Requests Extension of Deadline to 811013,per NRC 801222 Request Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants
ML20010H443
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/18/1981
From: Beckham J
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0612, RTR-NUREG-612 TAC-47007, TAC-47008, NUDOCS 8109240471
Download: ML20010H443 (1)


Text

.

Gecga Po^er Company 333 Pecmont A.ence Aranta Georg a 30308 Tecphone Q4 526-7020 Maug Acess Post c"ce Box 4545 R

A'.anta Georg a 30302 Georgia Power

??v Southern cu tre system J. T. Beckham, Jr.

Me Pres > dent and Genera! Maaa;er noear Generaten September 18, 1981

-- +

Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 NUREG-0612 " CONTROL OF HFAVY LOADS AT NUCLEAR POWER PLE TS Gentlemen:

Your December 22, 1980 letter requested the submittal of additional information by September 22, 1981.

Per discussion with Mr.

M.

Fairtile, Georgia Power Company requests an extension of this deadline to October 13, 1981.

Our engineering consultant has informed us that the preparation of our report has fallen oehind schedule. We therefore require additional time if we are to perform a complete review and ensure that the report is responsive to the EC request.

If you have any questions, please contact my office.

l Yours very truly, l

J. T. Beciham, Jr.

JH/mb

,4cs; 33 l

,Yp..;

xc:

M. Manry 5

M. Fairtile

~ k4 i

j Vg f/g R. F. Rogers, III

/.

g V

&J c,

^Y$

o l

'NDx Y.

.A f g p/

8109240471 810918 N--

PDR ADOCK 05000321 P

PDR

-