ML20077J334

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1983
ML20077J334
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/10/1983
From: Blackwell R, Nix H, Redwanz F
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
GM-83-789, NUDOCS 8308160234
Download: ML20077J334 (27)


Text

,

1 OPERATING DATA REPORT DOCKET NO.

50-321 DATE 08-10-82 COMPLETED BY: R. M. Blackwell TELEPHONE (912) 367-7851 OPERATING STATUS tbtes 1.

Unit Name: E. I. Hatch Nuclear Plant Unit 1 2.

Reporting Period: 07-83 3.

Licensed Thermal Power (MWt): 2436 4.

Nameplate Rating (Gross MWe): 809.3 5.

Design Electrical Rating (Net MWe): 777.3 6.

Maximum Dependable Capacity (Gross MWe): 801.2 7.

Maximum Dependable Capacity (Net MWe): 764.7 8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:

f 9.

Power Level to Which Restricted, If Any (Net MWe) l

10. Reasons for Restrictions, If Any:

"b5

/ "8 l

$5 This Month Yr-to-Date Cumulative I

gg 11. Hours In Reporting Period 744 5087 66455

stu 12. Number of Hours Reactor was Critical 744.0 3842.3 46794.8
13. Reactor Reserve Shutdown Hours 0

0 0

ou s 14. Hours Generator On-Line 744.0 3634.3 43784.6

15. thit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1794600 8056070 92304433 3h_18.NetElectricalEnergyGenerated(MWH) go 17. Gross Electrical Energy Generated (MWH) 575770 2622830 29892320 550650 2495851 28382066
19. Uhit Service Factor 100.0 71.4 65.9
20. Unit Availability Factor 100.0 71.4 65.9
21. Unit Capacity Factor (Using MDC Net) 96.8 64.2 55.9
22. Unit Capacity Factor (Using DER Net) 95.2 63.1 54.9

<23. Unit Forced Outage Rate 0.0 4.9 19.1

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shutdown at End of Report Period, Estimated Date of Startup:

p( 26. thits in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT P0"ER LEVEL

~

DOCKET NO.

50-321 DATE:

07-10-82 COMPLETED BY: F. J. Redwanz TELEPHONE (912) 367-7851 1

MONTH 07-83 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 749 17 734 2

752 18 741 3

748 19 739 4

750 20 742 5

750 21 743 6

750 22 739 7

750 23 741 8

753 24 730 9

613 25 735 10 726 26 742 11 748 27 744 12 748 28 749 13 745 29 750 14 746 30 745 15 745 31 749 16 745 (9/77)

OPERATING DATA REPORT DOCKET NO.

50-366 DATE 08-10-82 COMPLETED BY: R. M. Blackwell TELEPHONE (912) 347-7851 OPERATING STATUS 1

Notes 1.

Unit Name: E. I. Hatch Nuclear Plant Unit 2 2.

Reporting Period: 07-83 3.

Licensed Thermal Power (MWt): 2436 4.

Nameplate Rating (Gross MWe): 817.0 5.

Design Electrical Rating (Net MWe): 784.0 6.

Maximum Dependable Capacity (Gross MWe): 803.9 7.

Maximum Dependable Capacity (Net MWe): 774.5 i

8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:

1 9.

Power Level to Which Restricted, If Any (Net MWe):

10. Reasons for Restrictions, If Any:

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 5087 34225 q
12. Number of Hours Reactor was Critical 437.8 2680.4 23831.5
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 289.9 2531.7 22686.8
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energv Generated (MWH) 460584 4551164 48156847
17. Gross Electrical Energy Generated (MWH) 139120 1536330 15812800
18. Net Electrical Energy Generated (MWH) 123920 1447286 15035612
19. Unit Service Factor 39.0 49.8 66.3
20. Unit Availability Factor 39.0 49.8 66.3
21. Unit Capacity Factor (Using MDC Net) 21.5 36.7 56.7
22. Unit Capacity Factor (Using DER Net) 21.2 36.3 56.0
23. Unit Forced Outage Rate 55.2 20.1 13.4
24. Shutdowns Scheduled Over text 6 Months (Type, Date, and Duration of Each):
25. If Shutdown at End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL

).

DOCKET NO.

50-366 DATE:

08-10-82 COMPLETED BY: R. M. Blackwell TELEPFONE (912) 367-7851 MONTH 06,

-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-12 17

-16 1

2

-16 18 59 3

-16 19 152

}

4

-16 20 241 4

5

-15 21 428 6

-15 22 306 7

-15 23

-18

'8

-15 24 103 9

-16 25 433 10

-15

.26 568 11

-17 27 644 12

-16 28 586 j

13

-19 29 530 i

.14

-16 30 633 j

15-

-15 31 731 16

-14 (9/77) i i

i 4

I l

-a

50-321 DOCKET NO.

UNIT SilUTDOWNS AND F0WER REDUCTIONS UNIT N AME IIatch 1 l

8-4-83 i

DATE July COM?LETED BY R.M.

Blackwell*

REFORT MONTil TELEPi!ONE 912-367-7851 e.

i

' Cause & Corrective

.! ?

