Rev 0 to ISI Special Rept for Pressure Testing Unit 1 Catawba 1995 Refueling Outage 8
ML20086F335
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 06/20/1995
From: Boughman J
DUKE POWER CO.
To:
Shared Package
ML20086F328 List:
References
NUDOCS 9507130089
Download: ML20086F335 (20)


Text

. . . . - . - . .- - - . . .- . . - .- - - - _.- - - . - = -

d 16 Pages O ronu xis-10wnsas' o^Ti nseont ron insenvics issrecriou s As required by the Provisions of the ASME Code Rules i

I I

1. Owner: Duke Power Company 526 S. Church St.. Charlotte. NC 28201-1006 (Name and Address of Owner)
2. Plant: Catawba Nuclear Station. 4800 Concord Road. York. SC 29745 (Name and Address of Plant)

, 3. Plant Unit: 1 4. Owner Certificate of Authorization (if required) N/A )

5. Commercial Service Date: Lune 29,1985 6. National Board Number for Unit 13D
7. Components Inspected:

1 Component or Manufacturer or Manufacturer or State or National Appurentance Installer Installer Serial Providence No. Board No.  !

No. ,

Sm Section 1 Paragraph 1.1 in the Attached Report l

O l i

Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 /2i n. x 1

)

11 in., (2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is j numbered and the number of sheets is recorded at the top of this form. .

I i

l 1

I O i i

l 9507130089 950629 PDR ADOCK 05000413 i Q PDR l

. - . ,n.~ . . + . - - , , - - . . ~ . - , - - , , . . - - - . - . . . ~ . . . - . . . - - , . . . , -

i l

FORM NIS 1(back)

D)

( 8. Examination Dates 3/21/95 to 5/31/95 9. Inspection Interval from 6/29/85 to 6/29/95

10. Abstract of Examinations. Include a list of examinations and a statement concerning status of l l

work required for current interval. See attached ret ort.

11. Abstract of Conditions Noted. See attached ret, ort.
12. Abstract of Corrective Measures Recommended and Taken. See attached report.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.,

Date O N N. 19 Signed Duke Power Co. By ( ,

/

/ Owner Certificate of Authorization No. (if applicable) MLA Expiration Date NLA CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boller and Pressure Vessel Inspectors and/or the State or Province of / -

and employed by

'The HSBi&I Co. of have inspected the components described in this Owners Data Report during the period 3 c d

  • D to b ~ 3l' h b and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this owners' Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Date b~ 19

.2 - / Commissions iT Inspector's Signature National Board, State, Province and No.

"The Hartford Steam Boiler Inspection & Insurance Co.

200 Ashford Center North Suite 300 Atlanta Ga.,30338 1

1

.I

O INSERVICE INSPECTION SPECIAL REPORT FOR PRESSURE TES'ITNG UNIT 1 CATAWBA 1995 REFUELING OUTAGE 8 Location: 4800 Concotxl Road, York, South Carolina 29745 NATIONAL BOARD NO.130 Conunercial Service Date: June 29,1985 i

Owner: Duke Power Company l 526 S. Church St.

i Charlotte, N. C. 28201 1006 Revision 0 Q

l Pmpamd By: M3 m Date 6/lcy/9f ReviewedBy: '

E Date b!fd!96 Appmved By: -

M wt.) A Date $ f20 Qc5 l

l Copy No. 3 Assigned To NRC Document Control Contmlled x Uncontmiled

r 1

CONTROILED DISTRIBUTION Corwlk. Assigned To Original J. O. Barbour 1 J. E. Cherry 1 I

2 R. C. Giles 3 NRC Document Control 1

UNCONTItOTIRD DIS'11tlBUTION i

l 4 C. A. Ireland 1 (AIA, Atlanta, GA) i O

O

TABLE OF CONTlWrS Seedon litje Revision

1. General Information 0
2. Summary of Inservice Pressure Test Inspections 0 for Outage 8 After Plant Start Up.
3. First Ten Year Interval Pressure Test Inspection 0 Status
4. Final Inservice Inspection Pressure Test Plan for 0 Outage 8 After Plant Start Up.
5. Results of Pressure Test Inspections Performed 0 After Outage 8 Plant Start Up.
6. Reportable Indications 0
7. Personnel, Equipment, and Material Certihcations 0 0 8. Problem Investigation Process Forms 0
9. Reference Documents 0
10. Class 2 Repairs and Replacements 0

)

'l 1

l i

I l

O

rn 1.0 General Information O

This is a special report that describes the Inservice Inspection of Duke i Power Company's Catawba Nuclear Station Unit 1 Pressure Testing after I the 1995 Refueling Outage (also referred to as Outage 8), but before the end of the First Ten Year Interval, which terminates on June 29,1995. This report covers a time period from March 21,1995 through May 31,1995.

