Regulatory Licensing Status Summary Report.Data as of June 30,1983.(Blue Book)
ML20077B585
Person / Time
Issue date: 07/31/1983
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0580, NUREG-0580-V12-N06, NUREG-580, NUREG-580-V12-N6, NUDOCS 8307250332
Download: ML20077B585 (65)


Text

-_ ----- _

iis sj NUREG-0580 i

4 Vol.12, No. 6 h_

REGULATORY LICENSING STATUS

SUMMARY

REPORT l

t NUCLEAR POWER PLANTS DATA FOR-DECISIONS LBLUE BOOK?

JUNE 1 - JUNE 30,1983 UNITED STATES NUCLEAR REGULATORY COMMISSION-pga a%,,

+

4

AVAILABLE FROM NRC/GPO SALES PROGRAM SUPERINTENDENT OF DOCUMENTS GOVERNMENT PRINTING OFFICE WASHINGTON, D. C. 20402 A YEARS SUBSCRIPTION CONSISTS OF 12 ISSUES FOR THIS PUBLICATION MICROFICHE OF SINGLE COPIES ARE AVAILABLE FROM NRC/GPO SALES PROGRAM WASHINGTON,.D. C. 20555 r

I

-1.

b

NUREG-0580 Vol.12, No.6 REGULATORY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)

JUNE 1 - JUNE 30,1983 Manuscript Compieted: July 1983 Date Published: July 1983 Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGl'LATORY COMMISSION WASHINGTON, D.C. 20555 l

l f ~%,,

l s

f s

W-e w

L i.v s5

- t

' /

L

, j k

/

i 4

F0REW0RD

~

t 2 /

THIS MANAGEMENT REPORT, REGULAT0dY LICENSING STATUS

SUMMARY

REPORT, IC~ DESIGNED TO PROVIDE THE NECESSARY INFORMATI0H FOR CONTROLLING THE PROGRESS OF REVILW PROCESSES F0F CENTRAL STATION NUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FRDM THE 9FFICE OF NUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION 4 ENFORCEMENT; AND THE NATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.

SECTION I 0F THIS EDITION CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS THE NEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.

SECTIDH II REPRESENTS THE MAIN BODY'0F THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NON-POWER REACTOR

SUMMARY

EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.

._4 i

L-I C E N S I N G 0F NUCLEAR REACT 0RS THE U.S. HUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER TO OPERATE IT.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF.0BTAINING A CONSTRUCTION. PERMIT AND OPERATING LICENSE.

THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGH, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATI0H ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.

THE NRC MAKES COPIES OF THE APPLICATI0H AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM. TECHNICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMENTS ARE ALSD MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

i THE STAFF'S ANALYSIS IS SUBMITTED TO THE MRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE' APPLICANT, THE LICENSING-STAFF.AND OTHERS. THE ACRS FINDINGS ARE REPORTED TO THE HRC AND MADE PUBLIC.

A PUBLIC HEARING IS HELD, USUALLY MEAR THE PROPOSED SITE, BY AN MRC APPOINTED ATOMIC SAFETY 8 LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTIDH PERMIT.

THE BOARD'S DECISI0H IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORY COMMISSIGH.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE HRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.

AS CONSTRUCTION PROGRESSES, ADDITI0HAL INFORMATION IS DEVELOPED AND Ti!E UTILITY APPLIES TO THE MRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR HOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTIDH PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTI0H IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE.

COMMISSION.

n h

~

TABLE DF C0NTENT$

PRINTED IN THE ORDER LISTED 5ECTION I

SUMMARY

OF ACCOMPLISHMENTS OL

SUMMARY

OF ACCOMPLISHMENTS CP

SUMMARY

OF ACCOMPLISHMENTS COMBINED HUMERICAL

SUMMARY

OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE HEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE HEXT FIVE YEARS HEW APPLICATI0H FORECAST:

OPERATING LICENSE REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIM THE PUBLICATION SECTIOM II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS HON-POWER REACTORS l

5ECTION III l

EXAMPLE REVIEW l

l l

Z O

ke

>=

U kJ m

OL

SUMMARY

0F ACC0MPLI5HMENTS AS OF JUNE 30, 1983 JQHE FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL SER ' S SER ' S H0HE CATAWBA 1 &2 02/06/83 02/09/83C SEABROOK 1 8 2 01/12/83 03/07/83C SSER ' S SSER ' S CALLAWAY 1 06/28/83 06/28/83C BYROM 182 12/10/82 01/31/83C SEABROOK 1 82 06/30/83C CALLAWAY 1 06/00/83 96/28/83C WATERFORD 3 06/30/83C CATAWBA 182 05/02/83 05/02/83C WOLF CREEK 1 06/17/83C CLINTON 1 82 05/20/83 05/27/83C COMANCHE PEAK 182 03/11/83C EHRICO FERMI 2 02/04/83C GRAND GULF 1 82 05/31/83C MCGUIRE 2 02/14/83 02/28/83C MIDLAND 1 82 10/06/82 10/06/82C PALO VERDE 1,2,3 03/15/83 03/15/83C PERRY 1 42 12/29/82 01/19/83C PERRY 1 82 04/22/83 04/25/83C SEABROOK 1 8 2 03/07/83 06/30/83C SH0XEHAM 01/15/83 02/04/83C ST LUCIE 2 04/06/83 04/06/83C SUMMER 1 11/12/82 11/12/82C l

SUSQUEHANNA 1 03/01/83 j

SUSQUEHANNA 2 03/01/83 11/12/82C l

SUSQUEHANNA 2 03/31/83 03/29/83C WASHINGTON NUCLEAR 2 12/21/82 12/21/82C WASHINGTON NUCLEAR 2 05/20/83 05/20/83C 10/29/82C WATERFORD 3 10/22/82 WATERFORD 3 02/28/83 06/30/83C WOLF CREEK 1 05/27/83 36/17/83C DES ' S PES

' S LIMERICK 1 82 06/24/83 06/24/83C HARRIS 1 82 04/00/83 04/00/83C LIMERICK 1 &2 06/24/83 06/24/83C FES ' S FES 'S i

HONE CATAWBA 1 82 01/07/83 01/07/83C SEABROOK 1 4 2 12/08/82 12/08/82C l

~

l 11 1l' ll

,Il l1 1

l CCCC 3322 L

8888 nr A

////

U 7022 T

2111 C

////

A 5611 0011 D

E E

332 3 T

L 888 8 A

U

/ // /

D D

202 0

E 011 0

O H

/// /

T C

561 5

S 001 0

R A

E Y

S L

A T

C S

H I

F E

M D

M Y

T E

II I

1 L

U S

I A3 C

S 2 N I

A 2

ND F

S E1AR L

EI HO I

RCREF P 3 IUEUR 8

ULMQE M

9 G MST 1

S CTUUA 0

MSSSW C

0 3

L C

E 0

A N U

J F F O

0 S

A C

Y 3

L 8

R A

/

U 0

A T

1 C

/

M A

6 0

M U

S D

E 3

L 8

U

/

L D

0 E

1 0

H

/

C 6

S 0

E N

U J

M D

Y T

E I

L U

I C

S 2

A F

S E

I I

C R

U E

L W

O S

T P

S L

L L

U F

0 M

11 l'

l

C CC 3

32 L

8 88 A

/

//

U 1

20 T

1 03 C

/

//

A 3

52 0

01 D

E E

3 32 3

T L

8 88 8

A U

/

//

/

D D

1 20 0

E 1

03 3

O H

/

//

/

T C

3 51 6

S 0

01 0

R A

E Y

S L

A T

C S

N I

F 2

2 E

8 8

1 1

D M

Y T

D D

E H

I R

R L

R RO O

U I

E EF F

C V

VN N

S I

A I

IA A

F R

RH N

S L

/

/

H S

HT T

I P 3 C

CI I

8 S

N NG S

E S

G E

M 9 I

IA M

A M

1 L

R LK O

K S

O 0

C CS N

S N

R E

S S

C 0

3 E

S E

E P

C E

S S

D F

C A N U

J F F O

0 S

A Y

L R

A U

A T

C M

A M

U S

D E

3 L

8 U

/

P D

0 E

3 C

H

/

C 6

S 0

E N

U J

2 8

1 D

Y T

D E

I R

L O

U I

F C

N S

A A

F H

S

/

S T

I I

S E

E S

E S

G E

M M

H A

M O

R O

0 K

S O

N H

H S

N R

E S

S E

S E

E P

S S

D F

C I

l l

i d

1 l

l L

A U

T2 1

3 2 2

0 2

0 4

0 C

2 A

D E

L EU TD2 1

1 2

2 0 2

1 4 0 AE 2

DH C

OS T

R A

E Y

S M

L D D T

A C

E E H

S

)

)

I E

F

)

)

L P

)

)

)

)

U U M

L P

0 C L P L P S S H

0 C

(

C 0 C 0 C S S

(

(

S S

(

(

(

(

I I

I S S S S S S 3

L 8 R R S S 9

P 1

R R E E S S S S E E S S E E E E L

P M

0 0 3 S S S S D D F F 0 C C E N C U J

A F

O F S L

A A

0 U

T0 0

4 0

1 0

0 0

1 0

C A

Y R

A M

M y

U f

l S

U D0 0

1 0

1 0

0 1

1 0

E H

C S

uD D E E E

)

)

N U

)

)

L P

)

)

)

)

U U J

L P 0 C L

P L

P S S 0 C

(

C O C 0 C S S

(

(

S S C

(

(

(

I I

R S S S S E

S S W

S S O

R R P

R R E E S S S S L

E E S S E E E E L

P L

U S S S S D D F F 0 C F

N 1fl i

. ~ _ _

LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIDMS REPORT AS OF 06/30/83 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTIDH COMPLETION IN CY 1983-1984)

(LISTED IN ORDER OF. FACILITY NAME) i SER SSER EST.

STAFF TECH STAFF TECH ASLB COMMM APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

CONST.

PLANT (MONTHS) 211 TO DL lig Big EE1 TO DL 111R OF HRG DECISION RAIE COMPL.

BYROM 1 0

11/8tc 01/82C 02/82C 03/82C 04/82C 08/82C 01/83C 03/83C 11/83 11/83 12/83 CALLAWAY 1 0

09/8tC 09/81C 10/81C 11/81C 01/82C 01/82C 06/83C 11/8tC 10/83 03/84 04/84 8

CATAWBA 1 0

08/82C 01/83C 02/83C 03/83C 01/83C 04/83C 05/83C 10/83 05/84 05/84 05/84 COMANCHE PEAK 1 2

05/81C 07/81C 07/81C 11/81C 09/81C 10/83 11/83-12/81C 11/83 11/83 09/83 COMANCHE PEAK 2 0

05/81C 07/81C 07/81C 11/8 tC 09/81C 10/83 11/84 12/81C 11/83 11/84 12/84 DIABLO CANYOH 1 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C 07/83 12/76C 07/81C 08/83 DIABLO CANYON 2 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C N/S 12/76C 07/81C ENRICO FERMI 2 5

04/81C 05/77C 09/77C 08/81C 09/81C 01/83C 02/83C 03/820 10/82C 11/83 12/83' GRAND GULF t 13 05/81C 08/81C 09/81C 10/81C 10/81C 03/83C 05/83C N/A N/A 07/83 06/82C

{

LASALLE 2 0

03/78C 02/81C 03/8tC 04/81C 11/78C 07/83 07/83 N/A N/A 09/83 10/83 I

MIDLAND 2 0

P2/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82C 09/84 09/84 10/84 i

PALO VERDE 1 0

10/81C 10/81C 11/81C 12/81C 03/82C 07/83 08/83 04/82C 12/82C 07/83 08/83 PALO VERDE 2 0

10/81C 10/81C 11/81C 12/81C 03/82C 07/83 10/83 04/82C 12/82C 07/84 08/84 PERRY 1 0

02/82C 05/82C 05/82C 07/82C 08/82C N/S N/S 05/83C 03/84 11/84 12/84 SAN ONOFRE 3 3

01/81C 01/81C 02/81C 02/81C 04/81C 04/83 06/82C 06/81C 05/82C 11/82C-SEABROOK 1 0

05/82C 12/82C 03/83C 04/83C 12/82C N/S 06/83C 08/83 06/84 08/84 09/84 SHOREHAM 2

03/77C 03/81C 04/81C 10/81C 10/77C N/S 08/83 '

05/82C 07/83 08/83 ST LUCIE 2 3

10/81C 09/81C 10/81C 11/81C 09/82C 03/83C 04/83C N/A N/A 06/83C 03/83C SUSQUEHANNA 2 0

03/81C 03/81C 04/81C 08/81C 07/81C 02/83C 11/83 10/81C 04/82C 12/83 01/84 WASHINGTON NUCLEAR 2 0

07/81C 05/82C 03/82C 10/82C

.12/81C 11/82C 05/83C N/A N/A 08/83 09/83 WATERFORD 3 1

05/81C 05/81C 07/81C 08/81C 09/81C 05/83C 06/83C 03/82C 04/83C 05/83 WATTS BAR 1 0

06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 11/83 N/A N/A 12/83 01/84

' WATTS BAR 2 0

06/78C 06/82C 07/82C 08/82C 12/73C 09/82C 06/84 N/A N/A 12/84 01/85 i

WOLF CREEK 1 0

01/82C 03/82C 04/82C 05/82C 06/82C 08/82C 08/83 09/83 03/84 07/84 08/84 ZIMMER 1 0

10/76C 12/77C Of/79C 03/79C 06/77C 08/82C 08/82C 02/82C N/S 11/84 12/84 0 LICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDHESS REVIEW.

i l

l

1984 LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY ISSUE APPL. CONST.

PLANT ligE COMPLETE BEAVER VALLEY 2 02/85 12/85

  • {

BELLEF0HTE 1 12/84 05/85 BELLEFONTE 2 H/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 H/S 04/86 BYROH 2 02/84 05/85 CATAWBA 2 N/S 10/86 CLINTON 1 05/83C 01/86 N/S CLINTON 2 FERMI 2 (FSAR RESUB)

GRAND GULF 2 H/S H/S HARRIS 1 04/84 06/85 HARRIS 2 H/S 06/89 l

HOPE CREEK 1 01/86 l

LIMERICK 1 10/83 08/84 LIMERICK 2 H/S 04/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 H/S 12/87 l

MIDLAND 1 10/82C 02/85 MILLSTONE 3 11/84 11/85 i

HINE MILE POINT 2 01/84 02/86 I

PALD VERDE 3 09/85 11/85 PERRY 2 N/S 05/87 RIVER BEND 1 05/84 04/85 N/S RIVER BEND 2 SEABROOK 2 N/S 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 H/S 12/88 WASHINGTON NUCLEAR 1 N/S H/S WASHINGTON HUCLEAR 3 12/84 12/85 f

. ~

LICENSING SCHEDULES FOR ALL.PENDING CP APPLICATIONS REPORT AS OF '06/30/83'

.(LISTED IN ORDER OF FACILITY HAME)

SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

PLANT D.El TO DL if3 '

11LQ EEi-TO DL 11ER OF HRG DECISION DALE CLINCH RIVER 02/76C 02/83C 03/83C 04/83C 02/77C 09/83C 05/83C 08/82C' 04/84 06/84 SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 02/83C 06/83 11/82C 12/82C N/S N/S N/S 4

i i

I f

HEW APPLICATIOH F 0 R E C A 5 T --- O P E R A T I N G LICEHSE REVIEWS (AHTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)

AS OF WEEK ENDING 06/30/83

__ -=_ ___

._= --==__

--=

DOCKET PROJECT SUBMITS SUBMITS CONST.

