MONTHYEARML19341A3071980-12-22022 December 1980 Operability Review of ECCS at Plant Hatch Units 1 & 2 Project stage: Request ML20009A0081981-06-29029 June 1981 Forwards 6-month Response to NRC 801222 Request for Info Re Control of Heavy Loads,Section 2.1, General Requirements for Overhead Handling Sys Project stage: Request ML20010H4431981-09-18018 September 1981 Requests Extension of Deadline to 811013,per NRC 801222 Request Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants Project stage: Other ML20031G5931981-10-13013 October 1981 Forwards Info Requested in Sections 2.2 & 2.3 of Encl 3 to NRC Re Compliance w/NUREG-0612 Concerning Control of Heavy Loads Project stage: Other ML20053B7551982-05-24024 May 1982 Summarizes Findings & Expands Justification for Concluding No Safety Concern Exists Re Control of Heavy Loads.Complete Review of Overhead Handling Sys Performed.No Further Review of Design Bases for Load Handling Sys Required Project stage: Other ML20024D9221983-07-29029 July 1983 NUREG-0612 General Guidelines & Interim Protection Measures for Heavy Load Handling,Ei Hatch Units 1 & 2. App B Will Be Submitted by 831215 Project stage: Other ML20024D9191983-07-29029 July 1983 Forwards NUREG-0612 General Guidelines & Interim Protection Measures for Heavy Load Handling,Ei Hatch Units 1 & 2, in Response to Draft Technical Evaluation Rept.App B to Rept Will Be Submitted by 831215 Project stage: Draft Other ML20083D7741983-12-14014 December 1983 Advises That App B to Rept Comparison of Special Lifting Device Design to ANSI N14.6-1978, Per NUREG-0612 Will Be Transmitted by 840120 Project stage: Other ML20079N1131984-01-23023 January 1984 Forwards App B,Comparison of Special Lifting Device Design to ANSI N14.6-1978, Per 830729 Response to NUREG-0612, Control of Heavy Loads at Nuclear Power Plants Project stage: Other ML20087G4101984-03-12012 March 1984 Responds to 840229 Request for Addl Action to Verify Aspects of Overhead Crane Design at Facility,Per NUREG-0612 Guidelines.Crane Safety & Reliability Satisfactory Project stage: Request ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other 1982-05-24
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
.
Gecga Po^er Company 333 Pecmont A.ence Aranta Georg a 30308 Tecphone Q4 526-7020 Maug Acess Post c"ce Box 4545 R
A'.anta Georg a 30302 Georgia Power
??v Southern cu tre system J. T. Beckham, Jr.
Me Pres > dent and Genera! Maaa;er noear Generaten September 18, 1981
-- +
Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 NUREG-0612 " CONTROL OF HFAVY LOADS AT NUCLEAR POWER PLE TS Gentlemen:
Your December 22, 1980 letter requested the submittal of additional information by September 22, 1981.
Per discussion with Mr.
M.
- Fairtile, Georgia Power Company requests an extension of this deadline to October 13, 1981.
Our engineering consultant has informed us that the preparation of our report has fallen oehind schedule. We therefore require additional time if we are to perform a complete review and ensure that the report is responsive to the EC request.
If you have any questions, please contact my office.
l Yours very truly, l
J. T. Beciham, Jr.
JH/mb
,4cs; 33 l
,Yp..;
xc:
M. Manry 5
M. Fairtile
~ k4 i
j Vg f/g R. F. Rogers, III
/.
g V
&J c,
^Y$
o l
'NDx Y.
.A f g p/
8109240471 810918 N--
PDR ADOCK 05000321 P
PDR
-