3

.y Licensee P,

g7, -

No.

Date <

g 3g g

jj g 5 Event p

9s Action to o

~gg Report #

mo gu Prevent Recurrence

$5 5

~

u O

83-48 830709 S

8.08 B

5 NA RC CONROD Weekly turbine test & rod patterr adjustment.

l 83-49 830709 S

18.6 B

5 NA RC CONROD Recovery from above load reduc-tion l

i l

l i

I 1

l 3

4 I

2 Me: hod:

Exhibit G Instructions F: Forced Reason:

1 M nual for Prep: ration of Data S: S:hedu!cd A D;uipm:nt'Failur:(Expl:!n) 2Ranual Serr.m.

Entry Sh:ets for Licensee E..'.!:inte..an:e ci Test 3-Autumatic Scram.

Esent Report (LER) File (NUREG-l C-Refueling 4 -Continuations 0161)

D Regulatory Restriction E-Opera or Training & Ucense Examination 5-Icad Pcduction I

5 F-Administrative 9 -Other (Rxplain)

Exhibit I-Same Source G-Operations! Error (Exp!ain) j (9/77)

Il-Oth:r (Exp!:in)

I 1

l l

t 50-366 D

O.

UNIT S!!UTDOWNS AND FOWE?. REDUCTIONS Hatch 2 DATE 8-10-83 July COMPLETED BY R.M. Blackwell REPORT MONTil TELEPi!ONE 912-367-7851 jg 3

Y Licensee P,

'Cause & Corrective No.

Date -

g 3g s

jg5 Event y

E-8 Action to H

$5 5

~gc Report #

mO 8U Prevent Recurrence U

j O

83-3 830701 F

340.5 C

9 NA RC FUELXX Extension of refueling outage.

I 83-4 830714 S

7.93 11 4

NA RC FUELXX Ranping frcm above event.

~

83-5 830714 F

94.57 G

2 2-83-42 BC CONROD Operator inserted control rod out of i

SGCluence.

l j

83-6 830718-S 8.0 II 4

NA RC CONROD Ranping from above event.

83-7 830718 F

17.0 A

5 NA BC INSTRU lleld power until "A"

& "C" tips were y

returned to service & OD-1 printout obtained.

j 83-8 830719 S

12.75 11 4

NA BC INSTRU Ranping from above event.

i 83 830720 S

10.08 B

5 NA RB (DNBCD lleld load to perform scram tine testing.

I 83-10 830720 S

6.67 11 4

NA RB CONROD Ranping from above event.

I l

I 2

3 4

F: Forced Reason:

E!cthed:

Exhibit G -Instructions S: S:hedu!:d A 0;uipment Failur:(Explin) 1 -? hnual for Preparation of Data B-?!:inte. nance ci Test 2-Manu 1 S:r:m.

Entry Sh:ets for Licensee 3 Autornatic Scram.

Esent Report (LER) File (NUREG-C Ren.c!!ng 4 -Continuations 0161)

D Regulatory Restriction E Operator Training & License Examination 5'-Load Reduction 5

F-Administ rative 9 -Other (Explain)

Exhibit I-Same Sourec G Operation:1 Error (Exp!ain)

(9/77)

Il Cth:r (Exp!:in) l f

50-366 DOCKETWO.

UNIT SHUTDOWNS ANO F0WER REDUCTIONS UNIT NAME 0-#-C DATE R.M. Blackwell July COMPLETED BY REEGRT MONTil TELEPi!ONE 912-367-7851

^

n.

' Cause & Corrective

.S 3 3

.Y ~-1 Licensee E-,

No.

Date <

g 3g s

jj 5 s Event p

c.?

Action to

$E r3

~ di g Report #

mO 5O Prevent Recurrence u

g O

83-11 830720 F

3.33 B

5 NA IC INSTIU ileld load due to problems with "D'.' TIP.

i 83-12 830720 S

38.3 11 4

NA IC INSTIU Ranping frun above event.

sk 83-13 830722 F

3.63 11 5

2-83-51 Of TURBIN Reduced power due to reactor feedpump turbine fire.

83-14 830722 F

42.85 A

3 NA CII TURBIN Rx. scram on loss of Rx. feedpunp tur-bine.

i, 83-15 830724 S

70.83 II 5'

NA UI TURBIN Rower ascension from above.

83-16 830728 F

1.45 A

5 NA IIC IITEXCII Reducing load to stabilize vacuum.

83-17 830728 S

45.3 II 5

NA IIC IITEXCII Power ascension from above.

I i

l

~

3 4

~

M:thod; Exhibit G Instructions F: Forced Reason:

S: S:h:duled A b;u!prnentTeilur:(Exp!zin) 14hne:1

. for Preparation of Data E...liintenance ci Test 2-Manual Scr:m.

Entry Sh:ets for Licensee c.'Re fucun,.

