|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18040B2891999-03-12012 March 1999 Proposed Tech Specs Including Rev 0 to EMF-1997(P)(A) Into TS Section 5.6.5 & Including Revised MCPR Safety Limits in TS Section 2.1.1.2 ML18040B2881999-01-12012 January 1999 Proposed Tech Specs Re ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A6711998-07-0808 July 1998 Proposed Tech Specs,Implementing Improved Tech Specs of NUREG-1433.Page B3.8-1 of Incoming Submittal Not Included ML17159A3261998-05-12012 May 1998 Proposed Tech Specs Re Removal of Fire Protection Program ML20199C8741997-10-22022 October 1997 Rev 0 to NASI-00-507, Corrective Action Process Effectiveness Assessment ML18026A4711997-02-11011 February 1997 Proposed Tech Specs Requesting Improved TSs LCO 3.10.3 & LCO 3.10.4 Be Approved for Use During Susquehanna Ses Unit 2 Eighth Refueling & Insp Outage Scheduled for 970315 ML17158C0321997-01-0808 January 1997 Rev 4, Solid Radwaste Pcp. ML20129D7851996-09-23023 September 1996 Proposed Tech Specs Re MSIVs Leakage Testing ML20116K3491996-08-0909 August 1996 Proposed Tech Specs Re Battery Load Profiles ML17158B5581996-03-20020 March 1996 Proposed Tech Specs,Changing Open Logic for HPCI Suction Valve HV-155/255-F042 in Order to Eliminate HPCI Pump auto- Transfer on High Suppression Pool Level ML20115A8211996-02-29029 February 1996 Proposed Tech Specs,Removing Rod Block Monitor Requirements from TS by Reducing Number of Rod Movements During Power Maneuvers ML20115A8171996-02-29029 February 1996 Proposed Tech Specs,Relocating Spec 3/4.9.6, Refueling Platform to Document Which Is Controlled Under Requirements of 10CFR50.59 ML17158B1071996-02-12012 February 1996 Proposed Tech Specs to Implement 10CFR50,App J,Option B & Establish New Spec 6.8.5, Primary Containment Leakage Rate Testing Program. ML17158A6821995-04-26026 April 1995 Rev 3 to Nuclear Dept Procedure ON-100-009, Control Room Evacuation. ML17158A6841995-04-13013 April 1995 Rev 3 to Nuclear Dept Procedure ON-200-009, Control Room Evacuation. ML20081L9151995-03-14014 March 1995 Rev 1 to NS-ST-002, Security Training & Crucial Security Task Certification ML17164A5801995-02-10010 February 1995 Proposed Tech Specs for Aot/Sti Extensions ML17164A5891995-01-20020 January 1995 Rev 2 to PP&L SSES Odcm. ML17164A4351994-11-21021 November 1994 Proposed Tech Specs Increasing MSIV Leakage Rate & Deleting MSIV-LCS ML17158A5441994-10-28028 October 1994 Proposed Tech Specs,Incorporating Administrative Changes ML20058F8281993-11-24024 November 1993 Proposed Tech Specs Re Power Uprate W/Increased Flow ML17157C3881993-05-31031 May 1993 Rev 8 to ISI-T-100.0, ISI Program Plan for Pump & Valve Operational Testing. ML17157C3901993-05-31031 May 1993 Rev 5 to ISI-T-200.0, ISI Program Plan for Pump & Valve Operational Testing. ML18017A2671993-04-20020 April 1993 Exercise Manual. ML17157C2741993-04-0202 April 1993 Proposed TS 3.4.1.1.2 Re LCO for Recirculation Loops,Single Loop Operation ML18017A2631992-05-0606 May 1992 Emergency Exercise Std for Conduct in Performance of 920219 NRC Graded Exercise ML20113G9881992-02-19019 February 1992 Package Providing Basis for Conduct of Simulated Radiological Accident at Plant ML17157B0101991-12-31031 December 1991 Rev 4 to ISI-T-200.0, Sses,Unit 2,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 ML17157B0081991-12-31031 December 1991 Rev 7 to ISI-T-100.0, Sses,Unit 1,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 ML18017A2591991-10-16016 October 1991 Exercise Manual, Approved by Util as Std