ML20086G570

From kanterella
Jump to navigation Jump to search
Corrected Attachment II to Monthly Operating Rept for Aug 1983
ML20086G570
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/31/1983
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20086G556 List:
References
NUDOCS 8401120285
Download: ML20086G570 (2)


Text

.

REVISED PAGE

-- DECEMBER 14, 1983 Director, Office of. Resource Management Monthly Operating Report Pcge 3 S;ptember 12,L 1983 ATTACHMENT ~II OPERATING DATA REPORT DOCKET NO.

50/395 UNIT V.

C.

SUMMER I DATE 09/12/83 COMPLETED BY G. J. Taylor TELEPHONE (803) 345-5209 OPERATING STATUS

1. Reporting Period:

AUGUST 1983 Gross Hours in Reporting Period:

744

2. Currently Authorized Power Level (MWt):

2775 Max. Depend. Capacity (MWe-Net):

N/A Design Electrical Rating (MWe-Net):

900

3. Power Level to which restricted (If Any)(MWe-Net):

N/A

4. Reasons for Restrictions (If Any):

THIS MONTH YR TO DATE CUMULATIVE

5. Number'of Hours Reactor Was Critical 682.5 4113 1 5419 9
6. Reactor Reserve Shutdown Hours 0

0 0

7. Hours Generator on Line 662.8 4001 3 4262.6 l
8. Unit Reserve Shutdown Hours 0

0 0

9. Gross Thermal Energy Generated (MWH) 1,758,090 7,947,062 8,742,935
10. Gross' Electrical Energy Generated (MWH) 577,360 2,596,542 2,812,759
11. Net Electrical Energy Generated (MWH) 551,260 2,455,669 2,646,865
12. Reactor Service Factor N/A N/A N/A
13. Reactor Availability Factor N/A N/A N/A
14. Unit. Service. Factor N/A N/A N/A

'15. Unit Availability Factor N/A N/A N/A l

16.' Unit Capacity Factor (Using MDC)

N/A N/A N/A l

17. Unit Capacity Factor (Using Design MWe)

N/A N/A N/A

18. Unit Forced Outage Rate N/A N/A N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Steam Generator Eddy Current, November 1983, 14 days.

20. If Shut Down at End of Report Period, Estimated Date of Startup:

N/A

21. Units in Test Status (Prior to Commerical Operation):

(

FORECAST ACHIEVED l

Initial Criticality 10-20-82 10-22-82

-Initial Electricity 11-17-82 11-16-82 Commercial Operation B401120205 831214 PDR ADOCK O$000395 R

PM l-

e i

REVISED NAGE -- DECEMBER 14, 1983 g

Director, Office of Resource Management Monthly Operating Report Page 4 September 12, 1983

'd s

ATTACHMENT III

'A y '

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50/395 s'

1 UNIT V.

C.

SUMMER I DATE C9/12/83 COMPLETED BY G.

J.

Taylor TELEPHDNE (803) 345-5209 7';_

(1)RMETHOD OF (2) x TYPE SHUTTING'DOWN F: FORCED DURATION TFE REACTOR OR CORRECTIVE ACTIONS /

NO.

DATE S: SCHEDULED (HOURS) REASON REDUCING POWER COMMENTS 13 830811 F

35.3 A

3

13) Turbine Trip, high l

vibration.

.s 14 830813 F

12.6 A

3

14) Turbine Trip, 0-Ring l failure "A" Master Trip Solenoid 15 830517 F

33.3 0

3

15) Main Generator Trip, l

generator potential transformer drawer

_[ -

opened.

s s

k T

N

\\,

T

\\

'\\

i i

\\

l V.

x t

V

\\

. - - -,,,