Proposed Tech Specs,Modifying TS Section 15.3.5, Instrumentation Sys
ML20082R886
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/27/1995
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20082R879 List:
References
NUDOCS 9505020258
Download: ML20082R886 (4)


Text

. - _ _

e l

i 1

j l

Edited Technical Specification Pages Table 15.3.5-1 page 2 of 2 Table 15.3.5-3 page 2 of 2 15.3.5-6 i

8 1

l i

1 9505020258 950427 PDR ADOCK 05000266 p

PM

~

TABLE 15.3.5-1 (Continued)

[

(Page 2 of 2)

N0.

FUNCTIONAL UNIT CHANNEL SETTING LIMIT

t39593{ lay

volts iM-%

9.

Degraded Voltage (4.16 KV)

Disconnection of affected Time de Ic:: th:n 50 (A05, A06) bus from offsite power 000 t 0100% cf velt:ge ctting

'd $ C-.m _i E.s~iid._5.I _fiIi _ E _6 5. _1

_'T l

$present?

p._res_entN5$55dNISlEN!1 10.

Loss of Voltage a.

4.16 KV (A05, AOS)

Disconnection of affected a.

E3240156 volts i2%

bus from offsite power Time Ddlay-51 sec 110%

Start Diesel D?fMT0hiec 31 d~'IDfdf velt:ge

citing b.

480V(A05,AOS)}B03RBj4{

Load shedding b.

256 volts 3%

Timedelay:s.75j0{5secile%

, ~ ~

Ot 0 volt:

53.5 ::: 20 at 90% of velt g: Octting Unit 1 - Amendment No.

Unit 2 - Amendment No.

~

TABLE 15.3.5-3 (continued)

ENGINEERED SAFETY FEATURES I

2 3

'4 t

i NO. OF MININUM PERMISSIBLE' d-NO. OF CHANNELS OPERABLE BYPASS OPERATOR ACTION IF CONDITIONS-NO.

FUNCTIONAL UNIT CHANNELS TO TRIP CHANNELS CONDITIONS OF COLUMN 3 CANNOT BE MET b.

Start; Turbine-Driven Pump t

i.

Undervoltage.on 4KV Buses (A01 & A02) 2/each 1/each 1/each Ee in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />' bus bus bus ii.

Low Low Steam Gen.

Water. Level 3/SG 2/each-2/SG" Be in hot shutdown in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />' 3

SG 4.

SAFETY-RELATED ELECTRICAL LOADS i

a.

4.16KV Buses (A05, A06) 1.

Degraded Voltage.'3/ bus 2/ bus 2/ bus" ii.

Loss lof Voltage 2/ bus 1/ bus 1/ bus t

.3/ bus 2/ bus 2/ bus" b.

480V Buses (B03, B04)"

t 1.

Loss of Voltage 3/ bus 2/ bus 2/ bus" Be in hot shutdown.in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />' If minimum conditions are not met within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching hot shutdown,-the unit shall be in cold shutdown within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of the event ' causing the. unit shutdown.

If a channel is determined to be inoperable, resulting in one less than the total number of. channels being operable, power operation may continue if the following conditions are met:

1.

' The minimum number of operable channels is still-satisfied..

2.

The affected channel is placed in trip within I hour.

Declare the associated standby emergency _ power _ supply inoperable for the affected bus. The applicable Limiting Condition for Operation-(LCO) shall;be. entered. Separate LCOs may_ be entered for the Degraded Voltage and Loss of.

Voltage functions.

Both switches must-be activated simultaneously.

'Use the 3/ bus specification for each A05 and A06 bus that has been modified to the 2 out of 3 logic for the loss-of voltage protection function.

i i

Unit 1 - Amendment No.

Page 2 of 2 Unit 2 - Amendment No.

I l

in the reactor coolant system and the calculated saturation temperature. As a backup, the Plant Process Computer System (PPCS) displays subcooling margin by both addressable point and on the Safety Assessment System (SAS). A second backup display of subcooling information is available on seismically qualified plasma displays which receive input signals from seismically qualified multi-plexing equipment.

Control board indiN tions and a saturation curve can be used j

if failure of all direct subcooling indications occurs.

A deg raded vo,l t ag'e[ cond i ti 6n' 'do i ndi dent'~wi thf^s' sif[ety 'i hj set i onl 'si'gnall ca6, sis [thi

^

4.16KV ddgFided poltspef~p'fdtEdtioE'fd6Etion;'tojchiste w1th';s;~sh'ortuf'itiine'^dilsyy

~

^

4 Th'i s j?ejyp{i,3tyt'i,hi[]f }ng fjiisisd '[Tafity,[ fee,t,Uysi{thit"hijs~iifs{uiFdi i

s e(uin c e"lt i mi^fddli)T'"g'Fiiti'F"t hi&'l t h~i's5 h'6'rt~? t I me"'dsl ifl~6hd s F'"diiFidsdi^jbl tiis condi tions';^',The. s afety~ injsetidnis'ighlil ~'f r6ai~idh ~usit'~ i[ p?ovidsd as"i'n^;iiip'6_t a

~

^

to the"degrsdsd ' voltage pFot'sction foF'"each. 4.16KV 'safegbirds bus.'~ ',Th5 J

operability' r'sq0i'reinents' foi 'the' sa fety' ihjecti6ri'p'rotection 'funct' ion" afi

~

provided ',in this' Technical Specificitioni'sectidn_,~ Th^e,sifetyfinjs&t'16h,'.'ihpluj from a unit' to the ^degrsded voltage, prdt'ection'fu'nctionTis~dnl) ' require ~d)s,6d opdrable wh~s'n'safsty'injsctioh"is Feq6 ire'd t'6 bs' opbFable' for'that"Usit.':' If_ths safety _ irijectio'n input'is found'to be [inoperabld 'd0 ring p'eriods whe'n'the safst)

^

injection protsction' f0ndtion is re,quirsd to be 'opehble, the ' applicable 'adtion'5 i

for inoperability,of the 4:16KV dsg'Fadsd ~ volta'ge 'protsdti6n"funEtion' must,bs i

enteisdE l

1 i

Reference

")

FSAR - Section 7.5

")

FSAR - Section 14.3

")

FSAR - Section 14.2.5 Unit 1 - Amendment No.