Text

'

=

REVISED PAGE -- DECEMBER 14, 1983 Director, Office of aesource Management Monthly Operating Report i_

Page 3 t:

November 14, 1983 T'

ATTACHMENT II i

OPERATING DATA REPORT 22 DOCKET NO.

50/395 UNIT V.

C.

SUMMER I i

DATE 11/14/83 COMPLETED BY G.

A.

Loignon U

TELEPHONE (803) 345-5209 OPERATING STATUS

1. Reporting Period:

OCTOBER 1983 Gross Hours in Reporting Period:

745

2. Currently Authorized Power Level (MWt):

2775 Max. Depend. Capacity (MWe-Net):

N/A Design Electrical Rating (MWe-Net):

900

3. Power Level to which restricted (If Any)(MWe-Net):

N/A 3

4. Reasons for Restrictions (If Any):

g 3

THIS MONTH YR TO DATE CUMULATIVE p:.

5. Number of Hours Reactor Was Critical 711.4 5532.1 6838.9 f
6. Reactor Reserve Shutdown Hours 0

0 0

4

7. Hours Generator on Line 689.4 5375 7 613 7. 0 l *
8. Unit Reserve Shutdown Hours 0

0 0

). l

9. Gross Thermal Energy Generated (MWH) 1,810,240 11,506,707 12,302,580 7:
10. Gross Electrical Energy Generated (MWH) 607,880 3,781,572 3,997,789 t'
11. Net Electrical Energy Generated (MWH) 581,251 3,588,471 3,779,667 i;
12. Reactor Service Factor N/A N/A N/A j.
13. Reactor Availability Factor N/A N/A N/A y
14. Unit Service Factor N/A N/A N/A 24
15. Unit Availability Factor N/A N/A N/A 7
16. Unit Capacity Factor (Using MDC)

N/A N/A N/A 2

17. Unit Capacity Factor (Using Design MWe)

N/A N/A N/A

[. ;

18. Unit Forced Outage Rate N/A N/A N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Steam Generator Eddy Current, November 23, 1983 (approximately 15 days).

_, j

20. If Shut Down at End of Report Period, Estimated Date of Startup:

N/A

?:

21. Units in Test Status (Prior to Commerical Operation):

FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initial Electricity 11-17-82 11-16-82 Commercial Operation j

l 8401120295 831214 PDR ADOCK 05000395 l