MONTHYEARML20217M7571999-10-22022 October 1999 Advises That Attachment 1 to ,Marked as Proprietary,Re Safety Limit MCPR & Fuel Vendor Change Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217H8471999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML20217H9771999-10-13013 October 1999 Forwards SRO & RO Initial Exam Rept 50-354/98-302,suppl Rept on 990125-29,mtg Meeting on 990322,990429-30 & 0617-18 in-office Review & 990720 Telcon on Appeal Results.Overall, 11 of 16 Applicants Received NRC Licenses ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML20217C4391999-10-0606 October 1999 Informs That Util Authorized to Administer Initial NRC Retake Written Exam to Applicant Listed,During Week of 991011 ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR ML20217A6861999-10-0101 October 1999 Forwards Insp Rept 50-354/99-05 on 990711-0829.Four Violations Occurred Re Areas of Fire Protection,Operation at Reduced Feedwater Inlet Temp & safety-related Battery Charging Operation & Being Treated as NCVs LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20217K7781999-09-16016 September 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station for Month of Aug 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML20211N5421999-09-0808 September 1999 Forwards Amend 121 to License NPF-57 & Safety Evaluation. Amend Revises TSs by Relocating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML20211B5341999-08-20020 August 1999 Forwards RAI Re 2nd 10-yr ISI Interval Relief Requests Re Plant.Info Requested to Be Provided within 60 Days of Receipt of Ltr ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20210R4911999-08-11011 August 1999 Forwards Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted.Inspectors Reviewed Performance Indicators Submitted as Part of Pilot Program for New Regulatory Oversight Process & Verified Data ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys ML20210F3271999-07-22022 July 1999 Forwards SE Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3 Re First 10-year Interval for ISI Program at Hope Creek ML20210D3971999-07-16016 July 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML20209G2831999-07-14014 July 1999 Disclosure Closure of TAC MA1194 Re Licensee Response to RAI to GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, for Plant 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds ML20196J4421999-07-0101 July 1999 Forwards Request for Addl Info Re Increase of Allowable Main Steam Isolation Valve (MSIV) Leak Rate & Deletion of MSIV Sealing Sys for Plant LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196F9441999-06-21021 June 1999 Forwards Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Two Violations of NRC Requirements Occurred Re Reactor Bldg Ventilation Setpoints & Control Rod Drop Analyses ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209C0621999-06-21021 June 1999 Forwards NPDES Discharge Monitoring Rept,May 1999, for Hcgs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML20195J1101999-06-0707 June 1999 Informs of Completion of Review of Providing Updated Status on Implementation of Commitments Made in Response to GL 89-13.Confirms Revs Made to Previous Commitments to Resolve Monitoring Pressure Drop Problem ML20195J1051999-06-0707 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Jw Clifford Will Be Section Chief for Hope Creek Generating Station ML20207F2681999-06-0303 June 1999 Responds to by Forwarding Gfes & NRC Written Exam Grades for List of Hope Creek Operators Submitted by DE Jackson.Absence of Gfes Grade Indicates That Operator Previously Issued RO or SRO License.Without Encl ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML20207D0201999-05-27027 May 1999 Discusses 990512 Meeting to Identify Insp Activities at Hope Creek Facility Over Next Six Months & Informs of Planned Insps in Order for Licensee to Have Opportunity to Prepare & Provide Region I with Feedback on Schedule Conflicts ML20195B9931999-05-20020 May 1999 Forwards NPDES Discharge Monitoring Rept,Apr 1999, for Hgcs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20207A3451999-05-20020 May 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20206Q6211999-05-14014 May 1999 Informs That on 990119 Licensee Provided NRC with Several Revised TS Bases Pages for Plant.Ts Bases Pages B 3/4 6-1 & B 3/4 6-2 Were Revised 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML20206P1931999-05-10010 May 1999 Provides Updated Status of Plant Implementation of Commitments to GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment, Issued by NRC on 890718.Revised