REVISED PAGE
-- DECEMBER 14, 1983 Director, Office of. Resource Management Monthly Operating Report Pcge 3 S;ptember 12,L 1983 ATTACHMENT ~II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT V.
C.
SUMMER I DATE 09/12/83 COMPLETED BY G. J. Taylor TELEPHONE (803) 345-5209 OPERATING STATUS
- 1. Reporting Period:
AUGUST 1983 Gross Hours in Reporting Period:
744
- 2. Currently Authorized Power Level (MWt):
2775 Max. Depend. Capacity (MWe-Net):
N/A Design Electrical Rating (MWe-Net):
900
- 3. Power Level to which restricted (If Any)(MWe-Net):
N/A
- 4. Reasons for Restrictions (If Any):
THIS MONTH YR TO DATE CUMULATIVE
- 5. Number'of Hours Reactor Was Critical 682.5 4113 1 5419 9
- 6. Reactor Reserve Shutdown Hours 0
0 0
- 7. Hours Generator on Line 662.8 4001 3 4262.6 l
- 8. Unit Reserve Shutdown Hours 0
0 0
- 9. Gross Thermal Energy Generated (MWH) 1,758,090 7,947,062 8,742,935
- 10. Gross' Electrical Energy Generated (MWH) 577,360 2,596,542 2,812,759
- 11. Net Electrical Energy Generated (MWH) 551,260 2,455,669 2,646,865
- 12. Reactor Service Factor N/A N/A N/A
- 13. Reactor Availability Factor N/A N/A N/A
- 14. Unit. Service. Factor N/A N/A N/A
'15. Unit Availability Factor N/A N/A N/A l
16.' Unit Capacity Factor (Using MDC)
N/A N/A N/A l
- 17. Unit Capacity Factor (Using Design MWe)
N/A N/A N/A
- 18. Unit Forced Outage Rate N/A N/A N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Steam Generator Eddy Current, November 1983, 14 days.
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
N/A
- 21. Units in Test Status (Prior to Commerical Operation):
(
FORECAST ACHIEVED l
Initial Criticality 10-20-82 10-22-82
-Initial Electricity 11-17-82 11-16-82 Commercial Operation B401120205 831214 PDR ADOCK O$000395 R
PM l-
e i
REVISED NAGE -- DECEMBER 14, 1983 g
Director, Office of Resource Management Monthly Operating Report Page 4 September 12, 1983
'd s
ATTACHMENT III
'A y '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50/395 s'
1 UNIT V.
C.
SUMMER I DATE C9/12/83 COMPLETED BY G.
J.
Taylor TELEPHDNE (803) 345-5209 7';_
(1)RMETHOD OF (2) x TYPE SHUTTING'DOWN F: FORCED DURATION TFE REACTOR OR CORRECTIVE ACTIONS /
NO.
DATE S: SCHEDULED (HOURS) REASON REDUCING POWER COMMENTS 13 830811 F
35.3 A
3
- 13) Turbine Trip, high l
vibration.
.s 14 830813 F
12.6 A
3
- 14) Turbine Trip, 0-Ring l failure "A" Master Trip Solenoid 15 830517 F
33.3 0
3
- 15) Main Generator Trip, l
generator potential transformer drawer
_[ -