for Conduct in Performance of 911016 NRC Graded Exercise ML20082P1871991-09-0404 September 1991 Proposed Tech Specs for HPCI Sys Low Pressure Surveillance Test Acceptance Criteria ML17157A3381990-09-30030 September 1990 Cycle 5 Reload Summary Rept. ML17157A3371990-09-24024 September 1990 Proposed Tech Specs in Support of Facility Cycle 5 Reload ML17157A2441990-07-0202 July 1990 Proposed Tech Specs to Support Cycle 6 Reload ML17157A0891990-03-19019 March 1990 Rev 0 to Procedure MT-024-024, Diesel Engine Analysis & Load Balancing. ML17157A0871990-03-19019 March 1990 Rev 0 to Procedure TP-024-087, Data Collection for E Diesel Generator Combustion Intake Air Temp Test. ML20127B4271990-01-19019 January 1990 Rev 8 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing ML19325D7491989-10-19019 October 1989 Proposed Tech Specs 3.2.2 Eliminating Certain Requirements on One Time Basis for 3 Months ML20082C4101989-08-16016 August 1989 Spec Change Notice 7 to Rev 4 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156B1101989-04-14014 April 1989 Proposed Tech Specs,Making Changes to Emergency Svc Water Sys,Per 10CFR50,App R ML17156B0651989-03-31031 March 1989 Rev 6 to ISI-T-100.0, Pump & Valve Inservice Insp Testing Program. ML17156B0671989-03-31031 March 1989 Rev 3 to ISI-T-200.0, Pump & Valve Inservice Insp Testing Program. ML20082C4071989-03-23023 March 1989 Spec Change Notice 6 to Rev 4 to F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156B1391989-02-22022 February 1989 Rev 12 to EO-100-009, Plant Shutdown from Outside Control Room. ML20082B2771989-01-0404 January 1989 Rev 4 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3731988-11-0707 November 1988 Spec Change Notice 5 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3711988-11-0101 November 1988 Spec Change Notice 4 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3641988-10-14014 October 1988 Spec Change Notice 3 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156A7291988-08-10010 August 1988 Proposed Tech Specs,Extending Operation During Cycle 4 W/ One Recirculation Loop Out of Svc ML20082B2911988-07-11011 July 1988 Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers 1999-03-12
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20199C8741997-10-22022 October 1997 Rev 0 to NASI-00-507, Corrective Action Process Effectiveness Assessment ML17158C0321997-01-0808 January 1997 Rev 4, Solid Radwaste Pcp. ML17158A6821995-04-26026 April 1995 Rev 3 to Nuclear Dept Procedure ON-100-009, Control Room Evacuation. ML17158A6841995-04-13013 April 1995 Rev 3 to Nuclear Dept Procedure ON-200-009, Control Room Evacuation. ML20081L9151995-03-14014 March 1995 Rev 1 to NS-ST-002, Security Training & Crucial Security Task Certification ML17164A5891995-01-20020 January 1995 Rev 2 to PP&L SSES Odcm. ML17157C3901993-05-31031 May 1993 Rev 5 to ISI-T-200.0, ISI Program Plan for Pump & Valve Operational Testing. ML17157C3881993-05-31031 May 1993 Rev 8 to ISI-T-100.0, ISI Program Plan for Pump & Valve Operational Testing. ML18017A2671993-04-20020 April 1993 Exercise Manual. ML18017A2631992-05-0606 May 1992 Emergency Exercise Std for Conduct in Performance of 920219 NRC Graded Exercise ML20113G9881992-02-19019 February 1992 Package Providing Basis for Conduct of Simulated Radiological Accident at Plant ML17157B0101991-12-31031 December 1991 Rev 4 to ISI-T-200.0, Sses,Unit 2,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 ML17157B0081991-12-31031 December 1991 Rev 7 to ISI-T-100.0, Sses,Unit 