Included in this report are the final Pressure Test Inservice Inspection Plan, the inspection results for each item, a summary for Category C-H examinations and corrective action taken when unacceptable conditions were found. In addition, there is a section included for Repairs and Replacements required since December 27,1993.

1.1 Identification Numbers ligtu Manufacturerac Manufacturvr State or National Installer orinstaller Province No. Ikxml Serial No. No, Unit 1 Duke Power Co. N/A N/A 130 Iteactor Vessel Westinghouse Duke Power Co. N/A N/A Pressurizer Westinghouse DCFI'-1911 N/A W18589 Steam Generator 1A Westinghouse DCI'I'-1902 N/A W11300 Steam Generator 18 Westinghouse DCPI' 1901 N/A W11299 Steam Generator 1C Westinghouse DCFl'-1904 N/A W11302 Steam Generator i Westinghouse DCI'l'-1903 N/A W11301 Reactor Coolant Duke Power Co. C INC N/A 126 System Residual lleat Duke Power Co. C 1ND N/A 115 Removal System Safety injection Duke Power Co. C-1NI N/A 128 System Chemical and Duke Power Co. CINV N/A 127 Volume Cont-ol System Auxiliary Feedwater Duke Power Co. C-1CA N/A 121 System Feedwater System Duke Power Co. C-1CF N/A 120 Refueling Water Duke Power Co. C-1FW N/A 91 System Main Steam Supply Duke Power Co. C-ISA N/A 114 to Auxiliary Equipment Main Steam System Duke Power Co. C-ISM N/A 122 Main Steam Vent to Duke Power Co. C -1SV N/A 96 Atmosphere System Containment Spray Duke Power Co. C1NS N/A 118 System Pressure Test Special Report EOC 8 Page 1 of 2 Catawba Unit 1 Revision 0 Section1 June 21,1995

-. ._ . _ _ _ _ . _ _ ___ _ _ _ _ _ _ ... _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ .m O Uttu Manufacturer or installer Manufactunt orInstaller State or Province No.

National Boan!

Serial No. Nm Safety injection Southwest 0020 N/A 310 Accumulator Tank Fabrication &

1A Welding Co.

Safety injection Southwest 0019 N/A 309 Accumulator Tank Fabrication &

1B Welding Co.

Safety injection Southwest 0018 N/A 308 Accumulator Tank Fabrication &

1C Welding Co.

Safety injection Southwest 0021 N/A 311 Accumulator Tank Fabrication &

1D Welding Co.

The Reactor Vessel, Steam Generators, Pressurizer, Safety Injection Accumulator Tanks, Reactor Coolant Pumps, and Reactor Coolant System Piping were manufactured by or for Westinghouse Electric Corporation, Pittsburgh, PA under purchase agreements from Duke Power Company.

All other systems were fabricated and installed by or for Duke Power O Company,526 South Church Street, Charlotte, N.C. 28201-1006.

1.2 Authorized Nuclear Inservice Insnector(s)

Name: R. N. McGill l l

Employer. The Hartford Steam Boiler Inspection & Insurance i Company 1

Business The Hartford Steam Boiler Inspection & Insurance Co. l Address: 200 Ashford Center North  !

Suite 300 Atlanta, GA 30338 O Pressure Test Special Iteport EOC 8 Page 2 of 2 Catawba Unit 1 Ilevision 0 Section1 June 21,1995

2.0 Summnry ofInservice Insoections for Outage 8 After Plant Start Un The in.ormation shown below provides an abstract of ASME Section XI Class 2 Pressure Test Items scheduled and examined after Outage 8 plant start up but before the end of the First Ten Year Interval at Catawba Nuclear Station.

2.1 Cinas 2 Insoections Ernminntion Category C II All Pressure Retaining Components Total Ibtal Item Number Description Scheduled Examined l Pressure Vessels l C07.010 Pressure Itetaining 0 0 l Components '

C07.020 Pressure Retaining 1 1 Components ,

i Piping l C07.030 Pressure Retaining 1 1 Components f C07.040 Pressure Retaining 3 3 Components Pumps C07.050 Pressure Retaining 0 0 Components C07.060 Pressure Retaining 1 1 Components Valves C07.070 Pressure Retaining Covered in covered in Components Co7.030 Co7.030 C07.080 Pressure Retaining covered in Covered in ,

Components Co7.040 C07.040

'lDTALS 6 6 A detailed description of each examination listed above are located in Section 4 of this report. Results of each examination are located in Section 5 of this report.

