Similar Documents at Byron |
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20149M2951996-11-29029 November 1996 Exemption from Requirements of 10CFR50.60 Re Safety Margins Recommended in ASME Boiler & Pressure Vessel Code Case N-514 TXX-9522, Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources1995-08-26026 August 1995 Comment Opposing Proposed GL on Testing of safety-related Logic Circuits.Believes That Complete Technical Review of All Surveillance Procedures Would Be Expensive & Unnecessary Expenditure of Licensee Resources ML20059C2351993-12-17017 December 1993 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication ML20044A8111990-06-27027 June 1990 Comment Opposing Closure of Lpdr of Rockford Public Library ML20245J0191989-04-14014 April 1989 Comment Re Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20214X1871987-06-11011 June 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000 Based on Four Severity Level III Violations Noted During 860721-0808 Insp ML20205Q1711987-04-0202 April 1987 Order Imposing Civil Monetary Penalty in Amount of $25,000. App Re Evaluations & Conclusions Encl IR 05000812/20100311987-02-26026 February 1987 Order Imposing Civil Monetary Penalty in Amount of $100,000 Based on Violations Noted During Insps on 850812-1031 ML20210T7321987-02-11011 February 1987 Unexecuted Amend 6 to Indemnity Agreement B-97 Substituting Item 3 of Attachment to Indemnity Agreement in Entirety W/ Listed License Numbers,Effective 870130 ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20213G4381986-10-24024 October 1986 Unexecuted Amend 5 to Indemnity Agreement B-97,substituting Item 3 of Attachment to Agreement in Entirety W/Listed License Numbers,Effective on 861106 ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 IR 05000506/20070221986-05-0202 May 1986 Order Imposing Civil Monetary Penalty in Amount of $25,000 for Violations Noted During Insp on 850506-0722.Violations Noted:Failure to Establish Radiological Safety Procedures & to Adequately Train Personnel ML20138C7301985-12-0909 December 1985 Order Imposing Civil Penalty in Amount of $25,000 Per 850606 Notice of Violation & Proposed Imposition of Civil Penalty.Licensee May Request Hearing within 30 Days of Date of Order ML20205E8741985-10-28028 October 1985 Exemption from GDC 4 of 10CFR50,App a Requirement to Install Protective Devices Associated W/Postulated Pipe Breaks Primary Coolant Sys.Topical Rept Evaluation Encl ML20102A2981985-01-0707 January 1985 Petition Requesting Aslab Grant Intervenor Appeal & Order Further Hearings on Safety of Plant ML20099L2581984-11-27027 November 1984 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20099G5381984-11-23023 November 1984 Supplemental Appeal Brief in Response to Intervenor 841106 Supplemental Brief on Appeal & in Support of ASLB 841016 Supplemental Initial Decision Authorizing Issuance of Ol. Certificate of Svc Encl ML20100K0411984-11-22022 November 1984 Submits Concerns Re Safety of Local Residents in Event of Accident & Excessively High Cost of Projected Operation of Facility ML20107H7841984-11-0606 November 1984 Supplemental Brief on Appeal of ASLB 841016 Supplemental Initial Decision Granting Authority for Issuance of Ol. Decision Should Be Reversed.Certificate of Svc Encl ML20140E4081984-10-31031 October 1984 Executed Amend 1 to Indemnity Agreement B-97,deleting Items 2A & 3 in Entirety ML20098G8841984-10-0202 October 1984 Joint Statement of RW Manz & W Faires Re Findings 3-11 Through 3-17 of NRC 830930 Integrated Design Insp Rept. Certificate of Svc Encl ML20098G8681984-10-0202 October 1984 Answer to Intervenor Motion to Reopen Record Re Bechtel Independent Design Review.Motion Should Be Denied ML20098G8901984-10-0202 