3 Auturnatic Scram.

Esent Report (LER) File (NUREG-6'10161)

D Regulatcry Restriction 4 -Continuations

~

E-Operator Training & License Examination 5'-Ioad Pcduction 5

F-Administrative 9-OthOr (Explain)

Exhibit I-Same Source G-0.reration:1 Error (Explain)

(9/77)

Il-Oth:r (Exp!:in) 9

NARRATIVE REPORT l

UNIT 1 i

{

July 3rd 0030 Dropping load for weekly turbine test.

July 3rd 0119 Weekly turbine test complete.

i July 3rd 0207 Increasing load (load at 771 GMWe).

)

July 9th 0019 Reducing load for weekly turbine test & rod

{

-pattern adjustment.

July 9th 0220 Weekly turbine test complete & rod pattern aojustment continuing.

July 9th 0829 Rod pattern adjustment complete. Increasing back to rated.

July 17th 0050 Reducing loao to perform weekly turbine test.

July 17th 0215 Returning to rateo conditions.

July 24th 0045 Oropping loao to approximately 695 GMWe to perform weekly turbine test.

July 24th 0330 Weekly turbine test complete. Returning to l

rated conditions.

July 30tn 0095 Dropping load for weekly turbine test.

July 30th 0200 Weekly turbine test complete. Returningoto rated conditions.

e 3

i 1

i i

i

-e=e-w

+ rur-+

w r

  • w+ew

.~r--wsw-w-,,--.e+w-e--

.e,r

..++-e---

-+mee,*+,<---e,w-,-rs-='we--y*-ips,wgy - w -ev e, w e, e-re-=-y s-*e pg

=t--ww-r-,v-

-w

+ **-

-+-s

--pm4-w, y y

NARRATIVE REPORT UNIT 2 July 08tn 1825 Pulling rods.

July 08th 1946 Pulling rods.

July 10th 1950 Increasing reactor power via rods.

July 10th 2030 Stopped increasing reactor power at 200 psig.

July 11th 0032 Continued pulling roos.

July 11th 1115 Commenced rod insertion to lower reactor power.

July 11th 1645 Going to cola shutdown.

July 11th 1746 All control roos in full.

July 11th 1920 Reactor mode switch to shutcown.

July 11th 2243 Unit in cola snutoown.

July 12th 1625 Reactor mode switch to startup.

July 12th 1643 Commencea pulling control roos.

July 12th 1756 Reactor critical.

i July 13th 0530 Reactor pressure at 950 psig.

July 13th 2100 Startea pulling roos to go to run moae.

July 13th 2137 Reactor mode switch to run.

July 14th 0304 Main turbine rolling.

July 14th. 0335 Main turbine manually tripped to verify control valve closure.

July 14th 0430 Generator tied to line.

July 14th 1215 Heaucing reactor power via control roas.

July 14th 1226 Tripped main turbine.

July 14th 1321 Reactor scram oue to inability to sustain vacuum & rod insertion out of_ sequence.

July 17th 1018 Startea pulling rods for startup..

July 17th 1136 Reactor critical.

July:18th 0358 Reactor mooe switch to run.

i i

.v,.._,..

v.

.r

-._.....-,.-.~.,r,

,,,,. _.,,,...., ~.,....,,

July 18th 0948 Main turbine rolling.

July 18th 1100 Generator tied to line.

July 18th 1221 Holding load until feedwater heaters are placed in service.

July 18th 1720 Continued pulling roas.

July 18th 1900 Attempted OD-1, then discovered bad tip on "C"

tip machine.

July 20th 0045 Began scram time testing.

July 20th 1050 Scram time testing complete.

July 20th 1730 Experiencing "D"

tip problems.

July 20th 2050 Continuing power ascension.

July 22nd 1108 2A RFPT trippeo.

July 22nd 1123 Reducing loao per operations supervisor due to fire on 2A RFPT.

July 22nd 1446 Reactor scram oue to loss of 2A RFPT.

July 23rd 1445 Reactor critical.

July 24th 0937 Generator tied to line.

July 28th 1515 Reducing load to stabalize vacuum.

July 28th 1642 Increasing power to rated conoitions.

l l

HATCH 1 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR July 1983 1

NUMBER DATE COMPLETED DESCRIPTION 83-4628 U6-09-63 Removed filter elements &

inspecteo 0-rings on 1N62-D525A offgas prefilter.

DCR 83-90.83-679 06-22-o3 Installed flanges on "B"

RWCU pump oischarge, vent &

drain piping. DCR 80-379.

i 83-1684 06-01-83 Disconnected cables Z43-M09,M10,M11,M12,M13,M14,M1 5,M21,M22,M24 &

Z43-P001-M21. DCR 80-348.

i 83-2703 06-01-83 Disconnected caule Hll-P653-AX365 & removeo from conouit H11-P653-AX365.

DCR 80-348.

83-4148 06-29-83 Restored cable trays on R33 system. DCR 83-53 & 79-299.

83-4146 06-21-83 Restore cable tray an R33 system. DCR 83-53 & 79-299.

83-4737 06-23-83 Removea spare cables from trays TMQO-01 & TEN 7-01. OCR 83-53.

83-4145 06-21-83 Restored cable trays on R33 system. DCR 83-53,79-299.

83-4143 06-22-83 Restored cable trays on R33 system. DCR 83-53,79-299.