O Pressure Test Special lleport EOC 8 Page1of 1 Catawba Unit 1 Itevision o Section 2 June 21,1995

3.0 Fin,t Ten Year Interval Pmssure Test Insnection Status The completion etatus of Pressure Test inspections required by the 1980 ASME Section XI Code, including addenda through Winter 1981, is summarized in this section. The requirements are listed by the ASME Section XI Examination Category as defined in Table IWB-25001 for C? ass 1 Inspections, and Table IWC-2500-1 for Class 2 Inspections.

Class 1 Inspections Exarnination Inspections Inspections Perrentage Deferrul Category Description Reauirvd Completal Completed Allowed 1 B-E Pressure Retaining 55 Welds 55 Welds 100 % No Partial Penetration Welds in Vessels BP All Pressure Retaining Components System Leakage Test 140 14 0 100 % No Components Components System Ilydrostatic Test 20 20 100 % Yes Components Components Class 2 Inspections Eminination Inspections inspections Perrentage Deferral Cateeor, Descrintion Eequirrd Comnieted Completed Allowed 1 C-li All Pressure Retaining Components 1

System or Component 70 70 100 % No I l

Functional Test Components Components System liydrostatic Test 88 88 100% Yes Components Components 1

Deferral on inspection to the end of the interval as allowed by ASME Section XI Tables IWB-2500-1 and IWC-2500-1.

Pressure Test Special Report EOC 8 Page 1 of 1 j Catawba Unit 1 Revision 0 Section 3 June 21,1995

4.0 Finni Inservice Insnection Pressure Test Plan for Outaste 8 After Plant O Start Un The final ISI Plan shown in this section lists all ASME Section XI Class 2 examinations credited for Outage 8 at Catawba Nuclear Station Unit 1 after plant start up.

The information shown below is a field description for the reporting format included in this section of the report:

Item Number = ASME Section XI Tables IWB-2500-1  !

(Class 1), IWC-2500-1 (Class 2)

Drawing Number = Number of the Flow Diagram Revision = Revision of the Flow Diagram Test = Type of Pressure Test i

Comp = Vessel, Piping or Pump l Comp Name = Example: Reactor Vessel, etc., for piping - l System designation will be used O Req.Insp = Type inspection performed, i.e., VT2 Req. Proc = Required inspection procedure Comments = General and/or Detail Description  ;

i O Pressure Test Special Report EOC 8 Page 1of 1 Catawba Unit 1 Revision 0 Section 4 June 21,1995

PAGE NO. 1 CATAMBA t2 FIT NUISER 1 - 1st INTERVAL '

06/19/95 CIASS B (CETEOORY C-R) REoOIREBWITS FO OormaE Noi ER e i mEo. mEo.

ITEM NO. DRAWIleG REV TEST FCA NO. SYSTEM Egus INSP PROC COISMITS i C07.020.022 CN-1571-1.0 16 HYDRO N/A REFUEL WTR STRVT-2 QAL-15 This Item was examined after EOCB start up TANK and will be included in a seperate summary report.

C07.030.003 CN-1554-1.2 16 IE.AK CAT 1-0284 NV SYSTEM VT-2 QAL-15 This Item was examined after EOC8 start up and will be included in a seperate summary

) report.

j 1

C07.040.007 CN-1554-1.2 16 HYDRO N/A NV SYSTEM VT-2 QAL-15 This Item was examined after EOC8 start up

{ and will be included in a seperate summary report.

C07.040.011 CN-1554-1.6 10 HYDRO CAT 1-0284 NV SYSTEM VT-2 QAL-15 This Item was examined after EOC8 start up  ;

and will be included in a seperate summary report.

C07.040.038 CN-1571-1.0 16 HYDRO CAT 1-0284 FW SYSTEM VT-2 QAL-15 This Item wcs examined after EOC8 start up and will be included in a seperate summary  !

i report.

C07.060.001 CN-1554-1.2 16 HYDRO N/A RECIP CHGR VT-2 QAL-15 This Item was examined after EOC8 start up j- PUMP and will be included in a seperate summary

! report.

l

i l

1 I

I d

i

[

l 4

i i

f

I' p 5.0 Results Of Pressure Test Insoeetions Performed After Outage 8 Plant Start d .UR  !

i The results of each examination shown in the final ISI Plan (Section 4 of I this report) are included in this section. The completion date and status for ,

each examination are shown. All examinations revealing reportable  !

indications are described in further detail in Section 6. i The information shown below is a field description for the reporting format included in this section of the report: ,

i Item Number

= ASME Section XI Tables IWB-2500-1 (Class 1), IWC-2500-1 (Class 2)