October 1984 Joint Statement of Kj Green & RW Hooks Re Integrated Design Insp ML20098G8911984-10-0202 October 1984 Joint Statement of Cw Dick & EM Hughes Re Independent Design Insp ML20098G8821984-10-0101 October 1984 Affidavit of Kj Green Re Integrated Design Insp Concerning Mechanical Engineering Work ML20098G8741984-10-0101 October 1984 Affidavit of Br Shelton Re Integrated Design Insp ML20098G8881984-09-29029 September 1984 Affidavit of RW Hooks Re Integrated Design Insp Concerning Structural Design ML20098G8831984-09-28028 September 1984 Affidavit of W Faires Re Findings 3-15 & 3-16 of NRC 830930 Integrated Design Insp Rept ML20098G8811984-09-28028 September 1984 Affidavit of Cw Dick Re Independent Design Review ML20098G8791984-09-28028 September 1984 Affidavit of RP Tuetken Re Readiness for Fuel Loading ML20098G8781984-09-28028 September 1984 Affidavit of RW Manz Concerning Findings 3-11 Through 3-14 & 3-17 of NRC 830930 Integrated Design Insp Re Westinghouse ML20098G8871984-09-28028 September 1984 Affidavit of EM Hughes Re Idvp ML20098G8851984-09-27027 September 1984 Affidavit of Rl Heumann Re Costs of Delay in Startup & Operation of Unit 1 ML20098E2371984-09-24024 September 1984 Reply to Intervenor 840918 Proposed Supplemental Initial Decision.Certificate of Svc Encl ML20097E7221984-09-13013 September 1984 Agreed Motion for Time Extension Until 841101 to File Petition for Hearing Re Emergency Planning Commitment W ML20097C5311984-09-12012 September 1984 Motion to Reopen Record to Include Plant Design as Issue. Supporting Documentation & Certificate of Svc Encl ML20097B7791984-09-10010 September 1984 Proposed Supplemental Initial Decision Re Reinsp Program. Certificate of Svc Encl ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6441984-08-28028 August 1984 Notice of Withdrawal of Appearance in Proceeding.Related Correspondence ML20112D5271984-08-24024 August 1984 Applicant Exhibit A-R-4,consisting of Feb 1984 Rept on Bryon QC Inspector Reinsp Program ML20112D5031984-08-24024 August 1984 Applicant Exhibit A-R-5,consisting of June 1984 Suppl to Rept on Bryon QC Inspector Reinsp Program ML20112D7441984-08-23023 August 1984 Intervenor Exhibit I-R-1,consisting of Undated List of Teutken Safety Category Insp Types ML20112D7511984-08-21021 August 1984 Staff Exhibit S-R-1,consisting of 840813 Instruction for Walkdown of Cable Tray Hanger Connection Welds ML20112D4641984-08-21021 August 1984 Intervenor Exhibit I-R-11,consisting of Undated Chronological Date Listing of Util Responses to Interrogatory 12.VA Judson to Mi Miller Re Interrogatory 12 & Supplemental Responses Encl 1999-03-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:DEPOSITIONS
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20207E0051999-03-0202 March 1999 Transcript of 990302 Public Meeting with Commonwealth Edison in Rockville,Md.Pp 1-104.Supporting Documentation Encl ML20236H9381998-06-30030 June 1998 Transcript of 980630 Meeting W/Commonwealth Edison in Rockville,Md.Pp 1-123.Supporting Documentation Encl ML20198P3001997-11-0404 November 1997 Transcript of 971104 Public Meeting W/Ceco in Rockville,Md Re Measures Established by Ceco to Track Plant Performance & to Gain Understanding of CAs Put Into Place to Improve Safety.Pp 1-105.W/Certificate & Viewgraphs ML20209J3251987-01-30030 January 1987 Transcript of 870130 Commission Discussion/Possible Vote on Full Power OL for Facility.Pp 1-72.Supporting Viewgraphs Encl ML20211B0841986-08-0505 August 1986 Transcript of 860805 Meeting Between Region Iii,Computer Interference Elimination & Util in Redmond,Wa Re Plant as-built Drawing Review.Pp 1-200 ML20096A6261984-08-30030 August 1984 Summary of Rebuttal Testimony & Testimony of ML Somsag, Eb