83-4147 06-20-83 Restorea cable trays on R33 system. DCR 83-53,79-299.

83-4149 06-22-83 Restored cable trays.on R33 system. DCR 83-53,79-299.

i 83-4158 06-23-83 Restored cable trays on R33 system. DCH 83-53,79-299.

83-4144 06-22-83 Restorea cable trays on H33 j

system. DCH 83-53,79-299.

83-4152 06-25-63 Restored cable trays on R33 system. DCH 83-53,79-299.

i 83-2311 04-29-83 Installed caole tray Z-clips

& hold down clamps & banos in control room. DCR 83-53.

4

...,,-.-,--_..-,..-..,r-,,,__,,,_mrovy._.e w,__

.. ~. ~. _. _

--r.

_,m,,_--

83-2544 05-06-83 Removed kaowool from U1 & U2 intake structure. DCR 83-53,79-299.

83-2630 05-19-83 Restored cable tray covers for U1 diesel b1dg.

cabletrays.

83-2796 05-06-83 Replaced missing splice plate bolts & installed Z-clips on U1 intake i

structure cable trays. DCR 83-53.

83-4153 06-25-83 Restored cable trays in U1 cable spreading room. DCR 83-53, & 79-299.

83-4168 07-07-83 Restored cable trays in U1 Rx. Bldg. DCR 83-53.

83-4151 07-12-83 U1 cable spread room -

restoreo cable trays. DCR l

83-53.

83-1648 07-13-83 Installed piping & supports from G31-F214 to l

G31-F205A&B. DCR 79-95.

83-5118 07-12-83 Fabricated hangers C-9-C &

j J-3-C & installed. DCR 83-53.

83-5119 07-12-83 Fabricated & installed-hangers I-26-C, I-12-C, I-11-C, M-24-C & M-45-C &

installeo. DCR 83-53.

i 83-5120 07-07-83 Faoricated & installed hangers L-23-C, D-81-C, M-61-C & R-3-C.

DCR 83-53.

i 83-5121 07-12-83 Fabricated & installed I

hangers M-75-C & M-76-C. DCR j

83-53.

83-5122 07-12-83 Fabricated & installed knee i

braces L-21-C, L-22-C, i

M-73-C3, M-73-C8, & M-77-C.

DCR 83-53.

83-5174 07-08-83 Installed clips & straps on j

cable trays in diesel & Rx.

Bldg. DCR 83-53.

83-5071 07-07-83 Fabricated & install'ed l

hangers. DCR 83-53.

l 83-4740 07-07-83 Installed device to prevent l

lateral movement of cabletrays. DCR 83-53.

l

1 83-5117 07-12-83 Fabricated hanger M-73-C10.

DCR 83-53.

l 83-5116 07-12-83 Fabricated & installed hangers M-73-C4, M-73-C2, M-74,C & M-85-C. DCR 83-53.

82-2726 02-02-83 Terminated cables on stack rad. monitoring system. DCR 80-53.

3 83-4118 07-06-83 Added caole tray support arms.

DCR 83-53.

83-2481 07-19-83 Repaired cable tray supports in Ul S.E. diagonal.83-619 07-28-83 Fabricated clamps & shims for fuel pool transfer canal. DCR 82-19.

83-5389 07-21-83 Replaced IC32-N008 GE type 551 press transmitter with Rosemount 1151-GP type.

83-2397 04-28-83 Fabricated & installed conouit supports for U1 cable spread room. DCR 83-53.

83-5560 08-02-83 Replaced R33 system cable l

tray clamp nuts.

83-4102 05-15-83 Fabricated & installed conduit supports for U1 caole spread room. DCR 83-53.

83-4159 05-31-83 Restored U1 control bldg.

cable trays. DCR 83-53.

83-4154 06-04-83 Restore U1 computer room cable trays. DCR 83-53.

83-4122 05-31-83 Fabricated & installeo cable i

tray supports for U1 Rx.

81dg. DCR 83-53.

83-4121 05-19-83 Fabricated & installed cable tray supports for U1 Rx.

Bldg. DCR 83-53.

i 83-4150 06-25-83 Restored U1 control bldg.

cable trays.

DCR 83-53,79-299.

83-4157 06-21-83 Restored U1 Rx. Bldg. cable trays. DCR 83-53 & 79-299.

83-4155 06-25-83 Restored U1 Rx. 81dg. cable trays. DCR 83-53 & 79-299.

83-4123 05-19-83 Installed caole tray su arm in U1 control blog.pport DCR 83-53.

83-4156 06-25-83 Restored U1 Rx. Blag. cable trays. DCR 83-53. 4120 06-13-83 Fabricated & installea caole tray supports.

DCR 83-53.

82-1711 07-25-83 Installed conduit & pulled cable & installed junction I

box. DCR 80-349.

82-6490 07-20-83 Installed 1/2 couplings &

thermowells on torus water temp. monitoring system. DCR 80-197.83-577 02-18-83 Fabricated & installec 18" recirc pipe whip restraint.

DCR 82-263.

