Application for Amend to License DPR-72,consisting of Tech Spec Change Request 121 to Revise Auxiliary Bldg Ventilation Sys Spec & Allow Sys to Be Inoperable for 12 H to Perform Repairs & Maint
ML20093L255
Person / Time
Site: Crystal River 
Issue date: 07/25/1984
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20093L253 List:
References
NUDOCS 8407310340
Download: ML20093L255 (2)


Text

F.

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NO. 50-302/ LICENSE NO. DPR-72 REQUEST NO.121, REVISION 0 AUXILIARY BUILDING VENTILAiDN SYSTEM LICENSE DOCUMENT INVOLVED:

Technical Specifications PORTION:

3.7.8.1 Auxiliary Building Ventilation Exhaust System DESCRIPTION OF REQUEST:

Add on ACTION statement to Specification 3.7.8.1 requiring a plant shutdown if inoperable pairs of exhaust fans or filter systems cannot be restored to operable within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Specifically add the following ACTION statement:

b.

With more than one pair of exhaust fans or more than one filter system inoperable, restore one inoperable pair of fans or systems to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />."

Additionally, delete footnote I which stated:

"More than one filter system and more than one pair of exhaust fans may be inoperable for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing per Specification 4.7.8.1.b,e, or f."

REASON FOR REQUEST:

Florida Power Corporation requests this change to allow a sufficient length of time for maintenance and/or repair of exhaust fans and filter units. Currently, if maintenance must be performed on all fans or all filter systems during POWER OPERATION, the restrict:ons of Specification 3.0.3 apply. Within I hour actions must be taken to place the unit in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. This is not enough time to pertorm maintenance, test the systems and return the system to OPERABLE status.

EVALUATION OF REQUEST:

The purpose of the Auxiilary Building Ventilation Exhaust System is to:

1)

Provide suitable ambient conditions in the Auxiliary Building during all MODES of OPERATION.

0 g

P

E 2)

Mitigate the unfavorable conditions in the Auxiliary Building following an accident.

3)

Mitigate the consequences of an accident by filtering the release.

The accidents for which the Auxiliary building Ventilation System was assumed to operate include the Fuel Handling Accident (FSAR Section 14.2.2.3.1), Failure of Small Lines Carrying Primary Coolant Outside the Reactor Building (FSAR Section 14.2.2.6), and the Waste Gas Tank Rupture (FSAR Section 14.2.2.8).

With the approval of this Technical Specification Change, the ability of this system to perform its safety functions will not be significantly degraded. For the brief amount of time allowed for inoperability (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />), suitable ambient conditions can be maintained in the building.

To prevent an accident from occurring while this system is inoperable, Specification 3.9.12 requires that fuel movement be suspended.

If one of the accidents above was to occur while the Auxiliary Building Filters are inoperable the resultant doses are still well within 10 CFR 100 guidelines (300 Rem to the thyroid and 25 Rem whole body). The Fuel Handling Accident analysis does not assurne any filtration, therefore, the integrated dose at the Exclusion Boundary remains 14 Rem to the thyroid and.19 Rem whole body. The analysis for the Failure of Small Lines assumes that airborne nuclides are filtered through the HEPA and charcoal filters (90% lodine removal efficiency), with an integrated dose of.115 Rem thyroid and.066 Rem whole body. Without taking credit for charcoal filtration the integrated dosage becomes 1.15 Rem thyroid and

.068 Rem whole body. The Waste Gas Tank Rupture analysis indicates that integrated doses of 1.43 Rem thyroid and.92 Rem whole body would result.

Without taking credit for charcoal filtration the doses become 14.3 Rem thyroid and.92 Rem whole body.