Branch,D Demoss,Mr Frankel,Bf Maurer & Jk Buchanan Re Plant QC Inspector Reinsp Program & C Stokes Allegations Re Welds.Related Correspondence ML20096A6191984-08-30030 August 1984 Rebuttal Testimony of B Erler Re Stokes Allegations Concerning Evaluations of Discrepancies in Calculated Actual Stress Performed by Sargent & Lundy.Related Correspondence ML20096A6391984-08-30030 August 1984 Rebuttal Testimony of RW Hooks Re Validity of Info in Attachment 7 to Stokes Testimony Concerning Design Assumption for Plant.Stokes Info Inapplicable to Plant. Related Correspondence ML20094P7721984-08-17017 August 1984 Summary of Testimony & Direct Testimony of CC Stokes on Reinsp Program.Related Correspondence ML20094R1021984-08-17017 August 1984 Transcript of CC Stokes 840817 Deposition in Chicago,Il. Pp 1-173.Vol Ii.Related Correspondence ML20094P5991984-08-16016 August 1984 Direct Testimony of CC Stokes Re Engineering Evaluations Performed & Use of Engineering Judgement by Sargent & Lundy. Suggests Need for Independent Engineering Analysis of Safety Significance of Reinsp Program.Related Correspondence ML20094P6311984-08-14014 August 1984 Summary of Testimony & Testimony of Ds Kochhar on Contention 1 Re Reinsp Program.Certificate of Svc Encl.Related Correspondence ML20094P6831984-08-13013 August 1984 Summary of Testimony & Testimony of Wh Bleuel on Contention 1 Re Reinsp Program.Resume Encl.Related Correspondence ML20094P6951984-08-13013 August 1984 Summary of Testimony & Testimony of EP Erickson on Contention 1 Re Reinsp program-inspector Qualification & Work Quality.Resume & Certificate of Svc Encl.Related Correspondence ML20093L4881984-07-30030 July 1984 Summary of Testimony & Testimony of Eb Branch Re Contention 1 (Reinsp Program,Work Quality).Related Correspondence ML20093L1811984-07-30030 July 1984 Summary of Testimony & Testimony of KT Kostal on Contention 1 Re Capacity of Sys Control Corp Supplied Components to Carry Design Loads.Related Correspondence ML20093L2721984-07-30030 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Evaluations of Discrepancies in Cable Tray Hanger Connections,Solid Bottom Tray Welds & Ladder Tray Weld Connections.Related Correspondence ML20093L2051984-07-30030 July 1984 Summary of Testimony & Testimony of Ld Johnson on Contention 1 Re Adequacy of Sys Control Corp Supplied Main Control Boards.Related Correspondence ML20090E5521984-07-17017 July 1984 Testimony of Eb Branch Re Job Responsibilities,Educ Background & Work Experience.Related Correspondence ML20090A7981984-07-0909 July 1984 Testimony of Gf Marcus Re Pittsburgh Testing Lab Source Insp of Equipment & Components Supplied by Sys Control Corp ML20090A8121984-07-0909 July 1984 Testimony of Bf Maurer Re Analysis of Structural Adequacy of Main Control Panels Designed & Fabricated by Sys Control Corp ML20092P7921984-07-0202 July 1984 Summary of Testimony & Testimony of ML Somsag Re QA Inspector Reinsp Program for Hunter Corp.Related Correspondence ML20092P7891984-07-0202 July 1984 Summary of Testimony & Testimony of Rv Laney on Contention 1 Re Work Quality.Related Correspondence ML20092P7951984-07-0202 July 1984 Summary of Testimony & Testimony of Ak Singh on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7941984-07-0202 July 1984 Summary of Testimony & Testimony of LO Delgeorge on Contention 1 Re Reinsp Program,Inspector Qualification & Work Quality.Related Correspondence ML20092P5541984-07-0202 July 1984 Summary of Testimony & Testimony of Dl Leone on Contention 1 Re Reinsp Program for Work Quality ML20092P5551984-07-0202 July 1984 Summary of Testimony & Testimony of R French on Contention 1 Re Reinsp Program ML20092P7781984-07-0202 July 1984 Summary of Testimony & Testimony of Wj Shewski