MONTHYEARML19341A3071980-12-22022 December 1980 Operability Review of ECCS at Plant Hatch Units 1 & 2 Project stage: Request ML20009A0081981-06-29029 June 1981 Forwards 6-month Response to NRC 801222 Request for Info Re Control of Heavy Loads,Section 2.1, General Requirements for Overhead Handling Sys Project stage: Request ML20010H4431981-09-18018 September 1981 Requests Extension of Deadline to 811013,per NRC 801222 Request Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants Project stage: Other ML20031G5931981-10-13013 October 1981 Forwards Info Requested in Sections 2.2 & 2.3 of Encl 3 to NRC Re Compliance w/NUREG-0612 Concerning Control of Heavy Loads Project stage: Other ML20053B7551982-05-24024 May 1982 Summarizes Findings & Expands Justification for Concluding No Safety Concern Exists Re Control of Heavy Loads.Complete Review of Overhead Handling Sys Performed.No Further Review of Design Bases for Load Handling Sys Required Project stage: Other ML20024D9221983-07-29029 July 1983 NUREG-0612 General Guidelines & Interim Protection Measures for Heavy Load Handling,Ei Hatch Units 1 & 2. App B Will Be Submitted by 831215 Project stage: Other ML20024D9191983-07-29029 July 1983 Forwards NUREG-0612 General Guidelines & Interim Protection Measures for Heavy Load Handling,Ei Hatch Units 1 & 2, in Response to Draft Technical Evaluation Rept.App B to Rept Will Be Submitted by 831215 Project stage: Draft Other ML20083D7741983-12-14014 December 1983 Advises That App B to Rept Comparison of Special Lifting Device Design to ANSI N14.6-1978, Per NUREG-0612 Will Be Transmitted by 840120 Project stage: Other ML20079N1131984-01-23023 January 1984 Forwards App B,Comparison of Special Lifting Device Design to ANSI N14.6-1978, Per 830729 Response to NUREG-0612, Control of Heavy Loads at Nuclear Power Plants Project stage: Other ML20087G4101984-03-12012 March 1984 Responds to 840229 Request for Addl Action to Verify Aspects of Overhead Crane Design at Facility,Per NUREG-0612 Guidelines.Crane Safety & Reliability Satisfactory Project stage: Request ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other 1982-05-24
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
...........
^3orgia Power Corrpany l
333 P(4mont Avenue A!!anta, Gestg a 30308 Telephore 404 5264526 I'
Matng Address:
Post oftce Box 4545 Attanta Georg:a 3G302 h
Georgia Power L T. Guewa t% sot /wo mectnc system Manager Nucicar Engineer'ng NED 83-611 and ch,ef Nuclear Eng neer I
December 14, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief i
Operating Reactors Branch No. 4 j
Division of Licensing U. S. Nuclear Regulatory Comnission I
Washirgton, D. C. 20555 i
NBC DOCKETS 50-321, 50-366 OPERATIT, LICENSES DPR-57, NPF-5 EININ I. HA'ICH NUCLEAR PLANT UNITS 1, 2 NUREG-0612, "CONIROL OF HEAW IIPOS AT NLCLEAR POWER PLANTS" Gentlemen:
Our letter of July 29, 1983 transmitted a partial report addressing the cmpliance of Plant Hatch Units 1 and 2 with the " General Guidelines" of NUREG-0612.
It was estimated that the unfinished portion of the report (Appendix B, Comparison of Special Lifting Device Design to ANSI N14.6-1978) would be transmitted by Deconber 15, 1983. Confirming the December 12, 1983 discussion with Mr. George Rivenbark, hatch Licensing Project Manager, we now estimate that Appendix B will be transmitted by January 20, 1984.
Please contact this office if there are any questions.
Very truly yours,
/ T Q+_m L. T. Gucwa JH/jh xc: J. T. Beckham, Jr.
j H. C. Nix, Jr.
P. D. Rice J. P. O'Reilly (NRC-Region II)
Senior Resident Inspector t
h O
i i
l i l
8312280276y3]Qg i
PDR ADOCK PDR P
f
-. - - - -, - - - - -, ~ ~.
- ~ -. - - -
- - - - - - - ~