ML20081G633

From kanterella
Jump to navigation Jump to search
Forwards Table Listing Status of Emergency Operation Facilities Negative Consent Commission Papers,As of 830419. Table Reflects Status of Plants Not Meeting Requirements of Table 1 of Suppl 1 to NUREG-0737
ML20081G633
Person / Time
Site: 05000000
Issue date: 04/20/1983
From: Pagano F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20079F180 List:
References
FOIA-83-343, RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8311070142
Download: ML20081G633 (3)


Text

.

Ed Williams, IE

,sfmng*a UNITED STATES 8

NUCLEAR REGULATORY COMMISSION p-

{,,

c(

g WASH tNGTON, D. C. 20555

.;j

%',xqp f April 20,1983 v

i MEMORANDUM FOR:

Edward L. Jordan, Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement FROM:

Frank G. Pagano, Chief Emergency Preparedness Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

SUBJECT:

STATUS REPORT CONCERNING NEGATIVE CONSENT COMMISSION PAPERS FOR EMERGENCY OPERATIONS FACILITIES The enclosure reflects the status of our effort concerning)the Negative Consent Commission Papers for Emergency Operating Facilities (EOFs which do not meet the requirements of Table 1 of Supplement 1 of NUREG-0737 that we are reviewing O

as of April 19, 1983.

Others will be added as we begin the review for those sites.

g(

m AN

~

  1. /

Emergency Frank G.

- ief Adness Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

Enclosure:

Current Status of Negative Consent Papers for E0F cc:

See attached CONTACT: Ed Williams (492-7611) l

.r SO

~

8311070142 830818 PDR FOIA l

O'NEILL83-343 PDR

7 STATUS OF EOF NEGATIVE CONSENT COMMISSION PAPERS

_ (#

TO CONCURRENCES SECY CHILK LETTER LETTER TO PLANT DEPER IE REG NRR COMM.

N0 MEM0 TO NRR LICENSEE 1.

Sumer 2/4/83 2/18/83 2/28/83 83-85 3/15/83 4/4/83 2.

Turkey Point 2/25/83 3/17/83 3/7/83 3/8/83 3/21/83 83-111 4/8/83 3.

Brunswick 3/29/83 4/1/83 3/30/83

  • 0n Hold as of 4/1/83 4.

Robinson 3/29/83 4/1/83 3/30/83

  • 0n Hold as of 4/1/83 5.

Callaway 4/19/83 6.

Point Beach 4/19/83 7.

Trojan 8.

River Bend 9.

Clinton 4/19/83 10.

Davis Besse 1

$ aine Yankee M

riaterford 13.

San Onofre

14. Monticello 15.

Prairie Island

~

16.

Wolf Creek Discontinued on 4/12/83**

17.

TMI

18. Millstone 19 Haddam Neck
20. WNP-1&2 21.

WNP-3 22.

Grand Gulf 23.

Oconee j

!* L.icensee intends to change his design to meet the Commissions requirements -

i/ ~

iting a letter of confirmation.

C censee changed his design to meet Commission requirements

ho f

O' l

l s.

4 cc:

R. C. DeYoung, IE J. M. Taylor, IE S. A. Schwartz, IE F. G. Pagano, IE C. R. Van Niel, IE D. M. Crutchfield, NRR W. A. Paulson, NRR G. H. Smith, Region I J. P. Stohr, Region II J. A. Hind, Region III J. T. Collins, Region IV G. S. Spencer, Region V R. A. Scarano, NMSS I'

(

.#'4

... ~

... -