Transmittal Letter for Subsequent Renewed Licenses
ML20091L981
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/04/2021
From: Angela Wu
NRC/NRR/DNRL/NLRP
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
Wu A
Shared Package
ML20091L850 List:
References
Download: ML20091L981 (7)


Text

Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 29060

SUBJECT:

ISSUANCE OF SUBSEQUENT RENEWED FACILITY OPERATING LICENSE NOS. DPR-32 AND DPR-37 FOR SURRY POWER STATION, UNITS 1 AND 2

Dear Mr. Stoddard:

The U.S. Nuclear Regulatory Commission (NRC or the staff) has issued Subsequent Renewed Facility Operating License Nos. DPR-32 and DPR-37 to Virginia Electric and Power Company (Dominion), for Surry Power Station, Units 1 and 2 (Surry), respectively. The NRC issued the subsequent renewed facility operating licenses upon completion of the staffs review of your application dated October 15, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18291A842), as supplemented by the following letters:

Supplements to Application ADAMS Accession Number January 29, 2019 ML19042A137 April 2, 2019 ML19095A666 May 28, 2019 ML19148A441 June 10, 2019 ML19168A028 June 27, 2019 ML19183A386 July 17, 2019 ML19204A357 September 3, 2019 ML19253B330 September 19, 2019 ML19269B734 October 14, 2019 ML19294A044 October 31, 2019 ML19310E716 November 19, 2019 ML19329A287 February 20, 2020 ML20054B996 February 28, 2020 ML20062C033 May 20, 2020 ML20142A290 June 17, 2020 ML20169A452 July 15, 2020 ML20198M669 September 3, 2020 ML20247J635 October 8, 2020 ML20282A538 December 17, 2020 ML20352A377 January 25, 2021 ML21025A393 March 17, 2021 ML21076A527 April 1, 2021 ML21096A095 April 8, 2021 ML21098A261 May 4, 2021

D Stoddard Subsequent Renewed Facility Operating License Nos. DPR-32 and DPR-37 for Surry expire at midnight on May 25, 2052, for Unit 1, and January 29, 2053, for Unit 2.

The technical basis for issuing the subsequent renewed facility operating licenses for Surry is set forth in Safety Evaluation Report Related to the Subsequent License Renewal of Surry Power Station, Units 1 and 2, (ADAMS Accession No. ML20052F520).

The results of the environmental review related to the issuance of the subsequent renewed licenses are given in the Record of Decision which is provided as Enclosure 3 to this letter and in NUREG-1437, Supplement 6, Second Renewal, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Subsequent License Renewal for Surry Power Station, Units 1 and 2, Final Report, (ADAMS Accession No. ML20071D538). to this letter is Subsequent Renewed Facility Operating License No. DPR-32 and Technical Specifications for Surry, Unit 1. to this letter is Subsequent Renewed Facility Operating License No. DPR-37 and Technical Specifications for Surry, Unit 2.

No changes were made to the Technical Specifications as a result of this subsequent license renewal. is the Record of Decision. is a draft copy of the related Federal Register notice of issuance of the renewed licenses as sent to the Office of the Federal Register for publication.

If you have any questions regarding this issue, please feel free to contact me by phone at 301-415-2995 or by email at Angela.Wu@nrc.gov.

Sincerely, Angela Wu, Project Manager License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosures:

As stated cc: Listserv Signed by Wu, Angela on 05/04/21

Package: ML20091L850 Letter: ML20091L981 Subsequent Renewed License, Unit 1: ML20091L982 Subsequent Renewed License, Unit 2: ML20091L983 Technical Specifications, Units 1 and 2: ML21106A279 Record of Decision: ML20091L985 Federal Register Notice: ML20091L979

  • via email NRR-106 OFFICE PM:DNRL:NLRP*

PM:DNRL:NLRP*

LA:DNRL:NRLB*

Tech Editor*

NAME AWu (concur)

LGibson SGreen JMitchell DATE 3/25/2020 3/27/2020 4/3/2020 4/7/2020 OFFICE PM:DORL*

BC:DORL*

BC:NMSS:REFS*

BC:DNRL:NLRP*

NAME VThomas MMarkley RElliott LGibson DATE 4/7/2021 4/7/2021 4/22/2021 4/23/2021 OFFICE OGC (NLO)*

D:DNRL*

OD:NRR PM:NLRP:DNRL NAME KGamin ABradford AVeil AWu (sign)

DATE 4/20/2021 4/20/2021 5/4/2021 5/4/2021 Surry Power Station, Unit 1 Subsequent Renewed Facility Operating License:

ADAMS Accession No. ML20091L982 Technical Specifications:

ADAMS Accession No. ML21106A279 The Technical Specifications did not change as a result of the subsequent renewal of the Surry Power Station, Unit 1, license.

Surry Power Station, Unit 2 Subsequent Renewed Facility Operating License:

ADAMS Accession No. ML20091L983 Technical Specifications:

ADAMS Accession No. ML21106A279 The Technical Specifications did not change as a result of the subsequent renewal of the Surry Power Station, Unit 2, license.

Surry Power Station, Units 1 and 2 Subsequent License Renewal Record of Decision ADAMS Accession No. ML20091L985 Copy of the Draft Federal Register Notice of Subsequent Renewed Facility Operating Licenses Surry Power Station, Units 1 and 2 ADAMS Accession No. ML20091L979