\ _ NRC MONTHLY OPERATING REPORT
\ <
DOCKET NO. 50-362 UNIT SONGS - 2 DATE February 15, 1984 COMPLETED BY C. A. Morris TELEPHONE [714) 492-7700 Ext. 56264 OPERATING STATUS
.1. Unit Name: San Onofre Nuclear Generating Station, Unit 2
- 2. Reporting Period: 1 January 1983 through 31 January 1983
- 3. Licensed Thermal Power (MWt): _ 3390 ?
- 4. Nameplate Reting (Gross MWe): 1127
- 5. Design Electrical Rating _.(Net MWe): 1070 *
- 6. Maximum Dependable Capacity JGross MWe): 1127 _
t
- 7. Maximum.DependableCapacity(NetMWe): . 1070 *
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
.Since Last Report, Give Reasons:
NA
- 9. Powe Level To' Which Restricted, If Any khet MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting' Period _
744 744 11964.2
- 12. Number Of Hours Re -tor Was Critical -
298.55 298.55 6935.90
- 13. Reactor' Reserve StitJown Hourss 0 0 0
- 14. Hours Generator Or -Lis e 279.90 279.90 5460.77
- 15. Unit Reserve Shuttawn hours > 0 0 0
- 16. Gross Thermal Energy Generated _(MWH) .
879 377.4_ 879,377.4 14,097,243.8
- 17. Gross Electrical Mergy Generated (MWH) 302380.5 302,580.5 4,538,385.0
- 18. Net Electrical Energy Generated (MWH) 282,2 W $~ 282,230.5 4,139,795.0
- 19. Unit Service Factoh NA NA NA
- 20. Unit Availability Factor NA NA NA
- 21. Unit Capacity Factor (Using MDC Net) NA NA NA
- 22. Unit Capacity Factor. (Usbg3ER Net); '
NA NA NA Unit Forced Outage Rate
-23. 'NA NA NA
-24. Shutdowns Scheduled Over Next 6 Months (Type,iDate, and Duration of Each):
None
- 25. If Shut Dcwn~At End Of Report Period, Estimated Date of Startup: 12 February 1984
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY 7/17/82 7/26/82 INITIAL ELECTRICITY 9/82 9/20/82 COMMERCIAL OPERATION Under Review
- -Thesenumbatsh'avebehrevisedtoreflectupdatedStationauxiliaryloadsand potential de' creased capacity associated with rormal wear, system fouling, etc.
0565u 8403020010 BA0131
.PDR ADOCK 05000361 M[
R PDR 'x //
.- =- -
'f~ ,
AVERAGE DAILY UNIT POWER LEVEL
^
DOCKET NO. 50-361 UNIT SONGS - 2 DATE February 15, 1984 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 i MONTH January 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
'(MWe-Net) (MWe-Net) 1 1168.45 17 0 21 1088.97 18 0 3 111 .53 19 0 4 936.39 20 0 5- 0 21 __ 0 6 360.47 22 0 7 1156.16 23 0
'i 8 1167.20 24 0 9 1182.76 25 0 10 1183.24 26 0 111 1160.60 27 0 12 1057.87 28 0 13 1033.80 29 0 14 0- 30 0 15 0 31 0 i'
16 0 0565u w__--.
.+- +=!s; - -+
f .,' .
, .. . q' v ' ' '
' UNIT SHUTDOWNS AND' POWER REDUCTIONS.
DOCKET NO. M-361'
' UNIT ; NAME SONGS - 2 >
REPORT' MONTH JAMUARY; -.1984.- ' DATE Fmhruarv 15_ 1984' s a
.g -
COMPLETED BY C. A. M6 rri s~
- TELEPHONE'I7141 492-7700
, ,. Ext. 56264-
. g' C ' .-
Method of.. . . .
t - ;' Shutting-' p. Cause & Corrective
. Down . .. t
.p Duration 'S ystem' Component- ' ' Action te-
"N
=\. . .f 1- . 2~'~ . r3. ILER t. - 3 4 .< .