FACILITY HUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL

= -- ------- -==-_

-- =----._=

-__==-------------..-..--- __

---.=___.

FY83 MILLSTONE 3 050-00423-HORTHEAST NUCLEAR ENERGY E.DOOLITTLE 10/29/82C 10/29/82C 11/01/85 M.ROTHSCHILD MARBLE HILL 1 82 054680547 PUBLIC SERVICE OF INDIAHA P.0 CONNOR 11/23/82C 11/23/82C 06/00/86 E.CHEN BEAVER VALLEY 2 059-00412 DUQUESHE LIGHT L.LAZO 01/26/83C 01/26/83C 12/31/85 J.GUTEIRREZ HINE MILE POINT 2 050-00410 NIAGARA MOHAWK POWER M.HAUGHEY 01/31/83C 01/31/83C 02/00/86 B.MORDEHICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 8 GAS D. WAGNER 03/02/83C 03/02/83C 01/14/86 R. GODDARD V0GTLE 1 82 0424-0425 GEORGIA POWER M. MILLER 07/00/83 09/00/83 09/00/86 B.BORDF. HICK


....---__ _______ ---__=__---......-----.....- -__

l l

l NEW APPLICATION F0RECA5T-5PECIAL REVIEW AS OF WEEK ENDING 06/30/83 l

5TANDARDIZATION REVIEWS PROJ PROJECT TENDER PROJECT NO APPLICANT MANAGER DATE (HSS)WAPWR 668 WESTINGHOUSE G.MEYER 07/08/83 I

I 4

1 i

COMMOH ABBREVIAT IOHS USED WITHIH THE PUBLICATIOH i

ACRS: ADVISORY COMMITTEE OH REACTOR SAFEGUARDS L.A.:

LICENSING ASSISTANT AE ARCHITECT / ENGINEER LESR LIMITED EARLY SITE REVIEW (ALSD ABBREVIATED LES)

AEB:

ACCIDENT EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH ASB:

AUXILIARY SYSTEMS BRANCH LMFBR LIQUID METAL FAST BREEDER REACTOR ASLB: ATOMIC SAFETY LICENSING BOARD LQB LICENSEE QUALIFICATIONS BRANCH B8R BURNS 8 ROE MEB:

MECHANICAL ENGINEERING BRANCH B4V:

BLACK 4 VEACH MPA:

MANAGEMENT AND PROGRAM ANALYSIS B8W:

BABCOCK & WILCOX MTEB: MATERIALS ENGINEERING BRANCH l

BECH: BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BROWH 8 ROOT MWT MEGAWATTS THERMAL BWR:

BOILING WATER REACTOR HSSS: HUCLEAR STEAM SYSTEMS SUPPLIER CEB:

CHEMICAL ENGINEERING BRANCH OL:

OPERATING' LICENSE COMB: COMBUSTION ENGINEERING OLB OPERATOR LICEHSING BRANCH CP CONSTRUCTION PERMIT OPS:

OFFSHORE POWER SYSTEMS CPB CORE PERFORMANCE BRANCH l

CSB CONTAIHMENT SYSTEMS BRANCH j

CWE:

COMMONWEALTH EDISON PDA:

PRELIMINARY DESIGH APPROVAL PG8E: PACIFIC GAS 8 ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID PARTIAL IHITIAL DECISI0H PM:

PROJECT MANAGER FS POWER SYSTEMS BRANCH EEB EHVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRB: PROCEDURES AND TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDHESS LICENSING BRANCH PWR:

PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB:

EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB:

QUALITY ASSURANCE BRANCH ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAL:

RADIOLOGICAL ASSESSMENT BRANCH l

F.R.'

FEDERAL REGISTAR RSB:

REACTOR SYSTEMS BRANCH FDA:

FINAL DESIGN APPROVAL i

l FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT S8L:

SARGENT 8 LUNDY S8W STONE 8 WEBSTER SAB:

SITING ANALYSIS BRANCH G8H:

GIBBS 8 HILL SAR:

SAFETY ANALYSIS REPORT l

GHDRs GIBBS 8 HILL SDA:

STANDARD DESIGH APPROVAL I

GIL:

GILBERT COMM0HWEALTH SEB:

STRUCTURAL ENGINEERING BRANCH GSB:

GEOSCIENCES BRANCH SER:

SAFETY EVALUATION REPORT SIB:

SYSTEMS INTERACTION BRANCH i

SP:

SPECIAL PROJECT HGB:

HYDROLOGIC AND GE0 TECHNICAL BRANCH SSC:

SOUTHERN SERVICES COMPANY HTGR: HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA:

TENNESSEE VALLEY AUTHORITY ICB:

INSTRUMENTATION AND CONTROL BRANCH UEC:

UNITED ENG. 8 CONSTRUCTORS UFB:

UTILITY FINANCE BRANCH WEST WESTINGHOUSE c

M Z

O M

O uJ i

N

l PR0 JECT IHDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTIDH PERMIT REVIEWS STANDARD DESIGH REVIEWS OTHER REVIEWS 2-1 BEAVER VALLEY 2 2-37 CLINCH RIVER 2-39 (HSS)CESSAR SYSTEM 80 2-2 BELLEFONTE 1 82 2-38 SKAGIT/HANFORD 182 2-40 (HSS)GESSAR SEVERE ACC 2-3 BRAIDWOOD 1 82 2-41 (HSS)GESSAR-238 NI l

2-4 BYRON 1 82 i

2-5 CALLAWAY 1 l

2-6 CATAWBA 1 &2 l

2-7 CLINTON 1 82 2-8 COMANCHE PEAK 182 2-9 DIABLO-CANYOH 182 2-10 ENRICO FERMI 2 2-11 FERMI 2 (FSAR RESUB) 2-12 GRAND GULF 1 82 2-13 HARRIS 1 82 2-14 HOPE CREEK 1 2-15 LASALLE 2 2-16 LIMERICK 1 82 2-17 MARBLE HILL 1 42 2-18 MIDLAND 1 82 2-19 MILLSTONE 3 2-20 HINE MILE POINT 2 2-21 PALO VERDE 1,2,3 2-22 PERRY 1 &2 2 '. 3 RIVER BEND 1 3 2 2-24 SAN ONOFRE 3 2-25 SEABROOK 1 82 2-26 SHOREHAM 2-27 SOUTH TEXAS 1 8 2 2-28 ST LUCIE 2 2-29 SUSQUEHANNA 2 2-30 WASHINGTON HUCLEAR 1 2-31 WASHINGTON HUCLEAR 2 2-32 WASHINGTON NUCLEAR 3 2-33 WATERFORD 3 2-34 WATTS BAR 1 42 2-35 WOLF CREEK 1 2-36 ZIMMER 1 I

i

~

'NRR L I C E H S I.H G SY$ TEM PAGE NO: 2-l'

. BEAVER VALLEY 2 0.L CURRENT STATUS REP 0RT REPORT,AS OF 06/30/83 PL ANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET HO:

65000412 LIC. PM:

L. LAZO ASLB CHAIR: N/A

-APPLICANT 3 DUQUESHE LIGHT LIC. BC:

G. KNIGHTON MEMBER 1 LOCATION:

5 MI E OF E. LIVERPOOL, OH LIC. LA.:

E. HYLTON MEMBER 2 REGION:

1

. AE:

S8W COUNSEL:

J. GUTEIRREZ CONST. INSP S. FOLSON REAC. TYPE: PWR

-NSSS: WEST ANTITRUST J. RUTBERG RESID. INSP:

DESIGN PWR 2774 MWT/0852 MWE CONST: S8W RM ANALYST:

5. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-26-83.

The SAR was docketed on 05/18/83.

ER DOCKETED:

05/18/83 05/1E/93C

.ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

05/31/84 ISSUE DES:

07/31/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/31/84 CURRENT ENV. STATUS:

The ER was tendered on 01-26-83.

The-ER was docketed on 05/18/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

01/26/83 01/26/83C SAR DOCKETED:

05/18/83

.05/18/83C-SAR Q'S RECEIVED BY PM:

07/31/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/31/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/31/84 Opportunity for Hearing will be published in the Federal ISSUE DRAFT SER:

02/28/84 Register.

INPUTJTl0 SER:

08/31/84 ISSUE SER:

10/31/84 ACRS FULL COMMITTEE MEETING:

12/31/84 INPUTS TO SE SUPPLEMENT 1:

ISSUE SE SUPPLEMENT-1:

02/28/85

-FEMA LETTER RECEIVED:

C:tRRENT ANTITRUST:

The information for antitrust review of operating HEARING STARTED *'

-04/30/85 license application was tendered 12/15/82.

ASLB INITIAL DECISIDH:

11/30/85 COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

12/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

12/31/85 07/30/82

~ -...-

..~_

NRR LICENSING SYSTEM PAGE N0

.2-2-

i BELLEFONTE 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF ~06/30/83 I

PLANT CHARACTERISTICSt K.E Y PERS0NNELa DOCKET NO:

043880439 LIC, PM:

M. 1HADANI ASLB CHAIR N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM

' MEMBER 18 N/A LOCATION:

6 MI NE OF SCOTTSBORD, ALA LIC. LA.:

M. DUNCAN MEMBER 2 N/A REGION:

2 AE TVA COUNSEL:

B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR NSSS: B8W ANTITRUST J. RUTBERG RESID. INSPs'J. WILCOX DESIGN PWR 3760 MWT/1235 MWE CONST TVA RM ANALYST:

B. ST MARY l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the staff review schedule has been dalayed and the applicant has ER DOCKETED:

06/12/78 06/12/78C revised the fuel loadie.] to 05/85.

The staff evaluated ER SITE VISIT COMPLETE:

02/20/82 06/17/82C the impacts of this delay on the safety and environmental INPUT TO DES TO PM:

11/04/83 review schedules and issued new schedule on 01/25/83.

ISSUE DES:

12/16/83 RESPONSE TO COMMENTS ON DES:

03/05/84 i

ISSUE FES:

05/18/84 CURRENT ENV. STATUS:

As a result of applicant's construction delay, the environ-mental review schedule.was re-evaluated and revised as.

SAFETY / NEARING MILESTONES:

indicated in the environmental milestones. The environmental site visit was completed on 6/17/82.

APPLICATION TENDERED:

02/03/78 02/03/78C SAR DOCKETED:

06/12/78C SAR Q'S RECEIVED BY PM:

07/03/80 ft/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/02/83 1

j CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/20/84 No hearing is anticipated.

ISSUE DRAFT SER:

03/16/84 IMPUT TO SER:

06/15/84 ISSUE SER:

08/17/84 I

ACRS FULL COMMITTEE MEETING:

09/28/84 INPUTS TO SE SUPPLEMENT 1:

10/05/84 ISSUE SE SUPPLEMENT 13 12/14/84 FEMA LETTER RECEIVED:'

CURRENT ANTITRUST Pending determination HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISIGHz TECH SPECS COMPLETED:

02/01/85 4

COMMISSION DECISIDH 04/15/85 ISSUE LIC. WITH POWER Rc3TRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/85 No. 23 (12/17/82).

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On 07/06/82 TVA revised fuel load date to 5/85.

Staff CONSTRUCTION COMPLETI0H - APPL.:

05/06/85 07/06/82 evaluated impact on safety and environmental review schedules and issued new schedule on 01/25/83.

HRR LICEHSING SYSTEM PAGE ND* 2-3 BRAIDWOOD 1 82 0L CURRENT STATUS REPQRT REPORT AS OF 06/30/83 PLANT CHARACTERIST I C St KEY PERS0HHELa DOCKET NO:

045680457 LIC, PM:

J. STEVENS ASLB CHAIR:

M. MILLER l

APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

R. COLE LOCATION:

24 MI SSW OF JOLIET, ILL LIC. LA.:

M. RUSHBROOK MEMBER 2 D. CALLIHAN REGION:

3 AE:

SSL COUHSEL:

D. HASSELL CONST. INSP: J. HEISLER REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP:

L. MCGREGOR DESIGH PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST:

S. HEDLUND ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Draft SER will be issued during July, 1983.

11/30/78C ER DOCKETED:

ER SITE VISIT COMPLETE:

05/31/83 05/05/83C INPUT TO DES TO PM:

11/01/83 l

ISSUE DES:

01/01/84 RESPONSE TO COMMENTS ON DES:

04/15/64 ISSUE FES:

06/00/84 CURRENT ENV. STATUS:

Site visit was conducted during May, 1983.

Formal questions issued to applicant, May, 1983.

SAFETY / HEARING MILEST0HES:

APPLICATI0H TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM 12/31/82 12/31/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 05/06/83C INPUT TO DRAFT SER TO PM:

05/01/83 06/15/83C CURRENT HRG. STATUS:

Opportunity for Hearing was published in the Federal ISSUE DRAFT SER:

07/15/83 Register on 06/13/79. There will be a contested hearing.

INPUT TO SER:

11/01/83 ISSUE SER:

12/01/83 ACRS FULL COMMITTEE MEETING:

01/00/84 INPUTS TO SE SUPPLEMENT 1:

04/01/84 ISSUE SE SUPPLEMENT 1 05/00/84 FEMA LETTER RECEIVED:

H/S CURRENT ANTITRUST:

Applicant has submitted antitrust information pursuant to HEARING STARTED:

10/00/84 ASLB INITIAL DECISI0H:

03/00/85 Reg. Guide 9.3.

COMMISSIGH EFFECTIVENESS DECISI0H 04/00/85 TECH SPECS COMPLETED:

04/00/85 COMMISSION DECISI0H:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 LATEST AMENDMENT:

FSAR Amendment No. 42 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/85 04/14/82

HRR LICENSIHG SYSTEM PAGE HO: 2-4-

BYROH 1 82 0L CURREHT STATUS REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY PERS0NHELa DOCKET NO:

045480455 LIC. PM:

L. OLSHAN ASLB CHAIR:

I. SMITH APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

R. COLE LOCATION:

17 MI SW OF ROCKFORD, ILL LIC.

LA.'

M. RUSHBROOK MEMBER 2:

~D.

CALLIHAN REGICH:

3 AE:

S8L COUNSEL:

S. GOLDBERG CONST.'INSP: M. RING REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP: W. FORNEY DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER and Supplements 1 and 2 have been issued. Several outstanding and confirmatory issues remain to be ER DOCKETED:

11/30/78C resolved prior to licensing.

ER SITE VISIT COMPLETE:

05/31/81 05/31/81C INPUT TO DES TO PM:

08/15/81 08/15/81C ISSUE DES:

11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:

03/01/82 03/01/82C-ISSUE FES:

04/05/82 04/05/82C CURRENT ENV. STATUS:

Environmental review completed and FES (HUREG-0848) published in April 1982.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

08/15/81 08/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/07/81 11/07/81C l

Hearing began March 1,

1983.

