Letter Sequence Draft Other |
|---|
|
|
MONTHYEARML19341A3071980-12-22022 December 1980 Operability Review of ECCS at Plant Hatch Units 1 & 2 Project stage: Request ML20009A0081981-06-29029 June 1981 Forwards 6-month Response to NRC 801222 Request for Info Re Control of Heavy Loads,Section 2.1, General Requirements for Overhead Handling Sys Project stage: Request ML20010H4431981-09-18018 September 1981 Requests Extension of Deadline to 811013,per NRC 801222 Request Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants Project stage: Other ML20031G5931981-10-13013 October 1981 Forwards Info Requested in Sections 2.2 & 2.3 of Encl 3 to NRC Re Compliance w/NUREG-0612 Concerning Control of Heavy Loads Project stage: Other ML20053B7551982-05-24024 May 1982 Summarizes Findings & Expands Justification for Concluding No Safety Concern Exists Re Control of Heavy Loads.Complete Review of Overhead Handling Sys Performed.No Further Review of Design Bases for Load Handling Sys Required Project stage: Other ML20024D9221983-07-29029 July 1983 NUREG-0612 General Guidelines & Interim Protection Measures for Heavy Load Handling,Ei Hatch Units 1 & 2. App B Will Be Submitted by 831215 Project stage: Other ML20024D9191983-07-29029 July 1983 Forwards NUREG-0612 General Guidelines & Interim Protection Measures for Heavy Load Handling,Ei Hatch Units 1 & 2, in Response to Draft Technical Evaluation Rept.App B to Rept Will Be Submitted by 831215 Project stage: Draft Other ML20083D7741983-12-14014 December 1983 Advises That App B to Rept Comparison of Special Lifting Device Design to ANSI N14.6-1978, Per NUREG-0612 Will Be Transmitted by 840120 Project stage: Other ML20079N1131984-01-23023 January 1984 Forwards App B,Comparison of Special Lifting Device Design to ANSI N14.6-1978, Per 830729 Response to NUREG-0612, Control of Heavy Loads at Nuclear Power Plants Project stage: Other ML20087G4101984-03-12012 March 1984 Responds to 840229 Request for Addl Action to Verify Aspects of Overhead Crane Design at Facility,Per NUREG-0612 Guidelines.Crane Safety & Reliability Satisfactory Project stage: Request ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other 1982-05-24
[Table View] |
Forwards NUREG-0612 General Guidelines & Interim Protection Measures for Heavy Load Handling,Ei Hatch Units 1 & 2, in Response to Draft Technical Evaluation Rept.App B to Rept Will Be Submitted by 831215| ML20024D919 |
| Person / Time |
|---|
| Site: |
Hatch  |
|---|
| Issue date: |
07/29/1983 |
|---|
| From: |
Beckham J GEORGIA POWER CO. |
|---|
| To: |
Stolz J Office of Nuclear Reactor Regulation |
|---|
| Shared Package |
|---|
| ML20024D920 |
List: |
|---|
| References |
|---|
| REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR NED-83-339, TAC-47007, TAC-47008, NUDOCS 8308080429 |
| Download: ML20024D919 (1) |
|
Similar Documents at Hatch |
|---|
|
Text
e Georg:a Power Company 333 Piedmont Avenue Atlanta. Georpa 30308 Tetephone 404 526 7020 Ma:hng Address Post Offee Box 4545 Atlanta. Georgia 30302 Georgia Power J. T. Beckham, Jr.
the southem electnc system Vce President and General Manager ED-83-339 Nuclear Genera 0cn July 29, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 WC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 NUREG-0612, " CONTROL OF HEAVY LOADS AT NUCLEAR POWER PLANTS" Gentlemen:
Your letter of August 19, 1982 transmitted to Georgia Power Company (GPC) a draft Technical Evaluation Report (TER) which addressed the compliance of Plant Hatch Units 1 and 2 with certain aspects of N'JREG-0612.
GPC submits in response to that letter and subsequent discussions with the NRC staff and its consultants.
It is indicated in the Enclosure that Appendix B will be transmitted at a later date. This submittal is scheduled to be made by December 15, 1983.
As noted in our May 24, 1982 submittal, adequate procedures for the control of heavy load movement have been in effect at Plant Hatch.
- However, during the review of the TER, a number of procedural items which could be enhanced were found.
Procedure HNP-6977 has been developed to provide these procedural improvements, and has been referenced within the body of the enclosed report.
That procedure is expected to be implemented by September 15, 1983.
Please contact this office if there are any questions.
Very truly yours, 8308080429 830729 h
e DR ADOCK 05000 p
. T. Beckham, Jr.
JH/mb Enclosure xc (all w/ encl) h H. C. Nix, Jr.
U
. I J. P. O'Reilly (WC-Region II) l Senior Resident Inspector
,. _.,