82-8380 07-06-83 Installeo post accident sampling system conduits.

DCR 79-475.

l 82-8017 07-01-83 Paintea tubing & conduit supports on post accioent sampling system. DCR 79-475.

4 82-6866 05-23-83 Mooirlea RHR system pipe support.- DCR 82-75.

.a 82-6700 05-23-83 Mocifieo steam & exhaust pipe support. DCR 82-75.

82-6292 06-27-83 Modifiea containment purge &

inerting system pipe support. DCR 82-75.

82-7601 06-01-83 Rerouted fire detection conduit IMC-7963 &

fauricateo supports. DCR 80-348.

82-8402 06-02-83 Rerouteo conduits &

faoricated & installeo supports. UCR 80-348.

i 82-7164 06-02-83 Installed annunciator panel 2143 -P012 a

l 82-7469 07-01-83 Installed post accident sampling system conouits.

DCR 79-475.

j 1

-,-----i

l 82-8366 06-22-83 Core drilled RdCU A&B pump room floor. DCR 79-95.

82-6667 06-27-83 Modified RHR system pipe support. OCR 82-75.

82-6690 06-27-83 Modified RHR system pipe support. DCR 82-75.

82-7783 06-16-83 Relocated electrical equipment in airlock C.B.

el. 164'.

OCR 80-348.

82-7165 06-02-83 Sawed cut & scarified floor in control b1dg. el. 169'.

DCR 80-348.

82-8369 05-31-83 Installed pipe valves hangers a fittings on U1 east cauleway sprinkler system. DCR 82-133.

83-2312 06-01-83 Installed Z-clips & hold down clamps for caule trays in U1 cable spreading room.

DCR 83-53.

)

HATCH 2 SAFETY-RELATED MAINTENANCE HEQUESTS TO BE REPORTED FOR July 1983 NUMBER DATE COMPLETE DESCRIPTION 83-2214 05-16-83 Installea tray covers in U2 HPCI room.

83-2176 05-10-83 Installeo Z-clips holadowns, splice plate nuts, cable clips & kaowool.

83-1990 05-16-83 Installed Z-clips holdaowns,

splice plate nuts, cable clips & kaowool.

83-1937 05-10-83 Installed Z-clips, holddown clamps, splice & bolts &

nuts, kaowool, tray covers.

DCR 83-53.

83-1920 05-16-a3 Installeo Z-clips, holdaown clamps, splice & bolts &

nuts, kaowool, tray covers.

DCH 83-53.

83-1817 05-16-83 Installed Z-clips, nolo down clamps & banos on U2 control blog. cable trays. DCR 83-53.

83-1857 05-07-83 Insta11ea Z-clips, hold cown clamps & bands on U2 control bidg. cable trays. DCR 83-53.

83-1831 05-10-83 Installea junction box, knurlea bolts, ceraboard, kaowool, tray covers. DCR j

83-53.

i 83-3302 05-21-83 Replaced portions of damaged cable trays sections 2CAA 801, 2DEC801, & 2DED801.

83-1406 07-01-83 Fabricatea & installea containment box & support box for 16" pipe on post accident sampling system.

83-2926 06-13-83 Installed Z-clips, tray hola cowns, bolts & supports on oiesel generator bldg. cable trays.

i 83-2820 05-28-83 Installed kaowool for tray section 2RBD801.

i 83-2866 05-31-83 Installed kaowool in U2 Rx.

blag. south el. 130'.

4

__- -, -,, _ - - - -, - - -, -,,. -- -,__--.- - - -, -. - m,

,,,,mm

,._.,s~-,--

83-2844 06-01-83 Installeo tray nolo doens &

kaowool in U2 control bldg el. 112.

83-2708 06-04-83 Installed extended tray covers for sections 2BKA902, 2BCA701 & 2BDA701.

83-2733 06-04-83 Restored tray section in west cableway & turbine bldg. el. 130'. DCR 83-53.

83-2400 05-28-83 Restoreo U2 Rx. blog. caole trays. DCR 83-53.

83.-2436 06-07-83 Restored U2 east cableway &

control olog. cable trays.

DCR 83-53.

83-2318 05-11-83 Installed ceraboaro in U2 Rx. blog. caule trays.

83-2250 05-16-83 Hestored cable trays in U2 drywell per cable tray restoration.

83-2465 07-05-83 Mace wiring changes between main steam isolation valve limit switches & their respective junction boxes.

DCR 83-57.

83-2497 07-18-83 Performed grino out of indications area on manifold 4

to endcaps weld on 2831-1RC-228M-4. DCR 83-63.

83-3064 07-18-83 Performed initial service inspection on sensing lines connecteo to 2H21-P404 for ATTS instrument racks. DCR 81-139, R.l.

83-3307 07-12-83 Repaired oamaged cable &

deleted a circuit which violated cable divisional separation.

83-2944 07-18-83 Heat sink welded the endcap to manifold on 2831-1RC-22BM-4.

83-3320 07-01-83 Removed solenoid valve P33-F.20 from liquio nitrogen supply line to cetector collimator assemoly (2P33-P210). DCR 79-476.