ISSUE DRAFT SER:

i INPUT TO SER:

01/07/82 01/07/82C ISSUE SER:

02/07/82 02/07/82C ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 2:

08/20/82 08/20/82C ISSUE SE SUPPLEMENT 2:

12/10/82 01/31/83C FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Applicant has submitted antitrust information pursuant HEARING STARTED:

03/00/83 03/01/83C to Reg. Gui de 9.3.

ASLB INITIAL DECISION:

11/00/83 COMMISSION EFFECTIVENESS DECISIDH 11/00/83 TECH SPECS COMPLETED:

11/00/83 COMMISSIDH DECISION:

11/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/83 FSAR - Amendment 42 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETI0H - APPL.

12/00/83 6/21/83 A

HRR LICENSIHG SYSTEM PAGE NO: 2-5 CALLAWAY 1 0L CURREHT STATUS REP 0RT REPORT AS OF: 06/30/83 l

PLANT CHARACTERISTICSt KEY PERS0NHELe LIC. PM:

G.

EDISON ASLB CHAIR:

J. GLEASON DOCKET HO:

05000483 LIC. BC:

B. YOUNGBLOOD MEMBER 1:

G.

BRIGHT APPLICANT:

UNION ELECTRIC LOCATION:

10 MI SE OF FULTON, M0 LIC. LA.:

M.

RUSHBROOK MEMBER 2:

J. KLINE REGION:

3 AE:

BECH COUNSEL:

B. PERLESS CONST. INSP J. KOHKLIH REAC. TYPE: PWR HSSS: WEST ANTITRUST B.

V0GLER RESID. INSP J. HEISLER DESIGH PWR: 342S MWT/1188 MWE CONSTI DANIEL RM ANALYST S. HEDLUND ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SAR was docketed 08/08/80. The SER was issued by HRC on 12/12/80 12/12/80C 10/07/81 and the SER Supplement No. I was issued on ER DOCKETED:

ER SITE VISIT COMPLETE:

12/00/81 12/00/81C 01/15/82.

SSER 2 was issued 6/28/83.

INPUT TO DES TO PM:

08/01/81 08/01/81C ISSUE DES:

09/29/81 09/29/81C l

RESPONSE TO COMMENTS ON DES:

12/01/81 12/01/81C ISSUE FES:

01/29/82 01/29/82C CURRENT ENV. STATUS:

ER was docketed 12/12/80. The DES was issued by HRC on 09/29/81 and the FES was issued on 01/29/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/2S/79 10/25/79C l

SAR DOCKETED:

08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:

12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C l

INPUT TO DRAFT SER TO PM:

l CURRENT HRG. STATUS:

Hearings were held on limited issues during November 1981.

ISSUE DRAFT SER:

N/A A decision on these limited issues was rendered by the INPUT TO SER:

09/11/81 09/11/81C licensing board on 12/13/82.

Joint intervenors have ISSUE SER:

10/07/81 10/07/81C appealed the initial decision. Oral arguments on the appeal were made on 6/22/83.

The hearing on the one ACRS LETTER RECEIVED:

11/19/81 11/19/81C remaining contention, emergency preparedness, is scheduled INPUTS TO SE SUPPLEMENT 28 01/01/82 01/01/82C ISSUE SE SUPPLEMENT 22 06/00/83 06/28/83C for 8/31/83.

FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

HEARING STARTED:

11/17/81 11/17/81C OL review is in progress.

ASLB IHITIAL DECISIDH:

10/00/83 COMMISSION EFFECTIVEHESS DECISION: 11/00/83 TFCH SPECS COMPLETED:

02/00/84 COMMISSION DECISION:

03/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 ISSUE FULL POWER LICENSE AMEND:

07/00/84 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE The Caseload Forecast Panel is reviewing construction CONSTRUCTION COMPLETION - APPL:

04/00/84 08/23/82 I

HEW SLIPS / NOTES:

progress in order to make a new construction completion schedule estimate. An April 1984 estimate is based on the anolicant's recentiv revised fuel load date.

NRR LICEN$ING SYSTEM PAIE NO: 2-6 CATAWBA 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

041380414 LIC. PM:

K. JABBOUR ASLB CHAIR:

J. KELLEY APPLICANT:

DUKE POWER LIC. BC:

E. ADENSAM MEMBER 1:

D. CALLINAN LOCATION:

6 MI HNW OF ROCK HILL, SC LIC. LA.:

M.

DUNCAN MEMBER 2 R. FOSTER REGION:

2 AE DUKE COUNSEL:

G. JOHNSON CONST. INSP P. VAND00RN REAC. TYPE: PWR NS$$2 WEST ANTITRUST:

B. V0GLER RESID. INSP P. VAND00RN DESIGN PWR 3582 MWT/1145 MWE CONST: DUKE RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on February 9, 1983.

SSER of was issued on May 2, 1983.

ER DOCKETED:

06/11/81 06/11/81C ER SITE VISIT COMPLETE:

10/15/81 10/15/81C INPUT TO DES TO PM:

06/25/82 07/29/82C ISSUE DES:

08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:

11/30/82 11/30/82C ISSUE FES:

01/07/83 01/07/83C CURRENT ENV. STATUS:

DES was issued on 08/11/82. FES was issued on 1/7/83.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

03/26/79 03/26/79C SAR DOCKETED:

06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:

12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/10/82 12/10/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/02/82 12/30/82C Combined hearing anticipated to start 10/83.

ISSUE DRAFT SER:

11/19/82 11/19/82C INPUT TO SER:

01/09/83 01/19/83C ISSUE SER:

02/06/83 02/09/83C ACRS LETTER RECEIVED:

03/18/83 03/18/83C INPUTS TO SE SUPPLEMENT 1:

04/12/83 04/12/83C i.

ISSUE SE SUPPLEMENT 18 05/02/83 05/02/83C FEMA LETTER RECEIVED:

09/15/83 CURRENT ANTITRUST:

Operating license antitrust review is in progress.

HEARING STARTED:

10/00/83 ASLB INITIAL DECISION:

05/00/84 COMMISSION EFFECTIVENESS DECISION: 05/00/84 TECH SPECS COMPLETED:

05/00/84 COMMISSION DECISION:

05/00/84 ISSUE LIC. WITH POWER RESTRICTIDH LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/84 Revision 7 dated 02/22/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CP Amend. issued 12/23/80 indicating change in ownership.

CONSTRUCTION COMPLETION - APPL.:

05/00/84 05/00/82

I PAGE HO 2-7 NRR LICEHSIHG SYSTEM CLINTON 1 &2 0L CURRENT STATUS REP 0RT REPORT AS OF 06/30/83 i

j l

KEY PERS0HNELa PLAHT C H A R A C T E R I S T I C S:

LIC, PM:

H. ABELSON ASLB CHAIR H. CLARK LIC. BC A. SCHWENCER MEMBER 1 G. FERGUSON DOCKET HO:

046180462 APPLICANT:

ILLINDIS POWER LOCATION:

6 MI E OF CLINTON, ILL LIC. LA.:

E. HYLTON MEMBER 2:

0. PARIS REGION:

3 AE 58L COUHSEL:

R. GODDARD CONST. INSP F.

JABLONSKI REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP H. LIVERMORE DESIGN PWR: 2894 MWT/0950 MWE CONST: BALDWIH RM ANALYST:

B. ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

FSAR was docketed 09/08/80. SER was issued 02/17/82.

Supplement No. 1 was issued 07/22/82. SSER Ho. 2 was ER DOCKETED:

03/01/81 09/08/80C ER SITE VISIT COMPLETE:

issued in May 1983.

IHPUT TO DES TO PM:

12/08/81 12/08/81C ISSUE DES:

12/18/81 12/28/81C RESPONSE TO COMMENTS OH DES:

02/22/82 03/25/82C ISSUE FES:

05/20/82 05/20/82C 1

i CURRENT ENV. STATUS The draft environmental statement was completed December SAFETY / HEARING MILESTONES:

1981.

The FES was completed May 1982.

APPLICATION TENDERED:

12/01/79 12/01/79C SAR DOCKETED:

09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

A third prehearing conference was held June 2, 1983.

Five ISSUE DRAFT SER:

contentions are admitted. Hearing eshimated to start INPUT TO SER:

12/05/81 12/05/81C January, 1984 at the earliest. Awaittnq Board order.

ISSUE SER:

01/05/82 C2/17/82C ACRS LETTER RECEIVED:

02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 22 06/30/82 06/30/82C ISSUE SE SUPPLEMENT 28 05/20/83 05/27/83C FEMA LETTER RECEIVED:

H/S l

CURRENT ANTITRUST:

HEARING STARTED:

08/00/83 Operating license antitrust review completed ASLB INITIAL DECISION:

12/00/83 March 18, 1982 (SECY-82-120).

COMMISSIDH EFFECTIVENESS DECISIDH 01/00/84 TECH SPECS COMPLETED:

11/00/85 COMMISSIDH DECISION:

12/00/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSC AMEND:

04/00/86 LATEST AMENDMENT:

FSAR Amendment 025, 05/83.

A two year slip in fuel load date to 1/86 was announced by CONSTRUCTION COMPLETION - APPL.:

01/00/86 05/24/83 l

NEW SLIPS / NOTES:

IPC on 05/24/83.

1 NRR LICENSING SYSTEM PAGE NO: 2-8 COMANCHE PEAK 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET HO 044580446 LIC. PM:

S. BURWELL ASLB CHAIR P. BLOCH APPLICANT:

TEXAS UTILITIES GENERATING LIC. BC:

B. YOUNGBLOOD MEMBER 1:

W. JORDAN LOCATION:

4 MI H OF GLEN ROSE, TEX LIC. LA.:

M. RUSHBROOK MEMBER 2 K. MCCOLLOM REGION:

4 AE:

G8H COUNSEL:

M. ROTHSCHILD CONST. INSP: R. TAYLOR REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP D. KELLEY i

DESIGN PWR 3411 MWT/1150 MWE CONST: BRRT RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued 07/14/81. The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:

01/19/79 Ot/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:

06/20/80 08/07/80C issues.

SSER 81 was issued 10/16/81.

Application was INPUT TO DES TO PM:

08/15/80 04/27/81C reviewed by the ACRS on 11/13/81.

SSER 02 responding to ISSUE DES:

04/30/81 05/22/81C the ACRS was issued on 01/20/82. SSER 83 containing RESPONSE TO COMMENTS OH DES:

07/19/81 08/28/8tC l

emergency preparedness was issued 03/11/83.

ISSUE FES:

09/18/81 09/24/81C l

CURRENT ENV. STATUS:

The DES was issued on 05/22/81.

The EPA Federal Register i

Notice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:

I ended 07/13/81.

The FES was issued on 09/24/81.

l APPLICATION TENDERED:

03/01/78 03/01/78C i

SAR DOCKETED:

05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:

12/30/78 02/22/79C l

SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/13/79 0 3/11/81C Hearing began 12/02/81.

Issues heard were financial ISSUE DRAFT SER:

03/31/81 03/31/81C qualifications and operating QA program.

Further hearing INPUT TO SER:

05/22/81 07/08/81C sessions on QA/QC during construction were held 06/07-11/82, ISSUE SER:

07/14/81 07/14/81C 07/26-30/82, and 09/13-17/82.

The fifth and sixth hearing session continuing testimony on QA/QC during construction ACRS LETTER RECEIVED:

11/17/81 11/17/81C and emergency preparedness were held 5/16-20 and 6/13-16/83.

INPUTS TO SE SUPPLEMENT 4 10/14/83 The seventh hearing session continuing testimony on QA/QC ISSUE SE SUPPLEMENT 48 07/29/83 during construction has not been noticed.

FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

ALJ appointed on 02/23/82 to replace ASLB. Prehearing HEARING STARTED:

12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.

ASLB IHITIAL DECISION; 11/00/83 Briefs filed 05/04/82 request immediate imposition of COMMISSION EFFECTIVENESS DECISION:

11/00/83 settlement license conditions. A Memorandum a-d Order TECH SPECS COMPLETED:

09/00/83 approving settlement agreements 8 proposed license COMMISSION DECISION:

11/00/83 conditions 8 dismissing proceedings was issued 05/06/82.

ISSUE LIC. WITH POWER RESTRICTIDH:

12/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/83 40 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

SSER-4, an interim supplement, is slipped 1 month due to CONSTRUCTION COMPLETION - APPL.:

09/00/83 03/03/83 applicant delays in submittal of information and staff delay in reviewing earlier submittals. No impact on fuel load date is croiccted.

HRR LICEHSING SYSTEM PAGE HO: 2-9 DIABLO-CANYOH 1 82 0L CURRENT STATUS REPORT REPORT AS OF: 06/30/83 J

PLAHT CHARACTER ISTICSt KEY P E R S 0 N H E L:

LIC. PM:

B. BUCKLEY ASLB CHAIR:

J. WOLF DOCKET NO:

027580323 APPLICANT:

PACIFIC GAS 8 ELECTRIC LIC. BC:

G.

KHIGHTON MEMBER 1 J. KLINE LIC. LA.

J.

LEE MEMBER 2:

G. BRIGHT I

LOCATION:

12 MI WSW OF SAH LUIS OBISPO REGION:

5 AE:

PG8E COUHSEL:

L.

CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: J. CARLSON DESIGH PWR: 3338 MWT/1084 MWE CONST: PG8E RM ANALYST:

B.

ST MARY ENVIRONMENTAL MILEST0HES:

SCHED. DATE ACTUAL DATE I

CURRENT SAF. STATUS:

SSER 15 (Equip. Qualification) was issued on 10-02-81 SSER 16 is estimated for 07/10/83 (indicated as SSER9 ER DOCKETED:

11/09/71 11/09/71C on schedulo).

Favorable ASLB Initial Decision on a ER SITE VISIT COMPLETE:

full power license was issued on August 31, 1982.

Low IHPUT TO DES TO PM:

10/09/72 10/09/72C Power license was issued on 09-22-81 and suspended on ISSUE DES:

12/12/72 12/12/72C RESPONSE TO COMMENTS OH DES:

04/27/73 04/27/73C ISSUE FES:

09/15/75 05/28/76C November 19, 1981.

CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 07/10/73C SAR DOCKETED:

10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:

01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/01/74C INPUT TO DRAFT SER TO PM:

01/24/75 01/24/75C CURRENT HRG. STATUS:

LP hearings were held 05-19-81 through 05-22-81 A

ISSUE DRAFT SER:

INPUT TO SER:

01/24/75 01/24/75C favorable PID on low power operation was issued July 10/04/74 10/16/74C ISSUE SER:

17, 1981.

A full power hearing was completed on January 26, 1982.

In August 1982 an Initial Decision was issued ACRS LETTER RECEIVED:

05/00/78 07/18/78C authorizing issuance of a full power operating license.

The ASLAB decided to reopen the record on design quality INPUTS TO SE SUPPLEMENT 9:

06/21/83 06/21/83C ISSUE SE SUPPLEMENT 9:

07/10/83 assurance.

