7 OPERATING DATA REPORT 50-220 DOCKET NO.
DATE 5/8/84 COSIPLETED BY inomas n'.
Roman TELEPilONE (315)349-2422 OPERATING STATUS Nine Mile Point Unit #1 Notes
- 1. Unit Name:
4/1/84 thru 4/30/84
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
640
- 4. Nameplate Rating (Gross MWe):
630
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
DIU
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to-Date Cumulatise i1. Hours in Reporting Period 719 2544.5 127,079.2
- 12. Number Of Hours Reactor Was Critica!
O 1828.5 88,130.2
- 13. Reactor Reserve Shutdown Hours 0
0 1204.2
- 14. Hours Generator On-Line 0
1828.5 85313.8
- 15. Unit Reserve Shutdown Hours 0
0 20.4
- 16. Gross Thermal Energy Generated (MWH) 0 3,062,522.0 141,156,962.0
- 17. Gross Electrical Energy Generated (MWH) 0 1.034,284.0 46,666,065.0
.18. Net Electrical Energy Generated (MWH)-
0 1,001,923.0 45,196,682.0
- 19. Unit Service Factor 0
63.0%
69.2%
- 20. Unit Availability Factor 0
62.9 66.9
- 21. Unit Capacity Factor (Using MDC Net) 0 56.6 58.1
- 22. Unit Capacity Factor (Using DER Net)-
0 55.6 57.2
- 23. Unit Forced Outage Rate 0
0 17.1-l
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
Unit shutdown for biennial refuel.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION h
8405150267 840430 PDR ADOCK 05000220 l\\.
R PDR Wm 1
s
0 AVER AGE DULY UNIT POWER LEVEL 00~220 DOCKET NO.
UNIT 9 Mile Point Unit #
5/8/84 DATE ThomasW.Romah COtfPLETED Uy TELEPflONE _(315) 349-2422 April 1984 MONTH DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Nel)
(MWe.NetJ 0
I O
1.,
2 0
0 I8 0
0 3
19 4
0 20 0
5 0
0 21 6
0 0
22 7
0 0
23 0
8 0
24 9
0 25 0
10 0
26 0
11 0
0 27 0
12 0
2S 13 0
0 29 14 0
0 30 15 0
0 31 16 0
i INSTRUCTIONS I
On this format.: s the average daily unit power lesel m MWe-Net for each day in the repoitmp m.mth. Comp the nearest uhole megawstt.
e t
i
! 2
s UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-220 UNIT NAME 9 Mlle Pt. Unit #1 DATE 5/8/84 COMPLETED BY -Thomas W.
Roman REPORT MONT11 TELEPHONE (315) 349-2422 n.
E c
.! E 3
j.53 Licensee
,E g y".
Cause & Corrective W.
Daic g
3g s
,g g 5 Event 3?
j'3 9-Action to 5
jgg Report a mO H
Prevent Recurrence 6
84-6 E10317 S
C 1
Unit Shutdown for Biennial RefucI o
i o
f '
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Schedulet!
A. Equipment Failure (Explain).
I-Manual for Preparation of Data B. Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Ferueling 3 Automatic Scram.
Event Report (LER) File (NUREG-J D Regulatory Restriction 4-Ot her (Explain) 0161)
E-Operator Training & License Examination F-Administrative G. Operational Error (Explain) 5 Exhibit 1 - Same Source 19/77) ll Other (Explain)
.i
e- -.(-
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE April 1984 The station has been shutdown since March 17, 1984 for scheduled refueling and overhaul.,The scheduled startup for the Unit is June 1.
CLASS I WORK - MAINTENANCE - APRIL 1984 WR #24455 CRD 18-47, removed 71471, installed 71572 WR #24788 CRD 26-27, removed 71430, installed 71612 WR #25675 CRD Charging Water Valve, 46-27, replaced ball, spring, packing WR #25672 CRD Charging Water Valve, 26-23, replaced ball, spring, packing WR #25693~
CRD Charging Water Valve, 34-19, replaced ball, spring, packing WR #25679.
.CRD Charging Water Valve, 50-23, replaced ball, spring, packing WR #25671 CRD Charging Water Valve, 34-33, replaced ball, spring, packing WR #25673 CRD Charging Water Valve, 26-35, replaced ball, spring, packing
'WR #25100 Valve 53-03, replaced bonnet, straightened stem WR #25190 Raw Water Intertie to containment, #93-62 disassembled, inspected, reassembled WR #18629
- 107 Drain Valve, CRD 18-43, replaced stem, packing, handwheel WR #22992 Torus Manhole,. opened manhole cover for torus inspection WR #24748 Valve FW-55, replaced gasket WR #18628
- 12 Control Room HVAC Chiller, performed preventative maintenance WR #23383 Raw Water Intertie to containment, #93-60 disassembled, inspected, reassembled WR #24442 Scram outlet Valve, 26-11, replaced body gaskets, seat ring disc, retainer disc, and seat ring WR #24441 Scram outlet Valve, 30-37, replaced body gaskets, seat ring disc, retainer disc, and seat ring WR #25678 CRD Charging Water Valve, 02-27, replaced ball, spring, packing.
