ML20086G566

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1983
ML20086G566
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/30/1983
From: Loignon G
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20086G556 List:
References
NUDOCS 8401120283
Download: ML20086G566 (4)


Text

. .

1

. Director, Office of Resource Management Monthly Operating Report Page 2 December 14, 1983 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 12/14/83 COMPLETED BY G. A. Loignon TELEPHONE (803) 345-5209 MONTH NOVEMBER 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

1. 893 17 892
2. 894 18. 894 3 893 19 899
4. 892 20. 894 5 893 21. 892
6. 894 22. 891
7. 894 23 843
8. 894 24. 0 9 894 25 0
10. 895 26. 0

-11. - 894 27 0

12. 900' 28. 0 13 896 29 0
14. 836 30. 0 15 . 895 31. N/A
16. 895 8401120283 831214 gDRADOCK 05000305 PDR

Director,-Office of Resource Management Monthly Operating Report Pcge 3 D cember 14, 1983 i

ATTACHMENT II I OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER __I I DATE 12/14/83 i COMPLETED BY G. A. Loignon I TELEPHONE (803) 345-5209 OPERATING STATUS

1. Reporting Period: NOVEMBER 1983 Gross Hours in Reporting Period: 720
2. Currently Authorized Power Level (MWt) : 2775 Max. Depend. Capacity (MWe-Net) : N/A Design Electrical Rating (MWe-Net): 900
3. Power Level to which restricted (If Any)(MWe-Net): N/A
4. Reasons for Restrictions (If Any):

THIS MONTH YR TO DATE CUMULATIVE

5. Number of Hours Reactor Was Critical 551.9 6084.0 7390.8
6. Reactor Reserve Shutdown Hours 0 0 0
7. Hours Generator on Line 551.9 5927.7 6689.0
8. Unit Reserve Shutdown Hours 0 0 0
9. Gross Thermal Energy Generated (MWH) 1,518,120 13,024,827 13,820,700
10. Gross Electrical Energy Generated (MWH) 511,020 4,292,592 4,508,809
11. Net Electrical Energy Generated (MWH) 491,019 4,079,490 4,270,686
12. Reactor Service Factor N/A N/A N/A
13. Reactor Availability Factor N/A N/A N/A
14. Unit Service Factor N/A N/A N/A
15. Unit Availability Factor N/A N/A N/A
16. Unit Capacity Factor (Using MDC) N/A N/A N/A
17. Unit Capacity Factor (Using Design MWe) N/A N/A N/A
18. Unit Forced Outage Rate N/A N/A N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Spring Maintenance Outage Planned for April 1984.

20. If Shutdown at End of Report Period, Estimated Date of Startup: 12-13-83
21. Units in Test Status (Prior to Commerical Operation) :

FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initial Electricity 11-17-82 11-16-82 Commercial Operation 01-01-84 1

Director, Office of Resource Management Monthly Operating Report Pcge 4 D cember 14, 1983

-ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIOKS DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 12/14/83 COMPLETED BY G. A. Loignon TELEPHONE (803) 345-5209 (1) METHOD OF (2)

TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS /

NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER COMMENTS ,

22 831123 S 168.2 B 2 22) Manual trip to test Technical Support Center and begin Steam Generator Tube Eddy Current Outage.

,. _- - .- . . - _ ~ _ ,

= ,

. Director, Of fice of Resource Management

-Monthly-Operating Report-

-Page 5 .

December .14,-1983 A

ATTACHMENT IV NARRATIVE

SUMMARY

. 0F OPERATING EXPERIENCE- < ->

Virgil C. Summer Nuclear Station, Unit No. 1, continued to operate

.at approximately 100% power during the month of November 1983.

ion November 23, 1983, at -2351 hours, the Plant was manually tripped from approximately'18% power to test the Technical Support Center Computer. This also began the planned outage for. Steam Generator

. Tube Eddy Current examination. This outage was still in process at i the conclusion of the month. ,

- In accordance with Technical Specification 6.14.2, Southcarblina Electric & : Gas Company (SCE&G) hereby submits Licensee initiated changes to the Offsite Dose Calculation Manual. Please find enclosed a_ summary description of each of the changes made to the 2 the manual along with a complete copy of Revision 5 of the manual.

L Revision 5 was reviewed and approved by the Plant Safety Review Committee (PSRC) on November 9, 1983.