FEMA LETTER RECEIVED:

N/S l

CURRENT ANTITRUST:

HEARING STARTED:

10/29/75 12/07/76C j

Hot required ASLB INITIAL DECISION:

07/17/81 07/17/81C COMMISSIGH EFFECTIVENESS DECISIGHz 07/08/83 1

l TECH SPECS COMPLETED:

09/15/81 09/15/81C j

COMMISSIDH DECISI0H:

08/01/83 ISSUE LIC. WITH POWER RESTRICTION:

11/30/83 ISSUE FULL POWER LICENSE AMEND:

11/30/83 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Estimate of dates from end of LP hrq to lic, complete CCHSTRUCTION COMPLETION - APPL.

dependent upon dev./ approval of State and local Emergency Plans.

Ongoing Design Verif. Program likely to identify olant modifications.

Const. conoletion deoendent on mods.

NRR LICENSIHG S Y S T E fl PAGE HO: 2-to ENRICO FERMI 2 0L CURRENT STATUS REPORT REPORT AS OF2 06/30/83-l PLAHT CHARACTERISTICS KEY PERS0NNEL DOCKET HO 05000341 LIC. PM:

D.

LYHCH ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1 P. MORRIS LOCATION:

LAGUNA BEACH, MICH LIC. LA.:

M. RUSHBROOK MEMBER 2 D. SCHINK REGICH 3

AE S$l COUNSEL:

C. WOODHEAD CONST. INSP P. PELKE i

REAC. TYPE: BWR NSSS: GE ANTITRUST A.

HDDGDON RESID. INSP B. LITTLE DESIGH PWR: 3292 MWT/1093 MWE CONST DAHIEL RM ANALYST S. HEDLUND i

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81.

(See second page for milestone ER DOCKETED:

04/04/75 04/04/75C summary.)

SSER Ho. I was issued 09-25-81 SSER Ho. 2 was ER SITE VISIT COMPLETE:

09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.

INPUT TO DES TO PM 07/31/81 04/24/81C SSER No. 3 was issued on 02-04-83.

The design for the ISSUE DES:

05/01/81 04/30/81C

[

standby liquid control system may need to be modified.

RESPONSE TO COMMENTS ON DES:

07/31/81 06/29/81C l

ISSUE FES:

08/31/81 09/04/81C l

f CURRENT ENV. STATUS:

Addendum No. I to the FES was issued 03-03-82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:

06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

Monroe County, Michigan petitioned for INPUT TO SER:

03/05/76 05/20/77C leave to reopen hearings on the evacuation issue of ISSUE SER:

08/01/77 09/29/77C 1

Emergency Prepardness; the Board denied this petition.

ASLB issued initial decision on 10/29/82 authorizing ACRS LETTER RECEIVED:

08/20/81 08/11/81C operating Ilcense issuance. The Commission issued its INPUTS TO SE SUPPLEMENT 3:

08/22/82 01/05/83C Immediate Effectiveness Decision on 12/22/82.

ISSUE SE SUPPLEMENT 38 09/01/82 02/04/83C FEMA LETTER RECEIVED:

07/01/83 CURRENT ANTITRUST:

An ASLB decision on antitrust matters was issued on HEARING STARTED:

12/02/81 03/31/82C 04-25-78.

ASLB INITIAL DECISION:

10/00/82 10/29/82C COMMISSIDH EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

08/01/83 COMMISSION DECISION:

11/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/01/83 The latest final Safety Analysis Report Amendment is number 48.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

12/30/83 06/22/83

MRR LICENSING SYSTEM PAGE HO: 2-11 FERMI 2 (FSAR RESUB)

OL CURREHT STATUS REPQRT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY P E R S 0 H H E La DOCKET NO:

00007341 LIC. PM:

D. LYMCH ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISOH LIC. BC:

J. YOUNGBLOOD MEMBER 1:

P. MORRIS LOCATION:

LAGUHA BEACH, MICH LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. SCHINK REGION:

3 AE S8L COUNSEL:

C. WOODHEAD CONST. INSP P. PELKE-REAC. TYPE: BWR HS$$8 GE ANTITRUST A. HODGDON RESID. INSP B. LITTLE DESIGH PWR 3292 MWT/1093 MWE CONST DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

SCHED. DATE ACTUAL DATE All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81.

Summary of later milestones is on previous page.

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

10/22/74' 10/22/74C SAR DOCKETED:

06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:

07/01/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER 10 PM:

09/08/78 03/27/81C ISSUE DRAFT SER:

IMPUT TO SER:

06/10/81 06/23/81C ISSUE SER 06/30/81 07/10/81C i

CURRENT ANTITRUST:

l LATEST AMENDMENT:

HEW SLIPS /HOTES:

All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI-cause.

NRO L I C E N-S I N G 3YSTEM PAGE NO: 2-'12'

GRAND GULF 1 82 LIC CURRENT ' STATUS REP 0RT REPORT AS OF 06/30/83' PLANT CHARACTERISTICS KEY P E-R S 0 N.N E L DOCKET NO 041680417 LIC. PM:

D. HOUSTON ASLB CHAIR J. LAURENSON APPLICANT:

MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:

A.

SCHWENCER MEMBER 1:

G.' BRIGHT LOCATION:

25 MI S OF VICKSBURG, MISS LIC. LA.:

.E.

HYLTON MEMBER 2:

J. HARBOUR REGION:

2 AE:

BECH COUNSEL:

M. WAGNER CONST. INSP R..VANDORN 1

REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID.'INSP A. WAGNER' DESIGN PWR 3833 MWT/1250 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE -ACTUAL'DATE SER was issued on September 10, 1981.

SSERs were. issued c.

in December 1981, in June and July 1982 and in May 1983.

ER DOCKETED:

-06/05/73-06/30/78C:

The ACRS report on full power operation for Unit I was ER SITE VISIT COMPLETE:

C

.1 12/14/7 9C issued August 18, 1982.

Interim FEMA letter was received INPUT-TO DES TO PM:

04/30/81-04/30/8!C 12/17/82.

ISSUE DES:

05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:

08/15/81-08/15/81C s

ISSUEsFES:

09/15/81 10/09/81C~

CURRENT ENV. STATUS:

DES was issued in May 1981.

FES was issued October 9, 1981 SAFETY /HEARJHG MILESTONES:

-1 APPLICA'IION TENDERED:

04/28/.781-04/28/78C SAR DOCKETED: !.

06/05/78 i 'y06/30/78C

$AR Q'S RECEIVED BY PM:

04/24/79C SAR APPL.. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/a9C CURRENT HRG. STATUS:

. INPUT TO DRAFT SER TO PM:

N/S No hearing. Petition was filed by the State

' ISSUE DRAFT SER:

09/18/81C of Louisiana on basis of Court of. Appeals, District of INPUT TO SER:

04/01/81 08/14/81C Columbia, opinion on S-3 Table issue.

Board-denied petition ISSUE SER:

06/00/81 09/10/81C for intervention on October 20, 1982.

The State of Louisiana filed an appeal to the Board's denial.

Appeal ACRS LETTER RECEIVED:

07/00/81 08/18/42C Board upheld the denial for. intervention in a decision INPUTS TO SE SUPPLEMENT 48 04/01/82 03/15/83C~

issued December 8, 1982.

ISSUE SE SUPPLEMENT 43 05/31/83C FEMA LETTER RECEIVED:

04/00/83

's:

CURREK,I ANTITRUST:

OL review is in> progress. No significant changes have HEARING STARTED:

N/A occurred sinco the CP.

ASLB INITIAL DECISION -

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

09/01/81 06/16/82C t

COMMISSION DECISIDH:

07/00/83 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

08/15/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Unit 1 OL for fuel load to 5% power issued 06/16/82. FP de-CONSTRUCTION COMPLETI0H - APPL.:

06/16/82C OL ISSUED layed by Region II COA on TS surveillance procedure defic-iencies 8 outstanding items, maint. 8 mods for'1st refueling outaae.

A r.nl. not readv to ao above 5% until 8/83.

7

's L

k

'i s

t i

s HRR L I C E ~l! $ I N O SY$ TEM PAGE NO: 2-13

\\

0L CURRENT 15 T A.T U S REP 0RT REPORT AS OF 04/30/83 HARRIS 182 e

s PLANT CHARACTER.I$ TICS KEY PERS0NNEL DOCKET N0:

0400-0401 LIC. PM:

P. KADAMBI ASLB CHAIR:

J. KELLEY APPLICANT:

CAROLINA POWER R LIGHT LIC. BC:

G. KNIGHTON MEMBER 1 G. BRIGHT LOCATION:

20 MI SW OF RALEIGH, NC LIC. LA.:

J. LEE MEMBER 28 J. CARPENTER' REGION:

2 AE2 EBASCO COUNSEL:

C. BARTH CONST. INSP i

REAC. TYPE: PWR NSSS: WEST ANTITRUST J. RUTBERG

'RESID. INSP G. MAXWELL DESIGN PWR 2775 MWT/0915 MWE CONST: DANIEL

RM ANAL.YST B. ST MARY t

CURRENT SAF. STATUS ~

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81. Questions were sent to the applicant between 4/26/82 and 7/30/82. Most of ER DOCKETED:

12/22/81 12/22/81C i

applicant's responses were received by 08/31/82. Draft ER SITE VISIT CDMPLETE:

04/08/82 04/08/82C SER issued 2/1/83.

INPUT TO DES TO PM:

01/14/83 02/08/83C ISSUE DES:

04/00/83 04/08/83C j

~

RESPONSE TO COMMENTS ON DES:

06/10/83 ISSUE FES:

08/15/83 I

CURRENT ENV. STATUS:

ER was docketed on 12/22/81 The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MILESTONES:

i 04/28/82. Most of the applicant's responses were received by October 15, 1982.

Draft Environmental Statement APPLICATI0H TENDERED:

06/26/80 06/26/80C was issued in April 1983.

SAR DOCKETED:

12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:

07/09/82 07/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/08/82 11/08/82C IMPUT TO DRAFT SER TO PM:

09/01/83 CURRENT HRG. STATUS:

Motice for Opportunity -!or Hearing was pubilshed in the ISSUE DRAFT SER:

01/03/83 02/01/83C Federal Register on January 27, 1982.

Several petitions IMPUT TO SER:

09/09/83 to intervene were filed. Prehearing conference on petitions ISSUE SER:

11/01/83 was held on July 13-14, 1982.

Board decision on contentions issued September 23, 1982.

Further clarification issued ACRS FULL COMMITTEE MEETIHut 01/02/84 January 11, 1983.

A pre-hearing conference was held on IMPUTS TO SE SUPPLEMENT 18 03/01/84 February 24, 1983 on discovery and scheduling.

ISSUE SE SUPPLEMENT 12 04/02/84 FEMA LETTER RECEIVED:

04/09/84 CURRENT ANTITRUST Status to be determined.

HEARING STARTED:

01/04/84 ASLB INITIAL DECISIGHz 05/01/85 COMMISSION EFFECTIVEMESS DcCISION: 05/08/85 TECH SPECS COMPLETED 05/01/85 COMMISSIDH DECISIGHz 05/09/85 ISSUE LIC. WITH POWER RESTRICTION: 06/08/85 LATEST AMENDMENT ISSUE FULL POWER LICENSE AMEND:

06/03/85.

FSAR Ho. 4 ER Ho. 5 SCHED. DATE RECEIPT DATE HEW SLIPS / MOTES:

Staff schedule based on fuel load date of 06/03/85.

CONSTRUCTION COMPLETION - APPL.:

06/03/85 10/06/82

QRR LICEO5IQO

$Y$ TEM PAGE NO: 2-14 HOPE CREEK 1 0L CURRENT STATUS REP 0RT REPORT AS OF8 06/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

05000354 LIC. PM:

D. WAGNER ASLB CHAIR N/A APPLICANT:

PUBLIC SERVICE ELECTRIC & GAS LIC. BC A. SCHWENCER MEMBER 1:

LOCATION:

18 MI SE OF WILMINGTON, DEL LIC. LA.:

J. LEE MEMBER 2:

REGION:

1 AE2 BECH COUNSEL:

R. GODDARD CONST. INSP S. FOLSDM REAC. TYPE: BWR HS$$3 GE ANTITRUST RESID. INSPt DESIGN PWR8 3440 MWT/1067 MWE CONST BECH RM ANALYST B. ST MARY I

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was tendered on March 2, 1983 and docketed on June 29, 1983.

ER DOCKETED:

06/29/83 86/29/83C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

ER was tendered on March 2, 1983 and docketed on June 29, 1983.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/3f/83 03/02/83C SAR DOCKETED:

06/29/A3 06/29/83C SAR O'S RECEIVED BY PM:

SAR APPL. RESPONSE TO O'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRtyr SER TO PMt Notice of Opportunity for Hearing is to be published in ISSUE DRAFT SER the Federal Register.

INPUT TO SEit ISSUE SER8 ACR$ FULL COMMITTEE MEETING:

INPUTS TO SE SUFPLEMENT ISSUE SE SUPPLEMENT-FEMA LETTER RECEIVED:

CURRENT ANTITRUST Status to be determined.

HEARING STARTED:.

ASLB INITIAL DECISION:

COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

01/08/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

01/14/86 06/30/82

-~__

NRR LICEN5ING SYSTEM PAGE NO: 2-15 LASALLE 2 0L CURRENT STATUS REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY P E R S O N d E La DOCKET NO:

05000374 LIC. PM:

A. BOURNIA ASLB CHAIR M. MILLER APPLICANT:

CCMMONWEALTH EDISON LIC. BC:

A. SCHWENCER MEMBER 1 F. SHON LOCATION:

11 MI SE OF OTTAWA, ILL LIC. LA.:

E. NYLTON MEMBER 28

0. PARIS REGION:

3 AE

$8L COUNSEL:

C. WOODNEAD CONST. INSP H. WESCOTT REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP W. GULDEMOND DESIGN PWR 3293 MWT/1078 MWE CONST: CWE RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981.

SSER-2 was issued in February 1982.

SSER-3 was. issued on April 16, 1982.

ER DOCKETED:

01/17/77 05/12/77C SSER-4 was issued on July 14, 1982.

SSER-5 is scheduled ER SITE VISIT COMPLETE:

for 07/83.

INPUT TO DES TO PM:

02/17/78 02/17/78C ISSUE DES:

03/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:

07/14/78 07/14/78C ISSUE FES:

09/22/78 11/ 03/78C CURRENT ENV. STATUS:

Environmental Protection Plan has been issued with Unit 1 Ilconse.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/01/76 09/01/76C SAR DOCKETED:

04/08/77 05/12/77C SAR Q'S RECEIVED BY PM:

07/22/77 07/27/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/15/77 08/18/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/06/78 11/08/78C Ho hearing.

ISSUE DRAFT SER:

IMPUT TO SER:

12/29/78 02/27/81C ISSUE SER:

09/05/60 03/05/81C ACRS LETTER RECEIVED:

04/09/81 04/16/81C IMPUTS TO SE SUPPLEMENT 5 07/00/83 ISSUE SE SUPPLEMENT 58 07/00/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Complete.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

04/12/82 04/12/82C COMMISSION DECISION:

09/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

10/08/83 02/01/83 Lasalle Unit 1 criticality was achieved on June 21, 1982.