1,ISI Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 ML18017A2591991-10-16016 October 1991 Exercise Manual, Approved by Util as Std for Conduct in Performance of 911016 NRC Graded Exercise ML17157A0891990-03-19019 March 1990 Rev 0 to Procedure MT-024-024, Diesel Engine Analysis & Load Balancing. ML17157A0871990-03-19019 March 1990 Rev 0 to Procedure TP-024-087, Data Collection for E Diesel Generator Combustion Intake Air Temp Test. ML20127B4271990-01-19019 January 1990 Rev 8 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing ML20082C4101989-08-16016 August 1989 Spec Change Notice 7 to Rev 4 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156B0671989-03-31031 March 1989 Rev 3 to ISI-T-200.0, Pump & Valve Inservice Insp Testing Program. ML17156B0651989-03-31031 March 1989 Rev 6 to ISI-T-100.0, Pump & Valve Inservice Insp Testing Program. ML20082C4071989-03-23023 March 1989 Spec Change Notice 6 to Rev 4 to F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156B1391989-02-22022 February 1989 Rev 12 to EO-100-009, Plant Shutdown from Outside Control Room. ML20082B2771989-01-0404 January 1989 Rev 4 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3731988-11-0707 November 1988 Spec Change Notice 5 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3711988-11-0101 November 1988 Spec Change Notice 4 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082C3641988-10-14014 October 1988 Spec Change Notice 3 to Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML20082B2911988-07-11011 July 1988 Rev 3 to TS F1000, TS for Design & Installation of Electrical Raceway Fire Barriers ML17156A9491988-07-0707 July 1988 Rev 11 to EO-100-009, Plant Shutdown from Outside Control Room. ML20126M9281988-01-0404 January 1988 Rev 7 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing ML17146B1021987-11-30030 November 1987 Cycle 3 Proposed Startup Physics Tests Summary Description. PLA-2829, Rev 3 to Emergency Plan Implementing Procedure EP-IP-032, General Ofc Activation & Rev 5 to EP-IP-033, Dose Assessment & Protective Actions. W/Revised Lists of Effective Pages &1987-03-24024 March 1987 Rev 3 to Emergency Plan Implementing Procedure EP-IP-032, General Ofc Activation & Rev 5 to EP-IP-033, Dose Assessment & Protective Actions. W/Revised Lists of Effective Pages & ML17146A5951986-10-31031 October 1986 Rev 1 to Susquehanna Steam Electric Station Units 1 & 2 Fire Protection Program,App R,Deviation Request 6, Nonfireproofed Structural Steel. ML20207F9541986-09-12012 September 1986 Revised Offsite Dose Calculation Manual ML17146A4231986-05-31031 May 1986 Proposed Startup Physics Test Summary Description. ML17139C7691984-11-0101 November 1984 Rev 0 to Procedure TP-ISI-307, Manual Ultrasonic Exam of Austenitic Piping Welds. ML17139C7721984-11-0101 November 1984 Rev 0 to Procedure TP-ISI-309, Manual Ultrasonic Exam of Austenitic Thin Wall Piping Welds. Related Info Encl ML17139C7671984-11-0101 November 1984 Rev 0 to Procedure TP-ISI-332, Measuring & Recording Search Unit Location & Max Signal Amplitude Data During Ultrasonic Weld Exams. ML17139C7661984-07-25025 July 1984 Rev 4 to Procedure ISI-T-107.0, Component Listing & Inservice Insp 10 Yr Plan. ML17139C7641984-07-25025 July 1984 Rev 1 to Procedure ISI-T-106.0, Inservice Insp Program Plan,First 10 Yr Insp Interval. ML20215H0981984-05-25025 May 1984 Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP-IP-029 Re Activation of Technical Support Ctr & Rev 2 to EP-IP-049 Re Estimation of Core Damage During Emergency.W/Four Oversize Drawings