WR #25680 CRD Charging Water Valve, 34-35, replaced ball, spring, packing WR #25663-CRD Charging Water Valve, 06-35, replaced stem, spring, balt packing WR #25662 CRD Charging Water Valve, 14-43, replaced stem, spring, ball, packing WR #25661 CRD Charging Water Valve, 26-51, replaced stem, spring, balt packing WR #25658 CRD Charging Water Valve, 34-51, replaced stem, spring, balt packing WR #25659-CRD Charging Water Valve, 38-35, replaced stem, spring, balt packing WR #25677 CRD Charging Water Valve, 18-07, replaced ball, spring, packing hR #25674 CRD Charging Water Valve, 22-39, replaced _ ball, spring, packing WR #25676 CRD Charging Water Valve, 14-15, replaced ball, spring, packing WR #24003 39-06 Emerg. Cond. Sys., replaced plug and seat ring WR #24443 Scram outlet valve, 14-19 replaced body gaskets, seat ring disc, retainer disc, and seat ring
'WR #25253 CRD 30-43 Vent Valve, #107 replaced handle WR #26054 DWEDT IV 83.1-09, straightened stem WR #25668 CRD Charging Water Valve, 02-35, replaced stem, ball, spring, repacking WR #25666' CRD Charging Water Valve, 30-15, replaced stem, ball, spring, repacking
-WR #25667 CRD Charging Water Valve, 26-19, replaced stem, ball, spring, repacking WR #25254 CRD Charging Water Valve, 30-39, replaced stem, ball, spring, repacking WR #25665 CRD Charging Water Valve, 18-23, replaced stem, ball, spring, repacking
+
,7 41 s
CLASS I WORK - MAINTENANCE - APRIL 1984 Cont'd LWR #25669
'CRD Charging Water Valve, 06-39, replaced stem, ball, spring, repacking.
WR'#25664
- CRD Charging Water Valve, 10-35, replaced stem, ball, spring, repacking
.WR #25090 CRD Charging Water Valve,' 14-31, replaced stem, ball, spring, repacking WR #25761
. Core Spray. Check Valve 13, disassembled, inspected, reassembled WR.#24351.
Diese1~ Gen. #102 Cooling Water Pump #72-63, replaced l motor bearings WR #24754l Emerg.,Cond. BV #39-10, disassembled, inspected, reassembled
- WR #21480 Shutdown Cooling Isol. Valve 38-02, disassembled, inspected, reassembled WR #25911 RBCLC Butterfly Valve.137, removed old grease fitting, installed new one
>WR #25660 CRD Charging Water Valve, 18-51, replaced stem, spring, ball, repacking WR #25265-CRD Charging Water Valve, 46-39, replaced stem, spring, ball, repacking WR #23799
' Shutdown Cooling Isol. Valve, 38-06, replaced gasket WR #20590-CRD 42-19 Foot Valve, replaced worn parts and cleaned WR #24743
.CRD 42-27 Foot Valve, replaced worn parts and cleaned WR #21898 Feedwater Pumps #11 6 #12, valves 29-23, 24 replaced internals WR'#23099-Rx Drain Valve #37-10, installed cap screw WR.#26067 Core Spray Loop, #11 Recire, Safety Valve replaced safety valve WR #23458 Bergen Patterson Snubbers, stamped nameplates as requested
-WR #25954
. Core Spray Loop #11 Recirc Safety Valve, removed safety valve and installed blank flange for hydro MR #25111
- 112 Electromatic relief' valve, disassembled, rebuilt, reassembled, and installed J-WR #25955
- 33-02 CU inside IV, lapped tifreads on stem and nut WR #20924-Cond.~Sys. Relief Valve #50-103, replaced relief valve WR #24642
- 12 Emer. Vent Exh. Boot, replaced boots WR #23787--
Diesel Gen. replaced seals on soak back oil sys.
-#102 Diesel Gen.-replaced fuel oil pump WR #24610.
WR'#25112
- 122 Electromatic relief valve, disassembled, rebuilt, reassembled,
~
and installed WR #24596
- 128 D.W. Cooler CLC Blocking Valves, cleaned and repacked
-WR'#22155
- 11 D.W. Cooler #118 Check Valve, installed rebuilt valve WR #25113 -
- 123 Electromatic Relief Valve, disassembled, rebuilt, reassembled, and installed s
.CRD #71361, rebuilt CRD WR #26036-CRD #71453, rebuilt CRD WR #26038 CRD #71729, rebuilt CRD WR:#26041 CRD #71368, rebuilt CRD WR #26039 CRD #71471, rebuilt CRD
- f
IT..:
e CLASS I WORK - ELECTRICAL MAINTENANCE - APRIL 1984 WR #25657 -
DW FD MOV BV Cleaned Aux, contact WR #25685 Core Spray Suct IV 111 EQ refurbished WR #25684
. Core Spray Suct IV 122 EQ refurbished
.WR #25686 Core Spray Suct IV 112 EQ refurbished WR #25725 Containment Spray BV 80-41 moved conduit WR #25027 Supply Breaker 1053 replaced contact spring
-Wa #25736 Main Steam IV 111 Limitorque Operator installed pipe plug WR #25737s Main Steam IV 121 Limitorque Operator installed pipe plug WR #258612
' Emergency Exhaust Fan Motor 12 EQ meggar and check rotation WR #25935 Reactor Shutdown Cooling Pump Bkr. 12 replaced overcurrent devices WR #25941 Core Spray Pump.lll EQ meggar and check rotation WR #25943 Core Spray Pump 112 EQ meggar and check rotation WR #25834 Limitorque Valve Actuator IV 83.1-11 EQ replaced operator WR #25833 Limitorque Valve Actuator'IV 83.1-09 EQ replaced operator WR #25379 Limitorque Valve Actuator IV 33-02 EQ replaced operator WR #25378 Limitorque Valve Actuator IV 33-01 EQ refurbished WR #26152 4160V Breaker R1032 replaced charge spring motor WR #25313 Limitorque Valve Actuator IV 40-11 EQ replaced operator WR #25883 Limitorque Valve Actuator IV 38-13 EQ overhaul WR #25882..
Limitorque Valve Actuator IV 38-01 EQ overhaul WR #23349
-Limitorque Valve Actuator IV 33-04 EQ overhaul WR #25741 Core Spray Suction Limitorque Operator 81-02,' installed pipe plug WR #26154.
171 MG Set replaced overcurrent devices WR #26071 Core Spray IV 40-10 replaced bolt WR #25740 Limitorque Operator 40-09, 10 installed pipe plug (WR #26065 Power Board 17 R1053 adjusted limit switch WR #26155 Feed for PB 1671A, replaced overcurrent devices
-.WR #25880 Limitorque Valve Actuator IV 40-01 Void used WR #25946 WR #25858 Limitorque Valve Actuator IV 81-01 RX Core Spray EQ refurbished WR #26079 DG 102, repaired wire connection-WR #25743 Core Spray Suction Limitorque operator, 81-01 installed pipe plug WR/#26094 Emergency Vent BV 202-35 EQ replaced coil
'WR #26096 Emergency Vent BV 202-75 EQ replaced coil WR #26095 Emergency Vent BV 202-75 EQ replaced coil
. WR #25744 Core Spray Discharge Limitorque Operator 40-01, installed pipe plug WR #26105 FW Pump 11 Breaker replaced connection for charging motor WR #25946 Core Spray Inside Discharge Iv 40-01 EQ installed terminal strip and T drain WR #25148.
CRD Pump #11 replaced overcurrent devices WR #25749 RX-Shutdown Cooling Return IV 12 installed pipe plug WR #25750 s33-04 Installed pipe plug SURVEILLANCE TESTS N1-MST-M1 125 VDC Battery Pilot Cell Voltage and specific gravity test i
-F b
s
.m.-
,Y !k ja -
l CIASS I WORK - MAJOR ORDER - ELECTRICAL MAINT. - APRIL 1984 3410 Appendix R - ADS Logic Modification 13411 Appendix R - Core Spray /Rx Ilead Vent 3072
'Undervoltage relaying PB 102 and 103 3737 Control-Pa..HVAC'
-3405 Appendix R - Remote shutdown Panel 3
2131 Rx. Prot. Sys. MG sets-3406 Appendix R - Emergency Condenser Logic 3384 IIPCI - liigh Level Trip CLASS I WORK'- INSTRUMENT 6 CONTROL - APRIL 1984
)
WR #26001-Torus 0 sample line failed LLRT (201.2-70) 2 (replaced 0-rir.gs per N1-IMP-24.1)
WR #25609 CRD Scram Pilot valves airlines fittings leaking (tightened fittings 6 replaced tubing)
WR #25762 CRD-Scram Volume Vent G Drain SOV's (rebuilt S0V's per IMP-100) l f
d 3.-
9 I
l b
w
.+-y--
+
r,-
.r
.,,.-+--.
,v--.-r
r*
NUMOHAWK Y NIAGARA NMP-8473 NIAGARA MOHAWK POWER CORPORATION /300 ER!E BOULEVARD WEST. SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 May 11, 1984 l
Dircefor Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document and Control Desk Re: Docket No. 50-220 DPR-63
Dear Sir:
SabinLtted herewith is the Report af Operating Statistics and Shatdown for Aptil 1984 for the Nine Mile Point Nuclear Sta, tion Unit M1.
Also included is a nauative report of Operating Experience
.for Aptil 1984.
Very truty yours, Oh C. V. Mang Vice President Nuclear Engineering &
Licensing CVM/jkr Attachments-cc: Director, Office of I&E (10 copies) t
,\\,