1 STONE & WEBSTER MICHIGAN, INC.

P.O. Box 2325. BOSTON. M AssAcHustTTs 02107 United States Nuclear Regulatory Commission January 12, 1984 Midland Site Resident Office '

Route 7, J.O. No. 14358 Midland, Michigan 48640 Ref. MPF 68 Attention: Mr. R. Cook DOCKET NO. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDENT ASSESSMENT OF UNDERPINNING REPORT NO. 68 A copy of the Independent Assessment of Underpinning Weekly Report No. 68 for the period of January 1, 1984 through January 7, 1984 is enclosed with this letter. Included as attachments are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction, and Quality Assurance personnel.

If you have any questions with respect to this report please contact me at (617) 589-2067.

A. Stanley Luc.s Project Manager Enclosures ASL/pd 8403060415 840301 PDR ADOCK 05000329 G PDR

e, '

l

." l l

J.O. No. 14358 Midland Plant Units 1 & 2 .

Independent Assessment of Underpinning  !

Weekly Ecport No. 68 January 1, 1984 through January 7, 1984 Personnel on Site Stone & Webster Michigan, Inc.

P. Majeski 1/3 - 1/7 D. Benvie 1/3 - 1/7 R. Lykens 1/3 - 1/7 A. Lucks 1/4 - 1/5 Parsons Brinckerhoff, Michigan J. Oliveira 1/3 - 1/7 Meetings Attended Date Represented Purpose 1/4 - 1/6 Stone & Webster Daily Assessment Bechtel Team Meeting Consumers Power Parsons 1/4 - 1/6 NRC Review and Evaluation Bechtel of Criteria and Consumers Power Crack Mapping Stone & Webster Underpinning and Remedial Soils Activities - Construction The Stop Work Order issued October 21, 1983 continued in effect throughout the week. Rejacking and crack mapping activities were performed, as required, by the project procedures.

Assessment Team Observations The Stone & Webster CIO Team has completed their Phase III overview of the civil documents at the five Documen,t Control Stations associated with the Soils Remedial activities. As a result of the overview , Stone & Webster issued an NIR detailing nonconformances found at three of the five Document Control Stations. MPQAD issued a QAR based on nonconformances detailed in the NIR. Once the QAR is satisfactorily resolved, Stone & Webster will conduct another overview of the Soils Document Control stations.

An MPQAD audit noted document control problems similar to those identified in the NIR resulting in the preparation of a CPCo Management Corrective Action - '

Request / Report. The purpose of this report is to initiate evaluation of recurring document control problems.

An update on corrective actions being undertaken by US Testing was provided by Bechtel. A review of US Testing by Bechtel Field Engineering found that

2 J.O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning most of the corrective action items have been implemented by US Testing.

Cross training of US Testing personnel and development of Work Instructions are the two major items that are still open. Bechtel reported that a revised schedule would be provided next week targeting completion dates for cross referencing of inspectors and development of work instructions. The Assessment Team believes that US Testing should strive to complete the work on these two items in accordance with the revised schedule.

Work Activity Packages The following Work Activity Package overview is in the open response stage or have been completed during the past week. 9 WAP No. Title Status 71 SWPS-Thru Anchor Open Bolt Holes Nonconformance Identification Reports NIR No. Description Date (Opened)(Closed) 20 Concrete Admixture 12/1/83 Dispenser Calibration Open Items Items discussed during meetings are categorized as follows:

OPEN ITEM - An item for which an action is required. The item will remain open until the required action has been taken. Tracking is required.

CLOSED ITEM - An item, usually brought forward by the Assessment Team, that is discussed and adequately responded to. No tracking is required.

INFORMATION ITEM - An item, brought forward to provide general background information regarding work, such as work status or an upcoming design change.

