ML20086G566
| ML20086G566 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 11/30/1983 |
| From: | Loignon G SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | |
| Shared Package | |
| ML20086G556 | List: |
| References | |
| NUDOCS 8401120283 | |
| Download: ML20086G566 (4) | |
Text
.
. Director, Office of Resource Management Monthly Operating Report Page 2 December 14, 1983 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395 UNIT V.
C.
SUMMER I DATE 12/14/83 COMPLETED BY G.
A.
Loignon TELEPHONE (803) 345-5209 MONTH NOVEMBER 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
893 17 892 2.
894 18.
894 3
893 19 899 4.
892 20.
894 5
893 21.
892 6.
894 22.
891 7.
894 23 843 8.
894 24.
0 9
894 25 0
10.
895 26.
0
-11. -
894 27 0
12.
900' 28.
0 13 896 29 0
14.
836 30.
0 15 895 31.
N/A 16.
895 8401120283 831214 gDRADOCK 05000305 PDR
Director,-Office of Resource Management Monthly Operating Report Pcge 3 D cember 14, 1983 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT V.
C.
SUMMER __I DATE 12/14/83 COMPLETED BY G.
A.
Loignon TELEPHONE (803) 345-5209 OPERATING STATUS
- 1. Reporting Period:
NOVEMBER 1983 Gross Hours in Reporting Period:
720
- 2. Currently Authorized Power Level (MWt) :
2775 Max. Depend. Capacity (MWe-Net) :
N/A Design Electrical Rating (MWe-Net):
900
- 3. Power Level to which restricted (If Any)(MWe-Net):
N/A
- 4. Reasons for Restrictions (If Any):
THIS MONTH YR TO DATE CUMULATIVE
- 5. Number of Hours Reactor Was Critical 551.9 6084.0 7390.8
- 6. Reactor Reserve Shutdown Hours 0
0 0
- 7. Hours Generator on Line 551.9 5927.7 6689.0
- 8. Unit Reserve Shutdown Hours 0
0 0
- 9. Gross Thermal Energy Generated (MWH) 1,518,120 13,024,827 13,820,700
- 10. Gross Electrical Energy Generated (MWH) 511,020 4,292,592 4,508,809
- 11. Net Electrical Energy Generated (MWH) 491,019 4,079,490 4,270,686
- 12. Reactor Service Factor N/A N/A N/A
- 13. Reactor Availability Factor N/A N/A N/A
- 14. Unit Service Factor N/A N/A N/A
- 15. Unit Availability Factor N/A N/A N/A
- 16. Unit Capacity Factor (Using MDC)
N/A N/A N/A
- 17. Unit Capacity Factor (Using Design MWe)
N/A N/A N/A
- 18. Unit Forced Outage Rate N/A N/A N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Spring Maintenance Outage Planned for April 1984.
- 20. If Shutdown at End of Report Period, Estimated Date of Startup:
12-13-83
- 21. Units in Test Status (Prior to Commerical Operation) :
FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initial Electricity 11-17-82 11-16-82 Commercial Operation 01-01-84
Director, Office of Resource Management Monthly Operating Report Pcge 4 D cember 14, 1983
-ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIOKS DOCKET NO.
50/395 UNIT V.
C.
SUMMER I DATE 12/14/83 COMPLETED BY G.
A.
Loignon TELEPHONE (803) 345-5209 (1)
METHOD OF (2)
TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS /
NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER COMMENTS 22 831123 S
168.2 B
2
- 22) Manual trip to test Technical Support Center and begin Steam Generator Tube Eddy Current Outage.
_ ~ _,
=
. Director, Of fice of Resource Management
-Monthly-Operating Report-
-Page 5
.14,-1983 December A
ATTACHMENT IV NARRATIVE
SUMMARY
. 0F OPERATING EXPERIENCE-Virgil C.
Summer Nuclear Station, Unit No. 1, continued to operate
.at approximately 100% power during the month of November 1983.
ion November 23, 1983, at -2351 hours, the Plant was manually tripped from approximately'18% power to test the Technical Support Center Computer.
This also began the planned outage for. Steam Generator
. Tube Eddy Current examination.
This outage was still in process at i
the conclusion of the month.
In accordance with Technical Specification 6.14.2, Southcarblina Electric & : Gas Company (SCE&G) hereby submits Licensee initiated changes to the Offsite Dose Calculation Manual.
Please find enclosed a_ summary description of each of the changes made to the the manual along with a complete copy of Revision 5 of the manual.
2 L
Revision 5 was reviewed and approved by the Plant Safety Review Committee (PSRC) on November 9, 1983.
l I
L b
i l'
.