5-No. -- Da te ' .' Type.
(Hours) . Reason' Reactor- No ,' . Code Code Prevent Recurrence c +
1 26 840104 = F: L31.6 I A '2, "
NA ' CD~ VALVEX Unit was shut' down to repa i r a . ,.
s -
nitrogen leak in Main Steam -
g *
^3IJ 1 solation Valve 2HV-8204.
~ ~,
' 27 840113 .F
'432 5 A '.rt s < . NA . 3 CB PUMPXX' Unit was shut down for reactor '
- w. ,
\ % , . .'
. coolant pump seal replacement.
-l 9 .;.
4 .
.A
,'3 ' **
\ .4 Y
g.
s s
.t-N s 1
1 2 3 4
.. F- Fo rced Reason: Method: Exhibit F- I nst ruct iores
- S-Scheduled . A-Equipment Fa i lure' ( Expla in) '1-Manuat ' for Prepa ration of Data
% B-Maintenance or. Test 2-Manua l Scram.' Entry Sheets for Licensee C-Refueling. 3-Automatic Scram. Event Report (LER) Filn D-Regulatory Restriction 4-Continuation from (NUREG 0161)
E-Operator Training & License Examination , Previous Month F-Admi n i st ra t ive 5-Reduction of 20% 5 G-Ope ra t iona l Error (Explain) '
or. greater in the Exhibit H-Same Source H-Other ( Explain) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0563u 9-Other ( Explain) e 4
l L
~
~ '
('
L-
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH 00CKET NO. 50-361 UNIT SONGS - 2 DATE February 15, 1984 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 D_ ate / Time Event January 1,- '0001 Unit is in Mode 1 at 100% reactor power.
~ Turbine load is 1180 MWe gross.
- Janu ry 2, '
0245 Reduced reactor power to 74% and turbine load to 865 MWe gross at request of the SCE Energy Control Center.
~ January 3, 0600 Raised reactor power to 100% and turbine load to 1185 MWe gross.
January 4, 0230_ Reduced reactor power to 83% and turbine load to 982 MWe gross at request of the SCE Energy Control Center.
. January 4, 0645 Raised reactor power to 100% and turbine load to 1186 MWe gross.
January 4, 2034 Reduced reactor power to 15% and turbine load to 100 MWe gross. Tripped turbine and subsequently tripped reactor at 2047 to repair a nitrogen leak on a solenoid valve for main steam isolation valve HV-8204.
January 5, 0950 Entered Mode 2.
J ' January 5, 0959 Reactor critical.
- January 5, 1925 Satisfactorily completed testing of HV-8204 following completion of repairs.
January 6, -0220 ,
Entered Mode 1.
January 6, .0410 Synchronized generator, applied block load, and commenced power increase.
January 7, 0319 Achieved ~100% reactor power and turbine load of 1180 MWe gross.
' January 12,. 1435' Reduced reactor power to 85% and turbine load to 940 MWe gross to repair a leak in circulating water pump P-118 discharge.
January 13, 0412- Raised reactor power to 100% following repair of P-118.
. F;bruary 15, 1984 PAGE 2 0F 2 1 ,
SUMMARY
OF OPERATING EXPERIENCE FOR T'iE MONTH
- Date/ Time Event January 13, 1807 Commenced power reduction in preparation for reactor coolant pump seal outage.
. January 13, 2330 ~ Manually tripped turbine from 100 MWe gross.
. January 13, 2333 Entered Mode 2.
January 13, . 2345 Entered Mode 3.
4 _ January 14, 1415 Entered Mode 4.
January 15, _0023 Entered Mode 5 and commenced scheduled outage activities.
January 31, 2359 Unit is in Mode 5 at 105 degrees. The reactor coolant system is depressurized and drained to midioop. A reactor coolant pump seal outage is in progress.
