ML20099H687
Jump to navigation
Jump to search
| ML20099H687 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 06/30/1992 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20099H678 | List: |
| References | |
| NUDOCS 9208190157 | |
| Download: ML20099H687 (1) | |
Text
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _.
r.
l.:
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT June 1992 1.
Personnel Exposure -
For the month of June, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release for December has been
-compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for December has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this list.
9 9208190157 920813 l
[DR ADOCK 05000369 PDR
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ -