i NUREG-0580 1
Vol.12, No.1 REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS i; BLUE B00Ki JANUARY 1 - JANUARY 31,1983 UNITED STATES NUCLEAR REGULATORY COMMISSION ga a%,,
s 1
-AVAILABLE FROM HRC/GPO SALES PROGRAM l
SUPERINTENDENT OF DOCUMENTS t
GOVERNMENT PRINTING OFFICE-WASHINGTON, D.
C.
20402 A-YEARS SUBSCRIPTION CONSISTS OF 12 ISSUES FOR THIS PUBLICATION MICROFICHE OF SINGLE. COPIES ARE AVAILABLE FROM HRC/GPO SALES PROGRAM WASHINGTON, D. C. 20555'
/
i 9
b
NUREG-0580 Vol.12, No.1 REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)
JANUARY 1-JANUARY 31,1983 Date Pu ished ebruary 83 Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 s'"'*%,,
I ff)
F0REWDRD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS
SUMMARY
REPORT, IS DESIGNED TO PROVIDE THE HECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF HUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION & EHFORCEMENT, AND THE HATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IP.'LEMENTATION OF THE RLGULATORY INFORMATI0H SYSTEM.
SECTIDH I 0F THIS EDITION CONSISTS OF THE THREE
SUMMARY
OF ACCOMPLISHMENTS, THE NEW APPLICATI0H FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.
SECTIDH II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGH REVIEWS, OTHER REVIEWS, AND FINALLY, A H0H-POWER REACTOR
SUMMARY
. EACH PROJECT CONSISTS OF GENERAL f4CILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.
1 LICEN5ING 0F MUCLEAR REACTORS THE U.S. MUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE O BUILD THE FACILITY AND AMOTHER TO OPERATE IT.
LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A Cor.TRUCTION PERMIT AND OPERATING t
]
LICENSE.
THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATI0H ALSO COVERS THE UTILITY'S FINANCIAL' QUALIFICATIONS.
THE HRC MAKES COPIES OF THE APPLICPTION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.
TECHNICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION,AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMEN TS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.
THE STAFF'S ANALYSIS IS SUBMITTED TO THE HRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF IMDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATI0H IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACR$ FINDINGS ARE REPORTED TO THE NRC AND MADE PUBLIC.
i A FJBLIC HEARING IS HELD, USUALLY MEAR THE PROPOSED SITE, BY AM MRC APPOINTED ATOMIC SAFETY a LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.
4 AFTER REVIEWING THE HEARING RECORD INCLUDING THE MRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST T
j GRAhTING A CONSTRUCTION PERMIT.
t THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORY COMMISSION.
IF THE LICENSING BOARD AUTHOP.1ZES THE ISSUANCE OF A CONSTRUCTION PERMIT THE DIRECTOR OF THE DIVISION OF l,
LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE l
CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE HRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRCHMEMTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.
AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE HRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR HOT TO ISSUE THE OPERATING LICENSE.
l IN THE OPERATING LICENSE REVIEk PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE r
CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN i
OPERATING PERMIT IS SUBJECT TO THE APPr3 VAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE l
COMMISSION.
l
TABLE OF C0M1EHTS PRINTED IN THE ORDER LISTED SECTION I
SUMMARY
OF ACCOMPLISHMENTS f
SUMMARY
OF ACCOMPLISHMENTS CP
SUMMARY
OF ACCOMPLISHMENTS COMBINED HUMERICAL
SUMMARY
OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEFS FOR PLANTS SEEKING OPERATING LICENSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTIDH PERMITS IN THE HEXT FIVE YEARS HEW APPLICATION FORECAST
- OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS SPECIAL REVIEWS 3
COMMON ABBREVIATIONS USED WITHIH THE PUBLICATIDH 5ECTI'OH II 4
i PRDJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGH REVIEWS OTHER REVIEWS N0H-POWER REACTORS SECTIOH III
+
EXAMPLE REVIEW
~
M Z
O M
H U
W Vh
0L
SUMMARY
0F ACC0MPLISHMENTS AS OF JANUARY 31,1983 JANUARY FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHEDuilD ACTUAL SER ' S S ER ' S HONE NONE SSER ' S SSER ' S COMANCHE PEAK 1 82 01/28/83 BYROM 1 82 01/21/83 BYRON 1 82 01/21/83 COMANCHE PEAK 1 &2 01/28/83 MIDLAND 1 82 10/06/82 10/06/82C ENRICO FERMI 2 01/31/83 WASHINGTON NUCLEAR 2 12/15/82 12/15/82C SUMMER 1 11/12/82 11/12/82C WATERFORD 3 10/22/82 10/29/82C ENRICO FERMI 2 01/31/83 DES
'S DES ' S NONE HONE FES ' S FES ' s CATAWBA 1 82 01/07/83 01/07/83C SEABROOK 1 82 12/08/82 12/08/82C CATAWBA 1 82 01/07/83 01/07/83C 0L
'S I S S U E DM 0 L ' S I SSUEDW SUMMER 1 11/12/82 11/12/82C SUMMER 1 11/12/82 11/12/82C SUSQUEHANNA 1 11/12/82C SUSQUEHANNA 1 11/12/82C M
FULL POWER
]'
-l 1
l Il C
2 L
8 A
I U
0 T
3 C
/
A 2
1 D
E E
2 T
L 8
A U
/
D D
0 E
3 O
H
/
T C
1 S
1 R
A E
Y S
L A
T C
S N.
I F
2 E
8 D
1 M
Y T
D E
H I
R L
O U
5 I
F C
N S
I A
A F
H S
L
/
S T
I P
I S
E G
S E
S E
E 3
M N
A N
M M
8 O
R K
O O
S O
9 N
S M
H H
0 1
R E
S S
C 1
3 E
S E
E P
C Y
S S
D F
C A R A
U N
F A
J 0
F O
C Y
2 S
L 8
R A A
/
U 0
A T
3 C
/
M A
2 1
M U
S D
E L
U P
D E
C H
Y C
R S
A U
NA J
2 8
D 1
Y T
D E
I R
L O
U I
F C
N 5
A A
F H
/
S T
I I
S E
G S
E S
E E
N A
N N
N O
R K
O O
S O
N S
N H
M R
E S
S E
S E
E P
5 D
F C
l l(
lljllI'
SUMMARY
0F ACC0MPLISHMENTS AS OF JANUARY 31, 1983 JANUARY FISCAL YEAR TO DATE SCHEDULED ACTUAL SCHEDULED ACTUAL SER'S( 0L) 0 0
SER'SCOL) 0 0
5SER'SCOL) 3 0
SSER'S( 0L) 7 4
5SER'S( CP) 0 1
SSER'S( CP) 1 1
DES'S( 0L) 0 0
DES'S( 0L) 0 0
DES '
S( CP) 0 0
DES'S( CP )
0 0
FES'S( 0L) 1 1
FES'S( 0L) 2 2
FES'S( CP) 0 0
FES'S( CP) 0 0
OL'S I5SUEDM 1
2 0L'S I S.S U E DM 1
2 CP'S ISSUED 0
0 CP'S ISSUED 0
0 M FULL POWER l
l l
LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF8 01/31/83 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1983-1984)
(LISTED IN ORDER OF FACILITY HAME)
SER SSER EST.
STAFF TECH STAFF TECH ASLB COMMM APPL.
DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
CONST.
PLANT (MONTHS) RE1 TO DL 11R 519 EE1 TO DL 111R OF HRG DECISION PAIE COMPL.
BYROH 1 0
11/81C Ot/82C 02/82C 03/82C 04/82C 08/82C 01/83 03/83 07/83 08/83 08/83 BYRON 2 0
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C N/S 03/83 07/83 04/84 04/84 CALLAWAY 1 0
09/81C 09/81C 10/81C 11/81C 01/82C 01/82C 04/83 11/d1C 10/83 03/84 04/84 CATAWBA t 0
08/82C 01/83C 02/83 03/83 Ot/83C 04/83 04/83 09/83 03/84 09/84 10/84 CLINTON 1 0
12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 04/83 08/83 12/83 12/83 01/84 COMANCHE PEAK 1 0
05/81C 07/81C 07/81C 11/8tC 09/81C 01/83 06/83 12/81C 04/83 05/83 06/83 COMANCHE PEAK 2 0
05/81C 07/81C 07/81C 11/81C 09/81C 01/83 11/83 12/81C 04/83 11/84 12/84 DIABLO CANYON 1 0
12/72C 01/75C 10/74C 07/76C 05/76C 02/83 02/83 12/76C 07/81C DIABLO CANYON 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 02/83 N/S 12/76C 07/81C ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C 09/8tC 01/83C 01/83 C3/82C 10/82C 05/83 08/83 GRAND GULF 1 0
05/81C 08/81C 09/81C 10/81C 10/81C 01/83 02/83 N/A N/A 04/83 06/82C LASALLE 2 0
03/78C 02/81C 03/81C 04/81C 11/78C 01/83 02/83 N/A N/A 03/83 04/83 LIMERICK 1 0
05/83 07/83 08/83 09/83 10/83 10/83 10/83 04/84 09/84 10/84 10/84 MCGUIRE 2 0
10/75C 01/78C 03/78C 04/78C 04/76C 01/83 02/83 03/77C 06/81C 03/83 04/83 MIDLAND 1 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82C.
10/83 11/83 12/83 MIDLAND 2 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 11/83 11/82C 10/23 10/83 07/83 PALD VERDE 1 0
10/81C IC/81C 11/81C 12/81C 03/82C 01/83 02/83 04/82C 12/42C 07/83 08/83 PALO VERDE 2 0
10/81C 10/8tC 11/81C 12/81C 03/82C 01/83 10/83 04/82C 12/82C 07/84 08/84 PERRY 1 C
02/82C 05/82C 05/82C 07/82C 08/82C 10/83 04/83 05/83 08/83 10/83 11/83 SAN ONOFRE 3 0
01/81C Ot/81C-02/81C 02/81C 04/81C 02/83 01/83 C6/81C 05/82C 02/83 11/82C SEABROOK 1 0
05/82C 12/82C 03/83 04/83 12/82C 05/83 06/83 08/83 06/84 08/84 09/84 SHOREHAM 0
03/77C 03/81C 04/81C 10/81C 10/77C H/S 02/83 05/82C 06/83 10/83 06/83 ST LUCIE 2 0
10/8tC 09/81C 10/81C 11/81C 04/82C 12/82 02/83 N/A N/A 03/83 03/83 SUSQUEHANNA 2 0
03/81C 03/81C 04/81C 08/81C 07/81C 02/83 03/83 10/81C 04/82C 12/83 01/84 WASHINGTON NUCLEAR 2 0
07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 03/83 H/A N/A 08/83 09/83
]
WATERFORD 3 0
05/81C 05/81C 07/81C 08/81C 09/81C 01/83 02/83 03/82C 03/83 04/83 05/83 WATTS BAR 1 0
06/78C 06/82C_ 07/82C 08/82C 12/78C 09/82C 04/83 N/A N/A 07/83 08/83 WATTS BAR 2 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 06/84 N/A N/A 07/84 08/84 WOLF CREEK 1 0
01/82C 03/82C 04/82C 05/82C 06/82C 08/82C 08/82C 06/83 11/83 09/84 10/84 ZIMMER 1 0
10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C 06/82C 08/83 09/83 i
MLICENSING SCHEDULES AND DECISI0H DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.
T
LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1984 ISSUE APPL. CONST.
PLANT 11ER COMPLETE BELLEFONTE 1 12/84 05/85 BELLEFONTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 04/86 CATAWBA 2 N/S 03/87 CLINTON 2 N/S FERMI 2 (FSAR RESUB)
GRAND GULF 2 N/S N/S HARRIS 1 04/84 06/85 HARRIS 2 N/S N/S LINERICK 2 N/S MARBLE HILL 1 05/85 06/86 MARBLE HILL 2 12/87 MIL 8 STONE 3 12/84 11/85 PALJ VERDE 3 09/85 11/85 PERRY 2 N/S 05/87 RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 2 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 WASHINGTON NUCLEAR 1 N/S N/S WASHINGTON NUCLEAR 3 12/84 12/85
~.
7 LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS REPORT AS OF 01/31/83 (LISTED IN ORDER OF FACILITY NAME)
SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
PLANT El TO DL im 111A f.]Li TO DL jiiB 0F HRG DECISION D_Alf A
CLINCH RIVER 02/76C 02/83 03/83 05/83 02/77C 06/83 07/83 08/82C 04/84 06/84 SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 02/83 02/83 11/82C 12/82C 07/75C 04/83 07/83 1
l l
l
HEW APPLICATIOH F 0 R E C A S T --- 0 P E R A T I H G-LICEN5E REVIEWS (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)
AS OF WEEK ENDING 01/31/83
-___= -__________==
_________ - =---_._________________==__ ---____..___- =_____
LICENSING APPL.
APPL.
1ST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.
FACILITY HUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL
__ ____ ___=. ____-
_.. _ _ _ _ _ _ - _ _ _ _ _ _ - - _____-==--
_.__... _...__ - _==______________
FY83 MILLSTONE 3 050-00423 HORTHEAST HUCLEAR ENERGY E.DOOLITTLE 10/29/82C 10/29/82C 11/01/85 M.ROTHSCHILD MARBLE HILL 1 82 054680547 PUBLIC SERVICE OF INDIANA P.0 CONHCR 11/23/82C 11/23/82C 06/00/86 R.LESSY BEAVER VALLEY 2 050-00412 - DUQUESHE LIGHT L.LAZO 01/31/83 01/31/83 12/31/85 J.GUTEIRREZ HINE MILE POINT 2 050-00410 HIAGARA MOHAWK POWER M.HAUGHEY 01/31/83 01/31/83 03/00/86 B.BORDEHICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC & GAS D.WAGHER 03/31/83 03/31/83 06/00/86 R. GODDARD V0GTLE 1 &2 0424-0425 - GEORGIA POWER M. MILLER 07/00/83 09/00/83 09/00/86 B.BORDENICK
_______..--_ -__ ______==.
-- __ -__________=_____
_ _ _ _ _ _ _ _ _ _.. = = - _ _
9 NEW A P-P L I C A T I O N F 0 R E C A S T -- C D N S T R U C T I O N PERMITS AS OF HEEK ENDING: 01/31/83
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -.. _ _ = = _ - _ _ _ _ = =.
=___=._______________..__=__
FACILITY PROJECT PROJECT APPL. ER APPL. PSARl lHAME
=_ _ -
==_
UTILITY NUMBER-MANAGER SUB. DATE SUB. DATE l
_____ _=-__
= = - - - -
- --===____
-_____m_.____W-_-
__-- =.______=_ _
_ _. = _ - _ _ _
l CARROLL 142 COMMONWEALTH EDISON 559 D.MORAN 10/00/84 10/00/84 l l
_ _=
_=___
=___ =__
=__== ___
==._______......__......____
l l
[
[
C0MM0N ABBREV IATIONS USED WITHIH THE PUBLICATIOH ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:
LICENSING ASSISTANT AE:
ARCHITECT / ENGINEER LESR: LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)
AEB:
ACCIDENT EVALUATION BRANCH LGR:
LICENSING GUIDANCE BRANCH l
ASB:
AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR l
ASLB: ATOMIC SAFETY LICENSING BOARD LQB:
LICENSEE QUALIFICATIONS BRANCH B8R:
BURNS 8 ROE MEB:
MECHANICAL ENGINEERING BRANCH B8V:
BLACK & VEACH MPA:
MANAGEMENT AND PROGRAM ANALYSIS B8W:
BABCOCK & WILCOX MTEB: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BROWN 8 ROOT MWT:
MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: HUCLEAR STEAM SYSTEMS SUPPLIER CEB:
CHEMICAL ENGINEERING BRANCH OL:
OPERATING LICENSE COMB: COMBUSTION ENGINEERING OLB:
OPERATOR LICENSING BRANCH CP:
CONSTRUCTION PERMIT OPS:
OFFSHORE POWER SYSTEMS CPB:
CORE PERFORNANCE BRANCH CSB:
CONTAINMENT SYSTEMS BRANCH CWE:
COMMONWEALTH EDISON PDA:
PRELIMINARY DESIGN APPROVAL PG8E: PACIFIC GAS & ELECTRIC DES:
DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISIDH PM:
PROJECT MANAGER PS:
POWER SYSTEMS BRANCH EEB:
ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:
ENVIRONMENTAL PROTECTION AGENCY PTRB: PROCEDURES AND TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDNESS LICENSING BRANCH PWR:
PRESSURIZED WATER REACTOR ER:
ENVIRONMENTAL REPORT EQB:
EQUIPMENT QUALIFICATION BRANCH ESRs EARLY SITE REVIEW QAB:
QUALITY ASSURANCE BRANCH ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAB:
RADIOLOGICAL ASSESSMENT BRANCH F.R.:
FEDERAL REGISTAR RSB:
REACTOR SYSTEMS BRANCH FDA:
FINAL DESIGN APPROVAL FES:
FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT S8L SARGENT 8 LUNDY S&W STONE 8 WEBSTER SAB SITING ANALYSIS BRANCH G8H:
GIBBS 8 HILL SAR:
SAFETY ANALYSIS REPORT GHDR: GIBBS & HILL SDA:
STANDARD DESIGN APPROVAL GIL:
GILBERT COMMONWEALTH SEB:
STRUCTURAL ENGINEERING BRANCH GSB:
GEOSCIENCES BRANCH SER:
SAFETY EVALUATION REPORT SIB:
SYSTEMS INTERACTION BRANCH SP:
SPECIAL PROJECT HGB:
HYDROLOGIC AND GEOTECHNICAL BRANCH SSC:
SOUTHERN SERVICES COMPANY HTGR: HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATIDH TVA:
TENNESSEE VALLEY AUTHORITY ICB:
INSTRUMENTATION AND CONTROL BRANCH UEC:
UNITED ENG. & CONSTRUCTORS UFB:
UTILITY FINANCE BRANCH WEST: WESTINGHOUSE
r tu M
M Z
O M
>=
O LAJ m
Ap
' ' ~ ' "
w,%,
PR0 JECT INDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTIDH PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 BELLEFONTE 1 8 2 2-35 CLINCH RIVER 2-37 (BCP)BOPSSAR/BSAR-205 2-47 CARROLL SITE I
2-2 BRAIDWOOD 1 82 2-36 SKAGIT/HANFORD 182 2-38 (BOP)ESSAR/BSAR-205 2-3 BYRON 1 & 2 2-39 (BOP)ESSAR/CESSAR-80 2-4 CALLAWAY 1 2-40 (BOP)ESSAR/RESAR-414 2-5 CATAWBA 182 2-41 (BOP)GAISSAR 2-6 CLINTON 1 4 2 2-42 (BOP)GIBBSSAR (W) 2-7 COMANCHE PEAK 1&2 2-43 (BOP)SWESSAR/BSAR-205 2-S DIABLO-CANTON 142 2-44 (HSS)CESSAR SYSTEM 80 2-9 ENRICO FERMI 2 2-45 (HSS)GESSAR SEVERE ACC 2-10 FERMI 2 (FSAR RESUB) 2-46 (HSS)GESSAR-238 HI 2-11 GRAND GULF 1 4 2 2-12 HARRIS 182 2-13 LASALLE 2 2-14 LIMERICK 1 & 2 2-15 MARBLE HILL 1 & 2 2-16 MCGUIRE 2 2-17 MIDLAND 1 82 2-18 MILLSTONE 3 2-19 PALO VERDE 1,2,3 2-20 PERRY 1 & 2 2-21 RIVER BFMD 1 & 2 2-22 SAN ONOFRE 3 2-23 SEABROOK 1 42 2-24 SHOREHAM 2-25 SOUTH TEXAS 1 & 2 2-26 ST LUCIE 2 2-27 SUSQUEHANNA 2 2-28 WASHINGTON HUCLEAR 1 2-29 WASHINGTON HUCLEAR 2 2-30 WASHINGTON HUCLEAR 3 2-31 WATERFORD 3 2-32 WATTS BAR 1 82 2-33 WOLF CREEK 1 2 34 ZIMMER 1
t NRR LICENSING SYSTEM PAGE NO: 2-1 BELLEFONTE 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E La DP;dET NO:
043880439 LIC. PM:
R. HERMAN ASLB CHAIR N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 1:
N/A LOCATIDH 6 MI HE OF SCOTTSBORD. ALA LIC. LA.:
M. DUNCAN MEMBER 2:
N/A REGION:
2 AE TVA COUNSEL:
B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR HSSS: B8W ANTITRUST:
J. RUTBERG RESID. INSP J. WILCOX DESIGN PWR 3760 MWT/1235 MWE CONST: TVA RM AhALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the review schedule has been delayed. The applicant has ER DOCKETED:
06/12/78 06/i?/78C announced a delay in loading fuel to 05/85.
The ER SITE VISIT COMPLETE:
02/20/82 06/17i42C staff has evaluated the impacts of this delay on the INPUT TO DES TO PM:
11/04/83 safety and environmental review schedules and issued ISSUE DES:
12/02/83 new schedule on 01/25/83.
RESPONSE TO COMMENTS ON DES:
03/05/84 ISSUE FES:
05/01/84 CURRENT ENV. STATUS:
As a result of applicant's construction delay, the review schedule was delayed, and is being re evaluated.
SAFETY / HEARING MILESTONES:
The environmental. site visit was completed on 6/17/82.
APPLICATION TENDERED:
02/03/78 02/03/78C SAR DOCKETED:
06/12/78C SAR Q'S RECEIVED BY PM:
07/03/80 11/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/28/83 CURRENT HRG STATUS:
INPUT TO DRAFT SER TO PM:
01/20/84 No hearing is anticipated.
ISSUE DRAFT SER:
03/16/84 INPUT TO SER:
06/15/84 ISSUE SER:
08/17/84 ACRS FULL COMMITTEE MEETING:
09/28/84 INPUTS TO SE SUPPLEMENT 1:
10/05/84 ISSUE SE SUPPLEMENT 1:
12/07/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Pending determination HEARING STARTED:
N/A ASLB IHITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISIDH N/A TECH SPECS COMPLETED:
02/01/85 COMMISSION DECISIGHz 04/15/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/85 Ho, 23 (12/17/82).
SCHED. DATE RECEIPT DATF HEW SLIPS / NOTES:
On 07/06/82 TVA revised fuel load date to 5/85.
Staff has CONSTRUCTION COMPLETION - APPL.
05/00/85 07/06/82 evaluated impact on safety and environmental review schedules and issued new schedule on 01/25/83.
HRR LICENSING SYSTEM PAGE HO 2-2 BRAIDWOOD 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT C H A R A C T E R I S T I C 5:
KEY PERS0HHELa DOCKET NO:
045680457 LIC. PM:
J. STEVENS ASLB CHAIR:
M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:
24 MI SSW OF JOLIET, ILL LIC. LA.:
M. RUSHBROOK MEMBER 2:
D. CALLIHAM REGIGHz 3
AE 58L COUNSEL:
D. HASSELL CONST. INSP J. HEISLER REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP L. MCGREGOR DESIGN PWR: 3425 MWT/1120 MWE CONST: CWE RM ANALYST:
M. KING CURRENT SAF STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several portions are under contract review.
ER DOCKETED:
11/30/78C ER SITE VISIT COMPLETE:
04/15/83 INPUT TO DES TO PM:
11/01/83 ISSUE DES:
01/00/84 RESPONSE TO COMMENTS ON DES:
04/01/84 ISSUE FES:
06/00/84 CURRENT ENV. STATUS:
Inactive.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
12/31/82 12/31/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/01/83 Opportunity for hearing was published in the Federal ISSUE DRAFT SER:
09/20/83 Register on 06/13/79. There will be a contested hearing.
INPUT TO SER:
11/01/83 ISSUE SER:
12/01/83 ACRS FULL COMMITTEE MEETING:
01/00/84 INPUTS TO SE SUPPLEMENT 18 04/01/84 ISSUE SE SUPPLEMENT 18 05/00/84 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Applicant has submitted antitrust information pursuant to HEARING STARTED:
10/00/84 Reg. Guide 9.3.
ASLB INITIAL DECISION:
03/00/85 COMMISSION EFFECTIVENESS DECISION: 04/00/85 TECH SPECS COMPLETED:
04/00/85 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 FSAR Amendment No. 38 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/00/85 04/14/82
1 i
NRR LICEN$ING SYSTEM PAGE NO: 2-3 BYRON 182 0L CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
045480455 LIC. PM:
L. OLSHAN ASLB CHAIR:
I. SMITH
. APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:
17 MI SW OF ROCKFORD, ILL LIC. LA.:
M. RUSHBROOK MEMBER 2 D. CALLIHAN REGION:
3 AE 58L COUNSEL:
S. GOLDBERG CONST. INSP M. RING REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP W. FORNEY DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER and Supplement 1 have been issued. Several outstanding and confirmatory issues remain to be ER DOCKETED:
11/30/78C resolved prior to licensing.
ER SITE VISIT COMPLETE:
05/31/81 05/31/81C INPUT TO DES TO PM:
08/15/81 08/15/81C ISSUE DES:
11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:
03/01/82 03/01/82C' ISSUE FES:
04/05/82 04/05/82C CURRENT ENV. STATUS:
Environmental review completed and FES (NUREG-0848) published in April 1982.
SAFETY / HEARING MILESTONES:
l APPLICATIDH TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/09/78 11/30/78C l
SAR Q'S RECEIVED BY PM:
08/15/81 08/15/81C I
.SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/07/81 11/07/81C In discovery. Hearing scheduled to commence in ISSUE DRAFT SER:
March 1983.
INPUT TO SER:
01/07/82 01/07/82C ISSUE SER:
02/07/82 02/07/82C ACRS LETTER RECEIVED:
03/10/82 03/10/82C I
INPUTS TO SE SUPPLEMENT 2 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 28 01/21/83 FEMA LETTER RECEIVED:
CURRENT ANTITRUST Applicant has submitted antitrust information pursuant HEARING STARTED:
03/08/83 to Reg. Guide 9.3.
ASLB INITIAL DECISION:
07/08/83 COMMISSION EFFECTIVENESS DECISION: 08/00/83 TECH SPECS COMPLETED:
06/30/83 COMMISSIDH DECISION:
08/08/83 ISSUE LIC. WITH POWER RESTRICTION:
i LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/08/83 FSAR - Amendment 40 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
(
CONSTRUCTION COMPLETION - APPL.:
08/31/83 07/14/82
HRR LICEN5ING SYSTEM PAGE NO 2-4 CALLAWAY 1 0L CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLAHT CHARACTERISTICSt KEY PERS0NNELe DOCKET HO:
05000483 LIC. PM:
G.
EDISON ASLB CHAIR:
J. GLEASON APPLICANT:
UNION ELECTRIC LIC. BC B. YOUNGBLOOD MEMBER 1 G. BRIGHT LOCATION:
10 MI SE OF FULTON, MO LIC. LA.:
M. RUSHBROOK MEMBER 28 J. KLINE REGION:
3 AE:
BECH COUNSEL:
R. LESSY CONST. INSP J. KONKLIN REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP J. HEISLER DESIGN PWR 3425 MWT/1188 MWE CONST DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by HRC on 10/07/81 and the SER Supplement No. 1 was issued on ER DOCKETED:
12/12/80 12/12/80C 01/15/82. SSER 2 is scheduled for 4/83.
ER SITE VISIT COMPLETE:
12/00/81 12/00/81C INPUT TO DES TO PM4 08/01/81 08/01/81C ISSUE DES:
09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:
12/01/81 12/01/81C ISSUE FES:
01/29/82 01/29/82C CURRENT ENV. STATUS:
ER was docketed 12/12/80. The DES was issued by HRC on 09/29/81 and the FES was issued on 01/29/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/25/79 10/2S/79C SAR DOCKETED:
08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:
12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hearings were held on limited issues during Hovember 1981 ISSUE DRAFT SER:
N/A The hearing on the one remaining contention, emergency INPUT TO SER:
39/11/81 09/11/81C preparedness, is scheduled for May, 1983.
A decision on ISSUE SER:
10/07/81 10/07/81C these limited issues was rondered by the licensing board on 12/13/82. Joint intervenors are preparing to appeal ACRS LETTER RECEIVED:
11/19/81 11/19/81C and were granted an extension to 01/31/83 to file.
INPUTS TO SE SUPPLEMENT 2:
01/01/82 01/01/82C ISSUE SE SUPPLEMENT 28 04/30/83 FEMA LETTER RECEIVED:
03/00/83 CURRENT ANTITRUST:
OL review is in progress.
HEARING STARTED:
11/17/81 11/17/81C ASLB INITIAL DECISIDH:
10/00/83 COMMISSION EFFECTIVENESS DECISION: 11/00/83 TECH SPECS COMPLETED
- N/S COMMISSION DECISION:
03/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
The Caseload Forecast Panel is reviewing construction CONSTRUCTION COMPLETION - APPL.
04/00/84 08/23/82 progress in order to make a new construction completion schedule estimate. An April 1984 estimate is based on the anolicant's recentiv revised fuel load date.
i
NRR LICENSING SYSTEM PAGE Mos 2-5 CATAW3A 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERI5TICSt KEY PER50NNELa DOCKET NO:
041380414 LIC. PM:
K. JAB 00UR ASLB CHAIRt J. KELLEY APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 18 D. CALLINAM LOCATION:
6 MI NNW OF ROCK HILL, SC LIC. LA.:
M. DUNCAN MEMBER 2:
R. FOSTER I
REGION:
2 AEt DUKE COUNSEL:
G. JOHMSON CONST. INSPs P. VAND00RN REAC. TYPE: PWR NSSS WEST ANTITRUST B. V0GLER RESID. INSPs P. VAND00RM DESIGN PWR 3582 MWT/1145 MWE CONST8 DUKE RM ANALYST L. LANIER CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER is scheduled to be completed 02/06/83.
ER DOCKETED:
06/11/81 06/11/81C ER SITE VISIT COMPLETE:
10/15/81 10/15/81C INPUT TO DES TO PM:
06/25/82 07/29/82C a
i ISSUE DES:
08/05/82 08/11/82C
+
RESPONSE TO COMMENTS ON DE5:
11/30/82 ft/30/82C ISSUE FES:
01/07/83 01/07/83C CURRENT ENV. STATUS:
DES was issued on 08/11/82. FES was issued on 1/7/83.
SAFETY / HEARING MILESTONES
- l APPLICATI0M TENDERED:
04/07/81 04/07/81C SAR DOCKETED 06/11/81 06/11/81C l
SAR O'S RECEIVED BY PM:
12/15/81 12/15/81C L
l SAR APPL. RESPONSE TO 4'S RECEIVED: 12/10/82 12/10/82C CURRENT HRG. STATU$t INPUT TO DRAFT SER TO PM:
07/02/82 12/30/82C Combined hearing anticipated to start 09/83.
ISSUE DRAFT SER:
11/19/82 11/19/82C INPUT TO SER 01/19/83 ISSUE SER:
02/06/83
[
ACRS FULL CDMMITTEE MEETING:
03/10/83 l
l IMPUTS TO SE SUPPLEMENT 13 04/12/83 ISSUE SE SUPPLEMENT 1r 04/30/83 FEMA LETTER RECEIVED:
03/30/83 CURRENT ANTITRUST Operating Ilconse antitrust review is in progress.
HEARING STARTED:
09/28/83 ASLB INITIAL DECISION:
03/09/84 COMMISSION EFFECTIVEMESS DECISION: 04/08/84 TECH SPECS COMPLETED:
09/08/84 COMMISSIDH DECISIDMt 09/08/84 l
ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT 8 ISSUE FULL PDWER LICENSE AMEND 11/09/84 I
Revision 6 dated 10/25/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CP Amend. Issued 12/23/80 indicating change in ownership.
CONSTRUCTION CDMPLETION - APPL.
10/08/84 05/08/82 Staff is reassessing standard sssumptions for pr9jecting hearing schedules for plants with const. completion dates bevond '82.
This re-ammans. may result in a new schedule.
l
NRR LICENSING SYSTEM PAGE NO: 2-6 CLINTON 1 8 'e OL CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:
046180462 LIC PM:
H. ABELSON ASLB CHAIR:
H. CLARK APPLICANT:
ILLINDIS POWER LIC. BC:
A. SCHWENCER MEMBER 1 G. FERGUSON LOCATIDH 6 MI E C' CLINTCH, ILL LIC. LA.:
E. HYLTON MEMBER 28
- 0. PARIS REGIDH 3
AE 58L COUNSEL:
R. GODDARD CONST. INSP F. JABLONSKI l
REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP H. LIVERMORE
(
DESIGN PWR 2894 MWT/0950 MWE CONST BALDWIN RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80. SER was issued 02/17/82.
Supplement No. I was issued 07/22/82. SSER No. 2 is ER DOCKETED:
03/01/81 09/08/83C scheduisd for April 1983.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
12/08/81 12/08/810 ISSUE DES:
12/18/81 12/28/810 RESPONSE TO COMMENTS ON DES:
02/22/82 03/25/82C ISSUE FES:
05/20/82 05/20/82C CURRENT ENV. STATUS:
The draft environmental statement was completed December 1981 The FES was completed May 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/01/79 12/01/79C SAR DOCKETED:
09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
l CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Two petitions for leave to intervene were filed. The ISSUE DRAFT SER:
State of Illinois filed under 10 CFR 2.715(c).
IMPUT TO SER:
12/05/81 12/05/81C Prehearing conferences were held on 04/14/81 and on ISSUE SER:
01/05/82 02/17/82C 05/04/82. ASLB Memorandum and Order on 11/10/82 ruled on i
t proposed supplemental contentions, proposed issues, motion ACRS LETTER RECEIVED:
02/12/82 03/09/82C l
for summary disposition, and dismissed a previously INPUTS TO SE SUPPLEMENT 28 06/30/82 06/30/82C l
admitted contention.
ISSUE SE SUPPLEMENT 28 04/00/83 FEMA LETTER RECEIVED:
N/S 1
CURRENT ANTITRUST:
I Operating license antitrust review completed HEARING STARTED:
08/00/83 March 18. 1982 (SECY-82-120).
ASLB INITIAL DECISION:
12/00/83 COMMISSION EFFECTIVENESS DECISION:
12/00/83 TECH SPECS COMPLETED:
11/00/83 COMMISSION DECISIDH 12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/84 FSAR Amendment 821, 12/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
IPC announced fuel load date of 1/84 by letter dated CONSTRUCTION COMPLETION - APPL.
01/00/84 04/21/82 04/21/82. Stop work orders associated with consscuction QA may impact fuel load date.
HRR LICENSING SYSTEM PACE HO 2-7 COMANCHE PEAK 1 &2 0L CURREHT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERI$TICSt KEY PERS0NNEL DOCKET HO:
044580446 LIC. PM:
S. BURWELL ASLB CHAIR:
M. MILLER APPLICANT:
TEXAS UTILITIES GENERATING LIC. BC:
B. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:
' MI H OF GLEN ROSC. TEY LIC. LA.:
M. RUSHBROOK MEMBER 2:
K. MCCOLLOM REGIDH:
4 AE G8H COUNSEL:
M. ROTHSCHILD CONST. INSP R. TAYLOR REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP D. KELLY DESIGH PWR 3411 MWT/1150 MWE CONSh' BRRT RM ANALYST:
M. KING CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued C7/14/81. The staff deferred scheduling the Comanche Peak review by the ACRS untti sufficient ER DOCKETED:
01/19/79 Ol/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:
06/20/80 08/07/80C issues. SSER 81 was issued 10/16/81 Application was INPUT TO DES TO PM:
08/15/80 04/27/81C reviewed by the ACRS on 11/13/81 SSER 82 responding to ISSUE DES:
04/30/81 05/22/81C the ACRS was issued on 01/20/82. SSER 83 is scheduled RESPONSE TO COMMENTS ON DES:
07/19/81 08/28/81C to be issued 01/28/83.
ISSUE FES:
09/18/81 09/24/81C CURRENT ENV. STATUS:
The DES was issued an 05/22/81 The EPA Federal Register Hotice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:
ended 07/13/81 The FES was issued on 09/24/81.
APPLICATION TENDERED:
03/01/78 03/01/78C SAR DOCKETED:
05/12/78 05/12/78C SAR 0?S RECEIVED BY PM:
12/30/78 d2/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/13/79 03/11/81C The fir st hear ung session was held 12/02/81 in Fort Worth.
ISSUE DRAFT SER:
03/31/81 03/31/81C Issues heard were financial qualifications and the INPUT TO SER:
05/22/81 07/08/81C operating QA program, A second, third, and fourth hearing ISSUE SER:
07/14/81 07/14/81C sessions on QA/QC during construction were held 06/07-11/82, 07/26-30/82, and 09/13-17/82.
The fourth hearing session ACRS LETTER RECEIVED:
11/17/81 11/17/81C completed the remaining contention, emergency plans.
INPUTS TO SE SUPPLEMENT 3:
01/25/83 The ASLB is awaiting staff rebuttal testimony to allegation ISSUE SE SUPPLEMENT 38 01/28/83 concerning pipe hangers.
The fifth hearing session is N/S.
FEMA LETTER RECEIVED:
06/00/83 CURRENT ANTITRUST:
ALJ appointed on 02/23/82 4.3 replace ASLB. Prehearing HEARING ST*RTED:
12/02/81 12/02/8tC conference held 04/13/82 to determine status of parties.
ASLB INITIAL DECISIDH:
04/00/83 Eriefs filed 05/04/82 request immediate imposition of COMMISSIDH EFFECTIVENESS DECISIDH: 05/00/83 l
settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:
05/00/83 l
approving settlement agreements & proposed license COMMISSIDH DECISIDH:
05/00/83 conditions 8 dismissing proceedings was issued 05/06/82.
ISSUE LIC. WITH POWER RESTRICTIDH N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/00/83 37 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
SSER 83 has been delayed an additional etcht weeks due to CONSTRUCTIDH COMPLETION - APPL.:
06/00/83 10/29/81 staff resources. The delay will not impact the hearing schedule.
e NRR LICENSING SY$ TEM PAGE NO: 2-8 DIABLO-CANYON 1&2 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CNARACTERISTICSt KEY PERS0NNELe DOCKET NO:
027580323 LIC, PM:
B. BUCKLEY ASLB CHAIR:
J. WOLF APPLICANT:
PACIFIC GAS & ELECTRIC LIC. BC:
G. KNIGHTON MEMBER 18 J. KLINE LOCATION:
12 MI WSW OF SAN LUIS OBISPO LIC. LA.:
J. LEE MEMBER 28 G. BRIGHT REGION:
5 AE PGRE COUNSEL:
- b. JONES CONST. INSP D. r.IRSCH REAC. TYPE: PWR HSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP: J. CARLSON DESIGN PWR: 3338 MWT/1084 MWE CONST: PG8E RM ANALYST B. ST MARY C'JRRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER 15 (Equip. Qualification) was issued on 10-02-81 SSER 16 is estimated for 03/15/83 Cindicated as SSER9 ER DOCKETED:
11/09/71 11/09/71C on schedule). Favorable ASLB Initial Decision on a ER SITE VISIT COMPLETE:
full power license was issued on August 31, 1982.
Low INPUT TO DES TO PM:
10/09/72 10/09/72C Power license was issued on 09-22-81 and suspended on ISSUE DES:
12/12/72 12/12/72C Novemba-19, 1981.
RESPONSE TO COMMENTS ON DES:
04/27/73 04/27/73C ISSUE FES:
09/15/75 05/28/76C CURRENT ENV. STATUS:
Complete SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:
01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/01/74C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/24/75 01/24/75C LP hearings were held 05-19-81 through 05-22-81 A
ISSUE DRAFT SER:
favorable PID on low power operation was issued July INPUT TO SER:
01/24/75 01/24/75C 17, 1981.
A full power hearing was completed on January ISSUE SER:
10/04/7^
10/16/74C 26, 1982.
In August an Initial Decision was issued authorizing issuance of a full power operating license.
ACRS LETTER RECEIVED:
05/09/78 07/18/78C INPUTS TO SE SUPPLEMENT 98 02/18/83 ISSUE SE SUPPLEMENT 9:
02/07/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Not required NEARING STARTED:
10/29/75 12/07/76C ASLB INITIAL DECISIDH 07/17/81 07/17/81C COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
09/15/81 09/15/81C COMMISSIDM DECISION:
ISSUE LIC. WITH POWER RESTRICTIDH 09/22/81 09/22/81C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/30/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Est. of dates from end of LP hrq to lic, complete CONSTRUCTION COMPLETION - APPL.
dependent upon dev./aporoval of State and local Emergency Plans. Ongoing Design Verif. Program Ilkely to identify olant modifications. C nst. comol.ttion deoendent on mods.
MRR LICEN$ING SYSTEM PAIE NO: 2-9 ENRICO FERMI 2 0L CURRENT STATUS REP 0RT REPORT Av 0F 01/31/83 PLANT C H A.' A C T E R I S T I C St KEY PERSONNELa DOCKET NO:
0500:161 LIC. PM:
D. LYNCH ASLB CHNIR G. MILLHOLLIN APPLICANT:
DETRosi EDISDN LIC. BC:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 2:
D. SCHINK
+
REGION:
3 AE S8L COUNSEL:
C. WOODHEAD CONST. INSP: P. PELKE s
REAC. TYPE: BWR NSSS: GE ANTI! RUST:
A. HODGDON RESID. INSP B. LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST DANIEL RM ANALYST S. HEL?.UND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81 (See second page for milestone ER DOCKETED:
04/04/75 04/04/75C summary.) SSER No. I was issued 09-25-81 SSER No. 2 was ER SITE VISIT COMPLETE:
09/27/78 10/31/78C 4
issued 01-29-82 with 7 prelicensing issues outstanding.
INPUT TO DES TO PM:
07/31/81 04/24/81C SSER No. 3 is scheduled for issuance on 01-31-83.
ISSUE DES:
05/01/81 04/30/81C RE3PONSE TO COMMENTS ON DES:
07/31/81 06/29/81C ISSUE FES:
08/3f'81 09/04/8tC CURRENT ENV. STATUS:
Addendum No. 1 to the FES was issued 03-03-82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:
06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:
04-02-82.
The two contentions weres (1) QA/QC during INPUT TO SER:
03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:
08/01/77 09/29/77C the local community. Monroe County, Michigan petitioned for leave to reopen hearings on the evacuation issue.
ACRS LETTER RECEIVED:
08/20/81 08/11/81C ASLB issued initial decision on 10/29/82 authorizing INPUTS TO SE SUPPLEMENT 38 08/22/82 01/05/83C operating license issuance.
ISSUE SE SUPPLEMENT 3:
01/31/83 FEMA LETTER RECEIVED:
05/01/83 CURRENT ANTITRUST:
An ASLB decision on antitrust matters was issued on HEARING STARTED:
12/02/81 03/31/82C 04-25-78.
ASLB INITIAL DECISION:
10/00/82 10/29/82C COMMISSIDH EFFECTIVENESS DECISION:
12/22/82C TECH SPECS COMPLETED:
64/01/83 COMMISSIDH DECISION:
05/01/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/01/83 The latest final Safety Analysis Report Amendment is number 43.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
SSER 3 slipped 3 months. It has been slipped an additional CONSTRUCTION COMPLETION - APPL.:
08/01/83 10/01/82 few weeks to reflect the resolution of some pool dynamic loads issues. There is no impact on OL issuance.
i
~.
2 l
NRR LICEN5ING SYSTEM PAGE NO: 2-10 i
FERMI 2 (FSAR RESUB)
OL CURRENT STATUS REPORT REPORT AS oft 01/31/83-i PLANT CHARACTERI5TICSt KEY P E R S 0 N N E La DOCKET NO:
00007341 LIC. PM L. KINTHER ASLB CHAIR:
G. MILLHOLLIN APPLICANT:
DETROIT EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1 P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 28 D. SCHINK REGION 3
AE 58L COUNSEL:
C. WOODHEAD CONST. INSP P. PELKE i
REAC. TYPE: BWR NSSS: GE ANTITRUST 8 A. HODGDON RESID. INSPs B. LITTLE t
DESIGN PWRt 3292 MWJ/1093 MWE CONST DANIEL RM ANALYST S. HEDLUND i
CURRENT SAF. STATUS:
SCHED. DATE ACTUAL DATE All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 46-01-78 l
and the safety reviec was completed. A final SER was issued on 07-10-81.
Summary of later milestones is on previous page.
1 CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES
(
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
06/01/78 06/01/78C SAR t'S RECEIVED BY PM:
07/11/78 08/02/78C SAR APPL. RESPONSE To t'S RECEIVED: 08/08/78.
10/02/78C
~^
CURRENT HRG. STATUS 8 INPUT TO DRAFT SER TO PMt 09/08/78 03/27/81C I
ISSUE DRAFT SER:
INPUT TO SER:
06/10/81 06/23/81C ISSUE SER:
06/30/81 07/10/81C
)
l CURRENT ANTITRUST
- i 1
i l
I LATEST AMENDMENT:
NEW SLIPS / MOTES:
All information en this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI nause.
HRR LICEHSING SYSTEM PAGE HO: 2-11 GRAND GULF 1 82 LIC CURRENT
$TATUS REP 0RT REPORT AS OF 01/31/83 PLAHT CHARACTERISTICSt KEY P E R S 0 N N E L8 DOCKET NO:
041680417 LIC. PMt D. HOUSTON ASLB CHAIR J. LAURENSON APPLICANTt MISSISSIPPI POWER 4 LIGHT-COMPANY LIC. BC:
A. SCHWENCER MEMBER 18 G. BRIGHT LOCATION:
25 MI S OF VICKSBURG, MISS LIC. LA.:
E. HYLTON MEMBER 2:
J. HARBOUR REGION:
2 AEt BECH COUNSEL:
M. WAGNER CONST. INSPt R. VANDORH REAC. TYPE: BWR HSSS GE ANTITRUSTt B. V0GLER RESID. INSP8 A. WAGNER e
DESIGN PWRt 3833 MWT/1250 MWE CONST BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981 SSERs were issued in December 1981 and in June and July 1982.
The ACRS ER DOCKETED:
06/05/78 06/30/78C report on full power operation for Unit 1 was issued ER SITE VISIT COMPLETE:
12/14/7 9C August 18, 1982.
INPUT TO DES TO PM:
04/30/81 04/30/81C ISSUE DES:
05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:
08/15/81 08/15/81C ISSUE FES:
09/15/81 10/09/81C CURRENT ENV. STATUS:
DEC 1as issued in May 1981 FES was issued October 9, 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/28/78 04/28/78C l
SAR DOCKETED:
06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:
04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED 07/01/80 09/30/80C CURRENT HRG. STATUSt INPUT TO DRAFT SER TO PM:
N/S Ho hearing. Petition was filed by the State ISSUE DRAFT SER:
09/18/81C of Loulslana on basis of Court of Appeals, District of INPUT TO SER:
04/01/81 08/14/81C Columbia, opinion on S-3 Table issue. Board denied petition ISSUE SER8 06/00/81 09/10/81C for intervention on October 20, 1982.
The State of Louisiana filed an appeal to the Board's denial. Appeal ACRS LETTER RECEIVED:
07/00/81 08/18/82C Board upheld the denial for intervention in a decision INPUTS TO SE SUPPLEMENT 48 01/15/83 issued December 8, 1982.
ISSUE SE SUPPLEMENT 42 02/07/83 FEMA LETTER RECEIVED:
06/00/82 12/17/82C CURRENT ANTITRUST:
OL review is in progress. No significant changes have HEARING STARTED:
N/A occurred since the CP.
ASLB INIIIAL DECISION:
.H/A COMMISSION EFFECTIVENESS DECISI0H N/A I
TECH SPECS COMPLETED:
09/01/81 06/16/82C COMMISSIDH DECISION:
04/00/83 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST AMENDMENTt ISSUE FULL POWER LICENSE AMEND:
04/15/83 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
Unit 1 OL authorizing fuel load up to 5% power was issued CONSTRUCTION COMPLETION - APPL.
06/16/82C 06/16/82. Full power date delayed due to licensee's desire to complete number of outstanding items and accomolish maintenance 8 mods for first refuelino outaae.
t l'
l l
NRR LICEN$ING
$YSTEM PAGE NO: 2-12 HARRIS 1 8 2 0L CURRENT STATUS-REPORT REPORT AS OF 01/31/83 e
PLANT CHARACTERISTIC 52 KEY PERS0NNELt DOCKET NO 0400-0401 LIC, PM:
P. KADAMBI ASLB CHAIR J. KELLEY.
I APPLICANT:
CAROLINA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBER 13 G. BRIGHT LOCATION:
20 MI SW OF RALEIGH, NC LIC. LA.8 J. LEE MEM0ER 28 J. CARPENTER REGION:
2 AEt EBASCO COUNSEL C. BARTH CONST. INSPt REAC. TYPE: PNR NSSS: WEST ANTITRUST J. RUTBERG RESID. INSP G. MAXWELL DESIGN PWR 2775 MWT/0915 MWE CONST DANIEL RM ANALYST M. KING i
l CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES:
SCHED. DATE. ACTUAL DATE FSAR was docketed on 12/22/81. Review has started.
Questions were sent to the applicant between 4/26/82 ER DOCKETED 12/22/81 12/22/81C and 7/30/82. Most of applicant's responses were ER SITE VISIT COMPLETE:
04/08/82 04/08/82C received by 08/31/82.
INPUT TO DES TO PM:
01/31/83 ISSUE DES:
02/21/83
. RESPONSE TO COMMENTS ON DES:
06/10/83 ISSUE FES:
08/15/83 l-I CURRENT ENV. STATUS:
ER was docketed on-12/22/81. The site visit was complete on 04/d8/82 and questions were sent to. applicant on SAFETY / HEARING MILESTONES 04/28/82. Most of the applicant's. responses were received by October 15, 1982.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED 12/22/81 12/22/81C SAR Q'S RECEIVED BY PMt N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG STATUSt INPUT TO DRAFT SER TO PM:
01/31/83 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:
01/28/83 Federal Register on January 27, 1982.
Several petitions INPUT TO SER:
09/01/83 to intervene were filed. Prehearing conference on petitions ISSUE SERT 11/01/83 was held on July 13-14, 1982.
Board decision on contentions issued September 23, 1982.
Further clarification issued ACRS FULL COMMITTEE MEETING 01/02/84-January 11, 1983.
INPUTS TO SE SUPPLEMENT 1 03/01/84 ISSUE SE SUPPLEMENT 18 04/02/84 i
FEMA LETTER RECEIVED:
04/0C/84 CURRENT ANTITRUST 1
Status to be determined.
HEARING STARTED:
09/03/84 ASLB INITIAL DECISION:
05/01/85 COMMISSION EFFECTIVENESS DECISION: 05/00/85 TECH SPECS COMPLETED:
05/01/85 COMMISSION DECISION:
05/08/85-06/03/85 LATEST AMENDMENT ISSUE FU L OW R H E AMEND FSAR No. 4 ER No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
Staff schedule based on fuel load date of 86/03/85.
CONSTRUCTION COMPLETION - APPL.:
06/03/85 10/06/82 i
I i
1 u
HRR LICENS1NG SYSTEM PAIE NO: 2-13 LASALLE 2 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY PERS0NNEL:
DOCKET NO:
05000374 LIC. PM:
A. BOURNIA ASLB CHAIR:
M. MILLER APPLICANT:
C0r1MONWEALTH EDISON LIC. BC:
A. SCHWENCER MEMBER 1:
F. SHON LOCATION:
11 MI SE OF OTTAWA, ILL LIC. LA.:
E. HYLTON MEMBER 28
- 0. PARIS REGION:
3 AE:
58L COUNSEL:
C. WOODHEAD CONST. INSP H. WESCOTT REAC. TYPE: BWR HSSS: GE ANTITRUST.
B. V0GLER RESID. INSP: W. GULDEMOND DESIGN PWR 3293 MWT/1078 MWE CONST: CWE RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981.
SSER-2 was issued in February 1982.
SSER-3 was issued on April 16, 1982.
ER DOCKETED:
01/17/77 05/12/77C SSER-4 was issuef on July 14, 1982.
SSER-5 is scheduled ER SITE VISIT COMPLETE:
for 02/83.
INPUT TO DES TO PM:
02/17/78 02/17/78C ISSUE DES:
03/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:
07/14/78 07/14/78C ISSUE FES:
09/22/78 11/03/78C CURRENT ENV. STATUS:
Environmental Protection Plan has been issued with Unit I license.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/01/76 09/01/76C SAR DOCKETED:
04/08/77-05/12/77C SAR Q'S RECEIVED BY PM:
07/22/77 07/27/77c SAR APPL. RESPONSE TO Q'S RECEIVED: 12/15/77 08/18/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/06/78 11/08/78C Ho hearing.
ISSUE DRAFT SER:
INPUT TO SER:
12/29/78 02/27/81C ISSUE SER:
09/05/80 03/05/81C ACRS LETTER RECEIVED:
04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 5:
01/00/83 ISSUE SE SUPPLEMENT 5 02/00/83 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Complete.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:
04/12/82 04/12/82C COMMISSION DECISION:
03/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Lasalle Unit 1 criticality was achieved on June 21, 1982.
CONSTRUCTION COMPLETION - APPL.:
04/00/83 07/10/82 Construction completion date for Unit 2 is being reassessed by applicant-not expected to slip beyond 09/30/83.
HRR LICEN5ING SYSTEM PAGE HO 2-14 LIMERICK 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET HO:
035280353 LIC. PM:
R. MARTIN ASLB CHAIR:
L. BRENHER APPLICANT PHILADELPHIA ELECTRIC LIC. BC:
A. SCHWENCER MEMBER 1 R. COLE LOCATION:
35 MI HW OF PHILADELPHIA, PA LIC. LA.:
E. HYLTON MEMBER 2:
P. MORRIS' REGIDH 1
AE2 BECH COUNSEL:
A. H0DGDON CONST. INSP REAC. TYPE: BWR HSSS: GE ANTITRUST:
B. V0GLER RESID. INSP S. CHAUDHARY DESIGH PWR: 3440 MWT/1065 MWE CONST: BECH RM ANALYST:
L. LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant submitted Probabfilstic Risk Assessment with FSAR on March 17, 1981.
SAR was docketed on 07/27/81 ER DOCKETED:
07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; draft ER SITE VISIT COMPLETE:
08/20/82 08/20/82C HUREG/CR on PRA scheduled for issuance 01/28/83.
INPUT TO DES TO PM:
03/25/83 ISSUE DES:
05/06/83 RESPONSE TO COMMENTS ON DES:
09/06/83 ISSUE FES:
10/31/83 CURRENT ENV. STATUS:
ER was tendered with the FSAR on March 17, 1981 and was docketed on 07/27/81 ER site visit was completed SAFETY / HEARING MILESTONES:
on 8/20/82.
APPLICATION TENDERED:
01/00/81 03/17/81C SAR DOCKETED:
07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:
02/01/83 SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S Hotice of Opportunity of Hearing was pubilshed in the ISSUE DRAFT SER:
03/04/83 Federal Register on August 21, 1981.
Pre-hearing INPUT TO SER:
07/01/83 conference held January 6-8, 1982.
A special pre-hearing ISSUE SER:
08/08/83 conference order was issued on June 1, 1982.
Early hearings on three contentions related to Point Pleasant diversion ACRS FULL COMMITTEE MEETING:
09/08/83 were held beginning October 4, 1982, and ended on October INPUTS TO SE SUPPLEMENT 1:
10/07/83 26, 1982.
ISSUE SE SUPPLEMENT 1 10/30/83 FEMA LETTER RECEIVED:
10/07/83 CURRENT ANTITRUST Status to be determined.
HEARING STARTED 04/00/84 ASLB INITIAL DECISI0H:
09/00/84 10/00/84 COMMISSIDH EFFECTIVENESS DECISIDH ~ N/S TECH SPECS COMPLETED:
COMMISSIDH DECISIGHz 10/00/84 ISSUE LIC. WITH POWER RESTRICTION:
10/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/00/84 Rev. 9. December 30, 1982 (ER OL); Rev. 15. December 30, 1982 (FSAR); Rev. 4. December 30, 1982 (EP).
SCHED. DATE RECEIPT CATE NEW SLIPS / NOTES:
Several inputs to Draft SER have been delayed to late CONSTRUCTION COMPLETION - APPL.:
10/00/84 04/27/82 reprises from applicant.
.m.
.. ~.
N R R.
LICEN5ING SYSTEM PACE Not.2-15 j
MARBLE HILL 1 82 PCP CURRENT
$TATUS REPQRT.
REPORT AS OF 01/31/83-i
-PLANT CHARACTERI$ TICS:
KEY PERS0NNELt i
lL DOCKET NO:
054680547
'LIC. PMt P. O CONN 0R ASLB CHAIR E. BOWERS i
APPLICANT:
PUBLIC SERVICE OF INDIANA LIC. BC:
J.~YOUNGBLOOD.
MEMBER 1:
'M. MANN LOCATION:
10 MI S OF MADISON, IN.
LIC.~LA.*
-M.
SERVICE
-MEMBER 28 0.'STOBER REGION:
3 AEt SSL COUNSEL:
R. LESSY CONST. INSP E. SCHWEIBINZ q'
REAC. TYPEt PWR HSSSt WEST ANTITRUST:
J. RUTBERG RESID. INSP J. HARRISDN DESIGN PWR: 3415 MWT/1130 MWE CONST: PSI RM ANALYST:
S. HEDLUND i
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on 11/23/82.
ER' DOCKETED:
03/01/83 ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
02/01/84 RESPONSE TO COMMENTS ON DES:
ISSUE FESt
-08/01/84-i CURRENT ENV. STATUS:
Appilcation was tendered on 11/23/82.
i APPLICATION. TENDERED:
12/91/82 11/23/82C SAR DOCKETED:
03/01/83 i
SAR 0'S RECEIVED BY PM:
i l
SAR APPL. RESPONSE TO 0'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PMt-'
Opportunity for hearing will be pubIlshed in the Federal ISSUE DRAFT SER:
'05/01/84 Register.
INPUT TO SER:
ISSUE'SER:
01/01/85 ACRS FULL COMMITTEE MEETING:
02/01/85 INPUTS TO SE SUPPLEMENT 18
' ISSUE SE SUPPLEMENT 13 05/01/85
' FEMA LETTER RECEIVED:
d CURRENT ANTITRUST:
HEARING STARTED:
12/01/85 ASLB INITIAL DECISION:
06/01/86 1
COMMISSION EFFECTIVEMESS DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION 06/80/86 ISSUE LIC. WITN POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE NEW SLTPS/ NOTES:
CONSTRUCTION COMPLETION APPL.:
06/08/86 12/15/82 t
f L
i l
NRR L'I C E N.S I N G SYSTEM PAGE NO: 2-16 MCGUIRE 2 0L CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CNARACTERISTIC5 K E Y-PERS0NNELe DOCKET NO -
05000370 LIC. PM:
R. BIRKEL ASLB CNAIR R. LAZO APPLICANT DUKE POWER LIC. BC:
E. ADENSAM MEMBER 18-X. HAND LOCATION:
17 MI N OF CHARLOTTE, NC LIC.-LA.:
M. DUNCAN MEMBER 28 E. LUEBRE REGION:
2 AE DUKE COUNSEL:
J. CUTCNIN CONST. INSP M. NUNT REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP W. ORDERS DESIGN PWR 3411 MWT/1180 MWE CONST DUKE
-RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on 12/01/82, with issuance of the supplement scheduled ER DOCKETED:
05/31/74 05/31/74C for 02/14/83.
ER SITE VISIT COMPLETE:
01/30/75 01/30/75C INPUT TO DES TO PM:
.38/29/75 08/29/75C ISSUE DES:
11/07/75 10/29/75C I
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
05/07/76 04/20/76C l
CURRENT ENV. STATUS:
Complete.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
04/05/74 04/05/74C SAR DOCKETED:
04/29/75 05/05/75C SAR 0'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
. Complete.
ISSUE DRAFT SER:
IMPUT TO SER:
06/01/77 01/16/78C ISSUE SER:
02/21/78 03/01/78C ACRS LETTER RECEIVED:
04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6 Ot/21/83 ISSUE SE SUPPLEMENT 68 02/14/83 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Complete.
-NEARING STARTED:
03/15/77 03/28/77C ASLB IMITIAL DECISION:
06/00/81 06/08/81C COMMISSION EFFECTIVENESS DECISION: N/A TECN SPECS COMPLETED:
03/00/83 COMMISSION DECISION:
03/00/83 ISSUE LIC. WITN PO! DER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/02/83 No. 70 (December 15, 1982)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/01/83 05/20/82 l
NRR LICENSING SYSTEM PAGE NO: 2-17 MIDLAND 1 42 0L CURRENT STATUS REPORT FIPORT AS OF 01/31/83 i
PLANT CHARACTERI$TICSt KEY PERS0NNEL DOCKET NO:
033080329 LIC, PM:
D. HOOD ASLB CHAIR:
C. BECHN0EFER APPLICANT:
CONSUMERS POWER LIC. BC:
E. ADENSAM MEMBER 1:
F. COWAN LOCATIDH SW BOUNDARY OF MIDLAND, MICH.
LIC. LA.:
M. DUNCAN MEMBER 2:
J. HARBOUR REGION:
3 AE BECH COUNSEL:
W. PATON CONST. INSP R. LANDSMAN REAC. TYPE: PWR NSSS: B&W ANTITRUST:
B. V0GLER RESID. INSP R. COOK DESIGN PWR 2452 MWT/0818 MWE CONST: BECH RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete some review areas is currently ER DOCKETED:
04/01/78 04/14/78C in progress.
CP extension was issued 12/28/81. ACRS ER SITE VISIT COMPLETE:
09/08/78 09/08/78C Full Committee Meeting was held 06/04/82. SaER Of INPUT TO DES TO PM:
02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82. SSER 02 ISSUE DES:
02/05/82 02/OS/82C j
on soils settlement problems was issued 10/06/82.
RESPONSE TO COMMENTS ON DES:
07/08/82 07/08/82C ISSUE FES:
07/30/82 07/30/82C CURRENT ENV. STATUS:
The DES was issued 02/05/82. The FES was issued on July 30, 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/31/77 08/31/77C SAR DOCKETED:
09/30/77 11/18/77C SAR Q'S RECEIVEE CY PM:
03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/78 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:
N/A separate hearing on soils settlement. Hearing on soils INPUT TO SER:
04/23/82 04/23/82C settlement began July 7, 1981 and is continuing. Combined ISSUE SER:
05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.
ACRS LETTER RECEIVED:
06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 22 08/16/82 08/16/82C ISSUE SE SUPPLEMENT 2 10/06/82 10/06/82C FEMA LETTER RECEIVED:
02/01/83 CURRENT ANTITRUST:
Proceeding completed. License was amended 10/20/80.
HEARING STARTED:
11/15/82 11/15/32C ASLB INITIAL DECISION:
10/00/83 COMMISSION EFFECTIVENESS DECISION: 10/00/83 TECH SPECS COMPLETED:
08/00/83 COMMISSION DECISION:
10/00/83 ISSUE LIC. WITH POWER RESTRICTION: 09/00/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/83 110 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Applicant announced on 11/16/82 that July 1983 completion CONSTRUCTION COMPLETION - APPL.:
07/00/83 03/31/82 date has slipped by "some months".
Applicant will develop revised schedule in first calendar quarter of 1983.
5 NRR LICEN$ING SYSTEM
.PAGE NO: 2-14 MILLSTONE 3 0L CURREMT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY-PERS0NNELa DOCKET NO:
05000423 LIC. PM:
E. D0OLITTLE ASLB CHAIR:
APPLICANT:
MORTHEAST NUCLEAR ENERGY LIC. BC:
B. YOUNGBLOOD MEMBER 1:
LOCATION:
3.2 MI WSW OF HEW LONDON CT.
LIC. LA.:
M. RUSHBROOK MEMBER 28 REGION:
1 AE SaW COUNSEL:
M. ROTHSCHILD CONST. INSP A. TOTH REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP J. MATTIA DESIGH PWR 3565 MWT/1156 MWE CONST: SaW RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on 10/29/82, and will be docketed in February, 1983.
ER DOCKETED:
02/01/83 ER SITE VISIT COMPLETE:
04/21/83 J
INPUT TO DES TO PM:
ISSUE DES:
10/01/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
04/01/84 l
CURRENT ENV. STATUS:
ER to be docketed in February, 1983.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/01/82 10/29/82C i
SAR DOCKETED:
02/01/83 SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE To t'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM Notice of Opportunity for Hearing will be published in the ISSUE DRAFT SER:
12/01/83 Federal Register.
IMPUT TO SER:
ISSUE SER:
08/01/84 ACRS FULL COMMITTEE MEETING:
09/01/84 INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 1 12/01/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
NEARING STARTED:
05/01/85 ASLB IMITIAL DECISION:
11/01/85 i
COMMISSION EFFECTIVENESS DECISION -
TECH SPECS COMPLETED.
COMMISSION DECISION:
11/01/85
' ISSUE LIC. WITH POWER RESTRICTION:
~
1' LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND -
SCHED. DATE RECEIPT DATE l
NEW SLIPS / NOTES:
l' CONSTRUCTION COMPLETION - APPL.:
11/01/85 09/30/82 i
i s
HRR LICENSIHG SYSTEM PAGE HO: 2-19 PALO VERDE.1,2,3 0L *CURREHT STATUS REPORT REPORT AS oft 01/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 M N E Lt DOCKET NO:
0528-0530 LIC. PMt E. LICITRA ASLB CHA?Rt R. LAZO i
APPLICANT:
ARIZONA PUBLIC SERVICE LIC. BC:
G. KNIGHTON MEMBER 1 R. COLE i
LOCATION:
36 MI W OF PHOEHIX, AZ LIC. LA.
J. LEE
' MEMBER 2:
D. CALLIHAN REGION:
5 AE BECH COUNSEL:
L. DEWEY CONST. INSP L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMB ANTITRUST:
- 3. V0GLER RESID. INSPs C. FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST BECH RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several " Independent Design Review" meetings have been completed. The SER was issued on November 11, 1981.
SER ER DOCKETED:
07/01/80 06/20/80C supplement Hos.
1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:
01/30/81 01/30/81C and May 17, 1982, and September 23, 1982 respectively.
INPUT TO DES TO PH 10/05/81 10/05/81C ISSUE Dest 10/26/81 10/26/81C RESPONSE TO COMMENTS ON DES:
02/25/82 02/25/82C ISSUE FES:
03/11/82 03/11/82C CURRENT ENV. STATUS -
The ER (OL) review is complete. A site visit was completed on January 30, 1981 The DES was issued on SAFETY / HEARING MILESTONES:
October 26, 1981 and the FES was issued on March 11, 1982.
APPLICATION TENDERED:
10/05/79 10/05/79C SAR DOCKETED 06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS
on 6-22.
Hearing record was closed on 6-25-82.
Findings INPUT TO SER 10/30/81 10/30/81C by all parties have been filed. A late petition, dated TSSUE SER:
11/11/81 11/11/81C 10-13-82 deallnq with salt drift on farm crops, was filed by W. Valley Agri. Protection Council. On 12-30-82, the ACRS LETTER RECEIVED:
12/18/81 12/18/81C Board issued a favorable ID but reopened the hearing on INPUTS TO SE SUPPLEMENT 48 01/21/83 Units 2 and 3 to consider late petition by W. Valley.
ISSUE SE SUPPLEMENT 48 02/15/83 Board's decision authorizes full power license for Unit 1 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Antitrust OL review is in progress.
HEARING STA'IED:
04/27/82 04/27/82C ASLB INITIAL DECISION:
12/30/82 12/30/82C COMMISSIDH EFFECTIVENESS DECISICH: 01/00/83 TECH SPECS COMPLETED:
08/01/83 COMMISSION DECISION:
07/00/83 ISSUE LIC. WITH POWER RESTRICTION: 08/01/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/20/83 FSAR Amendment No. 10 ER Supplement No. 4 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES CONSTRUCTION COMPLETION - APPL.:
08/00/83 07/13/82
NRR LICEN$ING SYSTEM PAGE NO: 2-20 PERRY 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CHARACTERISTIC 5-KEY P E k 5 U ': NELa DOCKET NO:
044080441 LIC. PM:
J. STEFANO ASLB CHAIR:
P. BLOCH APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING LIC. BC:
J. YOUN3BLD0D MEMBER 18 J. KLINE LOCATION:
7 MI NE OF PAINESVILLE, OHIO LIC. LA.:
M.-RUSNBROOK MEMBER 2 G. BRIGNT REGIDH2 3
AE:
GIL COUNSEL:
J. CUTCHIN CONST. INSP P. PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST J. CUTCHIN RESID. INSP M. GILDNER DESIGN PWR 3759 MWT/1205 MWE CONST: KAISER RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.
The ACRS Report was issued on July 16, 1982.
SSER Ho. 1 ER DOCKETED:
06/26/81 06/19/81C i
was issued on Auoust 9, 1982.
SSER Ho. 2 was issued ER SITE VISIT COMPLETE:
1/15/83.
SSER Ho. 3 targeted for 4/83.
INPUT TO DES TO PM:
01/01/82 01/01/82C ISSUE DES:
32/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:
06/30/82 06/30/82C ISSUE FES:
08/13/82 08/13/82C
- URRENT ENV. STATUS:
Environmental acceptance review was completed on June 9,
1981.
The ER was docketed June 19, 1981 FES SAFETY / NEARING MILESTONES:
issued on August 13, 1982.
.i APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
01/09/81 01/30/81C SAR 9'S RECEIVED BY PM:
SAR APPL. RESPONSE TO 4'S RECEIVED:
CURRENT HRG. S"TATUS:
INPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C Conference call between Board, intervenor, applicant, and ISSUE DRAFT SER:
02/26/82 02/26/82C staff attorneys on 1/5/83 targeted start of hearing for INPUT TO SER:
04/10/82 05/10/82C 5/23/83.
ASLB decision slipped to 8/83 due to delay in ISSUE SER:
05/10/8E 05/24/82C hearing start.
ACRS LETTER RECEIVED:
07/16/82 07/16/82C INPUTS TO SE SUPPLEMENT 3:
10/08/83 ISSUE SE SUPPLEMENT 3:
04/15/83 FEMA LETTER RECEIVED:
04/08/83 l
CURRENT ANTITRUST:
CP antitrust review has been completed. OL antitrust HEARING STARTED:
05/23/83 status is under review.
ASLB INITIAL DECISION:
08/09/83 i
COMMISSION EFFECTIVENESS DECISION 2 09/09/83 TECH. SPECS COMPLETED:
06/00/83 COMMISSION DECISION:
10/08/83
+
ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/83 Humber 10 (11-23-62).
SCHED. DATE RECEIPT DATE NEW SLIPS / DOTES:
t Start of hearing has slipped to 5/83.
FEMA letter has CONSTkUCTION COMPLETION - APPL.:
11/09/83 02/22/82 slipped to 4/83 due to incomplete offsite plans. CFP audit scheduled in 1/83 to determine likelihood of Unit 1 fuel load ( 11/83).
4 1
~-
NRR LICEN$ING SYSTEM PAGE NO: 2-21
- RIVER BEND 1 & 2 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
045810459 LIC PM:
E. WEINKAM ASLB CHAIR:
B. COTTER APPLICANT:
GULF STATES UTILITIES LIC. BC:
A.
SCNWENCER MEMBER 1:
G. LINENBERGER LOCATION:
24 MI NNW OF BATON ROUGE, LA LIC. LA.:
E. HYLTON MEMBER 2 R. COLE REGION:
4 AE2 SRW COUNSEL:
J. GUTIERREZ CONST. INSP UNASSIGNED REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP R. BROWN DESIGN PWR 3015 MWT/0934 MWE CONST S8W RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81.
FSAR was docketed on 08/25/81. Draft SER targeted for ER DOCKETED:
08/25/81 08/25/81C 03/83.
Construction permit extension requested and granted ER SITE VISIT COMPLETE:
01/22/82 01/22/82C from 03/83 to 12/85.
INPUT TO DES TO PM:
12/09/83 ISSUE DES:
01/09/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
06/08/84 CURRENT ENV, STATUS:
Aoplicant tendered ER for docketing on 04/24/81.
tR was docketed on 08/25/81. DES targeted for 01/09/84.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/24/81 04/24/81C SAR DOCKETED:
08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:
12/07/81 06/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/31/83 CURRENT PRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/04/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
03/00/83 Faderal Register on 09/04/81. Prehearing conference INPUT TO SER:
11/04/83 scheduled fer 02/08/83, rescheduled to 05/24/83.
ISSUE SER:
12/02/83
!CRS FULL COMMITTEE MEETING:
01/13/84 INPUTS TO SE SUPPLEMENT 1:
04/00/84 ISSUE SE SUPPLEMENT 18 05/00/84 FEMA LETTER RECEIVED:
05/01/84 CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
10/00/84 ASLB INITIAL DECISION:
03/00/85 COMMISSION EFFECTIVENESS DECISION: 04/00/85 TECH SPECS COMPLETED:
10/00/84 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/05/85 Humber 6.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
NRR/0L revised the priority of the review on this case due CONSTRUCTION COMPLETION - APPL.
04/00/85 04/15/87 to 18-month slip in construction schedule.
NRR LICEHSING S Y S-T E N PAGE HO: 2-22 SAN ONOFRE 3 LIC CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT C H A R A C T E R I 5 T I C 5:
KEY PERS0NNEL DOCKET NO:
05000362 LIC, PM:
H. ROOD ASLB CHAIR:
J. KELLEY APPLICANT:
SOUTHERN CALIFORNIA EDISON LIC. BC:
G. KNIGHTON MEMBER 1:
C. HAND LOCATION:
5 MI 5 0F SAN CLEMENTE CA LIC. LA.:
J. LEE MEMBER ?:
E. JOHNSON REGION:
5 AE:
BECH COUNSEL:
L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR HSSS: COMB ANTITRUST:
J. GOLDBERG RESID. INSP A. CHAFFEE DESIGN PWR: 3410 MWT/1100 MWE CONST: BECH RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRON *lENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER on geological and seismological matters was issued on 12/31/80.
ACRS subcommittee meetings were held 01/30/81 and ER DOCfETED:
03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:
05/20/77 35/20/77C D3/12/81 SER (Non-TMI matters), was issued on 02/06/81 INPUT TD DES TO PM:
10/01/77 12/01/80C SER supplement on TMI issues was issued on 02/25/81. SER ISSUE DES:
01/27/78 01/20/81C supplement No. 2. 3. 4.
- 5. and 6 addressing open items were RESPONSE TO COMMENTS ON DES:
issued 05/08/81 09/16/81 01/22/82. 02/16/82, and 06/30/82.
ISSUE FES:
04/00/81 04/29/8tC ASLB PID was rendered en 01/11/82 and ID on 05/14/82.
Supplement No. 7 is scheduled for 1/15/83.
CURRENT ENV. STATUS:
DES addressing class 9 accidents was issued 01-20-81 FES was issued 04-29-81.
SAFETY / HEARING MILESTONES:
APPLICATION TEhDERED:
11/29/76C SAR DOCKETED:
03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:
08/15/77 09/29/77C SAR APPL. RSSPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.
ISSUE DRAFT SER:
01/15/81 01/15/8tC Hearing started 06/22/81 and ended 09/31/81.
INPUT TO SER:
06/23/78 01/15/81C ISSUE SER:
08/01/80 02/06/81C ACRS LETTER RECEIVED:
03/17/81 03/17/8tC INPUTS TO SE SUPPLEMENT 7 02/15/83 ISSUE SE SUPPLEMENT 7 01/15/83 FEMA LETTER RECEIVED:
12/01/81 12/01/81C CURRENT ANTITRUST:
The antitrust review is complete.
HEARING STARTED:
06/22/81 06/22/81C ASLB INITIAL DECISIDH 05/14/82 05/14/82C COMMISSIDH EFFECTIVENESS DECISIDH TECH SPECS COMPLETED:
11/15/82 11/15/82C COMMISSION DECISIGH:
02/28/83 ISSUE LIC. WITH POWER RESTRICTION: 11/15/82 11/15/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
03/14/83 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
CONSTRUCTION COMPLETI0H - APPL.:
11/15/82C 09/27/82
NRR LICEN5ING SYSTEM PAGE NO: 2-23 SEABROOK 182 0L CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
044380444 LIC. PM:
L. WHEELER ASLB CHAIR:
N. H0YT
~
APPLICANT:
PUBLIC SERVICE OF NEW HAMPSHIRE LIC. BC:
G. KNIGHTON ME65ER 1:
E. LUEBKE LOCATION:
10 MI S OF PORTSMOUTH, NH LIC. LA.:
J. LEE MEMBER 2:
J. HARBOUR-REGION:
1 AE UEC COUNSEL:
R. LESSY CONST. INSP A TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP A. CERNE DESIGN PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST:
B. ST MARY 1
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAP acceptance review was completed in September 1981 The FSAR was docketed October 5, 1981 Applicant has ER DOCKETED:
10/05/81 10/05/81C responded to round 1 Q's.
SER issuance has moved from ER SITE VISIT COMPLETE:
12/02/81 12/02/81C 01/12/83 to 03/83.
Partial draft SER has been issued.
INPUT TO DES TO PM:
03/01/82 03/01/82C ISSUE DES:
05/14/82 05/14/82C RESPONSE TO COMMENTS ON DES:
08/18/82 09/15/82C ISSUE FES:
12/08/82 12/08/82C CURRENT ENV. STATUS:
ER was tendered June 1981.
ER acceptance review was completed September 1981.
The ER was docketed SAFETY / HEARING MILESTONES:
October 5, 1981 DES was issued in May, 1982.
FES was issued in December 1982.
APPLICATION TEH0ERED:
06/29/81 06/29/8tC SAR DOCKETED:
10/05/81 10/05/8tC SAR Q'S RECEIVED BY PM:
01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/07/82 10/08/82C Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:
07/30/82 08/13/82C the Federal Register on October 19, 1981 First prehearing INPUT TO SER 11/30/82 12/29/82C conference was held May 6-7, 1982.
Second prehearing ISSUE SER:
03/00/83 conference was held July 15-16, 1982.
ASLB Order identifying parties, contentions and prehearing schedule ACRS FULL COMMITTEE MEETING:
04/00/83 was issued September 13, 1982.
Discovery is in progress.
INPUTS TO SE SUPPLEMENT 1 05/00/83 ISSUE SE SUPPLEMENT 18 06/00/83 FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
08/00/83 ASLB INITIAL DECISION:
06/00/84 COMMISSION EFFECTIVENESS DECISION: 07/00/84 TECH SPECS COMPLETED:
07/00/84 COMMISSION DECISION:
08/00/84 ISSUE LIC. WITH POWER RESTRICTIDH:
l LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
09/00/84 47 SCHED. DATE RECEIPT DATE SEW 3 LIPS / NOTES:
Fuel load slipped to 9/84 per applicant Ietter of 12/02/82.
CONSTRUCTION COMPLETION - APPL.:
09/30/84 12/02/82 ACRS schedule is being reevaluated.
l l
NRR LICENSING SYSTEM PAGE NO: 2-24 3HOREHAM 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000322 LIC PM:
R. CARUSO ASLB CHAIR:
L. BRENNER APPLICANT:
LONG ISLAND LIGHTING CO.
LIC. BC:
A. SCHWENCER MEMBER ::
P. MORRIS LOCATION:
BROOKHAVEN, NY (LI)
LIC. LA.:
E. HYLTON MEMBER 2 J. CARPENTER REGIDH:
1 AE 58W COUNSEL:
B. BORDEHICK CONST. INSP L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:
J. RUTBERG RESID. INSP: J. HIGGINS DESIGH PWR: 2436 MWT/0820 MWE CONST: 58W RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981 SER Supplement 2 was issued in March 1982.
An additional ER DOCKETED:
01/26/76 01/26/76C SER Supplement is scheduled for Feb. t*83 to address ER SITE VISIT COMPLETE:
08/06/76 08/03/76C resolution of additional outstanding matters.
INPUT TO DES TO PM:
11/22/76 11/29/76C ISSUE DES:
03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:
07/22/77 07/22/77C ISSUE FES:
10/21/77 10/18/77C l
CURRENT ENV. STATUS:
The environmental review is complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/09/75 09/04/75C SAR DOCKETED:
12/15/77 Ot/26/76C SAR Q'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STalUS:
INPUT TO DRAFT SER TO PM:
07/15/77 08/01/77C After a brief recess, hearings resumed in Hauppruge on ISSUE DRAFT SER:
January 10, 1983.
They will remain in Hauppruge INPUT TO SER:
03/10/81 03/10/81C indefinitely.
ISSUE SER:
04/10/81 04/10/81C ACRS LETTER RECEIVED:
09/18/81 10/19/8tC INPUTS TO SE SUPPLEMENT 3:
N/S ISSUE SE SUPPLEMENT 38 02/01/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Not required.
HEARING STARTED:
05/04/82 05/04/82C ASLB INITIAL DECISION:
06/00/83 COMMISSION EFFECTIVENESS DECISION: 10/00/83 l
TECH SPECS COMPLETED:
03/00/83 COMMISSIDH DECISIDH 10/00/83 ISSUE LIC. WITG POWER RESTRICTION: 03/30/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/00/83 FSAR Amendment 27 SCHED. DATE RECEIPT DATE i
HEW SLIPS / NOTES:
The current estimate for a partial initial ASLB decision CONSTRUCTION COMPLETION - APPL.:
06/00/83 04/30/82 on all matters except offsite emergency planning is the end of March, 1983.
A complete initial decision may not be available orior to Nav. 1983.
_~ -
.. -. ~. - - - - -..-
l.
HRR L I.C E N $ I N G SYSTEM PAGE NO: 2-25 j
SOUTH TEXAS 1 4 2 OL CURRENT S T A T U.S.
REPORT REPORT AS OF 01/31/43 h
PLANT C M A R A C T E R I S T I C 5:
KEY PERS0NNELt DOCKET NO:
049880499 LIC. PM:
H. SCHIERLING ASLB CHAIR 8 C. BECHH0EFER APPLICANT 8 HOUSTON LIGHTING 8 POWER COMPANY LIC. BC G. KNIGHTON MEMBER 18 J. LAMB LOCATION:
12 MI $$W OF BAY CITY. TEX LIC. LA.:
J. LEE MEMBER 28 E. HILL REGIDH:
4 AEt BECH COUNSEL:
J. GUTIERREZ CONST. INSP8 i
REAC. TYPE PWR HSSS WEST ANTITRUST
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESidWESt SCHED. DATE ~ ACTUAL DATE Limited work being performed due to higher priorities.
BRRT has been replaced by Bechtel as the A/E, BRRT ER DOCKETED:
07/17/78C has been replaced by Ebasco as the constructor.
ER SITE VISIT COMPLETE:
09/26/78 09/26/78C 4
Non-safety related construction restarted on June 15. 1982.
IMPUT TO DES TO PM:
08/09/85 Safety related construction restarted on August 15, 1982.
ISSUE DES 8 09/08/85 Current FLD is 12/86. Milestones now reflect a 12/86 FLD.
RESPONSE TO COMMENTS ON DES 8 01/09/86 ISSUE FES 02/00/86 i
i CURRENT ENV. STATUS:
1 Schedule revised to reflect new 12/86 FLD.
.[
SAFETY / HEARING MILESTONES:
l 4
APPLICATION TENDERED:
05/10/78 05/10/78C SAR DOCKETED:
07/17/78C SAR O'S RECEIVED BY PM:
01/22/79 02/08/82C SAR APPL. RESPONSE TO O'S RECEIVED: N/S t
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM8 03/08/85-1 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:
03/08/85 expedited hearing on GA proorams and management was IMPUT TO SER 11/00/85 e
j held.
The record of this phase of the hearing ISSUE SER 12/00/85 i
was closed on June 17. 1982.
Phase II of hearing l
will consider all aspects of Guadrex Report.
ACRS FULL COMMITTEE MEETING::
'01/08/86 1
Phase II is expected to begin in the Spring of '83.
INPUTS TO SE SUPPLEMENT 18 01/00/86 ISSUE SE SUPPLEMENT 12 01/08/86-FEMA LETTER RECEIVED:
N/S.
I CURRENT ANTITRUST:
s 3
Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:
06/08/86 l
proposed license conditions and dismissing proceeding.
ASLB INITIAL DECISION:
11/09/86
)
COMMISSION EFFECTIVENESS DECISION: 12/08/86 j
TECH SPECS COMPLETED:
12/08/86 COMMISSION DECISION:
12/09/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/08/86 l
FSAR amendment #28 was issued 12/06/82.
ER amendment 95 was issued 08/31/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES L
All schedules now reflect new officia "LD of 12/86.
CONSTRUCTION COMPLETION - APPL.:
12/06/86 03/08/82 l
NRR LICEN5ING SYSTEM PAGE NO 2-26 ST LUCIE 2 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CNARACTERI5TICSt KEY P E R S 0 N N E Lt DOCKET NO:
65000389 LIC. PM:
V. MERSES ASLB CHAIRt E. BOWERS APPLICANT:
FLORIDA POWER 8 LIGHT LIC..BCt G. KNIGHTON MEMBER 18-P.' MORRIS LOCATION:
12 MI SE OF FT. PIERCE, FLA LIC. LA.:
J. LEE MEMBER 28
- O. PARIS REGIDH 2
AEt EBASCO COUNSEtt W. PATTON CONST. INSP R. WRIGHT REAC. TYPE: PWR MSSSt COMB ANTITRUSTt B. V0GLER RESID. INSPs S. ELROD DESIGN PWRt 2700 MWT/0842 MWE CONST* EBASCO RM ANALYST S. NEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Status of Q-1 and 4-2 review is complete. The SER was issued on 10/09/81 SE Supplement No. I was issued ER DOCKETED:
02/17/81C on 12/30/81. SE Supplement No. 2 was issued on 09/30/82.
ER SITE VISIT COMPLETE:
02/18/81 02/18/81C ANPUT TO DES TO PM:
08/07/81 08/07/81C ISSUE DES:
10/16/81 10/16/81C RESPONSE TO COMMENTS ON DES:
02/08/82 02/08/82C ISSUE FEst 04/23/82 04/23/82C CURRENT ENV. STATUS:
The DES was issued on 10/16/01 and the FR Notice was j
published 10/30/81 The FES was issued on 04/23/82.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/17/81C SAR G*S RECEIVED BY PM:
06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
08/03/81 08/03/81C There have been no petitioners on matters dealing with ISSUE DRAFT SER:
08/10/81 08/10/81C health, safety and environment.
INPUT TO SER 09/11/81 09/11/81C ISSUE SER:
10/09/81 10/09/81C ACRS FULL COMMITTEE MEETINGt 11/12/81 11/12/81C INPUTS TO SE SUPPLEMENT 3 12/23/82 ISSUE SE SUPPLEMENT 38 02/11/83 FEMA LETTER RECEIVED:
08/20/82 08/20/82C CURRENT ANTITRUSTt Settlement among the Department of Justica, the NRC Staff HEARING STARTED:
N/A-and the licensee has been aqreed upon.
Case dismissed ASLB INITIAL DECISION:
N/A 3/82 following summary disposition and settlement agreement.
COMMISSION EFFECTIVENESS DECISIOF N/A TECH SPECS COMPLETED:
02/04/83 COMMISSION DECISION:
03/08/83 ISSUE LIC. WITN POWER RESTRICTION: N/A.
LATEST AMENDMENTS, ISSUE FULL POWER LICENSE AMEND:
03/01/83 No. 12 (FSAR)I No. 5 (ER)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Caseload Forecast Panel estimates 08/83 core load date.
CONSTRUCTION COMPLETION - APPL.t' 03/01/83 Applicant, in meeting with HRC on 09/30/82, estimates 03/83 core load date.
I
NRR LICEN$ING SYSTEM PAGE NO: 2-27 SUSQUEHAHMA 2 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83, TLANT CHARACTERISTICSt KEY PERSONNEL DOCKET NO:
05000388 LIC. PM:
R. PERCH ASLB CHAIR J. GLEASON APPLICANT:
PENNSYLVANIA POWER & LIGHT LIC. BC:
A. SCHWENCER MEMBER 1:
LOCATION:
7 MI NE OF BERWICK. PA LIC. LA.:
E. HYLTON MEMBER 2:
P. PURDOM REGION:
1 AE:
BECH COUNSEL:
J. CUTCHIN CONST. INSP: L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:
A. HODGDON RESID. INSP G. RHDADS DESIGN PWR: 3440 MWT/1052 MWE CONST BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTCHES:
SCHED. DATE ACTUAL DATE SER was issued 04/06/81. SSER 81 was issued 07/07/81 Post ACRS SSER 82 was issued 09/10/81 SSER 83 was ER DOCKETED:
06/10/78C issued 07/17/82. SSER 84 is scheduled for 03/01/83.
ER SITE VISIT COMPLETE:
10/20/78 10/20/78C INPUT TO DES TO PM:
ISSUE DES:
03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:
05/21/81 05/21/81C ISSUE FES:
06/15/81 07/02/81C CURRENT ENV. STATUS:
DES was issued on 03-30-81 FES was issued 07-02-81.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
06/05/78 04/10/78C SAR DOCKETED:
07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:
04-12-82.
INPUT TO SER:
03/23/81 03/23/81C ISSUE SER:
04/06/81 04/06/81C ACRS LETTER RECEIVED:
08/15/81C INPUTS TO SE SUPPLEMENT 4 02/01/83 ISSUE SE SUPPLEMENT 48 03/01/83 FEMA LETTER RECEIVED:
06/00/82 06/00/82C CURRENT ANTITRUST:
Complete.
HEARING STARTED:
10/06/31 10/06/81C ASLB INITIAL DECISIDH 04/12/32 04/12/82C COMMISSION EFFECTIVENESS DECISION:
i TECH SPECS COMPLETED:
1 COMMISSION DECISION:
12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/84 FSAR:
No. 30; ER:
No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
01/00/84
NRR L I C E N S I ll G.
5YSTEM PAGE NO 2-24' WASHINGTON NUCLEAR 1 0L CURRENT STATUS REP 0RT REPORT AS oft 01/31/83 PLANT CHARACTERI$TICSt KEY PERS0NNELa DOCKET NO:
05000460 LIC. PM:
M. THADANI ASLB CHAIRt M. GROSSMAN APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
E. ADENSAM MEMBER 18 G. BRIGHT-LOCATION:
to MI N OF RICHLAND, WA LIC. LA.*
M. DUNCAN MEMBER 28 J. HARBOUR REGION:
5
-AEt UEC COUNSEL 8 M. YOUNG CONST. INSP J. OLIN REAC. TYPE: PWR NSSS ' 58W ANTITRUST:
RESID. INSPs A. TOTH DESIGN PWR 3760 MWT/1266 MWE CONST: BECH RM ANALYST 8 L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES SCHED. DATE. ACTUAL DATE Application was tendered on 11-25-81.
This schedule is being reconsidered in light of a notice of. deferral from ER DOCKETED 07/08/82 07/16/82C the appilcant. A review schedule will be established ER SITE VIS1f COMPLETE:
following construction resumption. Appilcation was INPUT TO DES 70 PM:
docketed on July 16, 1982.
ISSUE DES:.
M/S RESPONSE TO COMMENTS ON DES:
ISSUE FES:
N/S CURRENT ENV. STATUS:
DES issuance will be scheduled following resumption of construction.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/25/81 11/25/81C SAR DOCKETED:
07/08/82 07/16/82C SAR O'S RECEIVED BY PM8 SAR APPL. RESPONSE TO O'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER.TO PM8 Notice of Opportunity for Hearing was published In the ISSUE DRAFT SER:
Federal Register on August 16, 1982.
A petition to IMPUT TO SER intervene has been received from the Coalition for ISSUE SER:
N/S Safe Power. A prehearing conference has been scheduled for January 26 and 27, 1983, to be held ACRS FULL COMMITTEE MEETING N/S in Richland, Wa.
INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 1 N/S FEMA LETTER RECEIVED:
CURRENT ANTITRUST HEARING STARTED:
N/S ASLB INITIAL DECISION:
N/S COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTION 8 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S Amendment 1 dated October 18, 1982 received in document Control System Nov.
1, 1982.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.
N/S 84/29/82 on 4/29/82.
I
HR9 LICEN5IHG SYSTEM PAGE HO: 2-29 WASHINGTON HUCLEAR 2 0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLAHT C H A R A C T E R I 5 T I C S:
KEY PERSOHHELa LIC. PM:
R. AULUCK ASLB CHAIR:
E. B0WERS DOCKET NO:
05000397 APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
A.
SCHWENCER MEMBER 1 R. COLE LOCATION:
30 MI NW OF RICHLAND. WASH LIC. LA.:
E. HYLTON MEMBER 2:
E. HILL REGION:
5 AE:
B3R COUNSEL:
W. PATON CONST. INSP A.
TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. IHSPs R. FEIL DESIGN PWR: 3323 MWT/1103 MWE CONST: BECH RM ANALYST:
L. LANIER ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER was issued 3/31/82. Geology / Seismology reviews were 02/28/77 04/20/77C included in SSER Ho. 1 issued August it. 1982.
ACRS ER DOCKETED:
meeting was held on October 7, 1982.
SSER No. 2 was ER SITE VISIT COMPLETE:
07/13/77 07/14/77C issued 12/21/82.
SSER 83 scheduled for 03/31/83.
INPUT TO DES TO PM:
06/30/81 06/30/81C ISSUE DES:
07/31/81 07/31/81C RESPONSE TO COMMENTS ON DES:
09/28/81 09/28/81C ISSUE FES:
12/31/81 12/31/81C CURRENT ENV. STATUS:
FES was issued 12-31-81.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/30/76 12/30/75C SAR DOCKETED:
04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C INPUT TO DRAFT SER TO PM:
10/12/81 10/12/81C CURRENT HRG. STATUS:
A prehearing conference is scheduled for Jan 26, 1983 ISSUE DRAFT SER:.
11/17/81 11/17/81C INPUT TO SER:
0S/30/82 05/30/82C in Richland. Wa.
ISSUE SER:
03/31/82 03/31/82C ACRS LETTER RECEIVED:
11/13/82 11/13/82C INPUTS TO SE SUPPLEMENT 3:
11/22/82 11/22/82C ISSUE SE SUPPLEMENT 3:
03/31/83 FEMA LETTER RECEIVED:
05/01/83 CURRENT ANTITRUST:
HEARING STARTED:
N/A Not required ASLB INITIAL DECISIDH:
H/A COMMISSION EFFECTIVENESS DECISIDH: N/A TECH SPECS COMPLETED:
07/06/83 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
09/00/83 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
CONSTRUCTIDH COMPLETIDH - APPL.:
09/00/83 05/07/82 l
NRR LICENSING SY$ TEM PAGE NO: 2-30 WASHINGTON NUCLEAR 3-0L CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000508 LIC. PMt A. VIETTI ASLB CHAIR R. LAZO APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC*
G. KNIGHTON MEMBER 1 E. LL'EBKE LOCATION:
26 MI W OF OLYMPIA, WA LIC. LA.:
J. LEE MEMBER 2:
D. SCHINK REGION 5
AEt EBASCO COUNSElt D. SWANSON CONST. INSP D. KIRSCH REAC. TYPEt PWR NSSS: COMB ANTITRUST
- B. V0GLER RESID. INSPt W. ALBERT DESIGN PWRt 3800 MWT/1242 MWE CONST EBASCO RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES SCHED. DATE ACTUAL DATE Application was tendered on June 2, 1982, and was docketed on 08/27/82. Safety review has started.
ER DOCKETED:
08/27/82 08/27/82C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
07/08/83 ISSUE DES:
09/07/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES 04/06/84 7
CURRENT ENV. STATUS
- Application was tendered on June 2, 1982. and was docketed on 08/27/82. Environmental review has SAFETY / HEARING MILESTONES:
started.
APPLICATION TENDERED:
06/02/32 06/02/82C SAR DOCKETED:
08/27/82 08/27/82C SAR 9'S RECEIVED BY PM:
04/05/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/13/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO.PMt 10/28/Ei Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER 12/01/83 Federal Register on 09/15/82.
INPUT TO SER:
06/05/84 ISSUE SER 08/09/84 ACRS FULL COMMITTEE MEETINGt 09/00/84 INPUTS TO SE SUPPLEMENT 18 11/06/84 ISSUE SE SUPPLEMENT 18 12/13/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST Notice of Opportunity for hearing was published in the HEARING STARTED:
05/00/85 Federal register on October 15, 1982.
ASLB INITIAL DECISION:
11/08/85 COMMISSIDH EFFECTIVENESS DECISION 12/00/85 TECH SPECS COMPLETED:
COMMISSION DECISION:
12/08/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES Detailed review schedule has been approved.
CONSTKUCTION COMPLETION - APPL.*
12/08/85 10/01/82
en 4
.NRR L I C E N 5 I N_G SY5 TEM PAIE NO: 2-31 WATERFORD 3 0L CURRENT-STATUS RdPORT REPORT AS OF '01/31/83 PLANT CHARACTERI5TICSt KEY PERS0NNELt j
DOCKET NO:
65000382 LIC PM:
J. WILSON ASLB CHAIR *
- 5. WOLFE APPLICAN18 LOUISIANA POWER S LIGHT LIC. BC:
G. KHIGHTON MEMBER 1 W. JORDAN LOCATION:
20 M1 W OF NEW ORLEANS LA LIC. LA.:
J. LEE MEMBER 2:
H. FOREMAN REGION:
4 AE8 EBASCO COUNSEL:-
S. TURK CONST. INSP
.-UNASSIGNED REAC. TYPEt PWR HSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP L. CONSTABLE DESIGN PWRt 3560 MWT/1151 MWE CONST EBASCO RM ANALYSTt M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
The safety review was expedited. Fuel load date j
delayed until 05/83 by applicant.. SSER 84 issued ER DOCKETED:
12/09/78 12/09/78C.
10/29/82.
ER SITE VISIT COMPLETE:
12/05/88 12/05/80C l
INPUT TO DES-TO PM:
04/06/81 84/06/8tC l
ISSUE DES:
05/01/88 05/01/81C i
RESPONSE TO COMMENTS ON DES:
07/24/81 08/19/8tC l
ISSUE FES:
09/30/81 09/30/81C j
4 CURRENT ENV. STATUS:
The DES was completed in May 1981.
FES was completed l
September 1981.
SAFETY / HEARING MILESTONES:
l APPLICATION TENDERED:
09/28/78 09/28/78C.
SAR DOCKETED:
12/18/78C '
1 SAR 4'S RECEIVED BY PM:
N/5 SAR APPL. RESPONSE TO 085 RECEIVED: 08/08/80 12/15/80C 1
l-CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/03/80 05/15/ SIC Contested hearing started 03/82. Discovery among the.
ISSUE DRAFT SER:
parties has been held. Partial initial decision issued IMPUT TO SER:
05/08/81 05/15/81C 11/03/82. Hearing for remaining item immergency ISSUE SERT 07/09/81 07/09/81C preparedness) scheduled for February 7-11 1983.
ACRS LETTER RECEIVED:
08/08/81 08/08/8tC INPUTS TO SE SUPPLEMENT 5 01/29/83 ISSUE SE SUPPLEMENT 5 02/28/83 FEMA LETTER RECEIVED:
Of/31/83 i
CURRENT ANTITRUST:
Staff is reviewing OL antitrust information.
HEARING STARTED:
03/08/82 03/23/82C ASLB INITIAL DECISION:
03/08/83 COMMISSION EFFECTIVEME55 DECISION: 04/08/83 i
TECH SPECS COMPLETED:
02/28/83 COMMISSION DECISION:
04/30/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 05/08/43 ER 93 - 8/81 FSAR 830 - 12/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.*
05/08/83 08/24/82 emergency plan.
l
- i
NMR LICEN5ING SYSTEM PAGE NO: 2-32 WATTS BAR 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 81/31/83 PLANT CHARACTERISTIC 58 KEY PERSONNELt DOCKET NO2 039080391 LIC. PMt T. KEMYON ASLB CHAIR N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 1 N/A LOCATIOMt 10 MI S OF SPRING CITY, TENN LIC. LA.*
M. DUNCAN MEMBER 28 N/A REGION:
2 AE8 TVA COUNSEL
- M. YOUNG CONST. INSPt W. SWAN REAC. TYPEt PWR NSS$8 WEST ANTITRUST:
J. RUTBERG RESID. INSP T. HEATHERLY DESIGN PWR: 3411 MWT/1165 MWE CONST* TVA RM ANALYSTt M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 08/83.
SER published 07/82.
ACRS subcommittee meetings held ER DOCKETED:
01/05/77 11/23/76C 04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:
03/18/77 02/25/77C held 08/13/82. ACRS letter received 08/16/82. Supplement INPUT TO DES TO PM:
07/06/77 08/18/77C 31 to SER published 09/22/82. Supplement 82 to SER ISSUE DES:
11/29/77 06/02/78C scheduled 04/22/83.
RESPONSE TO COMMENTS ON DES:
N/A ISSUE FES:
11/24/78 12/29/78C CURRENT ENV. STATUS Complete except for environmental tech specs.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/30/76 06/30/76C SAR DOCKETED:
10/04/76 18/04/76C SAR Q'S RECEIVED BY PM:
12/15/76 05/70/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/23/77 02/10/78C CURRENT HRG. STATUS INPUT TO DRAFT SER TO PM:
06/18/88 12/18/81C No hearings are assumed.
ISSUE DRAFT SER:
12/30/81 12/30/81C INPUT TO SER:
06/04/82 06/04/82C ISSUE SER:
07/01/82 87/01/82C ACRS LETTER RECEIVED:
09/09/82 88/16/82C INPUTS TO SE SUPPLEMENT 28 08/27/82 09/03/82C ISSUE SE SUPPLEMENT 28 84/22/83 FEMA LETTER RECEIVED:
04/08/83 CURRENT ANTITRUST:
Complete HEARING STARTED:
N/A ASLB INITIAL DECISION
- M/A COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED 07/06/83 COMMISSION DECISION:
07/OS/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/08/83 FSAR Ho. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - aart.:
08/00/83 04/09/82 I
w
..___m 4
~
NRR LICENSING SYSTEM PAGE NO: 2-33' WOLF CREEK 1 0 L-CURRENT STATUS REPORT REPORT AS oft 01/31/83:
P L A-N T C H A R A C T E R I S T I C S:
K E.Y P E R S O N N E Lt DOCKET NO:
05000482 LIC. PM:
J. HOLONICH ASLB CHAIR
- J. LA'URENSON APPLICANT:
-KANSAS GAS 8 ELECTRIC LIC. BCt-B. YOUNGBLOOD~
MEMBER 1:
G. ANDERSON LOCATIOh:
- 3.5 MI NE OF BURLINGTON, KAN LIC. LA.:
M. RUSHBROOK MEMBER 28 H. PAXTON i
REGION:
4 AEt-BECH COUNSEL M. KARMAN CONST. INSPt.
i j
REAC. TYPE: - PWR NSSS:. WEST ANTITRUST B. V0GLER RESID. INSP S. SCHUM DESIGN PWR 3425 MWT/115n MWE CONSTt DANIEL RM ANALYSTS
'S.
HEDLUND l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES SCHED. DATE' ACTUAL DATE l
i.
The SER was issued in April 1982.
SSER-1 was-issued in August 1982.
ER DOCKETED:
11/25/80 11/25/80C ER SITE VISIT COMPLETE:
07/28/81' 04/21/81C IMPUT TO DES TO PM:
~10/01/81 10/01/81C ISSUE DES:
01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C ISSUE FES:
06/11/82 06/11/82C.
i i
CURRENT ENV. STATUS The DES was issued in January 1982. The FES was issued in June 1982 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
.02/21/80 02/21/80C
.i SAR DOCKETED:
98/07/80' 08/07/80C l
SAR Q'S RECEIVED BY PM:
5 SAR APPL. RESPONSE TO 4'S RECEIVED:
CURRENT NRG. STATUS:
IMPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C Notice of Opportunity for Hearing was pubilshed in the ISSUE DRAFT SER:
Federal Register on 12/18/80. Two petitions for IMPUT TO SER:
03/19/82 03/19/82C i
leave to intervene were filed.
.A special combined ISSUE SER:
04/07/82 04/07/82C prehearing conference was held on 4/15/81.
.ACRS LETTER RECEIVED:
05/11/82 05/11/82C INPUTS TO SE SUPPLEMENT 18 08/10/82 08/10/82C ISSUE SE SUPPLEMENT 18 08/26/82 08/26/82C i
FEMA LETTER RECEIVED:
04/01/83-CURRENT ANTITRUST:
OL antitrust review is in progress.
-HEARING STARTED:
06/09/83 ASLB. INITIAL DECISI0H 11/09/83 COMMISSION EFFECTIVENESS DECISION:
12/00/83 i
TECH SPECS COMPLETED:
N/S COMMISSIDH DECISION:
09/00/84 l
ISSUE LIC. WITH POWER RESTRICTION: N/$
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND 10/09/84 SNUPPS FSAR - No. 10; Wolf Creek Site Addendum - No. 93-ER - No. 4.
SCHED..DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
10/09/84 08/24/82 f
L,
NRR LICENSING SYSTEM PAGE NO: 2-34 ZIMMER 1 0L C U R R E N T.
STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CNARACTERI5TICSt KEY PERS0NNELa DOCKET ND:
05000358 LIC. PM:
L. KINTNER ASLB CHAIR J. FRYE APPLICANT:
CINCINNATI GAS 8 ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1 F. HOOPER LOCATION:
24 MI SE OF CINCINHATI, ON LIC. LA.:
M. RUSNBROOK MEMBER 2 M. LIVINGSTON REGION:
3 AE S8L COUNSEL:
C. BARTN CONST. INSP D. HUNTER REAC. TYPE: BWR NSSS: GE ANTITRUST S. LEWIS RESID. INSP F. CHRISTIANSON DESIGN PWR 2436 MWT/0810 MWE CONST: KAISER RM ANALYST B. ST MARY CURRENT SAF. OTATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SE Supplement 01 was issued on 06/04/81 SE Supplement 82 was issued 10/81.
SE Supplement 93 issued on 08/23/82.
ER DOCKETED:
09/10/75 09/10/75C NRR is assisting Region IV in its vendor inspection of the ER SITE VISIT COMPLETE:
10/09/75 10/09/75C main steam line and its supporting structures in the INPUT TO DES TO PM:
88/20/76 08/19/76C turbine building.
ISSUE DES:
10/15/76 10/15/76C RESPONSE TO COMMENTS ON DES:
03/25/77 04/01/77C ISSUE FES:
06/10/77 06/10/77C CURRENT ENV. STATUS:
Complete SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
08/15/75 05/09/75C SAR DOCKETED:
09/15/75 09/10/75C SAR 9'S RECEIVED BY PM:
10/29/76 01/06/77C SAR APPL. RESPONSE TO 9'S RECEIVED: 12/31/76 07/29/77C CURRENT NRG. STATUS:
ISSUE DRAFT SER:
N/A INPUT TO DRAFT SER TO PMs-01/2a/77 08/11/77C Nearing completed 3/5/82. Board decision was rendered in June, 1982.
The Board exercised sua sponte authority to INPUT TO SER:
05/20/77 12/07/77C admit as Board issues 8 new gententions. The Commission ISSUE SER:
07/29/77 01/31/79C reviewed the action and directed the Board to issue an I
appropriate order dismissing the 8 contentions from the ACRS LETTER RECEIVED:
09/16/77 03/13/79C proceeding. On 11/12/82 the Commission issued an order to INPUTS TO SE SUPPLEMENT 38 06/17/82 08/02/82C Show Cause and Order Immediately Suspending Construction.
ISSUE SE SUPPLEMENT 38 08/23/82 08/23/82C On 12/8/82, applicant consented to the Order.
FEMA LETTER RECEIVED:
04/15/82 04/15/82C CURRENT ANTITRUST Antitrust review is now closed.
NEARING STARTED:
02/26/82 02/26/82C ASLB INITIAL DECISION:
06/21/82 06/21/82C COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:
05/08/83 COMMISSION DECISION:
08/08/83 ISSUE LIC. WITN POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL-POWER LICENSE AMEND:
09/09/83 Application amendment 143, FSAR novision 90 NEW SLIPS / NOTES:
Applicant letter of 09/24/82 revia d construction completion CONSTRUCTION COMPLETION - APPL.:
09/08/83 09/24/82 date to the third quarter of.1983.
Applicant letter of 01/24/82 requested latest construcilon completion date of 12/31/P4.
I
i N'R R
-L I C E N S-I N.G SYSTEM:
PAGE NO 2-35 CLINCH RIVER CP CURRENT S T A T.U S R E P.0 R T REPORT AS OF: 01/31/83L PLANT C H A R A C T E R I.-S T I C St KEY PERS0NNEL
. DOCKET NO:
05000537 LIC. PM:
R. STARK ASLB CHAIR M. MILLER
-APPLICANT:
PROJECT MANAGEMENT-CORP.; DOE;TVA LIC. BC:
H. GRACE
. MEMBER 1:
G. LINENBERGER LOCATION:
25 MI W OF KNOXVILLE, TH LIC. LA.:
P. SHUTTLEWORTH-MEMBER 2:
C. HAND REGION:
2 At:
B8R COUNSEL:
S. TREBY CONST. INSP '
REAC. TYPE: LMFBR HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP i
-DESIGN PWR 0975 MWT/0350 MWE CONST S8W RM ANALYST:
B.-ST MARY r
CURRENT SAF. STATUS:
-ENVIRbHMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE
. Safety. review was reinitiated in October.1981.
A revision to the Site Suitability Report was issued June 11, 1982.
ER DOCKETED:
04/11/75 04/11/75C On August 17, 1982, NRC issued an order granting Clinch ER SITE VISIT COMPLETE:
River's_ request to begin site pr2paration activities.
INPUT TO DES TO PM:
e The Site Suitability Report hearing sessions were held.
ISSUE DES:
-02/12/76C l'
in Oak Ridge during the week.of. August 23, 1982.
RESPONSE-TD COMMENTS ON DES:
j ISSUE FES:
02/07/77 02/07/77C CURRENT ENV. STATUS:
The FES was issued in February 1977. A draft supplement to the FES was issued on July 19,;1982. A final! supplement SAFETY / HEARING MILESTONES:
was issued on October 29, 1982.
APPLICATION TENDERED -
10/15/74-10/15/74C SAR DOCKETED:
06/13/75 06/13/75C SAR.0'S RECEIVED BY PM:
. 04/09/82 04/09/82C SAR-APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/16/82 07/16/82C Hearing sessions on the SSR took place on August 23-27, ISSUE DRAFT SER:
09/27/82 09/27/82C 1982.
The FES hearings were held November 15-19, 1982, INPUT TO SER:
02/04/83 i
December 13-17, 1982,-and on January 9-5, 1983.
ISSUE SER:
'03/04/83 7
ACRS FULL COMMITTEE MifTINGs.
05/06/83 INPUTS-TD SE SUPPLEMENT 1:
06/10/83 ISSUE SE SUPPLEMENT 1:
07/01/83-CURRENT.ANTITRukT
. HEARING STARTED:
08/23/82 08/23/82C' ASLB INITIAL DECISION:
04/01/84 COMMISSION EFFECTIVENESS DECISION : N/S
. TECH SPECS COMPLETEL:
l COMMIdSION DECISION:
06/01/84 CP ISSUED:
06/01/84 l
LATEST AMENDMENT:
I HEW SLIPS / NOTES:
I i
NRR LICENSING SYSTEM P' AGE NO: 2-36 SKAGIT/HANFORD 182 CP CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY PERSONNELe DOCKET NO:
052280523 LIC, PM:
C. MOON ASLB CHAIR J. WOLF APPLICANT:
PUGET SOUND POWER 8 LIGHT LIC. BC:
E. ADENSAM MEMBER 18 F. HOOPER LOCATION:
30 MI. Ed 9F RICHLAND, WA.
LIC. LA.:
M. DUNCAN MEMBER 2:
G. LINENBERGER REGIDH 5
AE:
B ECil COUNSEL:
L. DEWEY CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP:
DESIGN /WR 3833 MWT/1277 MWE CONST: EECH RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on.TMI-related action items. Site relocation ER amendment and PSAR ER DOCKETED:
09/30/74 09/30/74C amendment were submitted on 12/31/81.
The applicant is ER SITE VISIT COMPLETE:
02/05/82 02/05/82C relocating the site to the Hanford Reservation.
INPUT TO DES TO PM:
04/09/82 04/09/82C Supplement 3 to the SER was issued in 12/82.
The staff ISSUE DES:
05/04/82 05/04/82C recommends additional investigations of the May Junction RESPONSE TO COMMENTS ON DES:
08/06/82 09/30/82C Monocline. An ACRS subcommittee site visit and meeting ISSUE FES:
02/00/83 is schedul64 for 01/24-25/83.
CURRENT ENV. STATUS:
Site relocation (to Hanford) DES was issued on May 4, 1982.
The FES was expected to be issued 12/82.
SAFETY / HEARING MILESTONES:
A delay to 02/83 is now expected in order that FES issuance follow issuance of the draft report on need APPLICATION TENDERED:
08/06/74 08/06/74C for power by the Regional Power Council in 01/83.
SAR DOCKETED:
01/15/75 01/15/75C SAR Q'S RECEIVED BY PM:
02/10/82 02/10/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TG PM:
A special preheari,q conference was held on May 5, 1982.
' ISSUE DRAFT SER:
Safety hearings are expected to begin in 02/83.
INPUT TO SER:
07/11/77 07/11/77C Environmental hearings except for need-for power, are ISSUE SER:
08/31/77 08/31/77C expoeted to begin in 04/83. Need-for power hearing is expected to begin in 05/83 after the Regional Power ACRS FULL COMMITTEE MEETING:
02/00/83 Council publishes a regional conservation and electric INPUTS TO SE SUPPLEMENT 3:
11/30/82 11/30/82C power plan in 04/83. A prehearing conference was held ISSUE SE SUPPLEMENT 3:
11/30/82 12/30/82C on 12/02/82.
CURRENT ANTITRUST
- Complete HEARING STARTED:
07/15/75 07/15/75C ASLB It!ITIAL DECISIDH 04/00/83 COMMISSION EFFECTIVENESS DECISION: N/A TECH SPECS COMPLETED:
N/A COMMISSION DECISION:
07/00/83 CP ISSUED:
07/00/83 LATEST AMENDMENT:
NEW SLIPS / NOTES:
I l
w..
s..
NRR LICEN$ING. 5YSTEM
.PAGE NO: 2 -
(50P)BOPSSAR/BSAR-205 PDA. CURRENT S T A T.U S REPORT REPORT AS OF 01/31/83 PLANT C N A R A C T E-R I S'T I C St KEY PERS0NNEL:
LIC, PM:
. UNASSIGNED ASLB CHAIR
-DOCKET N08 95000560 APPLICANT:
FLUOR POWER SERVICES LIC. BC:
C. THOMAS MEMBER 1:
LIC. LA.:
P. ANDERSON MEMBER 2:
LOCATION:
N/A REGION:
1 AE FLUOR COUNSEL:
N/A CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR: 0000 MWT/0000 MWE CONST:
RM ANALYST S. NEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization.
ER DOCKETED:
1 ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
i ISSUE DES:
RESPONSE TO COMMENTS ON DES:
l ISSUE FES:
~l CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
j APPLICATION TENDERED:
10/31/77 10/31/77C SAR DOCKETED:
10/31/77 10/31/77C SAR 9'S RECEIVED BY PM:
04/14/78 06/20/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/02/78 07/31/78C-INPUT TO DRAFT SER TO PM:
05/25/78l 07/07/78C CURRENT NRG. STATUS:
ISSUE DRAFT SER:
INPUT 70 SER:
08/21/78 10/17/78C ISSUE SER:
10/02/78 12/29/78C ACRS LETTER RECEIVED:
11/17/78 02/16/79C INPUTS,10 SE SUPPLEMENT 15-12/08/78
.03/21/79C ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
-NEARING STARTED:
ASLB INITIAL DECISION:
i COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
'N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
(-
I l
NRR LICEN5ING SYSTEM PAGE N08 38 (BOP)ESSAR/BSAR-205 PDA C U P. RENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERI5T1 cst KEY PERS0NNELa DOCKET NO:
00002591 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
EBASCO SERVICES LIC. BC:
C. THOMAS MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGIDH:
0 AE:
EBASCO COUNSEL:
. UNASSIGNED CONST. INSP REAC. TYPE: BOP HSSSL ANTITRUST:
RESID. INSP DESIGN PWR 0000 MWT/0000 MWE CONST:
RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPtti TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/77C SAR DOCKETED:
02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 18 N/5 ISSUE SE SUPPLEMENT 1:
N/S CURRENT ANTITRUST:
HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMFt:DMENT:
i HEW SLIPS / NOTES:
NRR LICENSING SYSTEM PAGE NO: 2-39 (BOP)ESSAR/CESSAR-80 PDA CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICS:
KEY P E R S 0 N N E La DOCKET NO:
05000591 LIC. PM:
UNASSIGNED ASLB CHAIR:
APPLICANT:
EBASCO SERVICES LIC. BC:
C. THOMAS MEMBER 1:
LOCATIDH:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
O AE2 EBASCO COUNSEL:
. UNASSIGNED CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
.M.
KING RESID. INSP DESIGH PWR: 3800 MWT/0000 MWE CONST:
RM ANALYST:
CURRENT SAF. STASJS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization.
and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
i j
APPLICATION TENDERED:
11/23/77 11/23/77C l
SAR DOCKETED:
02/02/78 02/02/78C l
SAR Q'S RECEIVED BY PM:
N/S SAR APPL. DESPONSE TO 4'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S.
ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST HEARING STARTED:
ASLB INITIAL DECISION:
COMi11SSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
i
1 l
NRR LICEN5ING SYSTEM PAGE N0s.2-40 (BOP)ESSAR/RESAR-414 PDA CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CHARACTERI$ TICS KEY PERSONNELa DOCKET NO:
00007591 LIC. PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT:
EBASCO SERVICES LIC. BC:
C. TNOMAS MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 28 i
REGION:
0 AE EBASCO COUNSEL:
. UNASSIGNED CONST. INSP REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
DESIGN PWR 0000 MWT/0000 MWE CONST '
RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization.
and resources to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO CDMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/23/77 11/23/770 SAR DOCKETED:
02/02/78 02/02/7EC SAR 4'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER:
INPUT TO SER:
N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING ^
N/S INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT:
NEW SLIPS / MOTES:
NRR LICEN5ING SYSTEM PAGE HO: 2-41 i
(BOP)GAISSAR PDA C U R R E H.T S T A T.U.S REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E Lt DOCKET Not 05000595 LIC. PM:
. UNASSIGNED ASLB CHAIR APPLICANT:
GILBERT COMMONWEALTH LIC. BC:
C.
THOMAS MEMBER 18 t
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2 REGION 4
AE2 WEST COUNSEL:
M. KARMAN CONST. INSP REAC. TYPE: BOP NSSSt ANTITRUSTt RESID..IHSPt DESIGN PWR 0000 MWT/0000 MWE CONST:
RM ANALYSTt B. ST MARY CUPRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization and resources to conduct review.
ER DOCKETED:
i ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/24/78 92/24/78C SAR DOCKETED:
08/21/78C SAR 9'S RECEIVED BY PMt N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS IMPUT TO DRAFT SER TO PMt H/S ISSUE DRAFT SER N/S IHPUT TO SER:
N/S ISSUE SER:
N/S a
ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST HEARING STARTED:
ASLB INITIAL DECISION:
r COMMISSION DECISI0H:
SPECIAL PROJECT COMPLETE:
N/S LATEST AMENDMENT HEW SLIPS / NOTES:
t
)
~. -.
.~
i MRR LICEN5ING SYSTEM-PAGE NO: 2-42 (BOP)GIBBSSAR (W)
PDA CURRENT' S T A T-U S REPORT REPORT AS Oft 01/31/83 PLANT C N A R A C T E R I S T-I C St KEY PERS0NNELt I
DOCKET Not 05000584
'LIC, PM:
. UNASSIGNED ASLB CHAIR:
APPLICANT GIBBS 8 HILL
.LIC. BC C. THOMAS MEMBER 12 i
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2 REGION:
0 AEt GNDR COUNSEL:
M. WAGNER CONST. INSP REAC. TYPE: BOP HSSS:
ANTITRUSTr RESID. INSP -
1 DESIGN PWRt 0000 MWT/0000 MWE CONST RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE~
l Review in abeyance pending the future of standardization and rescurces to conduct review.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES i
ISSUE FES:
l f
l CURRENT ENV. STATUS:
7 SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
10/15/76 10/15/76C SAR DOCKETED:
04/08/77 05/10/77C SAR Q'S RECEIVED BY PM:
02/03/78 03/16/79C SAR APPL. RESPONSE.T0 Q'S RECEIVED: N/5.
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S ISSUE DRAFT SER INPUT TO SERT N/S ISSUE SER:
N/S ACRS FULL COMMITTEE MEETING:
N/S INPUTS TO SE SUPPLEMENT 18 N/S ISSUE SE SUPPLEMENT 18 N/S CURRENT ANTITRUST NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISION:
SPECIAL PROJECT COMPLETE:
N/S a
LATEST AMENDMENT:
NEW SLIPS / MOTES:
e h
4 i
L--
_~
. _ ~.
NRR L'I'C E N 5 I N G SYSTEM PAGE N08' 2-43 (BOP)SWESSAR/BSAR-205 PDA C'U R R E N T STATU$
REP 0RT REPORT AS OF - 01/31/83 PLANT CHARACTERI5TICSt KEY PERS0NNELa DOCKET-NO:
00000595 LIC. PM:
UNASSIGNED ASLB CHAIR:
APPLICANT:
STONE 8 WEBSTER LIC. BC:
C. THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE S&W COUNSEL:
UNASSIGNED CONST. INSP:
REAC. TYPE: BOP NSSS:
ANTITRUST:
RESID. INSP:
i DESIGN PWR: 0000 MWT/0000 MWE CONST: N/A.
RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization.
and resources to conduct review.
ER DOCKETED:
N/A ER SITE VISIT COMPLETE:
INPUT TO DES TO PMs-ISSUE DES:
RESPONSE TO COMMENTS CH DES:
ISSUE FES:
CURFENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATI0H' TENDERED:
12/15/75 12/22/75C i
SAR DOCKETED:
12/22/75
.12/22/75C t
11/12/76 04/04/77C SAR APPL. RESPONSE TD Q'S RECEIVED: 01/14/77 05/20/77C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/5 ISSUE DRAFT SER:
INPUT TO SER:
09/09/77 10/13/77C ISSUE SER:
10/19/77 12/02/77C l
ACRS LETTER RECEIVED:
01/15/78 01/13/78C INPUTS TO SE SUPPLEMENT 1 N/S j
ISSUE SE SUPPLEMENT 18 N/S t
CURRENT ANTITRUST:
I NEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION DECISIDH:
SPECIAL PROJECT COMPLETES-N/S LATEST AMENDMENT:
NEW SLIPS / NOTES '
N R-R LICENSING SYSTEM PAGE NO: 2-44 (HSS)CESSAR SYSTEM 80 FDA CURRENT STATUS REPORT REPORT AS OF 01/31/83 PLANT CHARACTERISTICS
-KEY PERS0NNEL DOCKET NO:
05000470 LIC. PM:
G. MEYER ASLB CHAIR APPLICANT:
COMBUSTION ENGINEERING LIC. BC:
C. THOMAS MEMBER 1 LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE COUNSEL:
M. WAGNER CONST. INSP REAC. TYPE: PWR NSSS: COMB ANTITRUST:
RESID. INSP DESIGN PWR 3800 MWT/1295 MWE CONST:
RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81.
Awaiting documentation to resolve ACRS, open, and confirmatory issues.
ER DOCKETED:
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
N/A.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/27/78 10/27/78C SAR DOCKETED:
12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:
09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C i
CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S l
N/A.
ISSUE DRAFT SER:
N/S INPUT TO SER:
11/01/81 11/13/81C ISSUE SER:
05/01/82 11/10/81C ACRS LETTER RECEIVED:
06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 18 02/28/83 ISSUE SE SUPPLEMENT 18 03/30/83 CURRENT ANTITRUST:
NEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION DECISIDH:
07/00/83 SPECIAL PROJECT COMPLETE:
07/29/83 LATEST AMENDMENT' HEW SLIPS / NOTES:
~
HRR LICENSING SYSTEM PAGE NO: 2-45 (NSS)GESSAR SEVERE ACC FDA CURRENT STATUS REP 0RT REPORT AS OF 01/31/83 PLANT CHARACTERI5 TICS:
KEY P E R S 0 N N E La DOCKET NO:
00007447 LIC, PM:
D. SCALLETTI ASLB CHAIR: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC, BC:
C. THOMAS MEMBER 18 N/A LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2 N/A REGION:
0 AE BRAUN COUNSEL:
B. BORDENICK CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:
RESID. INSP DESIGN PWR 3579 MWT/1220 MWE CONST:
RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.
Dates shown reflect review for the severe accident ER DOCKETED:
design.
ER SITE VISIT COMPLETE:
s INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:-
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
09/01/82 10/08/82C-SAR APPL. RESPONSE TD Q'S RECEIVED: 02/01/83 CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
INPUT TO SER:
0??01/84 ISSUE SER:
03/01/84 ACRS FULL COMMITTEE MEETING:
04/06/84 INPUTS TO SE SUPPLEMENT 18 04/21/84 ISSUE SE SUPPLEMENT 12 05/25/84 CURRENT ANTITRUST:
FDA antitrust review is in progress.
HEARING STARTED -
N/A~
ASLB INITIAL DECISI0Hz N/A COMMISSION DECISION:
N/A SPECIAL PROJECT COMPLETE:
05/00/84 LATEST AMENDMENT:
FDA Amendment No. 9 was received in November, 1982.
NEW SLIPS / NOTES:
HRR LICEN5ING SYSTEM PAGE NO: 2-46 (HSS)GESSAR-238 NI FDA C U R'R E N T STATUS REPORT REPORT AS OF 01/31/83 i
PLAHT CHARACTERISTICS:
KEY PERSONHEL:
[
DOCKET NO:
05000447 LIC. PM:
D. SCALETTI
' ASIS CHAIR: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C. THOMAS MEMBER 1 N/A LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2 N/A REGIDH 0
AE BRAUN COUNSEL:
B. BORDEHICK CONST. INSP I
REAC. TYPE: BWR NSSS: GE ANTITRUST:
RESID. INSP DESIGN PWR 3579 MWT/1220 MWE CONST:
RM ANALYST:
- 8. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED DATE ACTUAL DATE GESSAR II was docketed 02/82.
The foundation analysis issue wi1I require epecial attention. PRA for severe ER DOCKETED:
accident design was submitted 4/82.
Severe accident ER SITE VISIT COMPLETE:
design modifications were submitted 6/82 in Anendment INPUT TO DES TO PM:
No.
4.
GE has requested the EDO to accelerate the ISSUE DES:
PRA review schedule to coincide with the FDA.
RE5PONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR O'S RECEIVTD BY PM:
10/15/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/11/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
INPUT TO SER:
02/01/83 ISSUE SER:
03/02/83 ACRS FULL COMMITTEE MEETING:
04/01/83 INPUTS TO SE SUPPLEMENT.18 04/15/83 ISSUE SE SUPPLEMENT 18 05/12/83 CURRENT ANTITRUST:
FDA antitrust review is in progress.
HEARING STARTED:
N/A-ASLB INITIAL DECISION:
N/A COMMISSION DECISION:
N/A SPECIAL PROJECT COMPLETE:
05/00/83 LATEST AMENDMENT:
FDA Amendment No. 9 was received in November, 1982.
NEW SLIPS / NOTES:
i i
H.R R LICENSING S Y S T.E M PAGE'NO: 2 ' CARROLL SITE ESR C U R RlE N T S.T A T U S REP 0RT
. REPORT AS OF,2 01/31/83 I
^
3 PLANT CHARACTERIS. TICS KEY-P E R-S 0 N N E L:
4
-DOCKET NO:
05000S99 LIC..PM:
D. MORAN ASLB CHAIRS.
J. WOLF
+
APPLICANT:
COMMONWEALTH EDISON LIC. BC C. TH0flAS MEMBER-1:
G.
BRIGHT LOCATION:
' CARROLL COUNTY, IL.
LIC. LA.:
P. ANDERSON.
. fiE!!BER 2:
R. HOLTON.
REGION:
3 AE:
COUNSEL:
R. LESSY C 0!!S T. INSP:
I REAC. TYPE:
NSSS: WEST ANTITRUST:
A. HOD 0 DON RESID. INSP:
DESIGN PWR: 0000 MWT/1120 MWE-CONST:
RM ANALYST:
S. HEDLUND.
1 CURRENT SAF.' STATUS:
. ENVIRONMENTAL MILESTONES:
SCHED.'DATE, ACTUAL DATE 1
The commercial operation date has been l
postponed until 1999 - 2000.
This license ER DOCKETED:
04/07/79' 04/07/79C-1 is not under active review.
ER SITE VISIT COMPLETE:
.N/S INPUT-TO DES.TO PM:
N/S.
ISSUE DES:
'N/S' a
RESPONSE TO COMMENTS ON DEST.-
N/S ISSUE FES:
N/S CURRENT ENV. STATUS:
Portions of the alternate site study are under. review by DOE.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/20/78 12/20/78C SAR DOCKE;ED:
.SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
i
{
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PMa' Five intervenors have been admitted.
ISSUE DRAFT SER:-
INPUT.TO SER:
ISSUE SER.
i l
ACRS FULL COMMITTEE MEETING:
INPUTS'TO SE SUPPLEMENT s'
4 ISSUE SE SUPPLEMENT :
CURRENT ANTITRUST:
Awaiting updated antitrust information'from applicant.
HEARING STARTED:
N/S ASLB INITIAL DECISION:
N/S j
SPECIAL PROJECT COMPLETE:
N/S
]-
LATEST AMENDMENT:
NEW SLIPS / NOTES:
4 i
e n-
=
NRR LICENSING SYSTEM AS OF201/31/83 NON-POWER RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEM TER ISSUE FES OR START ISSUE HON-POWER FACILITY NUMBER DOCKET DE1 TO PM 118 EIA NEARING DL COMMENTS AFRRI, TRIGA 05000170 1000.0000KW POOL 10/80 N/A t9/81C 01/82 N/S 06/83 N/S CONTESTED CASE 19/80C 01/82C CORNELL U.,
TRIGA 05000157 100.0000KW POOL 05/80 N/A 04/83 06/83 06/83 N/A 06/83 05/80C CORNELL U.,
ZPR 05000097
.1000KW POOL 10/78 N/A 04/83 06/83 06/83 N/A 06/83 10/78C GE, HTR 05000073 100.0000KH POOL 11/79 N/A 06/84 09/84 09/84 N/A 09/84 11/79C IOWA STATE, UTR-10 05000116 10.0000KW 09/79 N/A 07/83 09/83 09/83 N/A 09/83 09/79C MANHATTAN COLLEGE 05000199
.0001KW POOL 08/83 N/A 08/84 10/84 10/84 N/A 10/84 MICHIGAN STATE, TRIGA 05000294 250.0000KW POOL 09/77 N/A 09/83 12/83 12/83 N/A 12/83 09/77C NBSR 05000184 10.0000KW T 12/80 02/82 09/82 03/83 09/82 N/A 03/83 POWER INCREASE TO 20 MW 12/80C 02/82C 09/82C 09/82C INCLUDED IN RENEWAL RENSSELAER 05000225
.0000KW CRITI 05/79 N/A 05/83 07/83 11/83 N/A 09/83 05/79C STATE U OF NY PULSTAR 05000057 2000.0000KW POOL 06/79 N/A 12/82 03/83 03/83 N/A 03/83 06/79C 12/82C TEXAS A8M, TRIGA 05000128 1000.0000KW POOL 07/79 N/A 07/82 10/82 02/83 N/A 02/83 07/79C 07/82C 10/82C U. OF KANSAS 05000148 250.0000KW POOL 03/80 N/A 02,64 04/84 04/84 N/A 04/84 03/80C
NRR LICENSING SYSTEM AS OF t 01/31/'. 3 H0N-POWER RENEWALS INPUT TSSUE DOCKET EARLIEST ISSUEM TER ISSUE FES CR START ISSUE NON-POWER FACILITY NUMBER DOCKET 211 TO PM 11R Eli HEARING AL COMMENTS U. OF MD., TRIGA 05000166 250.000'0KW TRIGA 05/80 N/A 07/83 09/83 09/83 N/A 09/83 05/80C U. OF MO., ROLLA 05000123 200.0000KW POOL 10/79 N/A 04/84 06/84 06/84 N/A 06/84 10/79C U. OF OKLA., AGN-211 10 05000112
.0150KW 10/78 N/A 05/83 07/83 06/83 N/A 09/83-10/78C U. OF TEXAS, TRIGA 05000192 250.0000KW POOL 05/80 N/A 05/83 08/83 N/A N/A 08/83 05/80C U. OF UTAH, TRIGA MARK 05000407 100.0000KW POOL 03/83 N/A 11/83 02/84 02/84 N/A 02/84 U. OF VA., CAVALIER 05000396 1000KW POOL 06/84 N/A 07/84 09/84 09/84 N/A 09/84 UNION CARBIDE 05000054 5000.0000KW POOL 05/80 N/A 10/82 04/83 04/83 N/A 04/83 05/80C 10/82C VA HOSP., TRIGA 05000131 18.0000KW TRIGA 01/80 N/A 04/83 07/83 07/83 N/A 07/83 01/80C VA. POLY. INST., UTR-10 05000124 100.0000KW 10/79 N/A 09/83 12/83 12/83 N/A 12/83 10/79C WEST., TRAINING REACTOR 05000087 10.0000KW R 12/81 N/A 11/83 02/84 02/84 N/A 02/84 12/81C WORCESTER POLY TECH 05000134 10.0000KW POOL 07/79 N/A N/A 12/82 N/S N/A 12/82 07/79C 12/82C 12/82C M FOR TEST REACTORS ONLY
. v M
M M
2 O
M N
O W
sh
I NRR LICENSING S Y'S T E M PAGE NO: 2-0L CURRENT STATUS REPORT REPORT AS OF PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL:
DOCKET NO:
Docket No. or Project No.,if not docketed LIC. PM:
Licensing Project Manager ASLB CHAIR: ASLB Chairman APPLICANT:
Utility LIC. BC:
Licensing Branch Chief MEMBER 1:
on panel LOCATION:
Miles and direction from nearest major town LIC. LA.:
Licensing Assistant MEMBER 2:
on panel REGION:
1 through S AE:
Architect / Engineer COUNSEL:
Attorney assigned to case CONST. INSP : Construction Inspector REAC. TYPE: PWR, BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST
- Antitrust Attorney RESID INSP: Resident inspector DESIGN PWR: Megawatts electric & thermal CONST: Constructor MPA AN ALYST MPA analyst assigned to track proj,ect CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late input from ER DOCKETED:
Environmental Report review branches should be indicated, along with indication of the critical path.
P O
T Project Manager ISSUE DES:
Draft Environmental Statement RESPONSE TO COMMENTS ON DES:
ISSUE FES:
Final Environmental Statement CURRENT ENV. STATUS:
Environmental status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:
input from review branches should be indicated.
APPLICATION TENDERED:
SAR DOCKETED:
Safety Analysis Report SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Changes in the hearing dates since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER Safety Evaluation Report contentions should be indicated.
ER ACRS LETTER RECEIVED:
Advisory Committee INPUTS TO SE SUPPLEMENT 3:
on Reactor Safeguards ISSUE SE SUPPLEMENT 3:
CURRENT ANTITRUST:
Changes in the antitrust status since the last issue of Blue Book.
HEARING STARTED:
ASLB INITIAL DECISION:
Atomic Safety & Licensing Baard ASLB FINAL DECISION:
TECH SPECS COMPLETED:
COMMISSIDH DECISION:
ISSUE PARTIAL POWER LICENSE:
I LATEST AMENDMENT:
ISSUE FULL POWER LICENSE:
The latest amendment submitted by the applicant.
SCHED. DA.TE RECEIPT DATE NEW SLIPS / NOTES:
s Slips or potential problema that should be brought to management's attention.
CONSTRUCTION COMPLETION - APPL.:~
M'., "h 8I
g f g 88 construction m construction completion complation
- U.S. 6vv s-n a PRINTING OFFICE: 1983-3:1-302:104
U.S. NUCL E AR ftEGUL ATcRY COMulSSION j
17 ??)
i BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol. 12 No. 1
- 4. TITLE AND SUBTITLE (Add Volume No., #1appropreaseJ
- 2. (Leave clariaJ Regulatory Licensing Status Sumary Report f
. RECWlENT'S ACCESSION NO.
(Bluebook)
- 7. AUTHOR!S)
- 5. DATE REPORT COMPLE TED M ON T H l YEAR Januarv 1983
- 9. PE RFORMING ORGANIZAT8oN N AME AND MAILING ADDRESS (lactude 20 Codel DATE REPORT ISSUED l^"
Office of Resource Management Februa r.y 1983 Management Information Branch
- s. (te.<e ainami U. S. Nuclear Regulatory Connission Washington, D.C.
20555
- 8. (Leave blanki
- 12. SPONSORING ORGANIZATION N AME AND MAILING ADDRESS (factude 2,p Codel
- 10. PROJE CT,T ASK/WG K UNIT NO.
Office of Resource Management Management Infonnation Branch ti. CONTR ACT NO.
U. S. Nuclear Regulatory Conmission Washington, D.C.
20555
- 13. TYPE OF REPORT PE RIOD COVE RE D (inclus,re dares)
January 1,1983 - Janugry 31, 1983
- 15. SUPPLEMENTARY NOTES 14 IL ' 8'*** f I
- 16. ABSTR ACT 000 words or less; l.
Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.
l w
- 17. KEY WORDS AND DOCUMENT ANALY$l$
17a DESCRIPTORS 3 7b. IDE NTIF aE RS' OPE N ENDE D TE RMS
~-
21 NO OF PAGE S Unclassified Unlimited 20
- Tv c As irropart 22 PRICE l
l i
r-l
~
- UNITED STATES nest classent.
. mim a ossPao.
. NUCLEAR REGULATORY C-am usmac WASHINGTON, D.C. 20M6 : '
easm o c :
91neut me kAL ~
OFFICIAL SUSWsESS.
4, -
~
^
- ^ - - >
PEteALTY FOR PftsvATE USEl63eo s M
'4-5 1 fi. '.
l
.t.
v-
. Sk y,3555" 1;c,r w L; y
11<t
- f.-
1,,
1 r
- . L
,4
' L, 5, k *
- j P*
y (l
j a i.) 5
{..
',/;
teO I{
i, 3
t ie t
m)
)
i 4,
gilil b -
it 4is,
".,. y C 1:,, \\ n : \\ <,~
3
n.
w 4
g 4
k 4
A
.*f.
s
-.I.r
- 4 s
-7.
t
{-
4 A
S$
1 4
4
_g's f
[
t r
}
F 4
t
?
4 I
k'.
._.