on Contention 1 Re Reinsp Program,Inspector Qualification.Related Correspondence ML20092P7811984-07-0202 July 1984 Summary of Testimony & Testimony of Jm Mclaughlin on Contention 1 Re Reinsp Program,Work Quality.Related Correspondence ML20092P7871984-07-0202 July 1984 Summary of Direct Testimony & Testimony of RP Tuetken Re Reinsp Program.Related Correspondence ML20092P7851984-07-0202 July 1984 Summary of Testimony & Testimony of Wb Behnke on Contention 1 Re Overview of Quality Program,Work Quality. Related Correspondence ML20092N4971984-06-29029 June 1984 Testimony of Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092N4911984-06-29029 June 1984 Summary of Direct Testimony of Jo Binder on Issues 5 & 6 Re Cable Overtensioning,As Limited by ASLB 840608 Order.Related Correspondence ML20092K7691984-06-26026 June 1984 Summary of Testimony of J Hansel on Contention 1 Re Reinsp Program.Prof Qualifications Encl.Related Correspondence ML20205H8901983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,585-7,610 ML20205H8941983-08-10010 August 1983 Public Version of Transcript of 830810 in Camera,Ex Parte Hearing W/Ofc of Investigations in Rockford,Il.Pp 7,611.1- 7,611.71 ML20205H8841983-08-0909 August 1983 Public Version of Transcript of 830809 in Camera,Ex Parte Hearing in Rockford,Il.Pp 7,304-7,405 ML20080B3051983-08-0303 August 1983 Testimony of RP Tuetken Re Util Reinsp Program of Work Performed by Contractor Insp Personnel Prior to NRC Region III Mar,Apr & May 1982 Insps.Appropriate Steps Taken to Remedy Problems ML20080B3091983-08-0303 August 1983 Testimony of Aw Koca Re General Nature of Hatfield Inspector Training & Certification Program.Certification of J Hughes Described ML20080B2951983-08-0303 August 1983 Testimony of Ma Stanish Re Recertification of Qa/Qc Inspectors Subsequent to NRC Region III Mar,Apr & May 1982 Special Team Insps.Reinsp Program Implemented to Review Work Performed by Inspectors Before NRC 1982 Insp ML20023C7151983-05-12012 May 1983 Testimony of P Holmbeck Re Investigation Into Adequacy of Emergency Plans Re Emergency Planning Contentions.Util Made No Attempt to Study Protective Value of Sheltering Populations Around Plant ML20204F5721983-04-26026 April 1983 Transcript of 830426 Hearing in Rockford,Il.Pp 5,964-6,156 ML20069M4791983-04-25025 April 1983 Handwritten Testimony of J Hughes Re Qa/Qc at Facility ML20069K5691983-04-21021 April 1983 Testimony of Ld Butterfield Re Steam Generator Tube Integrity.Proposed Steam Generator Mods Would Minimize Tube Wear Due to Flow Induced Vibration.Related Correspondence ML20069K5631983-04-21021 April 1983 Revised Testimony of Tf Timmons Re Steam Generator Tube Integrity (Flow Induced Vibration Phenomenon).No Significant Tube Wear Will Be Experienced in Steam Generators Due to Flow Induced Vibration.Related Correspondence ML20073J6691983-04-18018 April 1983 Testimony of Jl Murphy on Rockford League of Women Voters & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Consolidated Emergency Planning Contentions 3 & 13.Related Correspondence ML20073K4461983-04-18018 April 1983 Rebuttal Testimony of Levine Re Rockford League of Women Voters Contentions 8 & 62 & Dekalb Area Alliance for Responsible Energy/Sinnissippi Alliance for Environ Contention 2a on Public Risk.Related Correspondence ML20073G4241983-04-11011 April 1983 Testimony of Ee Jones Re State of Il Emergency Svc & Disaster Agency Responsibilities Concerning Emergency Planning for Nuclear Facilities & Intervenor Amended Emergency Planning Contention ML20073G4051983-04-11011 April 1983 Testimony of Jc Golden Re Amended Emergency Planning Contention ML20073G4121983-04-11011 April 1983 Testimony of Dl Smith Re Resources Available for Transport & Treatment of Contaminated Injured Persons.Resume Encl 1999-03-02
[Table view] |
Text
,
Edican 02/21/83; 02/15/83 vsreion
. corrected by incorpo-t rating errata.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
COMMONWEALTH EDISON COMPANY ) Docket No. 50-454-OLA
) 50-455-OLA (Byron Station, Units 1 and 2) )
COVER SHEET The testimony of Dr. Lawrence Conway addresses those portions of Contentions 42, 111 and 112 which assert that reduction of occupational exposure was not considered in the Byron Station design. Specifically, Dr. Conway's testimony describes his credentials qualifying him as an expert witness and explains how the Byron Station steam generators have incorporated mechanical and metallurgical design features to reduce occupational radiation exposure to workers. They are:
- a. Elimination of crud traps 1: . Material selection and control
- c. Primary channel head external drain
- d. Primary nozzle closure rings
- e. Mr y access openings of secondary side instrument and access openings.
Dr. Conway explains how these design features reduce personnel radiation exposure by providing distance between the radiation source and workers, by reducing worker time in radiation fields, and by minimizing radiation sources in the steam generators. Dr. Conway concludes that the Byron Station ste'm generators embody the very best design features to reduce occupational radiation exposure.
8302230461 830221 PDR ADOCK 05000454 PDR T
. Ediron.02/21/83; 02/15/83 version corrccted by incorpo-rating-errata.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
COMMONWEALTH EDISON COMPANY ) Docket No. 50-454-OLA
) 50-455-OLA (Byron Station, Units 1 and 2) ) '
TESTIMONY OF DR. LAURENCE CONNAY CONCERNING REDUCTION OF OCCUPATIONAL RALIATION EXPOSURE Q.l. State your name, address and present occupation.
A.l. My name is Lawrence Conway. My address is 1603 The Oaks Drive, Maitland, Florida 32751. My employer is Westingbouse, Steam Turbine Generator Division, and I am employed as En Advisory Engineer.
Q.2. Please state your educational background.
A.2. I graduated from high school in 1952 and was then-l employed as an apprentice engineer at C.A. Parsons and Company, Ltd., England. For the years 1952-56,
! I co-oped between Parsons and r.atherford College of Technology where I studied Mechanical Engineering, graduating with a Diploma in Mechanical Engineering in May, 1956.
i'
- In October 1956, I entered the Universityaof Durham,
- England and graduated in June 1959 with a First J
Class Honors Degree'in Mechanical-Engineering. I.
immediately re-enrolled at the University of Durham for post-graduate-studies and graduated in December 1962 with a Ph.D. in Mechanical Engineering.. During
~
the course of my education, I was awarded the-following academic honors - - Weighton Medal, t Stephenson Medal, Doxford Scholarship, and the Doxford Prize.
Q.3. Please state your work experience.
A.3. The years December'1962 through December 1963.were occupied by teaching'and performing mechanical >
engineering research at variousieducational 4 institutions. In. January 1964, I was employed by Brown Engineering Company, Huntsville, Alabama as a Mechanical Engineer, working on heat exchangers associated with Aero-space products. In the period i
from January through April 1967, I was successively 3
promoted to instrumentation Systems Department l Manager. ,
l In April 1967, I accepted employment by Westinghouse ;.
[ at the Advanced Reactors Divison as a Fellow Engineer. For the period up to August 1968, I
..,---,.-.v,_,.,,.,,,,,,,y., _-,.~,..x. .
, _ , - , - - - -..-,..,m- . , 9
performed heat transfer and safety and systems analyses on advan~ced nuclear power systems, predominately liquid-metal breeder concepts.