Drawing = Number of the Flow Diagram

{

Examination Date = Latest Examination Date i

Condition = Partial or Complete test l Status = Clear, Recordable or Reportable  ;

Comments = General and/or Detail Description

  • O i t

I t

4

(

l 1

O Pressure Test Special iteport EOC 8 Page 1 of 1 Catawba Unit 1 Revision 0 Section 5 June 21,1995

m O, u PAGE NO. 1 CATANBA UNIT NUMBER 1 - 1st INTERVAL 06/19/95 CLASS B (CATEGORY C-H) RESULTS FOR OUTAGE NUMBER 8 DATE IAST ITEM No. DRAWING EXAMINED CONDITION STATUS COMMENTS C07.020.022 CN-1571-1.0 05/22/95 COMPLETE CLEAR This Item was examined after EOC8 start up and will be included in a seperate surnmary report.

C07.030.003 CN-1554-1.2 04/20/95 COMPLETE CLEAR This Item was examined after EOC8 start up and will be included in a seperate summary report.

C07.040.007 CN-1554-1.2 05/31/95 CCMPLETE RECORDABLE This Item was examined after EOC8 start up and will be included in a seperate summary report.

C07.040.011 CN-1554-1.6 05/11/95 COMPLETE CLEAR This Item was examined af ter EOC8 start up and will be included in a seperate summary report.

C07.040.038 CN-1571-1.0 05/22/95 COMPLETE CLEAR This Item was examined after EOC8 start up and will be included in a seperate summary report.

C07.060.001 CN-1554-1.2 04/20/95 COMPLETE CLEAR This Item was exam *.ned af ter EOC8 start up and will be included in a seperate summary report.

& __ __ _ _ m-_. --

\

P' 6.0 RenortableIndications

(

There were no Class 1 or 2 reportable indications during this report period.

1 l

l 1

o a

Pressure Test Special Report EOC 8 Page1of 1 Catawba Unit 1 Revision 0 Section 6 June 21,1995

7.0 Personnel. Eauloment and Material Certifications All personnel who performed or evaluated the results of inservice inspec-tions from March 21,1995 through May 31,1995 at Catawba Nuclear Station Unit I were certified in accordance with the requirements of 1980 Edition of ASME Section XI with Addenda through Winter 1981. The appropriate certification records for each Duke Power Company inspector are on file at .

Catawba Nuclear Station or can be obtained through the Corporate Offices '

in Charlotte, North Carolina.

Records of periodic calibration of Duke Power Company inspection equipment are on file at Catawba Nuclear Station or can be obtained through the Corporate Offices in Charlotte, North Carolina.

O l

i

[

O Pressure Test Special Report EOC 8 Page1of 1 Catawba Unit i Revision 0 Section 7 June 21,1995 l

8.0 Pmblam Investigation Pmeens Forme

.O No Problem Investigation Process Forms resulting from Class 2 reportable .

items were originated during this reporting period.

I f

i

?

t i

1 O

t i

i t

i O Pressure Test Special Report EOC 8 1

Page 1 of 1 i Catawba Unit 1 Revision 0  ;

Section 8 June 21,1995 l

9.0 ' Refemnce Documents There were no reference documents that applied to the inservice inspections I performed during this reporting period at Catawba Nuclear Station, Unit 1. )

l i

t O  !

i I

I i

3 i

?

l O Pressure Test Special Report EOC 8 l

Page 1of 1  ;

Catawba Unit 1 Revision 0 ,

Section 9 June 21,1995

10.0 Claan 1 and 2 Renalrs and Renlacements There were no Class 2 Repairs or Replacements for work performed from March 21,1995 through May 31,1995 to report as required by ASME Section -

XI 1980 Edition.

l l

l l

l 0

-l O Pressure Test Special Report EOC 8 Page1of 1 Catawba Unit 1 Revision 0 Section 10 June 21,1995

J,,3q.a.c+5m54mM e 5.,g 4 eM a *ia-eh A 4 p.-4.4a-4h4 e.4Ma # -9.+mumL+Ae,4- 5 _' ' -#m & *# ale + WsWa44*W4w anm5.e44 W 4a h en EhmI3 MA.i4,e m.+@-,4mm.A mEs. M. A da5 4W.M.Sd.4ed-Sb h E44 4ummE n-- --

.455am . e h- 4.4w g v L w a-4 O hm A 4p.mM, b

d 4

4

? t

4 4

l 1

l l

I 6

a l

a l

i 4 .

I J

h i

n -

I t

I s

.!g I

i 8

Y. g I

e t

I e

l i

i I

I I.

< 9 f

r I

E i

4 I

i i

I a

a f

I I e e I d

i i

l l

I~

O

_ _ - -_ _ _- . -.-._