Construction completion da# 5 for Unit 2 has been reassessed by applicant and has sli eG to 10/83.

NRR L I C E la S I N 6 5Y$ TEM PASE NO: '2

'16 LIMERICK 182 0L CURRENT-STATUS REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERI$ TIC 5:

' KEY-PERSONNEL DOCKET NO:

835280353 LIC. PM:

R. MARTIN ASLB CHAIR L. BRENNER APPLICANT:

PHILADELPHIA ELECTRIC LIC. BC:

A. SCNWENCER MEMBER 1:

R. COLE LOCATION:

35 MI NW OF PHILADELPHIA. PA LIC. LA.:

E. HYLTON MEMBER 2:

P. MORRIS REGION:

1 AE BECH COUNSEL:

A. H0DGDON CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP S. CNAUDNARY DESIGN PWR 3440 MWT/1965 MWE CONST BECH RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981 SAR was docketed on 07/27/81.

ER DOCKETED:

07/27/81 07/27/ Sic NUREG/CR on PRA issued by Board Notification on 03/04/83.

ER SITE VISIT COMPLETE:

08/20/82 08/20/82C SER inputs scheduled for July 1,

1983.

INPUT TO DES TO PM:

06/10/83 06/10/83C ISSUE DES:

06/24/83 06/24/83C RESPONSE TO COMMENTS ON DES:

09/06/83 ISSUE,FES:

03/08/84 CURRENT ENV. STATUS:

ER was docketed on 87/27/81 DES ull! be issued in two parts (June 8 Oct. '83).

The second part will address SAFETY /HEARIMS MILESTONES:

impacts by severe accidents and will be based on applicants severe accidents risk assessment submitted April 21, 1983.

. APPLICATION TENDERED:

01/08/81 03/17/8tc SAR DOCKETED:

07/27/81 07/27/ SIC SAR 4'S RECEIVED BY PM:

07/04/82 02/01/43C SAR APPL. RESPONSE TO 4'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:

N/S Federal Register on August 21, 1981 A special prehearing INPUT TO SER*

07/01/83 conference addressing conditionally admitted contentions ISSUE SER:

88/08/83 was held 05/09/83. Actions were specified by the Board for all parties.

ACRS FULL COMMITTEE MEETING:

09/08/83 INPUTS TO SE SUPPLEMENT 1 18/07/83 ISSUE SE SUPPLEMENT 1 10/30/83 FEMA LETTER RECEIVED:

18/07/83 CURRENT ANTITRUST Status to be determined.

HEARING STARTED:

01/08/84 ASLB IMITIAL DECISION:

03/08/85 COMMISSION EFFECTIVENESS DECISION: 03/08/85 TECH SPECS COMPLETED:

03/09/85 COMMISSION DECISION:

03/08/85 ISSUE LIC. WITN POWER RESTRICTION: 03/08/85 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

03/09/85 Rev. 13 June 17, 1983 (ER OL); Rev. 20, June 17, 1983 (FSAR); Rev. 5, March 31, 1983 (EP), Rev 3, April 30, 1983 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant estimates 2 month improvement in construction CONSTRUCTION COMPLETION - APPLit 08/08/84 completion schedule. ASLB estimates that 17 months are 12/27/82 necessary for hearing.

_ = _ -

^

^

HRR LTCEH$ING SYSTEM PAGE NO: 2-17 MARBLE HILL 1 82 0L CURRENT STATUS REPORT REPORT AS OF 06/30/83 PLANT CHARACTER I$TICSt KEY P E R S O N H E La DOCKET NO:

054680547 LIC. /M P. O CONHOR ASLB CHAIR:

I. SMITH APPLICANT:

PUBLIC SERVICE OF INDIANA LIC. BC:

J. YOUNGBLOOD MEMBER 1 G. LINENBERGER LOCATIDH 10 MI S OF MADISON, IN LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. PARIS REGION:

3 AE 58L COUNSEL:

E. CHEN CONST. INSP: P. PELKE REAC. TYPE: PWR HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP: J. SCHAPKER DESIGH PWR: 3415 MWT/1130 MWE CONST: PSI RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was docketed on 02/25/83.

ER DOCKETED:

03/01/83 02/25/83C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

05/30/84 RESPONSE TO CCMMENTS ON DES:

ISSUE FES:

11/30/84 CURRENT ENV. STATUS:

Application was docketed on 02/25/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/01/82 11/23/82C SAR DOCKETED:

03/01/83 02/25/83C SAR Q'S RECEIVED BY PM:

08/15/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 12/02/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/02/84 An Atomic Safety and Licensing Board was established on ISSUE DRAFT SER:

04/06/84 4/26/83.

Three petitions for a hearing have been INPUT TO SER:

10/05/84 received.

ISSUE SER:

12/07/84 ACRS FULL COMMITTEE MEETING:

01/10/85 IHPUTS TO SE SUPPLEMENT 1:

03/01/85 ISSUE SE SUPPLEMENT 18 04/15/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Hotice of a receipt of antitrust information at OL HEARING STARTED:

09/15/85 stage published 4/6/83.

ASLB IHITIAL DECISIDH:

05/15/86 COMMISSIDH EFFECTIVENESS DECISIDH: H/S TECH SPECS COMPLETED:

06/00/86 COMMISSION DECISION:

06/00/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

Amendment 25 (05/16/83)

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTICH COMPLETION - APPL.:

06/00/86 12/15/82

NRR L I C E N $ I il G SYSTEM PAGE NO: 2 - 18 =

MIDLAND 1 82 0L CURRENT-STATUS REP 0RT REPORT AS OF 06/30/83 PLANT. C H A R A C T E R I $ T I C 58-KEY PERS0NNEL DOCKET N08-033080329 LIC..PM:

D. N00D ASLB CHAIR C. BECHNOEFER APPLICANT:

CONSUMERS POWER LIC. BC:

E. ADENSAM MEMBER 1 F. COWAN LOCATION:

SW BOUNDARY OF MIDLAPJ, MICH.

LIC. LA.:

M. DUNCAN MEMBER 28 J. HARBOUR REGION:

3 AE8 BECN COUNSEL:

W. PATON

.CONST. INSP R. LANDSMAN

.REAC. TYPE: PWR HSSS: B8W ANTITRUST:

B. V0GLER-RESID. INSP R. COOK DESIGN PWR: 2452 MWT/0818 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete some review areas is currently ER DOCKETED:

04/01/78 04/14/78C in progress.

CP. extension was issued 12/28/81. ACR$

ER-SITE VISIT CDMPLETE:

09/08/78 09/08/78C Full Committee Meeting was held 06/04/82. SSER Of INPUT TO DES TO PM:

02/03/82

-02/03/82C responding to ACRS letter was issued 6/30/82. SSER 92 ISSUE DEST-02/05/82 02/05/87C on soils settlement problems was issued 10/06/82.

RESPONSE TD COMMENTS ON DES:

07/98/82 07/08/82C ISSUE FES:

07/30/82 07/30/82C 5

CURRENT ENV, STATUS:

The DES was issued 02/05/82. The FES was issued on July 30, 1982.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

08/31/77 08/31/77C I

SAR DOCKETED:

09/30/77 11/18/77C l

SAR O'S RECEIVED BY PM:

03/20/78 10/02/78C SAR APPL. RESPONSE TO O'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/78 12/09/78C.

Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:

N/A separate hearing on soils settlement. Nearing on soils

. INPUT TO SER:

04/23/82 04/23/82C settlement began July 7, 1981 and is continuing. Combined ISSUE SER:

05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.

ACRS LETTER RECEIVED:

06/95/82 06/08/82C INPUTS TO SE SUPPLEMENT 28 08/16/82

'98/16/82C ISSUE SE SUPPLEMENT 28 10/06/82 10/06/82C t

FEMA LETTER RECEIVED:

01/14/83 01/14/83C CURRENT ANTITRUST 1

l Proceeding completed. License was amended 10/20/80.

HEARING STARTED:.

11/15/82 11/tS/82C ASLB INITIAL DECISION:

09/08/84 i

COMMISSION EFFECTIVENESS DECISION: 10/08/84 TECN SPECS COMPLETED:

09/09/84 i

COMMISSION DECISION:

09/08/84 I

ISSUE LIC. WITH POWER RESTRICTION: 09/09/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/09/84 l

110 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

Applicant announced revised completion schedule on 4/12/83.

CONSTRUCTION COMPLETION - APPL.:

10/08/84 04/12/83-Unit 2 slipped 14 mos. to 10/84, and unit I slipped 13 mos.

to February 1985.

HRC caseload visit conducted April 19-21.

1983.

,--._._,O

MRR LICEN5ING

$YSTEM PAGE NO: 2-19 MILLSTONE 3 0L CURRENT STATUS REPORT REPORT AS OF 06/30/83 l

PLANT CHARACTERISTIC 5:

KEY PERS0NNEL DOCKET NO:

05000423 LIC. PM:

E. DOOLITTLE ASLB CHAIR: N/A APPLICANT:

NORTHEAST NUCLEAR ENERGY LIC. BC:

B. YOUNGBLOOD MEMBER 1 N/A LOCATION:

3.2 MI WSW OF HEW LONDON CT.

LIC. LA.:

M. RUSHBROOK MEMBER 28 N/A REGION:

1 AE 58W COUNSEL:

M. ROTHSCHILD CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP T. REBELOWSKI DESIGN PWR 3565 MWT/1156 MWE CONST: 58W RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review questions sent to appilcant on 05/03/83.

ER DOCKETED:

02/01/83 02/03/83C ER SITE VISIT COMPLETE:

07/21/83 INPUT TO DES TO PM:

ISSUE DES:

04/17/84 RESPONSE TD COMMENTS UN Uts.

ISSUE FES:

11/16/84 CURRENT ENV. STATUS:

Environmental site visit planned for 07/20 and 07/21/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/01/82 10/29/82C SAR DOCKETED:

02/01/83 02/03/83C SAR Q'S RECEIVED BY PM:

04/15/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 08/01/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/83 Federal Register on March 4, 1983.

No requests for IMPUT TO SER:

05/15/84 hearing or petitions for leave to intervene were received.

ISSUE SER:

07/16/84 ACRS FULL COMMITTEE MEETING:

08/15/84 INPUTS TO SE SUPPLEMENT 1:

10/15/84 ISSUE SE SUPPLEMENT 18 11/15/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

11/00/85 TECH SPECS COMPLETED:

11/00/85 COMMISSION DECISIDH 11/01/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

Amendment 2 to FSAR received 04/21/83. Amendment 2 to ER received 04/21/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

--- -~

-- CONSTRUCTION COMPLETION - APPL.:

11/01/85 09/30/82 e

NRR LICENSING SYST EM PAGE NO: 2-20 NINE MILE POINT 2 0L CURRENT STATUS REPORT REPORT AS OF: G6/30/83 PL ANT C H A R A C T E R I S T I C S:

KEY PERS0NNELa DOCKET NO:

05000410 LIC. PM:

M.

HAUGHEY ASLB CHAIR:

APPLICANT:

NIAGARA MOHAWK POWER LIC, BC:

A.

SCHWENCER MEMBER 1:

LOCATION:

8 MI NE OF OSWEGO, NY LIC. LA.:

E. HYLTON MEMBER 2:

REGION:

1 AE:

58W COUNSEL:

B.

BORDENICK CONST. INSP: L. NARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:

L, DEWEY RESID. INSP:

DESIGN PWR: 3489 MWT/1080 MWE CONST $1W RM ANALYST:

B.

ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-31-83 and docketed on 04/12/83.

ER DOCPETED:

03/31/83 04/12/83C ER SITE VISIT COMPLETE:

08/05/83 INPUT TO DES TO PM:

05/18/84 ISSUE DES:

07/20/E4 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/14/84 CURRENT ENV. STATUS:

The ER was tendered on 01-31-83 and docketed on 04/12/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

01/31/83 01/3:1/83C SAR DOCKETED:

03/31/83 04/12/83C SAR Q'S RECEIVED BY PM:

08/01/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/27/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/19/84 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

02/16/84 Federal Req > ster on 05/13/83.

INPUT TO SER:

08/06/84 ISSUE SER:

10/05/84 ACRS FULL COMMITTEE MEETING:

11/08/84 INPUTS TO SE SUPPLEMENT 1:

ISSUE SF SUPPLEMENT 18 01/22/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

06/17/85 ASLB INITIAL DECISION:

02/14/86 COMMISSION EFFECTIVENESS DECISION: 02/00/86 TECH SPECS COMPLETED:

02/00/86 COMMISSION DECISION:

02/28/86 ISSUE LIC. WIIH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

02/00/86 01/31/83

5 NRR LICEN$ING SYSTEM PAGE NO: 2-21 PALO VERDE-1,2,3 0L CURRENT

$TATUS REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY-PERSONNEL DOCKET NO:

0528-0530 LIC. PM:

E. LICITRA ASLB CHAIR R. LAZO t*PLICANT:

ARIZONA PUBLIC SERVICE LIC. BC G. KNIGHTON MEMBER 1 R. COLE Lt*ATION:

36 MI W OF PHOENIX, AZ LIC. LA.:

J. LEE MEMBER 2:

D. CALLINAM REGION:

5 AE BECH COUNSEL:

L. DEWEY CONST. INSP L. VBRUEGGEN j

REAC. TYPE: PWR HSSS: COMB ANTITRUST B. V0GLER RESID. INSP G. FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST BECH RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED..DATE ACTUAL DATE Several " Independent Design Review" meetings have been completed.

The SER was issued on November it, 1981.

SER ER DOCKETED:

07/01/88 06/20/80C supplement Hos.

1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:

01/30/81 01/30/81C and May 17, 1982, and September 23, 1982 respectively.

INPUT TO DES TO PM:

10/05/81 10/05/8tc Supplement No. 4 was issued on March 15, 1983.

Supplement ISSUE DES:

10/26/81 10/26/81C Ho. 5 is targeted for 8/19/83.

RESPONSE TO COMMENTS ON DES:

02/25/82 02/25/82C ISSUE FES:

03/11/82 03/11/82C CURRENT ENV. STATUS:

The'ER (OL) review is complete. A site visit was completed on January 30, 1981.

The DES was issued on SAFETY / HEARING MILESTONES:

October 26, 1981 and the FES was issued on March 11, APPLICATION TENDERED:

10/05/79 10/05/79C 1982.

SAR DOCKETED:

06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

The heartnq started 4/27-30, 1982, resumed on 5/25-28 and ISSUE DRAFT SER:

I on 6-22.

Hearing record was closed on 6-25-82.

A. late INPUT TO SER -

10/30/81 10/30/81C petition, dated-10-13-82 dealing with salt drift on ISSUE SER:

11/11/81 11/11/81C farm crops, was filed by W. Valley Agri. Protection Council. On 12-30-82, the Board issued a favorable ID ACRS LETTER RECEIVED:

12/18/81 12/18/81C but reopened the hearing on Units 2 and 3 to consider INPUTS TO SE SUPPLEMENT 58 07/29/83 late petition by W. Valley.

Board's decision authorizes ISSUE SE SUPPLEMENT 5 08/19/83 full power license for Unit 1.

. FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Antitrust OL review has resulted in a finding of no NEARING STARTED:

04/27/82 04/27/82C significant antitrust changes since CP review.

A ASLB INITIAL DECISION:

12/30/82 12/30/82C Federal Register of the finding was published 2-9-83.

COMMISSION EFFECTIVEMESS DECISION: 04/27/83 04/27/83C-TECH SPECS COMPLETED:

08/01/83 COMMISSION DECISION:

07/08/83 ISSUE LIC. WITH POWER RESTRICTIONS. 08/01/83 ISSUE FULL POWER LICENSE AMEND:

08/20/83-LATEST AMENDMENT:

FSAR Amendment No. 11 SCHED. DATE RECEIPT DATE ER Supplement No. 4 1

CONSTRUCTION COMPLETION - APPL.:

68/08/83 07/13/82 l

NEW SLIPS / NOTES:

(

I 1

NRR LICEN5ING SYSTEM PAGE No: 2-22 PERRY 1 82 0L CURRENT 5TATUS REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY PERSONNFLa DOCKET NO:

044080441 LIC. PM:

J. STEFAN0 ASLB CHAIR:

P. BLOCH APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING LIC. BC:

J. YOUNGBLOOD MEMBER 1*

J. KLINE LOCATION:

7 MI NE OF PAINESVILLE, OHIO LIC. LA.:

M. RUSHBROOK MEMBER 2:

G. BRIGHT REGIDH 3

AE:

GIL COUNSEL:

J. CUTCHIM CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST J. CUTCHIN RESID. INSP: M. GILDNER DESIGN PWR: 3759 MWT/1205 MWE CONST: KAISER RM ANALYST:

5. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.

The ACRS Report was issued on July 13, 1982.

SSER No. 1 ER DOCKETED:

06/26/81 06/19/81C j

was issued in August 1982.

SSER No. 2 was issued in ER SITE VISIT COMPLETE:

Jan. 1983.

SSER No. 3 was issued in 4/83.

SSER No. 4 INPUT TO DES TO PM:

01/01/82 01/01/82C not yet scheduled.

ISSUE DES:

02/26/82 02/26/82C i

RESPONSE TO COMMENTS ON DES:

06/30/82 06/30/82C i

ISSUE FES:

08/13/82 08/13/82C l

CURRENT ENV. STATUS:

Environmental acceptance review was completed on June 9,

1981.

The ER was docketed June 19, 1981.

FES SAFETY / NEARING MILESTONES:

issued in August 1982.

APPLICATION TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPGT TO DRAFT SER TO PM:

02/24/82 02/24/82C Conference call between Board, intervenor, applicant, and ISSUE DRAFT SER:

02/26/82 02/26/82C staff attorneys on 1/5/83 targeted start of hearing for INPUT TO SER:

04/10/82 05/16/82C 5/23/83 en Issue 3 (QA Const. prog.).

Issues 1 (EP), 13 ISSUE SER:

05/10/82 05/24/82C (Turbine Missiles), 14 (In-core T/C's), and 15 (Steam Erosion) N/S.

Issue 6 (ATWS-auto SLCS) and'8 (H2 control ACRS LETTER RECEIVED:

07/13/82 07/13/82C for degraded core accident) deferred pending Comm. rulings.

INPUTS TO SE SUPPLEMENT 4 N/S All other issues deleted by summ disp. Hearing on issue (3)

ISSUE SE SUPPLEMENT 48 N/S l

completed 4/29/83.

Favorable Board decision expected.

FEMA LETTER RECEIVED:

12/00/83 CURRENT ANTITRUST:

CP antitrust review has been completed. OL antitrust HEARING STARTED:

05/23/83 05/23/83C status is under review.

ASLB INITIAL DECISI0H 03/00/84 COMMISSION EFFECTIVEMESS DECISION: 04/00/84 TECH SPECS COMPLETED:

10/00/84 COMMISSION DECISION:

11/00/84 ISSUE LIC. WITH POWER RESTRICTION: 12/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S Humber 11 (2-15-83).

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

FEMA Letter of 4/28/83 schedules completion of offsight CONSTRUCTION COMPLETION - APPL.:

12/08/84 03/08/83 emergency plan review by 12/83.

f l

3 3 E

2 8 T

/

E 0

R T

CC CCC0 C

A 1122 3

D 3 2 3 E

D A

12

/

G E

D 88 8888 8

8 6

R N

/ /

////

/

T

/

O 0

E G

L 52 4511 2

P 4 H

RB I

A 22 2200 0

I 1

EN SN U //

/ ///

/

E /

E F TEESW T

81 4862 5

C 1

G O TNLAO C

00 0001 0

E 0

R A

OIONR A

P S CLCUB A

E E

T T

BGR R T

R A

1234 4

1112 3333 4444 45545 5 A 5

O D 8888 8 8888 8888 8888 88888 8 D 8 P*

//// /

//// //// //// ///// /

/

PE R

SS

. 5299 8 4574 1042 3001 00000 0

0 R

I:

NN D 2200 0

2201 0300 1000 00000 0

D 0

A12II E //// /

//// //// //// ///// / E /

H H

8121 6

4825 9412 1455 03404 4

H 4

CRR..

C 0010 0

0010 0011 0000 10010 0

C 0

S EETD S

BBBSI s

LMMNS D

SEEOE F

N N

AMMCR V

O O

I I

I:

E S

TD L

C I

CN P

C IE P

E S

R G

E RM A

R E

N:

D TA E

D S :

I1 S

M T

S EE MC

Q P

ET S

RS N

N L ANN RR E

O S

M EN8 E

N O

KEOAEE PO O ME1 :

HN:

RE I

E HWTKLI S

T E

T IHLPGN E

E S

N D T

T M D DED EC T

H ECYE0A N

L:

T O E Y EETE IVEHWI E

R WSHRVL O

PM N T

R BE R ELNV SITDOL L

H T

MP E

S E S E TPEI ITEIP P

M 0 S

O M

E D DN S:

TPME : CCLS R M

0 EAEDBL E

CO M L

N EO R

IUEC DEEPIHE O

E P L

T O

I E VP TE MSLE EDFMCTW C

S I

T C

M T: IS FS:

M PR T

FOEIO T E M : IS DEE A

R OEP RLECDWP N

R

T DSE O G HECR RTE CSUR AA O
TS L

EID: T:

N 0TE DFS:

SE TINSN

.L I

S R SY A

TV S S I

IER.

A R LO T

STOCOCL T

E : :.:

Y MCALUL T

E UEEE R TK L OROE LTET IIEIIU C

P PBLERA N

KETDSF A

ACSP TDTS U SE GNSPSLF U

E CT N

E P

FS L NISSS R

.STN C O 'Q A S S NIA M

OITEOE H ID TETE TE I

I IEE T

U CCCUT N DSUUPU

/

L UUUU SUUA RBMHMUU S

Y IIIONM O

PSSS Y PRRR PSPS RPSM ALMCMSS N

G T LLLCAR R RRNSES T

PAAA NSNS CNSE ESOEOSS O

E I

EEIIRI E ASSS IIII AIIF HACTCII C

N A V

F K

N A

I T

E S

$ S H

t E T 3

ne 8m C H

/o 4

m 2r 8

e e

I E

0f

/

h y l

/

9 teb p

L R 5d 0

c p

0e

/

nne u

ieu S

1 t

1 R

8dn 0

rd R U

/ea 1

de L

4ur 8r efr O

R C 2sg

/o hne W W

/s 4f sod R

H 8E8 4id 2

icr E

5G$

0 n

/d l

o L

A Ra 4e bg nE 0t und L

t

T oSd e

pi r 3

0 S

, SS e

ng ra 8

E SN gtt or sao 9

C GESO nfs a

aeB 1

UAHC iae gt wh I

SO tru n

e.

ER eDq iS gr t

T I

k e

tE nPa s

i L

u c

eD o.r TN k

r g

S IO E

LT W

d1 n c

a.,

u I

IA M

8o o.

e1 e A

TB r/i d1 H8g R

U 4

o5s 8

/u y

F 3

f2n r/

r4o b

E SO 9

/e o5 o0R E

0 R8t f2 f/

d e.

u T 9TW

/

A0x

/

9n e

5AH T

S e

R8 y0 o n

d3 8

C 4TH W

Fn E0 t

t i

R9 0S M

ot ina m

nob r

A1 A

8 I

d i dn

u e

S edm

eo 8FM 5

R 5L R1 Srer Sr Strn t

F,

4U4 W0 Uete.

Ued Urei e

t os A 0G24B3 T d e p5 Tde Tot Td tu Ank 8 Ant A ps3 S

T 2

H Tecn/

Tee T pi 8 Ue N

S g

Stoo2 Stk SO g/

Rb E

E9u 1

c e4 T

M. Ot T

A ER di 8

C Io D

OT:

PW

.t t

.to

.fR1 1

NNN YP Fnsco Vnd Go /3 Tt N8 Nnn AO: T A a a ut Na R

l68 N

E

/ei D

T TCIN H

Scwr Ecs H e a0/

As Mr Sm G

i t3 ia cr 1

u Ae Pde N

EITO E

H KLAICI TlRs8 Tl w Tied 0 Tt b Inu B

CPCGAS N pA n /

Np Ntdl/

Na Tm Led A OPOEEE E pS o 3 E pR Eoee8 Et Su Sm R

DALRRD RAFC0 RAE RNFh0 RS EH AS E

L R

R R

R T

W V

U U

U U

A E

I P

C C

C C

L N

R ll rl1lllIll lllllll l'i}

l1 l

4 3 2 8 E

/

E T

0 T

CCCC C

.CCC CCCC C CC CCCC C A

11 1

21 1222 2

D 2 2 3 A

770t 1

  • 777 81

/

D 7788 8

' 777 7888 8 88 8888 8 8

6

//// /

//// //// / // //// /

T

/

O 0

N E L

3010 9

9398 1556 7

01 2445 5 P

7 H

Y OHE A

2202 2 2220 1110 1

30 2111 1

I 2

E SCF U //// /

//// //// / // //// /

E /

E F LDNSF T

352t 4

1392 8112 3

62 6551 1

C 9 G O LNHRA C

001O 0

1001 0000 0

01 0001 1

E 0

A EAOIH A

R P S KHJKC A

E E

T JCEDA T

T C

R A 7778 1

777 8880 1321 1222 23 A 2

O D

7777 8

777 7878 8888 8888 88 D 8 P

PP

//// /

/// //// //// //// //

/

E R

SS 1017 0

158 0531 7101 2445 50

. 5 R

I

NN D

0202 0

011 1120 t230 2111 10 D

1 A12II E

//// /

/// //// //// //// // E /

H H

3501 4

381 2168 3462 6551 15 H

1 CRR.

C 0010 0

001 0000 0001 0001 10 C

1 EET r S

S BBBSI LMMNS D

SEEOE E

N H

AMMCR V

O D

I I

I:

E S

TD L

C I

CN P

E C

IE P

S R

E RM A

D TA E

8 6

S N RG D

S M

S EE O ER L

T LER N

Q P

T S

RS N

E O

S M

N:

E N

O H DBE PO O

E6:

NN:

RE I

E DG NDI S

T E

T OIEALN E

E S

N D T

T DM D OED: EC T

H ONEHOA N

L:

T O E Y EETE IVEMWI E

R RKLCGL O

PM N T

R BE R VLNV SITDOL L

H T

MP E S E S E IPEI ITEIP P

M O S

O M

E D DN S:

EPME

CCLS R

M O HGJLJL E

CO M L N EO R

CUEC DEEPIHE O

E P L

T O I

E VP TE ESLE EDFMCTW C

S I

T C

M T: IS FS:

R PR T

FOEIO

IS DEE A R

EP RLECDWP H

T E M

R

T DSE O G HECR RTE RSUR AA D

S R TS L

EIC:T:

N 0TE DFS:

E SE TIHSH

.L I

.:SY A TV S S I

IER.

A R TO T

STDCDCL T

E Y

MCALUL T

E OEEE R TK L

OROE TTET IIEIIU C

P PBLERA N KETDSF A ACSP TDTS E SE GNSPSLF U

E CT N

E CO P LS L

NISSS R

S S

.S T N

.. NIA M OITEOE H

I D 'Q A TETE TE I

I IEE T

U CCCUT N DSUUPU

/

L UUUU SUUA RBMHMUU S

Y IIIONM O

PSSS Y PRRR PSPS RPSM ALMCMSS N

G T LLLCAR R RRNSES T

PAAA NSNS CNSE ESOEOSS O

E I

EEIIRI E ASSS IIII AIIF HACTCII C

N A V

F K

N A

I T

E S

S S d

H n

e2 ad r8 E T n n

.R e /

o1 a* E w0 C N 8 8S 3 d/1 / s/

D I

E e086 m6

.I u3/0.e0 1

BP L R s/5/1t 8

L B

s1 /28id SBA R

i020/

n 0

ALL 0

5na 2

SS R U sd n2e yAA 1

b ald o / p,

R C HBH wel 2o2 0

CMC hed0 6 d..

N EOE s he g/

d e12 BCB re unn6 e

t883 C.

eresoi u

n//8 1

ters s/

s a14/

I NA

T tweids2 s

r314 g//0 S

OC SS a w ee0 i

L S

SN ms
sur, 95/

C I,ESO gsasd s

e003 DEAHC lngwsd2 a

r 0

a i n,i a 8 w

edn I

ET cti

/

weon N

et) s62 s

d o e

T AE igeesa 2 t

nnD t

IM S

ME E

omerwd/

n oeId e

e l

RL W

l me n1 e

i I

OC M

oe tsa0 d

tddu p

inns m

F meete i

R IN 0

steau,,

c saas oc LA 0

ittms51 c.

o i

s,8 a

p12 E

AS 1

eit

/

1 s88s s

C 1

smiIi T

F

/

mmM 46 98 i//a i

1 d21 w 2NO T

domTI C

6R W

nco M,/

s9 21 w

3ES M

abcnT39 s2 y//)

e u o a-r617 i

A 0H 0TI 0

l s l H n,0
l4
a0J1 v

R 0UM R1 Sa l( o2, Sc0 Sm 7

e 5O W4 UcSu 1

U Umdn-

r A 0S55P3 TiRfRt 8

T gd TueoB T

A gC E n o/

Ane A st A St T

H ToAdSeN8 Tiu T

rdL Us N

S Sl n m 0

Sss SraeA Ru E

E o

et/

otr(

Tr M

T

.e.a.ln5

.ss ER C

ei

.fse It D

O OT:

PW 3

NNN YP F g011 pe0 Vr G

dn Ti N

N AO:T A

888pm Nds Rsgno Nt E

/

E T TCIH H Sn///ued Eda Hnnei An M

S R

EITD

.G o112 sl e aw oirs a

A P

F H

KLAICI T

311 pu T

Tir i

T I

O CPCGAS NR/ / / R ps NSS Ntasc Ne T

L N

A OPOEEE EE233Eus EEE Eoeae Eh S

S O

DALRRD RS100Ssi RDF RMHwD RT E

L R

R R

R T

W N

U U

U U

A E

A P

C C

C C

L H

S 1I!i l!lI!Ill

!l(l ll

HRR LICEHSIHG SYSTEM PAGE HO 2-25 SEABROOK 1 82 0L CURREHT STATUS REPORT REPORT AS OF: 06/30/83 PLANT CHARACT ERIST I C S:

KEY PERSOHHEL l

DOCKET NO:

044330444 LIC. PM:

L. WHEELER ASLB CHAIR:

H. H0YT APPLICANT:

PUBLIC SERVICE OF HEW HAMPSHIRE LIC. BC:

G. KNIGHTON MEMBER 1:

E. LUEBKE LOCATION:

13 MI S OR PORTSMOUTH, NH LIC. LA.:

J. LEE MEMBER 2:

J. H6RBOUR REGION:

1 AE:

DEC COUHStLa R.

