.; --- . . . _ - .. - . _ . . - - . . . ..

REVISED PAGE -- DECEMBER 14, 1983 Director, Office.of Resource Management

' Monthly Operating Report

-Page 3 October 14, 1983 ATTACHMENT Il OPERATING DATA REPORT 1.

DOCKET NO. 50/395-UNIT V. C. SUMMER I DATE 10/14/83 COMPLETED BY G. J.-Taylor TELEPHONE (803) 345-5209 OPERATING STATUS

1. Reporting ~ Period: SEPTEMBER 1983 Gross Hours in Reporting Period: 720 2.~ Currently Authorized Power Level (MWt): 2775 Max. Depend. Capacity (MWe-Net): N/A Design Electrical Rating (MWe-Net): 900
3. Power Level to.which restricted (If Any)(MWe-Net): N/A
4. Reasons for Restrictions (If Any):

THIS MONTH YR TO DATE CUMULATIVE

5. Number of Hours Reactor Was Critical 707.6 4820.7 6127.5 6.-Reactor Reserve Shutdown itours 0 0 0
7. Hours. Generator on Line 685.0 4686 3 5447.6 l-
8. Unit Reserve Shutdown Hours 0 0 0
9. Gross Thermal Energy Generated (MWH) 1,749,405 9,696,467 10,492,340
10. Gross Electrical Energy Generated (MWH) 577,150 3,173,692 3,389,909
11. Net Electrical Energy Generated (MWH) 551,551 3,007,220 3,198,416
12. Reactor Service Factor N/A N/A N/A
13. Reactor Availability Factor N/A N/A N/A
14. Unit Service Factor N/A N/A N/A
15. Unit Availability Factor N/A N/A N/A
16. Unit Capacity Factor (Using MDC) N/A N/A N/A
17. Unit Capacity Factor (Using Design MWe) N/A N/A N/A c18. Unit Forced Outage Rate N/A N/A N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Steam Generator Eddy'Curren't, November 1983, 14 days.

20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commerical Operation):

FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initial Electricity 11-17-82 11-16-82 Commercial Operation 8401120290 831214 DR ADOCK 05000