ML20092M9861984-05-14014 May 1984 Revised Offsite Dose Calculation Manual ML20082C3501984-03-26026 March 1984 Spec Change Notice 2 to Rev 2 to TS F1000, TS for Electrical Raceway Design & Installation of Exposure Fire Barriers & Fire Stops ML20079L8401984-01-0606 January 1984 Public Version of Rev 3 to Emergency Plan Implementing Procedure EP-IP-034, Reactor Bldg Sample Station Emergency Sampling, & Rev 2 to EP-IP-42, In-Plant & Emergency Operations Facility Chemistry Lab...Preparation ML20079P1851983-12-20020 December 1983 Public Version of Rev 0 to Emergency Plan Implementing Procedure EP-IP-022, Shift Turnover During Emergency,Receipt Form & Rev 31 to Table of Contents ML20082C3481983-12-13013 December 1983 Spec Change Notice 1 for Rev 2 to TS F1000, TS for Electrical Raceway Design & Installation of Exposure Fire Barriers & Fire Stops ML20086J6541983-11-11011 November 1983 Public Version of Rev 1 to Emergency Plan Implementing Procedure EP-IP-103, Review,Update,Control & Distribution of Emergency Plan & Implementing Procedures, Receipt Form & Rev 12 to Index ML20081G3601983-10-14014 October 1983 Public Version of Rev 2 to Emergency Plan Implementing Procedure EP-IP-009, Emergency Offsite Dose Calculations & Rev 1 to Procedure EP-IP-101, Inventory,Insp,Operational Testing & Calibr of ... Supplies ML20082B3101983-09-0808 September 1983 Rev 2 to Technical Specification for Electrical Raceway Design & Installation of Exposure Fire Barriers & Fire Stops ML20024D6741983-06-28028 June 1983 Public Version of Rev 1 to Emergency Plan Implementing Procedure EP-IP-001, Emergency Classification & Rev 1 to Procedure EP-IP-035, Emergency Vent Monitor Sampling. ML20024D7691983-06-14014 June 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-IP-045 Re post-accident Sampling Sys (PASS) 10-milliliter Gas Samples & EP-IP-046 Re PASS Iodine Particulate Sample 1997-10-22
[Table view] |
Text
_ _ _____ _
s r k; -
^*
l.5}' Ei. & :: ~.,.; ,q yg .. ..
PPaL ;h V
. . . . . , . - '8E8ttN'fttlFl
.% ,", r? -ii%,e,..,...p.,,c' TEt . O '. -
PAgg*** '
4AS?
gp- 3
(-
'l . ' J f'.I &
SPEcl ICAfiDNCHANGE'NOTICENG'.
(.}{.l 2
, ) :+
i
$.j '] 9. FOR A
~
lT i .. F TECIDlICAL -
i
'I (SPECIFICATION 84l@ffglg{
- 1 FOR
- m .. 1
,' ELECTRICAL RACEWAY DESIGN AND $
. Ja 4 . *
.. INSTALLATION OF EXPOSURE FIRE BARRIERSI-5 t*
.' k '.h AND FIRE SMPS
~
SUSQUENA.lel.s
-.STEAll ELECTRIC STATION, UNITS 1 AND 2 j! Y' STLVANIA POWER:& LIENT CORPA i
1 2
ALLENT 0tN,[ PENNSYLVANIA 1 0 -
y o .
l f (! ; :s j I W
{ -.
kb 3
! N 1 RECEIVED
.~
1 JUL 27.1992 y nucthAR' REC. SYS.
. i, .
C ,f
[ - '*
]' .j;i .) -
.' b ; f .
~: i 8 *
(. -
REPLACEMENT PAGE 5 AND 10 l 9504060310 941114 .
PDR FOIA 1 l
GUNTER94-137 PDR 3ltWAU N A.W ~
Albi NG w l DATE PREPAllED BT VER'FD AtPROVED . DESCRIPTION l
9 f .
s 1 -
4
'l k ;.bf' ..,
.fr k .Y . b.
- v. -4 .,
.n
- s.- *. ~r A.C
. 1 }_ f ';. 9 typ;.gf ~
Y.!.g).:,
i ),; } .f. .;s,} ~ h
. ^' k '
? k?ty.' W. :.
L.--l \
~.
$ ! f'y", L 1741000
' ({.' 'I [-
'Berision 2 c 9.. ; tr, p Spec. Change Notice #2
.C.W. Page.2 of 3
/4.M.Gj/t'/H Ej k- ', j y 1: $ qe.,
- v. " -
. . i s ~ .
- 3 .- .4.2.2 If tha ab e tray is not emple sly filled vi ca es Insulation "d ?- Blanket, the'ysame width as th's cable tray shall be ins'arted ever the cables 4 in suf ficient*1a {ers to bring the outn surf ace of th~e Insulation Blanket even with thshe {of the tray sides and completely' fill all. void spaces. The insulation mater al is to be sandwiched between the cables and the cover. N' I~ The covers arelsecured per drawing E-49.
fI .
