ML20078G332
| ML20078G332 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 09/29/1983 |
| From: | Baetsen L WISCONSIN PUBLIC SERVICE CORP. |
| To: | Matthew Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20078G335 | List: |
| References | |
| NUDOCS 8310120206 | |
| Download: ML20078G332 (6) | |
Text
WISCONSIN PUBLIC SERVICE CORPORATION Kewaunee Nuclear' Power Plant Route 1, Box 48 Kewaunee, WI 54216 n
i September 29, 1983
-U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Attn: Marsha Smith
Dear Ms. Smith:
During a recent conversation with personnel in our Corporate Office, I was
~
informed that you did not receive the June 21, 1983 revisions to our Emergency Plan Implementing Procedures.
Enclosed please find two (2) copies of our updated index, dated September 20, 1983, and the June 21, 1983 revisions.
Sincerely,
\\.
}
hk
' ' l%
Lori A. Baetsen Technical Support Clerk Enc.
cc:
R.P. Pulec b., 3 (
L.R. Seebart v
j i
M pf r10 831012O206 830929 PD7 ADOCK 05000305 F
t.Page 1 of 5 REVISED 9-20-83
' :l,,
l '-
EMERGE CY PLAN IMPLEMENTING PROCEDURES
-Index ~
h Procedure #
TITLE.
REVISION DATE D
03-10-83 EP-AD-1 Plant Emergency Organization C
03-10-83 EP-AD-2 Emrgency Class Determination B
03-10-83 EP-AD-3 Unusual Event
-B 03-10-83 EP-AD-4 Alert B
03-.10-83 EP-AD-5 Site Emergency B
03-10-83 EP-AD-6 General Emergency EP-AD-7 Notification of Unusual Event G
8-16-83
.EP-AD-8 Notification.of Alert G
8-16-83
- EP-Ab-9 Notification of Site Emergency
~G 8-16-83
.i EP-AD-1D Notification of Gener'al Emergency EG 8-16-83
~
-C 06-21-83 EP-AD-11 Emergency Radiation Controls Personnel Assenbly and Accountability D
03-13-83 EP-AD-12 9
03-03-83
. EP'-AD-13 Personnel Evacuation 4
DELETED 03-1-83
~
EP-AD-13A Limited nrea Evacuation EP-ADi3B Emergency Assembly / Evacuation DELETED 03-1-83 l
DELETED 03-1-83 EP-AD-13C Site Evacuation I
5P-AD-14 Search-and Rescue.
A 03-10-83
~
A 03-10-83
~
EP-AD-15 Recovery Planning
- EP-AD-16 Occupational Injuries or Vehicle Accidents A
03-10-63 During Emergencies E
8-16-83
~
EP-AD-17 Communications
~
EP-AD-18 Availability of. Inorganic Iodine Salts for A
03-10-83 Iodine Saturation of the Human Thyroid Gland EP-ENV-1 Environmental Monitoring Team Or(janization B
03-10-83 '
('-
~
EP-ENV -2 Site Access Facility (SAF) Activation
,8 03-10-83
.1
~
l-REVISED 9-20-83 Rage 2 of 5
~
EMERGENCY PLAN IMPLEMENIIt(G PROCEDURES
\\
-Index-(cont'd)
REVISION DATE Procedure #
TITLE EP-ENV-3A Environmental Protection Director H
06-21-83 Actions and Directives EP-ENV-3B EM Team Actions
- E 06-21-83 r ~_.
j EP-EIN-3C Primary Dose Projection Calculation - IBM
~
06-21-83 Personal Computer 06-21-83 EP-EtW-3D Primary Detennination of Meteorological Data EP-ENV-3E Manual Determination of X/Q (KNPP E.
06-21-83 Meteorolo'gical Data)
EP-ENV-3F Manual Determination of X/Q (Green Bay -
D 06-21-83 Meteorological Data).
~
D 06-21-83
~
EP-ENV-3G Manual Dose Projection Calculation
~
EP-ENV-3H Protective Action. Recommendations B
~ 06-21-83 C
03-10-83 EP-ENV-4A Sample Acquisition, Portable Instrument Use B
05-21-82 EP-ENV-48 Sample Acquisition, Air Monitoring Devices i
EP-ENV-4C Sample Acquisi-tion, Environmental Sampling Techniques
.B 05-21-82 B
4-21-83 EP-ENV-5A LCS-1 Operation B
4-21-83 EP-ENV-58 MS-3 Operation C
03-10-83 EP-EN'-5C
" SAM II Operation
~
V A
12-21-81 EP-ENV-50 PAC-4G Operation A
03-10283
~
EP-ENV-5E Reuter-Stokes Operation EP-EtN-6 Data Analysis, Dose P'rojections and Protective del.ITED Action Recommendations EP-EtN-6A Relocation of Site Access Facility A
03-10-83 (Habitability) l EP-EiN-53 SAF Envir6nmental. Sample Analysis -Relocation A
11-24-82 B
03-10-83 EP-ENV-7 Site Access Facility C.ommunications
~A 7-26-83 EP-ENV-8 Total Population Dose Estimate Calculations
~
REVISED 8-20-83 Page 3 of 5 sMERGENCYPLANIMPLEMEttTINGPROCEDURES.