Commitments to Subject Gl,Listed 05000354/LER-1998-008, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a1999-05-0404 May 1999 Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML20206D3301999-04-27027 April 1999 Submits Completion of Requested Actions for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2411999-04-22022 April 1999 Forwards Draft Revised Pages 4.1 & 4.2 of Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Changes Are Noted in Italics ML18107A1841999-04-14014 April 1999 Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl ML18107A1691999-04-12012 April 1999 Forwards Proprietary & non-proprietary Epips,Including Rev 17 to EPIP 807,rev 1 to NC.EP-EP.ZZ-0801(Q) & Rev 2 to NC.EP-EP.ZZ-0806(Q) & Revised EPIPs Table of Contents. Proprietary Info Withheld ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept 05000354/LER-1999-004, Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl1999-04-0808 April 1999 Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl ML18106B1491999-04-0505 April 1999 Forwards Drafts of Proposed Changes to Pages 4.1 & 4.2 of Emergency Plan,Which Are Contained on Page 4.2 & Noted in Italics & Underlined ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML18107A2201999-03-30030 March 1999 Forwards Final Exercise Rept for 980303,full-participation Plume Exposure Pathway Exercise & 980505-07, full-participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response for Salem & Hope Creek ML18106B1411999-03-30030 March 1999 Forwards Decommissioning Info on Behalf of Conectiv Nuclear Facility License Subsidiaries,Atlantic City Electric Co & Delmarva Power & Light Co,For Listed Nuclear Facilities 05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made1999-03-26026 March 1999 Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made LR-N990111, Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records1999-03-25025 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records LR-N990131, Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities1999-03-22022 March 1999 Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N990132, Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 19971999-03-22022 March 1999 Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 1997 LR-N990133, Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 1011999-03-22022 March 1999 Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 101 ML18106B1071999-03-22022 March 1999 Forwards Annual Rept on Results of Individual Monitoring for Salem & Hope Creek Generating Stations,Iaw 10CFR20.2206.Info Provided on Encl Floppy Disk.Without Disk ML20206J4021999-03-10010 March 1999 Responds to NRC Oversight of Nuclear Plants Response to Y2K Bug.Consideration of More Aggressive Action to Forestall Any Y2K Problems,Requested LR-N990112, Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve1999-03-0505 March 1999 Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve ML18106B0861999-03-0101 March 1999 Forwards Annual Repts for Salem & Hope Creek Generating Stations,Containing Data on Number of Station,Utility & Other Personnel Receiving Exposures Greater than 100 Mrem/ Year & Collective Exposures According to Work & Job 1999-09-08
[Table view] |
Text
_ - __ _ _ _ _ _ _ _ . _ _ . . _ _
e Put*c Serv i c t'
' [InCtric (IN.1 Can COmpitny Stanley LaBruna K e E m e E tt"c x d Gas C ; gany P.O. Bvx A . tw-- w ks Imap tu GO38 604 339-1200 (3 f ri ,.p,t .f, t ; .g. . p NOV 1 5 1991 NLR-N91191 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
IN-SERVICE TESTING REQUIREMENTS RELIEF REQUEST HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Pursuant to the provisions of 10 CFR 50.55a(g) (5) (iii) , and in accordance with Technical Specification 4.0.5.a for the Hope Creek Generating Station, Public Service Electric and Gas Comoany (PSE&G) hereby submits, in Attachment 1, a revision to our In-Service Testing (IST) Program as currently approved in your September 27, 1990 letter.
Should you have any questions, we will be pleased to discuss them with you.
Sincerely, -
', -QhfN+m S. LaBruna Vice President -
Nuclear Operations Attachments t
04 (1 mwwna t,D ~0au. osoa,ga
'd P D:t
j . Document Control Desk 2 NDy } 7, pg; NIR-N91191 C Mr. Stephen Dembek Licensing Project Manager Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering __
CN 415 Trenton, NJ 08625 m
ATTACILMENT_OHE IN-SERVICE TCSTING REQUIREMENTS RELIEF REQUEST llOPE CREEK GENERATING STATION DOCKFT NO. 50-354
. ...J
NIR-N91191 IDPE CREEK IST COMPONENTS:
Post Accident Sampling System (PASS), Remote Manual Containment Isolation Vaives RC-SV-8903A and RC-SV-8903B.