83-2958 18-83 Grinded out welded plug from recirc riser "A". DCR 83-63.

83-3003 06-25-83 Replaced shaft on D/b equipment drain sump pump 2G11-C006B. DCR 83-83.

83-2764 07-18-d3 Replaced rx. recirc manifold enacap BM-4. DCR 83-63.

83-3400 07-01-83 Connected valves 2E41-F121 &

2E41-F122. DCR 79-476.

83-3440 07-01-83 Tightened nut on valve 2P70-F004 on drywell pneumatics system. DCR 4

81-112.

83-3579 07-14-63 Installed post accident sampling cooler on panel 2P33-P214.

a 83-3607 07-19-83 Fauricated & installea RCIC whip restraint "C".

DCR 83-103.

83-2933 06-17-83 Installed new supports &

missing nardware on U2 rx.

blag, cable trays. DCR 83-53.

83-2934 06-13-83 Restored cable trays in U2 Rx. Bldg. below elev. 130' i

torus room. DCR 83-53.

83-2619 06-03-83 Installed cable tray supports on cable trays in U2 Rx. Bldg. below elev.

130' (N.E. Diagonal).

1 83-3209 07-06-83 Acced missing tray support &

conault support in U2 cable 4

spreading room elev. 147'.

DCR 83-53.

1 83-3152 07-12-83 Installed tray supports & 4" channel horizontal &-

l vertical connector on cable tray in'U2 Rx. Bldg.. torus room below elev. 130'. DCR 83-53.

83-3207 07-12-83 Repaired notched cable tray

& added tray supports in U2

{

control bldg. DCR 83-53.

1 83-3208 07-06-83 Aaded missing tray supports

& modified existing. tray supports & repaired tray rungs per cable restoration.

DCR 83-53.

l i

, -.. _. ~. -,.

. _,....,, _.. _.... ~.. - -.

83-2728 06-13-83 Installed new tray supports for cable trays in U2, Control Bldg. elev. 112'.

DCR 83-53.

83-2730 07-12-83 Installed kaowool wrap on cable trays in U2 control Bldg. east cableway. DCR 83-53.

83-2731 06-20-83 Installed kaowool wrap on cable trays in U2 Rx. Bldg.

N.W.

elev. 130'. DCR 83-53.

83-1994 06-25-83 Installed Z-clips hold down clamps, bands'& knurled bolts on U2 control Blog.

147' elev. cable trays. DCR 83-53.

83-2204 05-06-83 Installed tray hold down, kaowool & splice plates on U2 control Bldg. elev. 164' caule trays. DCR 83-53.

83-2215 05-07-83 Installed tray hold downs &

reworked cables on U2 Rx.

Bldg. elev. 228" caule

]

trays. DCR 83-53.

83-2251 05-09-83 Restorea cable trays in U2 Rx. Bldg. below elev. 130' 4

N.E.

diagonal. DCR 83-53.

83-2292 05-28-83 Installea Z-clips, hold downs, tray covers & splice plates on U2 Rx. Bldg. elev.

185'. DCR 83-53.

83-2361 06-03-83 Insta11eo tray covers, hold downs, bolts & nuts &

ceraboard & Z-clips on U2 Rx. Bldg. elev. 203' cable trays. DCR 83-53.

83-2486 06-15-83 Retagged instrument valves on racks 2H21-P404A through 2H21-P405A. DCR 81-139.

83-2525 06-22-83 Installed annunciator windows on'2H11-P603. DCR 82-100.

83-2833 07-05-83 Installed thermister on 2T43-TE-N0298. DCR 78-358.

2 m

.m.

83-2832 07-05-83 Installed thermister on 2T43-TE-NO308. DCR 78-358.

83-2834 07-05-83 Installed thermister on 2T43-TE-NO30A. DCR 78-358.83-818 06-17-83 Removeo insulation on HPCI &

RCIC turbine exhaust check valves. DCR 81-15.

83-1241 06-27-83 Installeo pipe support 2E11-RHR-H705. DCR 82-76.

83-2835 07-05-83 Installed new thermister 2T43-TE-NO31A. DCR 78-358.83-820 06-30-83 Calibrated level switches on torus 2E51-Nu62A&B & on CST 2E51-N060 & N061. DCR 81-175.

83-2179 06-25-83 Terminated cables CJX806C10

& CJX806M01 on primary containment isolation system. DCR 80-91.

83-2253 06-25-83 Installeo GE control relay 2C61-K82 in MCR panel 2Hll-P623.

1 83-2371 06-27-83 Relocated electrical conduit support G5812A per FDR 82-76-115. DCR 82-76.

83-2392 06-22-83 Pulled cables for installation of 2E41-F049.

DCR 81-15-.

83-3310 06-29-83 Retagged conduits, cables &

conductors on 2Hll-P657 system. DCR 80-157.

83-3395 07-01-83 Replaced bypass valve for lines E & F on RCS un-diluted grab sample station 2P33-P221. DCR 79-476.

l l

82-4254 07-01-83 Fabricated & installed supports for PASR condensing unit. OCR 79-476.