No tracking is required.

l OPINION ITEM - An opinion or suggestion, given by the Assessment Team, expressing an alternate construction or quality assurance technique. The opinion or suggestion is given as a possible alternate that may facilitate an operation. No response or implementation is required as a result of_an l Opinion Item. ~

CLOSES ITEM -XX-XX - This notation identifies an action that closes a previously identified open item. Tracking of the open item stops.

n

~ -

e e .

.- 3 J.O. No. 14358 l Midland Plant Units 1 & 2 Independent Assessment of Underpinning The following is a listing of all Open items from the Daily Meeting Notes with Bechtel, the Weekly Meeting with MPQAD or the text of Weekly Reports. Carry-over items from past weeks which have been Closed this week are also listed.

Item No. Description Closure WR 54, Pg. 3 Weld Tech Sheets Open 57-17 Wall Ties open WR 58, Pg. 2 Lack of Drawing Open References 58-3 Tubular Steel open Lagging 64-7 QAP Review Program Open 64-10 Trend Analysis Open WR 64, Pg. 1 US Testing Open Corrective Action 65-19 Review of Phase III Open SWO Resolution 66-30 Review of Phase III 68-6 SWO Resolution 66-50 Request for IR Open Distribution 67-15 Reference Drawing 68-12 List 4

4 P ett Eng'ineer Project Manager 1 .

1 c

i

! Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 ,

Consumers Power Company Held at Midland Site Midland, Michigan January 2, 1984 l

No meeting was held on this day. (Site Holiday) l 2

4 l

I I

. I Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site Midland, Michigan January 3, 1984 No meeting was held on this day, t

4 l

Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 l Consumers Power Company l Held at Midland Site Midland, Michigan January 4, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster G. Murray J. Fisher J. McMaster P. Majeski E. Cviki R. Sevo D. Benvie R. Lykens Parsons J. Oliveira

_ PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant , Units 1 & 2.

DISCUSSION Status Items Item 68 Stop Work Order Update.

The Stone & Webster (CIO) overview of the 5 Soils Document Control stations found non-conformances with stations, 8, 10, and 13. Stone &

Webster wrote an NIR detailing nonconformances found during the overview.

MPQAD will respond to the NIR today and Stone & Webster will again overview the above referenced three (3) stations. (INFORMATION ITEM)

Item 68 Rejacking of Piers.

J. Fisher reported that as of today, no piers were on active jacks.

(INFORMATION ITEM)

Item 68 US Testing Corrective Action.

J. Fisher stated that an update on Corrective Actions undertaken by US Testing would be forthcoming this week. (ITEM WR-64, pg. 1 REMAINS OPEN) (INFORMATION ITEM) .

New Items Item 68 Review of Reference Mechanical & Electrical Drawings. '

1 J. Fisher inquired as to the status of Stone & Webster's review of the '

referenced drawings required for drill & excavation permits. P. Majeski responded that the Assessment Team had completed its review of attachments to the reference mechanical & electrical drawings required for processing drill & excavation permits to support underpinning activities over the next 30 days. The review verified that attachments to the referenced drawings had adequately completed the FCR/FCN review cycle. (CLOSED ITEM) l

1 l

Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Unita 1 & 2 Consumers Power Company Held at Midland Site Midland , Michigan January 4, 1984 Item 68 Controlled Copies of Reference Electrical & Mechanical Drawings.

P. Majeski inquired if there were controlled copies of reference electrial

& mechanical drawings required for processing of drill & excavation permits available at the FSO controlled drawing station. J. Fisher responded that he would determine whether or not these reference drawings are available. (OPEN ITEM)

Response Items Item 68 Review of Phase III SWO Resolution.

P. Majeski stated that since Stone & Webster (CIO) has started its Phase III overview of the five (5) Soils Document Control Stations, Item 66-30 can be closed. (CLOSES ITEM 66-30) l l

l' l

l

Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site Nudland, Michigan January 5, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster None J. Fisher J. McMaster P. Majeski E. Cviki G. Carpenter D. Benvie W. Brandes R. Lykens Parsons J. Oliveira PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant Units 1 & 2.

