. Director, Office of Resource Management Monthly Operating Report Page 2 December 14, 1983 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50/395 UNIT V.

C.

SUMMER I DATE 12/14/83 COMPLETED BY G.

A.

Loignon TELEPHONE (803) 345-5209 MONTH NOVEMBER 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

893 17 892 2.

894 18.

894 3

893 19 899 4.

892 20.

894 5

893 21.

892 6.

894 22.

891 7.

894 23 843 8.

894 24.

0 9

894 25 0

10.

895 26.

0

-11. -

894 27 0

12.

900' 28.

0 13 896 29 0

14.

836 30.

0 15 895 31.

N/A 16.

895 8401120283 831214 gDRADOCK 05000305 PDR

Director,-Office of Resource Management Monthly Operating Report Pcge 3 D cember 14, 1983 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

50/395 UNIT V.

C.

SUMMER __I DATE 12/14/83 COMPLETED BY G.

A.

Loignon TELEPHONE (803) 345-5209 OPERATING STATUS

1. Reporting Period:

NOVEMBER 1983 Gross Hours in Reporting Period:

720

2. Currently Authorized Power Level (MWt) :

2775 Max. Depend. Capacity (MWe-Net) :

N/A Design Electrical Rating (MWe-Net):

900

3. Power Level to which restricted (If Any)(MWe-Net):

N/A

4. Reasons for Restrictions (If Any):

THIS MONTH YR TO DATE CUMULATIVE

5. Number of Hours Reactor Was Critical 551.9 6084.0 7390.8
6. Reactor Reserve Shutdown Hours 0

0 0

7. Hours Generator on Line 551.9 5927.7 6689.0
8. Unit Reserve Shutdown Hours 0

0 0

9. Gross Thermal Energy Generated (MWH) 1,518,120 13,024,827 13,820,700
10. Gross Electrical Energy Generated (MWH) 511,020 4,292,592 4,508,809
11. Net Electrical Energy Generated (MWH) 491,019 4,079,490 4,270,686
12. Reactor Service Factor N/A N/A N/A
13. Reactor Availability Factor N/A N/A N/A
14. Unit Service Factor N/A N/A N/A
15. Unit Availability Factor N/A N/A N/A
16. Unit Capacity Factor (Using MDC)

N/A N/A N/A

17. Unit Capacity Factor (Using Design MWe)

N/A N/A N/A

18. Unit Forced Outage Rate N/A N/A N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Spring Maintenance Outage Planned for April 1984.

20. If Shutdown at End of Report Period, Estimated Date of Startup:

12-13-83

21. Units in Test Status (Prior to Commerical Operation) :

FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initial Electricity 11-17-82 11-16-82 Commercial Operation 01-01-84

Director, Office of Resource Management Monthly Operating Report Pcge 4 D cember 14, 1983

-ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIOKS DOCKET NO.

50/395 UNIT V.

C.

SUMMER I DATE 12/14/83 COMPLETED BY G.

A.

Loignon TELEPHONE (803) 345-5209 (1)

METHOD OF (2)

TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS /

NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER COMMENTS 22 831123 S

168.2 B

2

22) Manual trip to test Technical Support Center and begin Steam Generator Tube Eddy Current Outage.

_ ~ _,

=

. Director, Of fice of Resource Management

-Monthly-Operating Report-

-Page 5

.14,-1983 December A

ATTACHMENT IV NARRATIVE

SUMMARY

. 0F OPERATING EXPERIENCE-Virgil C.

Summer Nuclear Station, Unit No. 1, continued to operate

.at approximately 100% power during the month of November 1983.

ion November 23, 1983, at -2351 hours, the Plant was manually tripped from approximately'18% power to test the Technical Support Center Computer.

This also began the planned outage for. Steam Generator

. Tube Eddy Current examination.

This outage was still in process at i

the conclusion of the month.

In accordance with Technical Specification 6.14.2, Southcarblina Electric & : Gas Company (SCE&G) hereby submits Licensee initiated changes to the Offsite Dose Calculation Manual.

Please find enclosed a_ summary description of each of the changes made to the the manual along with a complete copy of Revision 5 of the manual.

2 L

Revision 5 was reviewed and approved by the Plant Safety Review Committee (PSRC) on November 9, 1983.

l I

L b

i l'

.