82-4667 07-01-83 Provided all caulking sealants for past accident sampling room. DCR 79-476.-

83-961 06-28-83 Pulled cables for drywell pneumatics system. OCR 80-112.83-821 06-30-63 Redlined all cables for DCR 81-175. Auto transfer of RCIC pump suction from CST to torus.

83-2046 06-24-83 Disconnected cables ZAE714C01 through C03 & cut cable ZAE714C03 & removed part of conduit 2E12104. DCR 80-348.

83-2604 07-06-83 Redlined circuits on RPS vertical board. OCR 82-100.

83-3379 06-30-83 Installed splice box on 2Hll-P602 panel. DCR 82-004.

83-2637 06-22-83 Modified location of actuator on primary containment purge & inerting system isol. valve 2T48-F307. DCR 83-51.83-816 06-15-83 Reclined caules for low-low set, lowering MSIV, & 2E32 transmitter changeout for ATTS system. DCR 81-139.83-815 06-15-83 Redlined internal wiring for low-low set, lowering MSIV,

& 2E32 transmitter changeout on ATTS system. OCR 81-139.

83-2511 06-27-83 Routec & supported conduits for 2Hll-P654 panel. DCR 82-004.

83-3045 07-05-83 Installed new thermister 2T43-TE-N029A. DCR 78-358.

83-3566 07-04-83 Repaired drywell pneumatic isolation valve 2P70-F066.

OCR 81-112.

83-3439 07-01-83 Replaced switch operator on post accident sampling valves in panel 2Hll-P700A&B.83-964 06-29-83 Redlined circuits on RCIC low speed transition bypass.

DCR 80-440.

83-1374 07-06-83 Sealed instruments on Rx.

Bldg. instrument air system.

DCR 82-004.

83-1892 07-06-83 Redlined circuits nn Rx.

81dg. Instrument a?r system 2P52-N002. OCR 82-001.-

83-778 06-30-83 Installed new temp. switches

& seismic supports on safeguaro equipment cooling system. DCR 82-004.

83-1543 06-02-83 Modified hanger 2B21-MSRV-R47. DCR 82-76.

83-1577 06-04-83 Mooified hanger 2821-MSRV-R46. DCR 82-76.

l 83-1578 06-27-83 Modified hanger 2821-MSRV-R49. DCR 82-76.

83-2310 06-02-83 Modified hanger 2821-MSRV-R79. DCR 82-76.

]

83-2314 06-02-83 Modified hanger 2821-MSRV-R88. DCR 82-76.

83-2714 06-27-83 Performed hydrostatic test of sensing lines for panels 2H21-P405A thru E.

DCR 81-139.

83-2831 06-22-83 Modified pipe support i

2T48-CPUR-R49. DCR 83-51.

83-3082 06-22-83 Repaireo pipe support 2T48-CPUR-R49. DCR 83-51.81-250 06-27-83 Replaced solenoid valve 2621-F004 with environmentally qualifieo one. DCR 79-460.81-628 07-01-83 Replaced solenoid valve 2T41-F0448 with environmentally qualified one. DCR 79-460.

81-4854 06-26-83 Replaced solenoid valve 2E21-F0066 with environmentally qualifiea one. DCR 79-460.

82-2234 02-17-83 Routeo & supported 1/4" S.S.

tubing between Rx. Blog.

vent plenum & monitor 2Dil-P005. DCR 80-54.

82-2318 06-01-83 Engraved annunciator windows for drywell sump rad.

monitors. DCR 79-474.

83-2627 06-29-83 Disconnected cables for completion'of recirc endcap AM-4 weld overlay. DCR 83-63.

83-2222 07-01-83 Sealed mecnanical penetrations 1,8,10,11, & 12 in post accident sampling room. DCR 79-476.

83-2538 07-05-83 Calibrated & repaired thermister 2T43-N0318.

83-2351 06-27-83 Installed conduit support per DCR 82-76 on conduit 2E15312.

83-2791 07-01-83 Replaced pressure regulator 2P33-F300. DCR 79-476.

83-1098 06-28-83 Installed selector switch &

indicating lights for 2P70-F0018. OCR 80-112.

q 83-3043 07-01-83 Replaced temporary locksets

& ooor stops o.: post accicent sampling room doors. DCR 79-476.

83-3337 06-30-83 Repaired auto transfer level switch 2E51-LS-N0626. DCR 81-175.

83-3267 07-01-83 Repaired RCIC turbine LSTB line isolation valve. DCR 80-440.81-251 06-20-83 Replaced solenoid valve 2821-F003 with environmentally qualified valve. DCR 79-460.81-602 06-25-83 Replaced solenoid valve 2L21-F0037A with environmentally qualified valve. DCR 79-460.81-603 06-25-83 Replaced solenoid valve

~2L21-F00378 with environmentally qualified valve. DCR 79-460.

