I i F

. , ' L, v

4 Telephone (412) 4564000 Peuclear Dmtion P.O Box 4 snippinoport. PA 150774004 Director of fluclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch fio. 1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No.1 Docket flo. 50-334, License No. OPR-66 Revision 1 to Change Request No. 86 to Operating License Centlemen:

Enclosed are three (3) originals and thirty-seven (37) copies of Revision 1 to our Application No. 86 for Amendment to Operating License DPR-GG. Revision 1 involves clarification of the coincidence levels for the P-7, P-8, P-9 and P-10 pemissives previously submitted by Technical Specification Change Request No. 86, dated July 14, 1983.

The P-7, power range neutron flux coincidence has been revised from 2/4 to 3/4 and the turbine impulse chamber pressure coincidence has been revised from 1/2 to 2/2. The P-8, power range neutron flux coin-cidence has been revised from 2/4 to 3/4. The P-9, power range neutron flux coincidence has been revised frca 2/4 to 3/4. The P-10, power range neutron flux coincidence has been revised from 3/4 to 2/4.

The P-7, P-8 and P-9 pemissives are defined by the coincidence levels required to automatically block reactor trips when below the setpoint. The P-10 pemissive is defined by the coincidence level that allows the manual block of reactor trip when above the setpoint.

These changes are consistent with the system logics and the Updated Final Safety Analysis Report (UFSAR) and more clearly define the coin-ciaence required for the applicable pemissive. No physical change is ,

being made to any plant equipment as a result of the above changes. The changes are being made to confom to the UFSAR format.

We have detemined that these changes provide clarification of an existing submittal, therefore, no change to the previous safety evaluation is required and no fee is required.

i 8309290152 830922 PDR ADOCK 05000334 P PDR

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Revision 1 to Change Request No. 86 to Operating License Page 2 The OSC and ORC have reviewed and approved this revision to Technical Specification Change Request No. 86.

Therefore, page 3/4 3-7 should be removed from our initial application and the enclosed page should be inserted.

Very truly yours,

. J. Carey Vice President, Nuclear Enclosure cc: Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P.O. Box 2063 Harrisburg, PA 17120 Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 i