- E 4.3 EXPOSURE FIRE BARRIER DESIGN 4.3.1 Exposure \lFire Barriers shall be installed as necessary on electrical cable trays, conduits and junction / terminal boxes at locations specified per Susquehanna Fire Protection Review Report Appendix "A".
4.3.2 Exposure Fire Barriers shall be made by encasing the cable trays, conduits and unction / terminal boxes in one or three hour rated barrier system.
4.3.3 The purpose of Exposure Fire Barriers is to prevent damage, during complete engulfmant fire, to electrical cables serving one division of equipment required for safe shutdown of the plant when redundant safe shutdown divisions occupy the same fire area. . .
- 4 4.3.4 The Exposure Fire Barrier construction system shall also encase all ,
raceway support steel within 18 inches of the protected raceway.
f I 4.4 EXPOSURE FIRE BARRIER CONSTRUCTION (Typical for Insulation Blanket Material only) '
4.4.1 Exposure Fire Barriers shall completely encapsulat~e the indicated cable tray or conduit f or the entire length specified.-
3 l 4.4.2 If the cable tray is not covered and is not completely filled with cables, Insulation Blanket, the same width as the cable tray, shall be inserted over the cables in sufficient layers to bring the outer surface of the Insulation Blanket even with the top of the tray sides.
t 4.4.3 Thefirstl(interior)layeroftheInsulationBlanketshallwrap completely around the perimeter of the cable tray with the ends of the blanket overlapping a minimum of 3 inches. Adjacent blankets shall be placed tightly together!so as to prevent any gaps in the bitt joints between blankets. This layer shall be held in place by Righ Perfoir.ance Filament Tape spaced not more than 14 inches apart and not less than 4 inches from butt joints.
l 1 i ,
1 i .-
~
.i u
, [N.
l l
t..,
p ! ; '
'[
D .'~ 'o f [y y.1000
.I '"
^
i 7,d $. e
) _.
Revision 2 '
y ;. .
- y Page 10 3- '
Spec.. Change Notice #2 8.C.N.' Fage 3 of.3 d . ,\ i .b f4.8 DOCUMENTATION
[ f. f. .. . . . . .
.'All records generate 'a result of this specification shall be included in
. the, appropriate Quality] Assurance Records File and SSES Reebrds Management Systen File. . .,
- 5.0 TESTING AND INSPECTION REQUIREMENTS
. . Hi #$ J St i . :
ff ' h:'*4 . f;g
. . . Quality Contro 1 check t a
~
stops'are stalled in 9 e dan a with the o'cification .
, , , , ',. q;,, .
'7 5.2, Quality Control s 11 check that all Elsaket Type' Exposure Barriers are
- installed in accordance}with this specification, and that each blanket layer completely encompasses the raceway.,
5.3 Quality Control shall check that all TSI Inc. Type Exposare Barriers are -
installed in accordance with this specification.
)k 5.4: The following additional requirement shall be checked for the TSI Inc. -
type installations (Commercial quality seaturing devices are acceptable for use.) ,
~
- a. Proper installation of the Thermo-Lag Stress Skin or 351 Primer. "
- b. Proper temperature (above 40'F) of the substrate to which Thermo-Lag %
330-01 is to be; applied. ,
Proper Dry Pilm. Thickness prior to recoat.
- c. - -
I
- d. Proper dryness between coats.
- e. Inspection for surface blemishes in final surface.
i
- f. Proper methods for repair work. ,
I 6.0 PREPARATION FOR DELIVERY This section is not applicable to this specification.
I i #
7.0. QUALITY ASSURANCE PROGRAM 7.1 Nuclear Depart at Instruction - QA-8.2.3 shall only apply to the activities of this specification which involve fire barriers. [E 7.2 Materials used 'for this specification are not unique to the Nuclear Industry and are commercially available.
7.3 For PP&L internal ulse of this specification, the Quality Assurance Program Requirements shall be as required by the scope of Operatidnal Policy Statement - 1. {
. 't