ML20093L262

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Revising Auxiliary Bldg Ventilation Spec & Allowing Sys to Be Inoperable for 12 H to Perform Repairs & Maint
ML20093L262
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/25/1984
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20093L253 List:
References
NUDOCS 8407310342
Download: ML20093L262 (1)


Text

C.

3 PLANT SYSTEMS 3/4.7.8 AUXILIARY BUILDING VENTILATION EXHAUST SYSTEM LIMITING CONDITION FOR OPERATION 3.7.8.1 The Auxiliary Building ventilation exhaust system shall be OPERABLE and shall consist of a minimum of two independent pairs of exhaust fans and four filter systems.

APPLICABILITY: MODES 1,2,3 and 4.

ACTION:

With one pair of exhaust fans or one filter system inoperable, restore the a.

inoperable pair of fans or system to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.

With more than one pair of exhaust fans or more than one filter system inoperable, restore one inoperable pair of fans or systems to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQIJIREMENTS 4.7.8.1 The Auxiliary Building ventilation exhaust system sha!! be demonstrated OPERABLE:

a.

At least once per 31 days on a STAGGERED TEST BASIS by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying tnat the system operates for at least 15 minutes.

b.

At least once per 18 months or (1) after any structural maintenance on the HEPA filters or charcoal adsorber housings; or (2) following painting, fire or chemical release in any ventilation zone communicating with the system by:

1.

Verifying that with the system operating at a flow rate of 156,680 cfm

+ 10% and exhausting through the HEPA filters and charcoal adsorbers, the total bypass flow of the system to the facility vent, including leakage through the system diverting valves, is d 1% when the system is tested by admitting cold DOP at the system intake.

8407310342 840725 yDRADOCK 05000302 PDR CRYSTAL RIVER - UNIT 3 3/4 7-23

-