DISCUSSION Status Items Item 68 Stop Work Order Uedate.

As a result of the NIR issued yesterday detailing nonconformances found during Stone & Webster's (CIO) overview the 5 Soils Document Control Stations, a QAR will be issued today. After the QAR is resolved, Stone & Webster will again overview Stations 8,10, and 13 (INFORMATION' ITEM)

Item 68 Rejacking of Piers.

J. Fisher reported that no piers were on active jacks. (INFORMATION IIEM)

New Items No new items were discussed.

Response Items Item 68 Controlled Copies of Reference Electrical & Mechanical Drawings.

J. Gaydos reported that as of this date reference mechanical & electrical drawings required for,processir.g drill & exesvations permits to support underpinning activities over the next 30 days were available at the FSO drawing station. J. Gaydos stated that in the near future FSO will have a complete set of reference electrical & mechanical drawings at their drawing station. (CLO3ES ITEM 68-5)

Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site Midland, Michigan January 6, 1984 Present For:

Consumers Power Bechtel MPOAD Stone & Webster G. Murray E. Cviki J. McMaster P. Majeski D. Puhalla J. Fisher G. Carpenter D. Benvie J. Gaydos B. Lykens N. Swanberg  ;

R. Cleary Parsons I

. erner J. Oliveira PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items Item 68 Stop Work Order Update.

A QAR was issued yesterday as a result of the NIR written by Stone & Webster (CIO) detailing overview findings of the 5 Soils Documents Control Stations. '

When the QAR is resolved, Stone & Webster will again overview the 5 Soils Document Control Stations. An MPQAD audit noted similar document control problems, resulting in preparation of a CPCo Management Corrective Action l Request / Report. This report was prepared to initiate evaluation of recurring document control problems by CPCo and Bechtel. (INFORMATION ITEM)

Item 68 Update on US Testing Corrective Action.

R. Cleary and J. Werner provided a status report on Corrective Actions being undertaken by US Testing. J. Werner reported that new personnel in key positions (i.e. site manager) have been assigned to the site to implement c orrective a etions. Also it was reported that cross training of technicians is ongoing and will be for the forseeable icture. It was agreed that a schedule will be issued next week targeting a realistic completion date for cross training of inspectors on site.

J. Werner stated that US Testing is in the process of developing a total of 60 Work Instructions for use by US Testing personnel in performing required inspections. These work instructions are being prepared to simplify procedures presently being used by US Testing to perform inspections. It was agreed that a schedule will be provided next week showing completion dates for the Work Instructions. Bechtol reported that a restatus on Corrective Action taken by US Testing would be issued next week. (ITEM WR-64, Pg. 1 REMAINS OPEN) (INFORMATION ITEM)

l Notes of Daily Meeting Independenc Assessment of Underpinning Midland Plant Units 1 & 2 Consumers Power Company Held at Midland Site 1 Midland, Michigan l January 6, 1984 New Items Item 68-11 - Cracking on the Tontrol Tower el. 685' Slab.

Three cracks were found yesterday in the control tower on the el. 685' slab. These cracks were found in an area of the control tower that was not previously included in the crack mapping program. It is not known whether these cracks existed prior to or are a result of underpinning activities. One 3.5 in. diameter core was taken at a crack location and is presently being evaluated by Bechtel. Initial examination of the core has shown the cracks to be at least 12 in. deep. (INFORMATION ITEM)

Response Item Item 68 Reference Drawing List.

The Assessment Team has completed review of attachments to the referenced electrical & mechanical drawings required for processing drill & excavation permits needed to support underpinning activities over the next 30 days.

The review verified that attachments to the referenced drawings have adequately completed the FCR/FCN review. Also grout plans formulated to date for the SWPS and the excavation permit required to implement the grouting program have been received by Stone & Webster. (CLOSES ITEM 67-15)

--