In August 1968, I transferred to Westinghouse Tampa Steam Generator facility as a Fellow Engineer.
Initially, I performed heat transfer analyses of Westinghouse steam generators but in August 1969,.I transferred disciplines to stress analysis and design. The tasks generally were to lay out the geometry of a steam generator, size the parts, .then draft a stress report in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,Section III.
In 1972, I was promoted to Manager of Stress Analysis and supervised the efforts of 10 to 20 l
mechanical engineers performing analyses of all steam generator models.
In 1977, I became Manager of Engineering Mechanics, which embraced all of fluids, heat transfer, stress analysis, and testing required for Westinghouse steam generators. In 1979, I became Manager of Heat Exchanger Engineering and I supervised the design, drafting, analysis and testing of all Tampa heat
transfer products. The personnel involved numbered 50 to 60, depending upon factory loading.
In September 1982, I transferred to the Steam Turbine Generation Divisions as an Advisory a
Engineer.
In sum, I have over 14 years experience with respect to the design and fabrication of Westinghouse Steam Generators, 0.4. What is-the scope of your testimony?
A.4. My testimony addresses those portions of Contentions 42, lil, and 112 which assert that plant design for reducing amounts of occupational radiation exposure were not considered in the design of the Byron Station. Specifically, my testimony will explain the design features that have been incorporated in the Westinghouse steam generators installed at Byron Station to reduce occupational radiation exposure to workers.
Q.5. What design features have been incorporated in the Westinghouse steam generators installed at the Byron Station to reduce occupational radiation exposure?
A.S. The Byron Station steam generator design minimizes personnel radiation. exposure by providing distance between the radiation source and workers, by reducing the time spent by workers in the radiation field, and by minimizing radiation source levels in the steam generators. Mechanical and metallurgical design features have been incorporated in the Byron Station steam generators to directly address these considerations. They are:
- a. Elimination of " crud traps"
- b. Material selection and control
- c. Primary channel head external drain
- d. Primary nozzle closure rings
- e. Manway access openings
- f. Secondary side instrument and access openings.
Q.6. Please describe how the elimination of crud traps in the Byron steam generators reduce occupational radiation exposure.
A.6. Two design features have been incorporated into the Byron steam generators to reduce occupational radiation exposure. These design features reduce worker exposure by eliminating or reducing areas where radioactive crud so,urces could accumulate, thereby minimizing the build-up of radioactive i
products within the primary side of the Byron steam generators.
First, Byron utilizes a' flush or slightly recessed weld of the tube to tubesheet seal. This weld is used in lieu of a protruding tube seal weld and results in a smoother face of the tubesheet. This eliminates an area-where radioactive deposits can potentially accumulate.
Second, the entire primary channel head interior in the Byron steam generators,-exclusive of the primary nozzle closure ring seals discussed in the answer to 0.10, are free of crevices, ledges or baffles which T
might act as traps for radioactive deposits from the
- reactor primary coolant or from external sources that might inadvertantly be brought into the steam generators during inservice inspection.
Q.7. What materials or material controls have been incorporated in the design of the Byron steam generators to reduce occupational radiation exposure?
A.7. Austenitic stainless steel and Inconel 600 (a nickel-chronium-iron alloy) are the only materials utilized in the Byron steam generators that come in t
, , , , - - - , . . . - - -.---% -.- -.-m.-- -.
contact with the primary coolant. -Cobalt 59 (CO-59), a stable isotope, is always present as an impurity in these' materials. CO-59 when exposed to neutron radiation present in the primary coolant will be changed to the radioactive isotope Cobalt 60 (CO-60). Redeposition of this radioactive CO-60 back to the wetted surfaces of the primary side of the steam generators increases the radiation _ levels.
To minimize such exposures, the amount of CO-59 contained in tre stainless steel and Inconel used in the Byron steam generators is limited. At Byron, specificatione for these materials limit the amount of cobalt to 0.2 percent la stainless steel and 0.1 percent in Inconel. By limiting the amount of CO-59 present in the stainless steel and Inconel used in the Byron-steam generators to these levels,.the potential occupational exposure from Co-60 can be minimized.
