Annual Summary of Changes,Tests & Experiments Performed at Aerotest Radiography & Research Reactor, for Period Ending June 1983
ML20077F846
Person / Time
Site: Aerotest
Issue date: 07/25/1983
From: Lamb I, Newacheck R
AEROTEST OPERATIONS, INC.
To:
Shared Package
ML20077F834 List:
References
NUDOCS 8308030084
Download: ML20077F846 (4)


Text

,

I puq, e AEROTEST OPER ATIONS, INC.

Al\ 3455 FOSTORIA WAY

ANNUAL

SUMMARY

OF CHANGES, TESTS AND EXPERIMENTS PERFORMED AT THE AER0 TEST RADIOGRAPHY AND RESEARCH REACTOR (ARRR)

DOCKET NO. 50-228 FOR PERIOD ENDING 30 JUNE 1983 h

I. E. Lamb APPROVED BY: c'4v2f/ /

R.f.Newacheck, President AER0 TEST OPERATIONS, INC.

8308030084 830725 PDR ADOCK 05000228 R PDR A SUBSIDI ARY OF L

SECTION I.

PART I - Changes A. The top of the concrete shield has been covered with approximately 12 inches thick fir blocks. The purpose of this additional material is to further reduce the personnel exposure in the overall facility.

B. The original uninterruptible power supply was replaced by the manufacturer with a unit rated at 50% greater power. No failures of this unit have been experienced in the short time it has been in service.

C. The Channel No. 1 vacuum tube log ratemeter was replaced with an equivalent solid state system.

D. The Channel No. 1 detector was changed from a BF3 gas filled proportional counter to an equivalent boron-lined propor-tional counter. The new detector is expected to have a longer life . .

PART II - Experiments No new experiments were performed during the year. The experiments performed during the year as follows:

Experiment Number 114 Perform neutron radiography in the neutron radiography facilities.

l 116 Irradiation of hydrocarbon activation. analysis samples for the Chevron Research Company.

l 120 Irradiation of plastic slides impregnated with l microscopic quantities of fissionable materials for the McClellan Air Force Base and General Electric Company.

L 123 Calibration of fission detectors in the TIA position of the thermal column for the General Electric l Company.

l l

- _ . _ . , . ._._,___-,_y , . _ , _,m.__m,_. _ ,- ,_ . .-m . , , , , - - . - - -, , ,

SECTION II ARRR MONTHLY OPERATIONS

SUMMARY

Operating Kilowatt Accumulated Experiments & Unscheduled Date Hours Hours kw Hours Irradiations Shutdowns July 1982 100.2 23425 3243890 7 1 Aug. 1982 99.9 20541 3264431 7 4 Sept.1982 96.4 22485 3286916 8 1 Oct.1982 128.2 30872 3317788 8 3 Nov.1982 105.5 24302 3342090 6 1 Dec.1982 116.3 27942 3370032 6 0 Jan.1983 108.7 26757 3396789 9 1 Ftb.1983 121.4 28681 3425470 9 2 Mar.1983 142.7 33923 3459393 7 4 Apr.1983 126.7 27385 3486778 11 3 May 1983 98.3 20860 3507638 9 0 June 1983 83.4 21999 3529637 9 0 TOTAL 1,327.7 309172 96 20 t

ARRR UNSCHEDULED POWER REDUCTIONS 7/1/82 - 6/30/83 TYPE OF SCRAM CHENNEL AFFECTED Oper. Barth H0

  1. Date Auto Man. Spur. Error Cal 1 2 3 4 Quake 2 Comments Switching 1 7-8-82 X X X verne 2 8-27-8. ! X p nt E 3 8-30-8:! X X X Fast 4 8-30-8:! X X X Fast 5 8-30-8:: X X X Fast 6 9-20-8'/ X p.G.& E.

7 10-11-f;2 X X 8 10-11-f 2X X 9 10-12-f 2X '.G.& E.

10 11-29-E 2X ).G.& E.

11 1-31-8 X X 12 2-7-83 X X 13 2-28-83 X X 14 3-8-83 X X liigh 15 3-8-83 X X X lligh 16 3-9-83 X X X 1[igh 17 3-29-83 X X X Fast 18 4-18-83 X X Rod Magnet Iemp.

19 4-18-83 X X Rod Macnet temp.

20 4-18-83 X X Rod Mnener Temp.

P.G.& E. = 4 Un.4 : 4 Ch. 4 = 4 Magnet Temp.= 3 Unknown = 5

_ _