LESSY CONST. INSP: A.

TIJ T H REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP A. f,iRNE DESIGN PWR 3411 MWT/1198 MWE CONST: UEC RM ANALYST:

B. ST NARY f

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981.

l The FSAR was docketed October S, 1981.

Applicant has ER DOCKETED:

10/05/81 10/05/81C responded to round 1 Q's.

SER was issued 03/07/83. ACRS ER SITE VISIT COMPLETE:

12/02/81 12/02/81C subccmmittee meeting was held Aprjl 1-2, 1983.

ACRS INPUT TO DES TO PM:

03/01/82 03/01/82C l

full committee meeting was held on April 15, 1983.

The ISSUE DES:

05/14/82 05/14/82C ACRS letter is contained in SSER 2 which was issued RESPONSE TO COMMENTS ON DES:

08/18/82 09/15/82C 06/30/83.

ISSUE FES:

12/08/82 12/08/82C CURRENT EHV. STATUS:

ER was tendered June 1981.

ER acceptance review was completed September 1981.

The ER was docketed SAFETY / HEARING MILESTONES:

October 5, 1981.

DES was issued in May, 1982.

FES was i ssued in December 198?.

APPLICATION TENDERED:

06/29/81 06/29/81C SAR DOCKETED:

10/05/81 10/05/81C SAR 9'S RECEIVED BY PM:

01/20/82 03/05/82C SAR APPL. RESPONSE TO C'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

05/07/82 10/08/82C Hotice for Opportunity for Hearing was published in ISSUE DRAFT SER:

07/30/82 08/13/82C the Federal Register on October 19, 1981.

Prehearing IHPUT TP SER:

11/30/82 12/29/82C conferences were hold May 6-7, 1982. July 15-16, 1982 ISSUE SER:

01/12/83 03/07/83C and April 7-8, 1983.

ASLB Order identifying parties, contentions and prehearing schedule was issued September ACRS LETTER RECEIVED:

02/17/83 04/19/83C 13, 1982.

Hearings will begin in August, 1983.

IHPUTS TO SE SUPPLEMENT 1 N/S ISSUE SE SUPPLEMENT 1:

03/07/83 06/30/83C FEMA L ETTER RECEIVED:

09/00/83 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

08/00/83 ASLB INITIAL DECISION:

06/00/84 COMMISSIGH EFFECTIVENESS DECISI0H: N/S TECH SPECS COMPLETED:

07/00/84 l

COMMISSION DECISION:

08/00/84 l

ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

09/00/86 LATEST AMENDMENT:

48 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Fuel load slipped to 9/84 per applica,t letter of 12/02/82.

CONSTRUCTION COMPLETION - APPL.4 09/30/84 12/02/82 l

l l

l HRR LICENSIHG SYSTEM PAGE ND: 2-26 SHOREHAM 0L CURREHT STATUS REPQRT REPORT AS OF 06/30/83 PLANT CHARACTERISTICS:

KEY P E R S 0 N N E La DOCKET NO:

05000322 LIC, PM:

R. CARUSO ASLB CHAIR L. BRENNER APPLICANT:

LONG ISLAND LIGHTING CO.

LIC. BC A. SCHWENCER MEMBER 18 P. NORRIS LOCATION:

BROOKHAVEH, NY (LI)

LIC. LA.:

E. HYLTON MEMBER 28 J. CARPENTER REGION:

1 AEt

$8W COUNSEL:

B.

BORDENICK CONST. INSPt L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:

J.

RUTBERG RESID. INSP: J. HIGGINS i

DESIGH PWR 2436 MWT/0820 MWE CONST: S8W RM ANALYST L. LAHIER l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.

SER Supplement 2 was issued in March 1982.

SER 83 was ER DOCKETED:

01/26/76 01/26/76C issued 02/04/83.

ER SITE VISIT COMPLETE:

08/06/76 08/03/76C INPUT TO DES TO PM:

11/22/76 11/29/76C ISSUE DES:

03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:

07/22/77 07/22/77C ISSUE FES:

10/21/77 10/~8/77C CURRENT ENV. STATUS:

The environmental review is complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/00/75 09/04/75C SAR DOCKETED 12/15/77 01/26/76C SAR Q'S RECEIVED BY PMt 06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/15/77 08/01/77C The Board concluded hearings regarding all issues ISSUE DRAFT SER:

except emergency planning on April 8, 1983.

Draft emergency INPUT TO SER:

03/10/81 03/10/81C planning contentions filed on 06/24/83. A new Board was ISSUE SER:

04/10/81 04/10/81C constituted on 05/12/83 to hear the emergency planning contentions.

The members are: James A. Cuserenson, ACRS LETTER RECEIVED:

09/18/81 10/19/81C Dr. Jerry R. Kline, and Dr. M.

Stanley Livingstone.

INPUTS TO SE SUPPLEMENT 4:

N/S ISSUE SE SUPPLEMENT 4:

08/15/83 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST Not required.

HEARING STARTED:

05/04/82 05/04/82C ASLB INITIAL DECISI0H 07/00/83 COMMISSIDH EFFECTIVENESS DECISION:

10/00/83 TECH SPECS COMPLETED:

08/00/83 COMMISSION DECISION:

ISSUE LIC. WITH POWER RESTRICTIDH 08/00/83 LATEST AMENDMENT ISSUE FULL POWER LICENSE AMEND 10/00/83 FSAR Amendment 27 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

The current estimate for a partial initial ASLB decision CONSTRUCTION COMPLETION - APPL.:

08/00/83 03/31/83 on all matters except offsite emergency planning is July, 1983.

A complete initial decision may not be avai10ble orior +o October. 1983.

l flj; 7

3 E

2 8 T

/

E 0

T CC CCC A

2 3

R A 88 882 D 2

/

E D 77 778 8

6 F

//

///

T

/

O 0

E L

76 078 P

0 N

O A

12 110 I

0 H

U //

///

E /

E F HBL L T

79 572 C

3 G O CML L

C 00 000 E

0 R

A EAI I

A P S BLH H A

E E

T T

CJE W T

R A

85566 8 9 5555 666 66666 6

A 6

O D

78888 7

7 8888 888 88888 8 D 8 P

PP

/////

/ /

//// / //

///// /

/

60000 0

2 1111 000 00000 0

0 E

R SS 1

2 0000 000 00000 0

D 0

R I:

NN D

20000 A12II E

/////

/ /S ////

///S ///// /

E

/

H 98912 5

1/

2212 111/

61222 2 H 2 H

000N 01111 1

C 1

C 00000 0

0H 0011 CRR S

EETD S

BBBSI D

LMMNS E

N H

SEEOE V

O D

AMMCR I

I I:

E S

TD L

C I

CN P

C IE P

E G

S R

G E

RM A

N E

N8 D

TA I1 S

IN D

S M

T S

EE LO Q P ET S

RS N

N L

RT SRR E

O S

M ENr

E N

O EH IEE HN:

RE I

E IG LLI S

T E

PO O ME1 T

HIERGH E

E S

N D T

T M D 0ED: EC T

N CHEE0A N

L:

T O E Y EETE IVENWI E

R SKLPVL O

PM N T

R BE R ELNV SITOOL L

N T

MP E S E S E TPEI ITEIP P

M O S

O M

E D DN S:

TPME : CCLS R M

0 HGJRBL E

CO M L

N EO R

IUEC DEEPIHE O

E P L

T O

I E VF TE MSLE EDFMCTW C

S I

T C

M T: IS FS:

M PR T

rOEIO M : IS DEE A

R OEP RLECDWP N

T E R

T DSE O G NECR RTE CSUR AA O

S R TS L

EID: T:

N OTE DFS:

SE TIHSN

.L I

A R LO T

STDCOCL T

.:SY A TV S S I

IER E : :

Y MCALUL T

E OEEE R TK L

OROE LTET IIEIIU C

P PBLERA N

KETDSF A ACSP TDTS U SE GNSPSLF U

CO P FS L

NISSS R

E CT N

E I D 'Q A TETE TE I

I IEE T

S S

.STN NIA M OITEOE H

U CCCUT N DSUUPU

/

L UUUU SUUA RBMHMUU S

Y IIIONM O

PSSS Y PRRR PSPS RPSM ALMCMSS N

G T LLLCAR R RRNSES T PAAA NSNS CNSE ESOEOSS O

E I

EEIIRI E ASSS IIII AIIF HACTCII C

H A V

F K

N A

I T

E S

S S d

H n

2 E

T 8

.D a

92L C H 18F s.

9 tng I

E

,16 en 5

,8

/

s mi 6

L R T

1 R

52 a

3 ed 8

w g 8 l e

/

R R

e1 1

n n '

te 2

.n B

uta at i tc 1

R U O

C rJs ngr f eo

,ena sr f

0mie.o R C Y HTS

.o ut p

o N CSA Etngc H

A EEB

/coue 8erhtr g

/ga re ng D

P BWE Au Al L

M rd f

D 2aefom in L

O etene L

2nhopm vi F

T hstor F

/a eu os 0

CX S

E SS tnr 9meIRS rs 3

l RT SN oadw 6

hI pi 8

a scteo 8

fdt xe pm

/. i W,ESO C

E AHC a stn

/

on eeh as 02 c

28 i I

OY eer 2

af s rt i

1 r oad 2d

//

f PT lhras T

I et te es han 8

51 f

&C t

nsn w

d m eP ui 9d 00 o

S E

hsoeo e

ras Q 1 n

/

n d2 w

Ora.fi

,a GY W

cairt n

gh e1 e

I NA M

e t s

IB Bocne t

n o p2 o g 6s u

n R

T 0

cuol c

or 8 e

n sd HF 5

ysrii e

i ps9 sb yo se t E

GO 2

battM l

s i1t ai iu c

sAh,co Mt s e I

1 bsc f

ss l

iQt et e

i dEnu.

e 9LW

/

e or r

m 7p dd ai f

9 S

T C 4NS W

cyct6 m nf1 sd en w

e 0O M

ab s8 o

ooo ae uo s r t

C e

t sc 1 a A

8TI l

dn/

8SM 0

pd e o 2 gdnl c s

3w w R 9U R0 Seetc1 Sd Sanrul e ie o

s 6

n 4O2 W8 Urca Ue U ioJap A

0H14P3 T

alds Ts T nrc x

Trn

t#

2 Anl eei Ai Aiaenre See Tn : s H

Teprt Tv T

eroe Udc NetSe See aD Se Sdh ds Rri EmnEl e

edii TOl MdeTu

. b r yl L

.r

.ddhes I

DnmOd ER C

teF 1

OT:

PW NNN YP Fsner Ve GieTsnI Tdd NedNe S

AO: T Aaef t

Nl Rvt ooI Nne Emn/h A

T TCIH H

Sheayn Eu Hoi l c Aas MaeSc X

EITD

.G bste d

rd.c e

o A

mPs E

H KLAICI TT er Te Tpod ls Top RaI T

CPCGAS NRsnfr Nh N

pl sla Nmo TA Ll A OPOEEE ERaoau Ec Esxeaih Eer SSRSl H

DALRRD RBhHSC RS RAehwwP RMp EFE A T

L R

R R

R T

W U

U U

U U

A E

O P

C C

C C

L N

S il{il 1fl1

,lIlIlllll 1Ilj'1ll'll l1l l

l

.ll ll ll

NRR L ICENSING SYSTEM PAGE NO: 2-20 ST LUCIE 2 LIC CURRENT STATUS REPQRT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

05000389 LIC. PM:

V.

HER$ES ASLB CHAIR:

E. BOWERS l

APPLICANT:

FLORIDA POWER & LIGHT LIC. BC G. KNIGHTON MEMEER 1:

P. MORRIS i

LOCATION:

12 MI SE OF FT. PIERCE, FLA LIC. LA.:

J. LEE MEMBER 2:

O.

PARIS REGION:

2 AE:

EBASCO COUNSEL:

W. PATTON CONST. INSP: R. WRIGHT REAC. TYPE: PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP: S. ELROD DESIGN PWR 2700 MWT/0842 MWE CONST EBASCO RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Status of Q-1 and Q-2 review is complete.

The SER was issued on 10/09/81 SE Supplement No, I was issued ER DOCKETED:

02/17/81C on 12/30/81.

SE Supplement No. 2 was issued on C9/30/82.

ER SITE VISIT COMPLETE:

02/18/81 02/18/81C SE Supplement No. 3 was issued in 4/83.

On 04/06/83 INPUT TO DES TO PM:

08/07/81 08/07/8tC licensee was issued a full power license limited to low ISSUE DES:

10/16/81 10/16/81C power testing. On 6/10/83 the full power license RESPONSE TO COMMENTS ON DES:

02/08/82 02/08/82C amendment was issued.

ISSUE FES:

04/23/82 04/23/82C CURRENT ENV. STATUS:

The DES was issued on 10/16/81 and the FR Notice was published 10/30/81. The FES was issued on 04/23/82.

SA*ETY/ HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/17/81C SAR Q'S RECEIVED BY PM:

06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

08/03/81 08/03/81C There have been no petitioners on matters dealing with ISSUE DRAFT SER:

08/10/81 08/10/81C health, safety and environment.

INPUT TO SER:

09/11/81 09/11/81C ISSUE SER:

10/09/81 10/09/81C i

ACRS FULL COMMITTEE MEETING 11/12/81 11/12/81C l

INPUTS TO SE SUPPLEMENT 3:

03/31/83 03/31/83C l

ISSUE SE SUPPLEMENT 3 04/06/83 04/06/63C l

FEMA LETTER RECEIVED:

08/20/82 08/20/82C CURRENT ANTITRUST:

Settlement among the Department of Justice, the NRC Staff HEARING STARTED:

N/A and the licensee has been agreed upon.

Case dismissea ASLB INITIAL DECISION:

N/A 3/82 following summary disposition and settlement agreement.