CATEGORY:
These valves are ASME Category A fast acting solenoid valves.
lEST REOUIREMENTS FOR WHICH RELIEF IS REOUESTED:
RC-SV-8903A and RC-SV-8903B are currently exercised tested, stroke time tested and fail safe tested every three months in accordance with the following ASME Code requirements:
IWV-3412 Exercisina Procedurg (a) Valves shall be exercised to the position required to fulfill their function unless such operation is not practical during plant operation. If only limited operation is practical during plant operation, the valve shall be part-stroke exercised during plant operation and full-stroke tested during cold shutdowns. Valves that cannot be exercised during plant operation shall be specifically identified by the owner and shall be full-stroke exercised during cold shutdowns. Full-stroke exercising during cold shutdowns for all valves not full-stroke exercised during plant operation shall be on a frequency determined by the intervals between shutdowns as follows:
For intervals of 3 months or longer - exercise during each shutdown.
For intervals of less than 3 months - full-stroke exercise is not required unless 3 months have passed since last shutdown exercise.
(b) The necessary valve disc movement shall be determined by exercising the valve while observing an appropriate indicator, which signals the required change of disk position, or observing indirect evidence (such as changes in system pressure, flow rate, level, or temperature),
which reflect stem or disk position.
PN2; 1 OF 5 A'ITAQiMDTr 1 l
l
l HIR-N91191 HOPE CREEK IST IWV-3413 Power Op_erated Valves (a) The limiting value of full-stroke time of each power operated valve shall be specified by the owner. Full-stroke time is that time interval from initiation of the actuating signal to the end of the actuating cycle.
(b) The stroke time of all power operated valves shall be measured to the nearest second, for stroke times 10 seconds or less, or 10% of the specified limiting stroke time for full-stroke times longer than 10, whenever such a valve is full-stroke tested.
JWV-3415 Fail-Safe Valves When practical, valves with fail-safe actuators shall be tested by observing the operation of the valves upon loss of actuator power. If these valves cannot be tested once every 3 months, they shall be tested during each cold shutdown; in case of frequent cold shutdowns, these valves need not be tested more often than once every three months.
BASIS FOR RELIEF:
Testing RC-SV-8903A and RC-SV-0903B while at power has, on several occasions, caused inadvertent plant transients and/or actuations of Emergency Safegards Features (ESFs). This has been attributed to pressure perturbations caused by cycling the affected valves. These perturbations are communicated, via instrumentation sensing lines, to various reactor level transmitters. The most recent event occurred on September 23, 1991 and is described here in detail.
Initial conditions were as follows (reference Hope Creek P&ID Nos. M-38, sheets 1 and 2 and M-42, sheets 1 and 2):
- Reactor at 100% power Reactor Level at 35" Reactor Water Level Control selected to "A" Channel
- Line downstream of RC-SV-8903B depressurized due to cycling the jet pump sample valve, RC-SV-0624-D24, during periodic qualification testing by Chemistry.
Line between RC-SV-8903A and B at some indeterminate low pressure due to minor leakage past RC-SV-8903B.
Operations initiated PASS Containment Isolation Valve Inservice testing in accordance with OP-IS.RC-0101(Q).
PNQ3 2 OF 5 ATIAWMENT 1 1
l
NIR-N91191 Il0PE CREEK IST Upon opening the upstream PASS jet pump sample containment isolation valve, RC-SV-8903A, a pressure perturbation was initiated due to the lower downstream pressure which caused RC-SV-8903B, the downstream valve, to lift to its full open position. This was indicated by the process computer alarm chronology.
The pressure redaction was subsequently felt at the variable leg side of 1BBLT-N085A, the reactor shroud level (fuel zone range) transmitter. This is a Rosemount 1153 transmitter utilizing an oil-filled capacitor as its sensor. Insofar as the transmitter sensor assembly constitutes a filled system of small volume, any pressure perturbation can readily propagate through it to the reference side of the transmitter; at this point, it is in direct communication with all the instruments on the Channel "A" reference leg. The volume of this portion of the system is relatively small since llope Creek utilizes 3/8" stainless steel tubing from the excess flow check valves outside containment all the way to the instruments. The somewhat dampened pressure perturbation at the reference leg side of 1BBUT-N085A is therefore propagated to all Channel "A" reactor water level and steam dome pressure transmitters.