-Index-(cont'd)
.(
)
v REVISION DATE Procedure #
TITLE ~
EP-EOF-1 C'drporate Staff Emergency Response Organization H
8-16-83 EP-E CF -2 Emergency Operations Facility (E0F) Activation E
8-16-83 F
03-ld-83 EP-ECF-3 Corporate Response to an Unusual Event H
8-16-83 EP-EOF-4 Corporate Response to an Aler.t H
8-16-83 EP-EOF-5 Corporate Response to a Site Emergency H
8-16-83 EP-EOF-6 Corporate Response to a General Emergency-EP-EOF-7 Communica'tions Documentation E
03-10-83 DELETED 03-01-83 EP-E0F-8 Relocation of EOF EP-E0F-9 Interface with Support Organizations F
8-16-83 t'
rx f
\\-
Q"!
Control. Room Emergency Organization A
1-03-83 EP-OP-1 l
B l-03-83 i
, EP.-0P Emer.gency Control Room Activation "for 1
Emergency Response EP-0P-3 Control Roan Communications A
1-03-83 EP-0SF-1 Operational Support Facility (OSF) Organization A
1-15-82 EP-OSF-2 OSF Activation A
05-21-82 A
1-15-82 EP-0SF-3 Work. Requests During an Emergency EP-0SF-4 OSF Coinmunications B
03-1 83 W--W.WWW-6-me-e--e EP-RET-1 Radiation Emergency Team (RET) Organiza' tion C
03-10-83
~
C 03-10 EP-RET-2 Inplant RET e
m
REVISED 9-20-83
,' Page 4 of 5 EMERGENCY PLAN IMPLEMENTING FROCEDURES
-Index-(p (cont'd)
' 'w,/
REVI5 ION DATE Procedure #
TITLE C
Q3-10-83
~
EP-R ET-2A RP0/RAF Activation
~
EP-RET-28 Gaseous Effluent Sample and Analysis C-03-01-83 EP-RET-2C Containment Air Sampling and Analysis DELETED 03-0143
^
B 03-l0-83 EP-RET-20 Emergency Radiation Entry, Controls and Implem ntation A
03-10-83 EP-RET-2E Handling of Injured Personnel B
03-10-83 EP-RET-2F Personnel Decontamination C
03-10-83 EP-RET-3 Emergency Chemistry Team A
12-21-81 EP-RET-3A Liquid Effluent Release Paths EP-RET-3B Post-Accident Reactor Coolant Alternate B
03-10-83
~
Sampling Procedbre EP-RET-3C Post Accident Operation of the High Radiation *
~
A 07-26-83 Sample Room l
EP-RET-3D Containment Air Sampling. Analysis Using CASP A
06-21-83 EP-RET-3E Post Acciddnt Operation of High Rad Sample Room d7-26-83 Inline Multiported Count Cave C
03-10-83
~
~
EP-RET-4 Site RET EP-RET-4B Radiological Controls at Site Access Facility (SAF) A 03-10-83
~
'A 03-10-83 EP-RET-4C Site R'adiological Monitoring EP-RET-5 Plume Projections B
7-26-83 EP.-RET-5A Plume Projections (Backup Method)"
B 9-20-83 B
7-26-83 EP,-R ET-6 Dose Projection A
03-10-83 EP-RET-7 RAF/RP0 Communications EP-RET-B Contamination Control at the Two Rivers A-03-10-83 Community Hospital
(' O e
4-
..e REVI' SED 9-20-83 f... Page 5 of 5 5MERGENCYPLANIMPLEMENTINGPROCEDURES.
g
-Index-y (cont'd)
(/)v REVISI'ON DATE Procedure #
TITLE '
A 03-10-83 EP-SEC-1 Se' cur'.ty Organization C
03-01-83 EP-SEC-2 Security Force Response to Emergencies
- t DELETED 1-29.-82 EP-SEC-2(a)
Manual Activation of Emergency Sirens Personnel Accountability (Ini.tial and Maintaining) ' D 03-10-83 EP-SEC-3 A
03-10-83
~
$P-SEC-4 Dosimetry Issue at SAF 12-21-81
' EP-TSC-1 Technical Support Center (TSC) Organization C
03-10-83 EP-TSC-2 TSC Acti.vation g
B 03-10-83 EP-TSC-3 Pla6t Status Pr.ocedure.
}
~
12-21-81 EP-TSC-4 Emergency Design Change, Major ' Equipment Repair
.A 03-10-83
~
' EP-TSC-6 Assessment of Reactor Core Damage
's A 03-10-83 m
O g.
O M
e
(
)
x _/
_ - _. _,.. _