Corrected Attachment II to Monthly Operating Rept for Oct 1983
ML20086G590
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/31/1983
From: Loignon G
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20086G556 List:
References
NUDOCS 8401120295
Download: ML20086G590 (1)


Text

'

=

REVISED PAGE -- DECEMBER 14, 1983 Director, Office of aesource Management Monthly Operating Report i_

Page 3 t:

November 14, 1983 _

T' i

ATTACHMENT II OPERATING DATA REPORT 22 DOCKET NO. 50/395 -

UNIT V. C. SUMMER I i DATE 11/14/83 COMPLETED BY G. A. Loignon U TELEPHONE (803) 345-5209 OPERATING STATUS .

1. Reporting Period: OCTOBER 1983 Gross Hours in Reporting Period: 745  :
2. Currently Authorized Power Level (MWt): 2775 Max. Depend. Capacity (MWe-Net): N/A Design Electrical Rating (MWe-Net): 900 -
3. Power Level to which restricted (If Any)(MWe-Net): N/A 3
4. Reasons for Restrictions (If Any): g 3

THIS MONTH YR TO DATE CUMULATIVE p:.

5. Number of Hours Reactor Was Critical 711.4 5532.1 6838.9 f
6. Reactor Reserve Shutdown Hours 0 0 0 4
7. Hours Generator on Line 689.4 5375 7 613 7. 0 l *
8. Unit Reserve Shutdown Hours 0 0 0 ). l
9. Gross Thermal Energy Generated (MWH) 1,810,240 11,506,707 12,302,580 7:
10. Gross Electrical Energy Generated (MWH) 607,880 3,781,572 3,997,789 t'
11. Net Electrical Energy Generated (MWH) 581,251 3,588,471 3,779,667 i;
12. Reactor Service Factor N/A N/A N/A j.
13. Reactor Availability Factor N/A N/A N/A y
14. Unit Service Factor N/A N/A N/A 24
15. Unit Availability Factor N/A N/A N/A 7
16. Unit Capacity Factor (Using MDC) N/A N/A N/A 2
17. Unit Capacity Factor (Using Design MWe) N/A N/A N/A [. ;
18. Unit Forced Outage Rate N/A N/A N/A ,
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Steam Generator Eddy Current, November 23, 1983 (approximately 15 days). _, j

20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A  ?:
21. Units in Test Status (Prior to Commerical Operation):

FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 '

Initial Electricity 11-17-82 11-16-82 Commercial Operation _ j 8401120295 831214 l PDR ADOCK 05000395 l R pyg  ;