuracy concerns from 1906 to

-7/5 at 0312.

During power escalation, the unit held at 96% power from 0312 to 0908 to repair a failed feedwater valve.. The unit reached 100%

-full power at:1019. On 7/22 at 1955Lthe unit started a power decrease and held'at 95% power from 2055 to 7/23 at 0014 for reactor protection system testing.

The-unit was returne to 100% full power at 0156.

On On 7/25.at 0746 tto unit started a power decrease and held at 98% power from 0804 toc 1140 for reactor protection system testir, The unit was

-returned to 100% full power at 0156. The unit operated at or near 100%

for the remainder of the month.

Prepared by:

N. C. Simmons LTelephone:

704-382-5263

=

MONTHLY REFUELING INFORMATION REQUEST 1.-

Facility name: McGuire, Unit-2 3.

Scheduled next refueling shutdown: June 1993

-3.

Scheduled restart following refueling: August 1993 THE--PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE. OR LICENSE AMENDMENT. THE'EFORE, QUESTIONS 4 THROUGH 6 WILL NO IANGER BE MAINTAINED IN THIS REPORT.

4..

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important : licensing considerations (new or different design or supplier, - unreviewed ' design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel-assoublies (a) in the core: 193 (b) in the spent fuel pool: 741 8.

Present licensed fuel p,.)ol capacity: 1463

-Size of requested _or planned increase:

- 9.

Proj ected - date ' of last refueling. which can be accommodated by

.present-. licensed capacity: December 2 0,j_3,3 DUKE. POWER COMPANY.

DATE:

August-13, 1992 Name of

Contact:

R.

A. Williams Phone:

704-382-5364 l-l l