Text
September 29, 9
Docket Nos.
50-269, 50-270, and 50-287 Mr. H. B. Tucker, Vice President Nuclear Production Department Duke Power Company 422 South Church Street Charlotte, North Carolina 28242
Dear Mr. Tucker:
SUBJECT:
TEMPORARY WAIVER OF COMPLIANCE -
OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 By letter dated September 29, 1989, you requested an emergency Technical Specification (TS) change which would add a note to TS Table 4.4-1, specifying when integrated (Type A) and local (Type C) leak rate testing becomes applicable for containment penetration 53.
The TS change also modifies Table 4.4-1 to reflect the requirement to perform Type C testing of this penetration. The current TS requirement to test this penetration has not been properly performed, requiring isolation of the penetration. However, intermittent use of this penetration is required during plant operation to charge the A core flood tank with nitrogen. This emergency TS change is required to commence startup of Unit1 and to continue operation of Units 2 and 3.
We have reviewed your evaluation and the justification, including compensatory actions, provided in your submittal and find them acceptable. This letter confirms the verbal granting of a temporary waiver of compliance from the requirement of TS 3.6.3c to allow intermittent use of this penetration to charge the A core flood tank. This temporary waiver of compliance will be in effect while the staff completes the processing of your emergency change request.
Sincerely, Gus C. Lainas, Assistant Director for Region II Reactors Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
?.,* a
Enclosure:
c-F As 'stated cc w/encl:
See next page DISTRIBUTION Docket File R. Ingram 14-H-25
<c NRC' PDR L. Wiens 14-H-25 Local PDR OGC (For inform. Only) 15-B-18 PDII-3 Reading E. Jordan MNBB-3302 A
cO S. Varga 14-E-4 B. Grimes 9-A-2 0(
G..Lainas I
P-315 D.;Matthews 14-H-25
[Oconee Plant File]
OFC :PDII-3
- L s
- LC ocker
- G('nas DATE :%///89 89 3 / 1/89
/'1/89 OFFICIAL RECUDb CUPY Document Name:
TUCKER LTR 9/29
TABUE 4.4-1 C.
IsolatIom valves are required to operate Iatermitteetiy uder post accident CMq40ams.
- d.
Cck vaives used for Containent isoilion.
019 Reverse direction test of inside contaimnt Isolmtima valve auLberized.
Leakage results are conservative.
amf 10 System is submerged during pent-accident conditions and perfemasce of Type A test.
fttm will be draimed to the extent possible.
30311 Type 3 test performed am the blind flanges inside the Reactor filding.
The tube drais valves and valvues outside tile cestaimment are met tested.
301 2
A.me-tis extensin fmn the 'NJ lea tee& mriw u
u examot fro Seutimm Hw..
and 111.D.3 of hppsudixz J to 10 anR -rart S i. granted such that It be pert me during the 1963 Wait I refueling outage, pruvided that such outaw baginm later Maon July 16. 1963.
1u 3 The requirements to perforim a type A test in accordance with Notes 1 and 3 of Table 4.4-1, w ill cuimuce during the end of cycle 12 refueling outage an unit 1, and during the end of cycle 11 refueling outage& on Units 2 and 3.
For the type c tqzt, the initial test will be performed Cm Umit 2 no later ChA January 1S-1990. and during the end of cycle 11 refueling outage an Unit 3.