0565ui
REFUELING INFORMATION DOCKET N0. 50-361 UNIT SONGS - 2 DATE February 15, 1984 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264
- 1. Scheduled date for next refueling shutdown.
.e
.Not yet determined.
- 2. Scheduled date for restart following refueling.
-Not yet determined.
.3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?'
.Not yet determined.
- What will these be?
Not yet-determined.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined.
- 5. Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design.or performance analysis methods,
'significant changes in fuel design, new operating
. procedures.
Not yet determined.
- 6. The number of fuel assemblies.
a) .In the core. 217 b) -In the spent fuel storage pool. 0-
- 7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. NA n 8. Projected d' ate of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
-NA 0565u.
't NRC MONT5'LY OPERATING REPORT DOCKET NO. 50-362 UNIT ' SONGS - 3 DATE February Ib, 1984 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generating Station, Unit 3
- 2. -Reporting Period: 1 January 1983 through 31 JanJary 1983
- 3. Licensed Thermal Power (MWt): 3390 r 4.- Nameplate. Rating (Gross MWe): 1127
-5. Design Electrical Rating (Net MWe): 1070 *
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): 1070 *
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since-Last Report, Give Reasons:
NA
- 9. . Power Level To Which Restricted, If Any (Net MWe): NA
~ 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. -Hours In Reporting Period 744 744 3073
- 12. Number Of Hours Reactor Was Critical 142.80 142.80 2221.96
- 13. -Reactor Reserve Shutdown Hours 0 0 0
- 14. ' Hours Generator On-Line 123.00 123.00 123.00
'15. Unit Reserve Shutdown Hours 0 0 0
~16. Gross' Thermal Energy Generated (MWH) 415,741.2 415,741.2 3,964,610.5
.17. Gross Electrical Energy Generated (MWH) 140,226.5 140,226.5 1,238,514.0
- 18. ) Net Electrical Energy Generated (MWH) 126,656.5 126,656.5 1,123,714.0
- 19. Unit Service Factor NA NA NA 20 .' Unit Availability Factor- NA NA NA
- 21. Unit Capacity Factor (Using MDC Net) NA NA NA
- 22. Unit Capacity Factor (Using DER Net) NA NA NA 123. Unit Forced Outage Rate NA NA NA
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: 25 February 1984 26 .' Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY -
8/29/83 INITIAL ELECTRICITY -
9/25/83 COMMERCIAL OPERATION Under Review
- These numbers have been revised to reflect updated Station auxiliary loads and potential decreased capacity associated with normal wear, system fouling, etc.
.0565u
j[ ~~ : .
' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-362 UNIT SONGS - 3 DATE February 15, 1984 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 I
Ext. 56264 k MONTH January 1984 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
-(MWe-Net) (MWe-Net) 1 1138.39 17 0 2 1142.54 18 0 3 -1140.29 19 0
. 4 _
1142.18 20 0 5 -1134.60 21 0 6- 144.54 22 0
- 7. 0 23 0 8 0 24 0 9 0 25 0
- 10 0 26 0-11 0 27 0
- 12 0 28 0 13 '0 29 0
- 14 0' 30 0 15 0 31 0 0
0565u t<
s _
_.7 - - -
_ y;
- s
- ~ ~
' UNIT SHUTDOWNS AND POWER. REDUCTIONS -DOCKET NO. 50-352 UNIT NAME SONCH -3._
REPORT' M00sTH JANUARY, ' 1984 DATE-FebrJLrV i 3 _I _,4 Jo COMPLETED BY C. A. 9e rr s TELEPHONE f714) 4492-7700 Ext. 56264 Method of Shutting. Cause & Corrective
. Duration Down LER System. Component' Action to 1 2-. 3 4' 5 No. Date- Type - ( Hou rs ) - Reason Reactor No. Code Code Prevent Recurrence 13 840106 S 621.0 B '2 NA NA NA , Unit tripped f rom 100% power in accordance with startup testing.