Q.8. Please describe how the-primary channel head external drain has been designed to minimize occupational radiation exposure.
A.8. In preparing for primary side steam generator
^
maintenance, all of the reactor coolant should be drained from the steam generator. Most of the
coolant is drained via the reactor coolant loop piping. A few gallons remain in each. channel head because the loop piping nozzle is not.the lowest point. In the Byron steam generators, a single central drain has been installed at the lowest level of the channel head bowl to facilitate the removal of the radioactive water remaining in both,the hot and cold leg sides of the divider plate. Without this provision, maintenance workers would have to enter the radioactive channel head to mop-up or dry this trapped water. Removal of this source of potential radioactivity minimizes occupational exposure to workers by largely eliminating the need to perform this manual mop-up operation.
Q.9. Please describe how the Byron steam generators primary nozzle closure rings reduce occupational radia' tion exposure.
A.9. Each primary nozzle has a closure ring seal. welded to the inside surface of the channel head bowl.
These rings provide a seat for nozzle maintenance covers which help shield workers from dose rates due to radiation streaming from the reactor coolant piping.
Q.10. Please describe how the design of the manway access openings in the Byron steam generators reduce occupational radiation exposure.
A.10. The Byron steam generators each have four sixteen inch inside diameter manways to provide easy-access to steam generator internals. Two of these manways provide access to the primary side of the steam generator and two provide access to the secondary side. These manways utilize standard bolted and gasketed covers and are designed with the minimal i
number cf component parts to facilitate disassembly and reassembly operations for quick access. This feature minimizes worker exposure time in entering and exiting the manways.
A sixteen inch diameter was chosen as the optimal design for the Byron steam generators primary manways to minimize the external radiation shine area from the tubes and tubesheet. This diameter size also provides an adequate opening for unhindered movement of personnel and tools in and out of the steam generator in order to minimize exposure time.
The two secondary manways in the Byron steam generators have been located in the upper shell of
the steam generator well above the top of the tube bundle. This positioning provides additional shielding, from three levels of deck plates and primary water separators, to workers in the normal work area on the mid-deck plate. If work is required at a lower level, suitable built-in ladders and deck plate access openings have been provided to m
hasten workar ingrese and egress. The presence of these built-in design features also minimizes worker exposure levels by climinating the need to install and then remove temporary ladders and/or scaffolding The inside the upper shell of the steam generators.
secondary manways also serve as additional points of thereby ingress and egress to the steam generator, reducing the amount of time a worker has to spend inside the generator to get to his work area.
Q.11.
How do the design features of the secondary side instrument and access openings of the Byron steam generators reduce occupational radiation exposure?
A.ll.
The minimum necessary number.of small instrument and access openings (handholes) have been provided for necessary inspection and maintenance operations of the Byron steam generators. These openings have been optimally placed to minimize radiation exposure on the lower portion of the steam generator shell.
i l
1
' I
-- __ __ - - _ _ _ \
e The location of these openings has been selected to provide optimum visibility of steam generator internals for' functional duties, such as sludge lancing above the tubeplate, which can then be performed by workers positioned at greater distances from the radiation source.
In the case where the wrapper (a thin cylinder just inside the outer steam generator shell) is penetrated by an instrument or access opening, a simple wrapper seal plug is used. All of these seal plugs have simple standard gasketed and bolted closures. This design facilitates disassembly and assembly operations for quick access to the steam generator interior.
Finally, all secondary side openings have simple i standard gasketed and bolted closures which also l minimize worker disassembly and reassembly time.
l l
l l 0.12. Do you have an opinion concerning the design l
l adequacy of the Byron Station steam generators from f the standpoint of minimizing occupational radiation l
exposure.
A.12. Yes. I consider the steam generators in both units L
( of Byron Station to embody the state-of-the-art I
l l
e l
?
. design features from the perspective of minimizing occupational radiation exposures.
I s
l l
,