4 81-608 05-19-83 Replaced solenoid valve 2E41-F054 with environmentally qualified valve. DCR 79-460.81-621 05-03-83 Replaced solenoid valve 2T41-F0llA with environmentally qualified valve. DCR 79-460.

l'81-623 05-25-83 Replaced solenoid valve l

2T41-F003A with l

environmentally qualified valve. DCR 79-460.81-629 05-03-83 Replaced solenoid valve 2T41-F044A with environmentally qualified 1

valve. DCR 79-460.81-646 06-28-83 Replaced solenoid valve 2T46-F0036 with environmentally qualified valve. DCR 79-460.81-632 06-23-83 Replaced solenoid valve 2T46-F0028 with environmentally. qualified valve. DCR 79-460.

81-4878 06-26-83 Replaced solenoid valve 2 Ell-F0508 with environmentally qualifiec valve. DCR 79-460.

81-4879 06-25-83 Replaced solenoid valve 2E21-F006A with environmentally qualified valve. OCR 79-460.

83-1653 06-22-83 Replaced flow switches for automatic isolation of service water. DCR 78-68.

83-2123 06-30-83 Fabricated & installed 2" S.S. pipe, fitting & valve on drywell pneumatics system. DCR 81-112.

83-2762 06-27-83 Disconnected cables TPE806CO2 & TPE809CO2 at box for valve 2T48-F212. DCR 82-76.

83-2382 06-04-83 Disconnected & retagged cables for drywell cooling system. DCR 80-157.

83-1809 06-29-83 Modified MCR panel 2H11-P700 per DCR 81-112 for crywell pneumatic system.

83-1457 06-25-83 Routed & supported conduits for orywell pneumatics system. DCR 81-112.

83-1468 06-23-83 Replacea limit switenes on t

standby gas filter butterfly A0 valve. DCR 80-204.

l t

A 83-1547 06-02-83 Modifieo hanger 4

2821-MSRV-R64. DCR 82-76.

83-1019 06-27-63 Modified hanger 2E51-RCIC-HR2. DCH 82-76.

83-1026 06-27-83 Installed hanger 2E41-HPCI-Al2 on HPCI system. DCR 82-76.

83-1086 06-02-83 Modified hanger 2T49-RS-R37 on post LOCA Hyorogen recombiner. DCR 82-76.

83-1122 06-02-83 Replaced hanger 2T49-RS-H39 on post LCCA hydrogen recombiner. DCR 82-76.

83-1129 06-27-83 Modified pipe support 2 Ell-RHR-R226. DCR 82-76.

81-4877 06-28-63 Replaced solenoid valve 2 Ell-F050A & limit switches witn environmentally qualified ones. DLR 79-460.

83-83 07-01-83 Core orillea electrical penetration for conduit on east wall of post accident sampling room. DCR 79-476.

82-1478 06-09-83 Core orill all electrical conduit penetrations for post accicent sampling room.

DCR 79-476.

82-1320 07-01-83 Placed equipment in room, installed steel & construct roof. Provide all-grouting &

sealants. DCR 79-476.

82-2764 05-25-83 Run & install piping for the 2P70-F100 system. DCR 79-476.

83-1843 05-04-83 Installed stanoby lube oil system for 2k43-S001A. DCR-82-259.

83-3403 06-27-83 Reviseo the internal wiring on panel 2Hll-P700 on the 2P70 system. OCR 81-112.

83-2897 06-24-63 Painted newly install cebris-screens on 2T48-D324. DCR 83-51.

83-2304 06-06-83 Paint piping, valves, fitting supports install per DCR 87-206 on the 2C11-F035A system.

83-2519 06-10-83 Complete internal wiring on 2Hll-P657. DCR 80-157.

83-1741 06-28-83 Install cables listed for 2Hil-P700. DCR 81-112.

83-1794 06-25-83 Paint all carbon steel pipe, fitting, valves on 2P70. DCR 81-112.

83-1509 06-24-83 Terminate cables for DCR 80-157 on the 2Hil-P605A&B system.

83-2865 07-12-83 Replaced states block on 2821-2534.

83-1952 06-22-83 Calibrate dP switches for 2P41-394A,B.

83-1743 07-08-83 Performed HNP-2-6130 o f 2Cll-C001A,8.

82-2573 06-28-83 Installed conduit on 2P70-N014. DCR 81-112.

82-4944 06-13-83 Performed HNP-2-C001 (PM) on 2E21-C001A.83-929 06-02-83 Replace old motors w/ones that are qualified DCR 81-117 on 2 Ell-F027A, 2E11-F0758, 2E11-F007A&B, d

2E11-F003A.83-932 06-30-83 Reseal torus temp. elements (2T48). DCR 80-198.

83-1479 06-30-83 Lubricate ASCO solenoid valves installeo by DCR 79-469.

~

Georgis Powtr Comp 1ny Post Office Box 439 Baxlay, Georgia 31513 a

Telephone 912 367-7781 912 537-9444 I

Edwin :. Hatch Nuclear Plant August 10, 1983 GM-83-789 l!

PLANT E.

I.' HATCH NRC Monthly Dperating Report Director Office of Inspection.and Enforcement United States Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket #50-321,_and for Hatch Unit 2, Docket #50-366.

I

.dL

~

H.

C.

Nix-a General Manager HLS/hh j

.}

4 1

di 1(f

_..