ANNUAL
SUMMARY
OF-CHANCES, TESTS'AND EXPERIMENTS-PERFORMED'AT'THE-AER0 TEST RADIOGRAPHY AND RESEARCH' REACTOR i
(ARRR) 1 i
[
DOCKET N0'.
50-228 FOR PERIOD ENDING JUNE 30, 1988 i
l l
1 BY e
I.
E.
LAMB REACTOR SUPERVISOR APPROVED BY :,9
'f f.,r A i
'V+R.TL'./NEWWCHECK N'
PRBSIDENT AER0 TEST OPEFATIONS, INC.
i
.l
(
~
cS?
S i
GGOS2h K
[,
p eos 8
N SECTION I PART I - CHANCES A.
During the year, no fuel additions were required.
B.
The secondary portion of the heat exchanger was cleaned during the reporting period.
This service was1 performed during of f hours with no resultant loss of normal operation.
C.
The biennial inspection of fuel elements was performed during the reporting period with no-anomalies poted other than one element was bowed a normal occurrence.
After removal and reloauing of all elements, new control rod calibrations were performed using a new rod drop technique obtained from General Atomics With this technique, a gain of approximately S0.10 was noted in the loss to power measurement.
PART II - EXPERIMENTS No new experimeits were performed during-the year.
The experiments performed in this reporting period were as follows:
EXPERIMENT NUMBER 114 Neutron radiography perfo med in the radiography facilities.
116 Irradiation of hydrocarbon activation analysis samples.
120 Irradiation of plastic slides impregnated with microscopic quantities of fissionable materials for the McClellan Air Force Base and General Electric Company.
EECTION II ARRR MONTHLY OPEhATIONS
SUMMARY
OPERATING KILOWATT ACCUMULATED EXPERIMENTS &
UNSCHEDULED DATE HOURS LOURS kw Il00RS IRRADIATIONS S il D T D O W N S 7-87 170 42516 5363807 7
I 8-87 163 40827 5404634 7
0 9-87 173 43246 5447880 2
0 10-87 204 51089 5498969 6
0 11-87 159 39776 5538745 6
1 12-87 155 38660 5577405 3
0 1-88 165 41175 5618580 2
2 2 88 201 30185 5668765 3
0 3-88 235 58857 5727622 4
0 4-88 187 46671 5774293 6
1 5-88 186 46467 5820760 8
0 6-88 201 50295 5871055 5
2 Totals 2199 549864 5871055 59 7
i
ARRR UNSCHEDULED POWER REDUCTIONS TYPE OF SCRAM CHANNEL AFFECTED Oper.
Barth H0 Date Auto Han.
Spur.
Error Cal 1_
2 3
4 Ouake 2
Comments 1
/-14-87 X
X X
X X
Power Failure 2
11_-20-87 X
X X
X X
High Temo 3
1-20-88 X
X X
X X
High Temo 4
1-27-88 X
X X
X X
High Temo Ch.f2 Hioh 5
4-27-8B X
X X
voltace 007 6
6-23-8B X
X X
X X
Power Failure Spurioue 7
6-27-8s X
X vnoe porinA m.
- mam 4.-
W w
i
(
j i
,e I
e i
T+
AEROTEST OPERATIONS, INC.
3455 FOSTORIA WAY. SAN RAMON, CAUFORNIA S*,583. (415) 8661212 Wi 28 July, 1988 U.S.
Nuclear Regulatory Commission, Region V Division of Radiation Safety and Safeguards 1450 Maria Lane, Suite 210 Walnut Creek, ca. 94596 Attention: Mr. Ross Scarano, Director
Subject:
Annual Summary of Changes, Tests and Experiments at Aerotest Radiography and Research Reactor (ARRR),
Docket No. 50-228, for period ending 6/30/88
Dear Mr. Scarano:
T' <
enclosed report summat;ior the ARRR operations from July 1,
1987 through June 30, 1988.
This submittal complies with the requirements set forth in 10 CFR, part 50.59, "Authorization of Changes, Tests and Experiments."
Summary forms of monthly opera-tions and unscheduled power reductions are included.
As shown in the summary table of unscheduled shutdowns, all of the events were occasioned by high water temperatu e (pool),
electric power failure and one occurrence of a spurious fast period.
We elected to again service the heat exchanger and cooling tower. Since this service, we have experienced no further scrams from water temperature.
1 The new uninterruptible power supply (UPS) installed last reporting period has functioned well during momentary power outages.
No unusual problems have been noted during the year and the reactor has been operating in a safe and reliable manner.
l l
Very truly yours, AER0 TEST OPER'TIONS INC.
b Irvin E.
Lamb Reactor Supervisor Enclosure j