Unit remained shutdoi n for a
-surveillance and reactor coolant pump seal outage.
1 -
2 3 4 F-Fo rced Reason: Method: Exhibit F- Instructions S-Scheduled A-Equipment Fa i l u re ( Exp la in) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Sc ra m. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File D-Regulatory Restriction Continuation from (NUREG 0161)
E-Operator Training & License Examination Previous Month F-Admi n i st ra t ive 5-Reduction of 20% 5
, G-Opera t iona l Error TExplain) or greater in the Exhibit H-Same Source H-Other (Expla in) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0565u 9-Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-362 UNIT SONGS - 3 DATE February 15, 1984 COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 Date/ Time Event-January 1, -0001 Unit is in Mode l'at 100% reactor power. Turbine load is 1145 MWe gross.
January 6, 0300 Performed the " Generator Trip and Dynamics Effects Test" from 100%
reactor power. Reactor tripped
-accordingly when unit circuit breakers were intentionally opened.
' January 6, - 0430 Entered Mode 2.
January 6, 0442 Reactor critical.
January _7,- 0010- Commenced reactor shutdown in preparation for surveillance and reactor coolant pump seal-outage.
January 7, 0020 Entered Mode 3.
January 7, 1435 Entered Mode 4.
January 8, 0425 Entered Mode 5 and commenced scheduled outage activities.
January 13, 0215' -D'iscovered leaking seal on low pressure safety injection pump (LPSI) P-016 delaying draining of the reactor coolant system for reactor coolant pump soal replacement.
January 30, . -1000 Satisfactorily completed inservic.e
. testing of LPSI P-015 for shutdown cooling, following completion of
. repairs.
' January.30, 2359 Unit is in Mode 5 at 127 F. The reactor coolant system is depressurized and drained to midloop. A surveillance and reactor coolant pump seal outage is in progress.
'0565u
1.
REFUELING INFORMATION DOCKET NO. 50-362 UNIT SONGS - 3 DATE February 15, 1984
- COMPLETED BY C. A. Morris TELEPHONE (714)~492-7700 Ext. 56246 l'. Scheduled date for next refueling shutdown.
Not yet determined.
- 2. Scheduled date for restart.following refueling.
Not yet determined.
- 3. Will refueling.or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined.
What will these be?
Not yet determined.
- 4. Scheduled date-for submitting proposed licensing action and
-supporting information.
Not yet determined.-
-5. Important Licensing considerations associated with
! refueling, _ e.g. new or- differ ent fuel. design or supplier, E .unreviewed design or performance analysis methods, significant changes-in fuel design, new operating procedures.
Not yet determined.
- 6. The number of fuel assemblies.
2 a) In the core. -217 b) In the spent fuel storage pool. u
- 7. Licensed _ spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. M
- 8. Projected date of last. refueling that can be discharged to
-spent fuel storage pool' assuming present capacity.
.NA LO565u
4 -
Southern California Edison Company WE SAN ONOFRE NUCLE AR GENER A TING ST A TION P.O. BO X 128 S AN CLEMENTE, C ALIFORNI A 92672 J. G. H A YN E S TELEPHONE CT ATION M AN AGE R (714) 492 7700 February 15, 1984 Director Office of Management Information and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
Subject:
Docket Nos. 50-361/50-362 Monthly Operating Reports for Jsnuary 1984 San Onofre Nuclear Generating Station, Units 2 and 3 Enclosed are the Monthly Operating Reports as required by Section 6.9.1.10 of Appendix A, Technical Specifications to Facility Operating Licenses NPF-10 and NFF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.
Please contact us if we can be of further assistance.
Sincerel ,
< h L I L/
M~ i Enclosures cc: J. B. Martin (Regional Administrator, USNRC Region V)
A. E. Chaffee (USNRC Resident Inspector, Units 1, 2 and 3)
J. P. Stewart (USNFC lbsident Inspector, Units 2 and 3)