ML20081G595
| ML20081G595 | |
| Person / Time | |
|---|---|
| Site: | 05000000 |
| Issue date: | 05/12/1983 |
| From: | Pagano F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Jordan E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20079F180 | List: |
| References | |
| FOIA-83-343, RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8311070133 | |
| Download: ML20081G595 (4) | |
Text
Ed Williams, IE g
o ter
- p og'o
[
6 UNITED STATES
!T,3,([gg NUCLEAR REGULATORY COMMISSION 7,/c j WASHINGTON, D. C. 20555
[v ;.I s/
May 12,1983 f
. MEMORANDUM FOR:
Edward L. Jordan, Director r
Division of Emergency Preparedness
,f and Engineering Response Office of Inspection and Enforcement FROM:
Frank G. Pagano, Chief Emergency Preparedness Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and-Enforcement
SUBJECT:
STATUS REPORT CONCERNING NEGATIVE CONSENT C0tEISSION PAPERS FOR EMERGENCY OPERATIONS FACILITIES The enclosure reflects the status' of our effort concerning)the Negative Consent Conunission Papers for Emergency Operati:1g Facilities (EOFs which do not meet the ' requirements of Table 1 of Supplement 1 of NUREG-0737 that we are reviewing as of May 10, 1983.
Others will be addhd as we begin the review for those sites.
A /)
(6M2Lu WW Frank G. P n
Emergency P ep
's Branch Division of ergency Preparedness and Engineering Response Office of Inspection and Enforcement
Enclosure:
Current Status of Negative Consent Papers for EOF cc:.See attached
'i l
8311070133 830818 PDR FOIA O'NEILL83-343 PDR
[
CONTACT: Ed Williams
(/
(492-7611)
--c-
.,_r-,e-..
.._.__.s t
n V
cc:
R. C. DeYoung, IE J. M. Taylor, IE
-. =.,.
S. A. Schwartz, IE F. G. Pagano, IE C. R. Van Niel, IE F. Kantor, IE D. M. Crutchfield, NRR
~
~~
~~" " '"
. ~
T~
W. A. Paulson, NRR T. T. Martin, Region 'I J. P. Stohr, Region II J. A. Hind, Region III J. T. Collins, Region IV R. A. Scarano, Region V O
'\\
o
4 STATUS OF E0F NEGATIVE CONSENT COMMISSION PAPERS y
\\ ' ANT TO CONCURRENCES TO SECY CHILK LETTER LETTER Td PL DEPER IE REG NRR COMM.
NO MEM0 TO NRR LICENSEEj Sumer 2/4/83 2/18/83 2/28/83 83-85 3/15/83 4/4/83 4/25/83.
Turkey Point 2/25/83 3/17/83 3/7/83 3/8/83 3/21/83 83-111 4/8/83 4/21/83 4/29/83 Brunswick 3/29/83 4/1/83 3/30/83
- Discontinued on 4/19/83 Robinson 3/29/83 4/1/83 3/30/83
- Discontinued on 4/19/83 Callaway 4/19/83 4/25/83 4/19/83 4/21/83 :5/2/83 83-161
. _ =.
Point Beach 4/19/83
~4/20/83 Trojan 5/10/83 River Bend 4/19/83 4/27/83 4/20/83 4/21/83 4/28/83 83-152 Cijnton 4/19/83 4/27/83 4/20/83 4/21/83 4/28/83 83.-152
).
Davis Besse 5/9/83 4/29/83 5/3/83 n:t Yankee 5/9/83 4/29/83 5/3/83 t.,.Waterford 5/9/83 5/5/83 5/3/83 f.
San Onofre
~
l.
Monticello i.
Prairie Island i.
Wolf Creek
- Discontinued on 4/12/83 TMI
- Discontinued on 5/5/83 l.
Millstone Haddam Neck Kf;P-2 WNP-3 Grand Gulf Oconee
,._j w i
ce changed his design to meet Comission requirements
e s
J STATUS OF EOF NEGATIVE CONSENT COMMISSION PAPERS TO CONCURRENCES TO SECY CHILK LETTER LETTERj PLANT DEPER IE REG NRR COMM.
NO MEMO TO NRR LICENSEi!
4).
North Anna 8
I Surry Comanche Peak 1 g..
~
~
5 F mi p. ;-
u
-x
'8.
P;ach. Bottom Arkansas One Vermont Yankee 1.
Palo Verde 2.
39dian Pt. 2 3.
dian Pt. 3 g
4.
Fi".zpatrick 5.
Nine Mile Pt.
1.
Oyster Creek F.
Yankee Rowe 1
+.
LJ ee changed his desigr to meet Comission requirements U
t