Ao:On 750418,during ECCS Simulated Automatic Test,Core Spray Pump 2B Failed to Start.Caused by Looose Contact on Breaker Closing Circuit.Contact Tightened
ML20084U155
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/21/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084U154 List:
References
NJK-75-211, NUDOCS 8306270075
Download: ML20084U155 (1)


Text

m - , , ,

Contmortwegth Edloon -

f C-- p OJad Cit;ntgrcungStiton

~

Fost Othc e is.. .. w e.

1 -Q,/?fJ Cordove.11~.M fA2'2

. otophono303/r44-2241

'M p T AJK-75-28I April 21, 1975 ,,

J. Keppler, Regional Director Of rectorate of Reguistory Operations - Region ill U. 5. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, IL 60137 i

REFERENCE:

quad-Cities flucicar Power Stat.lon, Unit 2 i

Docket No. 50-265. OPR-30 Appendix A, Sections 1.0.A.4, 6.6.B. i ta.

Daar Mr. Keppler:

Th2 purpose of this 1ctter- is to provide you with notification of an Abnormal Occurrence as required by. Technical Specification 6.6.8. l.a. within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

At 8:00 p.m. on April 18. 1975, during the emeroency core cooling system simu-lated automatic initTation test, 28 core spray purr.p failed to start Irnrrediately cfter receiving the initiation signal. It did start, howaver, after Bus 24-I

{

was transferred to the 1/2 diesel generator and could have also been manually Started. _

Upon investigation, a loc:;c contact was found and tightened in thaThe normal power emergency supply auto initiation portion of the brccker closing circuit.

i povr' e r supply auto Initiation portion and the manual portion of the breaker closing circuit were both found intact. The pump was retested on AprII 20, 1975, cnd started satisfactorily..

1

?

This occurrence was discussed by telephone with Mr. Folerabend of your office en April 21,.1975 Further information will be provitted by Abnormal Occurrence Rrport A0 50-265/75-13 which will be sub;nitted within 10 days of the date of this occurrence.

~

Vary truly yours, COMMONWEALTH EDISON COMPAliY .

QUAD-CITIES NUCJ.E R POWElt STATION

/fkN N. J. thlivianakis

^W,?

// ~

Station Superintendent l NJK:SRH/dkp ,

cc: Directorate of Licensing J. S. Abel 8306270075 750428 PDR ADOCK 05000265 h S PDR , - -