The reactor water level transmitters sense the differential pressure between a constant height of water (reference leg) and the height of water in the reactor (variable leg), both of which are exposed to reactor pressure. The differential pressure is therefore proportional to reactor water level. Since a small change in differential pressure translates into a relatively large change in level, a pressure perturbation can cause these transmitters to momentarily sense a change in level beyond their setpoints while actual level remains constant. On this occasion, the change in level as sensed by the affected transmitters was on the order of 40" of water; this was indicated by the GETARS computer. On other occasions involving attempts to sample from the PASS jet pump cample line, or vulving transmitters, even larger transients have been noted.
The reactor pressure instruments are not as susceptible to pressure perturbations since they require larger pressure changes to reach their setpoints.
PNSE 3 OF 5 KITA0 MENT 1 l
N1R-N91191 IDPE CREEK IST The instruments of primsry concern including their corresponding setpoints and trip functions are as follows:
. ISMLT-N081A NSSSS (Level 1 and 2)
. 1BBLT-N091A HPCI, Core Spray, RHR (Levels 1, 2 and 8) 1BBLT-N091E HPCI, Core Spray, RHR (Levels 1, 2 and 8)
ISALT-N402A Redundant Reactivity Control System (Level 2)
- 1BBPDT-N004A Reactor Water Level Control
. 1BBLT-N080A RPS, NSSSS (Level 3)
On this occasion, GETARS indicated water level oscillated due to the pressure perturbation four times in a period of approximately 250 milliseconds. The lowest level indicated by GETARS was approximately -2.5". Since this is below the calibrated range of the instrument (0-60 inches) it is taken as an approximation as linearity cannot be confirmed outside the calibrated range. As a result of dropping below +12.5", the following occurred:
- 1. A full recirc runback and reactor water level setpoint setdown to +18" was generated from the Reactor Water Level Control System (1BBPDT-N004A). This was a result of Reactor Water Level Control using the Channel "A" transmitter for control. The channel selected for control supplies the signal to the alarm units which generate the runback and setpoint setdown signals.
- 2. A half scram on RPS Channel "A" was generated (1BBLT-N080A).
- 3. A half isolation signal was generated by NSSSS (1BBUT-N080A) for the RHR Shutdown cooling inboard isolation valve 1BCHV-F009-Ell, reactor head spray inboard isolation valvo 1BCHV-F022-Ell, RHR flush to radwaste inboard isolation Valve 1BCHV-F049-E11, RHR inboard sample valves 1BCSV-F079A and B.
As a result of the full anback, actual reactor water level started to increase. The water level increase coupled with the reduced water level setpoint caused all three reactor foodpump turbine low pressure control valves to fully close. This in turn transferred the turbines to Governor Manual Control. Prompt operator action was necessary to control reactor water level and prevent further degradation of plant conditions.
EN2: 4 OF 5 ATTAWME!fP 1
NIR-N91191 IKiPE CREEK IST There have been two other occasior.s in which operation of the PASS jet pump sample valves have directly or indirectly resulted in ESF actuations.
On August 22, 1986, during power ascension testing, PASS was being utilized to obtain reactor coolant samples. Pressure perturbations induced by valving manipulations caused 1BBLT-N091A and E to sense level both below -38" and above +55".
Consequently, the HPCI system received both an initiation signal and turbine trip signal. Operator actions were required to restore the HPCI system to standby operation.
Subsequent to the August 22, 1986 event, it was decided that BB-LT-N085A would be isolated prior to testing the PASS isolation valves. This was done on July 14, 1987. However, when valving the transmitter back in to service after the test, pressure perturbations were once again experienced and resulted in HPCI again receiving concurrent initiation and turbine trip signals.
ALTERNATE TESTING:
PSE&G proposes to exercise test, stroke time test, and fail safe test RC-SV-8903A and RC-SV-8903B at least once per 18 months during plant shutdown.
EN235 OF5 ATTAOMENT 1