COMMISSION EFFECTIVENESS DECISIDH TECH SPECS COMPLETED:

03/31/83 03/31/83C COMMISSION DECISION:

06/10/83 06/10/83C ISSUE LIC. WITH POWER RESTRICTION: 04/06/83 04/06/83C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/10/83 06/10/83C No. 13 (FSAR); No. 5 (ER)

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

03/31/83C

NRR LICEN$ING SY$ TEM PAGE NC 2-29 SUSQUEHAMMA 2 0L CURRENT STATU$

REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERI$TICSt KEY PERSONNELa LIC PM:

R. PERCH ASLB CHAIR:

J. GLEASON DOCKET NO:

05000388 APPLICANT:

PENNSYLVANIA POWER 8 LIGHT LIC. BC:

A. SCHWENCER MEMBER 1:

LOCATION:

7 MI ME OF BERWICK, PA LIC. LA.:

E. HYLTON MEMBER 2:

P. PURDOM REGION:

1 AE BECH COUNSEL:

J. CUTCHIM CONST. INSP L. MARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:

A. HODGDON RESID. INSP J. MCCANN DESIGN PWR 3440 MWT/1052 MWE CONST BECH RM ANALYST L. LAMIER ENVIRONMENTAL MILESTOMES:

SCHED. DATE ACTUAL,DATE CURRENT SAF. STATUS:

SSER 95 is scheduled for 03/01/83.

[

SER was issued 04/06/81. SSER 81 was issued 07/07/81.

ER DOCKETED:

<06/10/78C Post ACRS SSER 82 was issued 09/10/81. SSER 83 was ER SITE VISIT COMPLETE:

10/20/78 10/20/78C issued 07/17/62. SSER 84 was issued 11/12/82. SSER 95 INPUT TO DES TO PM:

t was issued 3/29/83. SSER 86 is scheduled for 11/83.

ISSUE DES:

03/30/81 03/30/81C RESPONSE TO COMMENTS DW OES:

05/21/81 05/21/81C ISSUE FES:

06/15/81 07/02/81C l

l CURRENT ENV. STATUS:

I DES was issued on 03-30-81 FES was issued 07-02-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/74C SAR DOCKETED:

07/31/78 07/3t/78C l

SAR O'S RECEIVED BY PM:

SAR APPL. RESPONSE TO t'S RECEIVED 2 N/S CURRENT HRG. STATUS:

IMPUT TO DRAFT SER TO PM:

04/07/80 04/07/40C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:

INPUT TO SER:

03/23/81 03/23/41C 04-12-82.

ISSUE SER:

04/06/81 04/06/81C ACRS LETTER RECEIVED:

08/15/8tC IMPUTS TO SE SUPPLEMENT 68 02/01/83 02/03/83C ISSUE SE SUPPLEMENT 6 11/08/83 FEMA LETTER RECEIVED:

06/09/82 06/08/82C CURRENT ANTITRUST HEARING STARTED:

10/06/81 10/06/41C Complete.

ASLB INITIAL DECISION:

04/12/82 04/12/82C COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

12/08/83 COMMISSION DECISION:

12/09/83 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL PGWER LICENSE AMEND:

01/08/84 LATEST AMENDMENT:

FSAR:

No. 30; ER:

No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

01/08/84

~

NRR LICEN$ING SY$ TEM PAGE NO 2-30 WASHINGTON NUCLEAR 1 0L CURRENT. STATUS REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

05000460 LIC. PM:

M. THADANI ASLB CHAIRt M. GROSSMAN APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

E. ADENSAM MEMBER 1 G. BRIGHT LOCATION:

10 MI N OF RICHLAND, WA LIC. LA.*

M. DUNCAN MEMBER 28 J. HARBOUR REGION 5

AE UEC COUNSEL M. YOUNG CONST. INSP: J. OLIN REAC. TYPE: PWR NS$58 88W ANTITRUST J. RUTBERG RESID. INSP: A. TOTH DESIGN PWRt 3760 MWT/1266 MWE CONST: BECH RM ANALYST

  • L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATJ ACTUAL DATE Application was tendered on 11-25-81.

Appilcation was i

docketed on July 16, 1982.

The staff reviews will be ER DOCKETED:

07/09/82 07/16/82C performed on " manpower available" basis. The construction ER SITE VISIT COMPLETE permit was amended effective 06/f6/83, extending the INPUT TO DES TO PM:

construction completion date from 01/01/82 to 06/01/91.

ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

ISSUE FES:

N/$

CURRENT ENV. STATUS The staff reviews will be performed on

  • Manpower available" basis.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED 11/25/81 11/25/81C SAR DOCKETED:

07/08/82 07/16/82C SAR Q'S RECEIVED BY PMt SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

IhPUT TO DRAFT SER TO PM:

Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER Federal Register on August 16, 1982.

A petition to INPUT TO SER:

intervene has been received.from the Coalition for ISSUE SER N/S Safe Power. A prehearing conference was held in Richland, Wa., on January 26 and 27, 1983.

ASLB ACRS FULL COMMITTEE MEETING N/S deniad CP amended hearing contention 01, and admitted INPUTS TO SE SUPPLEMENT 1 CP contention 82.

The schedules for CP extension-ISSUE SE SUPPLEMENT 1 N/S hearing in preparation.

FEMA LETTER RECEIVED:

CURRENT ANTITRUST HEARING STARTED:

N/S ASLB INITIAL DECISION:

N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

COMMISSION DECISION:

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT ISSUE FULL POWER LICENSE AMEND:

N/S ER amend. I dated 02/11/83, received 03/04/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.:

N/S 04/29/82 on 4/29/82.

~

HRR LICEN5IHG SYSTEM PAGE HO: 2-31 l

{

WASHINGTON NUCLEAR 2 0L CURREHT STATUS REPORT REPORT AS OF 06/30/83 PLAHT C H A R A C T E R I S T I C S:

KEY PERS0HHEL:

DOCKET NO:

05000397 LIC. PM:

R. AULUCK ASLB CHAIR E. BOWERS APPLICANT:

WASHINGTOH PUBLIC POWER SUPPLY SYSTEM LIC. BC:

A.

SCHWENCER MEMBER 1 R. COLE LOCATION:

30 MI NW OF RICHLAND, WASH LIC. LA.:

E. HYLTON MEMBER 2 E. HILL REGION:

5 AE:

B8R COUNSEL:

W. PATON CONST. INSP:

A.

TOTH REAC. TYPE: BWR HSSS: GE ANTITRUST:

B. V0GLER RESID. INSP R.

FEIL DESIGN PWR 3323 MWT/1103 MWE CONST: BECH RM ANALYST:

L. LAHIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

l SER was issued 3/31/82. Geology / Seismology reviews were included in SSER Ho. 1 issued August 11, 1982.

ACRS ER DOCKETED:

02/28/77 04/20/77C l

meeting was held on October 7, 1982.

SSER No. 2 was ER SITE VISIT COMPLETE:

07/13/77 07/14/77C issued 12/21/82. SSER 83 issued on 05/20/83.

INPUT TO DES TO PM:

06/30/81 06/30/81C ISSUE DES:

07/31/81 07/31/81C RESP 0 HSE TO COMMENTS ON DES:

09/28/81 09/28/81C l

ISSUE FES:

12/31/81 12/31/81C l

l CURRENT ENV. STATUS:

FES was issued 12-31-81 SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

12/30/76 12/30/76C SAR DOCKETED:

04/01/78 06/22/78C SAR Q'S RECEIVED BY PM 01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C INPUT TO DRAFT SER TO PM:

10/12/81 10/12/81C CURRENT HRG. STATUS:

A prehearing conference on CP extension order was held ISSUE DRAFT SER:

11/17/81 11/17/81C on January 26, 1983, in Richland, Wa.

On February 22, INPUT TO SER:

05/30/82 05/30/82C 1983, the ASLB denied the request for hearing filed by ISSUE SER:

03/31/82 03/31/82C the Coalition for Safer Power and dismissed the proceeding.

ACRS LETTER RECEIVED 11/13/82 11/13/82C No OL hearings scheduled.

INPUTS TO SE SUPPLEMENT 3:

11/22/82 11/22/82C ISSUE SE SUPPLEMENT 38 05/20/83 05/20/83C FEMA LETTER RECEIVED:

08/01/83 CURRENT ANTITRUST:

HEARING STARTED:

N/A l

Hot required ASLB INITIAL DECISIDH N/A COMMISSION EFFECTIVENESS DECISIDH:

l TECH SPECS COMPLETED:

07/00/83 l

COMMISSIDH DECISION:

08/00/83 I

ISSUE LIC. WITH POWER RESTRICTION:

j ISSUE FULL POWER LICENSE AMEND:

09/00/83 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

01/00/83 05/07/82 I

l

t

(

HRR LICEHSING SYSTEM PAGE NO: 2-32 WASHINGTON NUCLEAR 3 0L CURRENT STATUS REPORT REPORT AS OF 06/33/83 PLAHT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000508 LIC. PM:

A. VIETTI ASLB CHAIR:

M. MARQULIES APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC, BC:

G. KNIGHTON MEMBER 1 G. BRIGHT LOCATION:

26 MI W OF OLYMPIA, WA LIC. tA.:

J. LEE MEMBER 2:

J. CARPENTER REGION:

5 AE:

EBASCO COUNSEL:

D. HASSELL CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRJST:

B. V0GLER RESID. INSP: W. ALBERT DESIGH PWR 3800 MWT/1242 MWE CONST EBASCO RM ANA?.YST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on June 2, 1982, and was docketed on 08/27/82.

Review effort from FSAR docket ER DOCKETED:

08/27/82 08/27/82C thru applicant responses to Q's.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

07/08/83 ISSUE DES:

09/07/83 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

04/06/84 CURRENT ENV. STATUS:

Application was tendered on June 2, 1982, and was I

docketed on 08/27/82. Review effort from ER docket SAFETY / HEARING MILESTONES:

l thru preparation and issuance of the DES.

i APPLICATI0H TENDERED:

06/02/82 06/02/82C SAR DOCKETED:

08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:

07/00/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/13/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/28/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/83 Federal Register on 09/15/82. On February 25, 1983, a INPUT TO SER:

06/05/84 request for a hearing and petition for leave to intervene ISSUE SER:

08/09/84 was received from coalition for Safe Power of Portland, Oregon.

On April 21, 1983 the Licensing Board handed down ACRS FULL COMMITTEE MEETING:

09/00/84 an order to accept its late filed petition. Prehearing INPUTS TO SE SUPPLEMENT 1:

11/06/84 is currently scheduled for August 3-4, 1983.

ISSUE SE SUPPLEMENT 18 12/13/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

f Hotice of receipt of Antitrust Information was published HEARING STARTED:

05/00/85 in the Federal Register on October 27, 1983.

ASLB IHITIAL DECISIDH 11/00/85 COMMISSION EFFECTIVENESS DECISION: 12/00/85 TECH SPECS COMPLETED:

12/00/85 COMMISSIGH DECISION:

12/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Unless alternative finarcing is found, the unit CONSTRUCTION COMPLETI0H - APPL.:

12/00/85 10/01/82 will be mothballed for three years.

~

NRR L ICEN$ING S Y S T E T1 PACE NO: 2-33 WATERFORD 3 0L CURRENT STATUS REPORT REPORT AS OF 06/30/83 f

PLANT CHARACTERISTICSt KEY PERSONNEL DOCKET NO:

05000382 LIC. PM:

J. WILSON ASLB CHAIR:

S. WOLFE APPLICANT:

LOUISIANA POWER 8 LIGHT LIC. BC:

G. KNIGHTON MEMBER is W. JORDAN I

LOCATION:

20 MI W OF NEW ORLEANS, LA LIC. LA.:

J. LEE MEMBER 2:

H.

FOREMAN I

REGION:

4 AE EBASCO COUNSEL:

S.

TURK CONST. INSP UNASSIGNED REAC. TYPE: PWR HSSS: COMB ANTITRUST B. V0GLER RESID. INSP:

L. CONSTABLE DESIGN PWR 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST L. LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The safety review was expedited. Fuel load date delayed until 05/83 by applicant. SSER 04 issued ER DOCKETED:

12/00/78 12/00/78C ER SITE VISIT COMPLETE:

12/05/80 12/05/80C 10/29/82.

INPUT TO DES TO PM:

04/06/81 04/06/81C ISSUE DES 2 05/01/81 05/01/81C RESPONSE TO CCMMENTS ON DES:

07/24/81 08/19/81C ISSUE FES:

09/30/81 09/30/81C CURRENT ENV. STATUS:

The DES was completed in May 1981.

FES was completed SAFETY / HEARING MILESTONES:

September 1981 APPLICATION TENDERED:

09/28/78 09/28/78C SAR DOCKETED:

12/18/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C INPUT TO DRAFT SER TO PM:

10/03/80 05/15/81C

(

CURRENT HRG. STATUS:

I Contested hearing started 03/82.

Partial initial ISSUE DRAFT SER:

l decision issued 11/03/82.

Hearing for remaining item INPUT TO SER:

05/08/81 05/15/81C l

(emergency preparedness) was held February 7-11, 1983.

ISSUE SER:

07/09/81 07/09/81C l

Record closed February 11, 1983.

Appeal Board hearing was held April 19, 1983 to hear rebuttal of 11/03/82 PID.

ACRS LETTER RECEIVED:

08/08/81 08/08/81C Second partial initial decision issued 05/24/83 by ASLB.

INPUTS TO SE SUPPLEMENT 5:

05/18/83 05/18/83C ISSUE SE SUPPLEMENT 5:

02/28/83 06/30/83C FEMA LETTER RECEIVED:

09/15/83 CURRENT ANTITRUST:

Staff is reviewing OL antitrust information.

HEARING STARTED:

03/00/82 03/23/82C ASLB INITIAL DECISION:

10/00/82 05/24/83C COMMISSION EFFECTIVENESS DECISION: 07/00/83 TECH SPECS COMPLETED:

07/00/83 COMMISSION DECISION:

ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

05/00/83 LATEST AMENDMENT:

ER #3 - 8/81 SCHED. DATE RECEIPT DATE FSAR #31 - 3/83.

NEW SLIPS / NOTES:

To date State of Louisiana does not have an aoproved CONSTRUCTION COMPLETION - APPL.:

05/00/83 08/24/82 emergency plan.

l l

HRR LICENSING SY$ TEM PAGE NO 2-34 WATTS BAR 1 82 0t CURRENT STATUS REPORT REPORT AS OF 06/30/83 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

039080391 LIC. PM:

T. KENYON ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1 N/A LOCATION:

10 MI S OF SPRING CITY, TENN LIO. LA.:

M.

DUNCAN MEMBER 2:

N/A REGION:

2 AE:

TVA COUNSEL:

M. YOUNG CONST. INSP W.

SWAN REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSPs T. HEATHERLY DESIGN PWR: 3411 MWT/1165 MWE CONST: TVA RM ANALYST:

L.

LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 06/84.

SER published 07/82.

ACRS subcommittee meetings held ER DOCKETED:

01/05/77 11/23/76C 04/30/82 and 08/10/82.

ACRS full committee meeting ER SITE VISIT COMPLETE:

03/18/77 02/25/77C held 08/13/82.

ACRS letter received 08/16/82.

Supplement INPUT TO DES TO PM:

07/06/77 08/18/77C 81 to SER published 09/22/82. Supplement 82 to SER ISSUE DES:.

11/29/77 06/02/78C scheduled 11/83.

RESPONSE TO COMMENTS ON DES:

N/A ISSUE FES:

11/24/78 12/29/78C CURRENT ENV. STATUS:

Complete except for environmental tech specs.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/30/76 06/30/76C SAR DOCKETED:

10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:

12/15/76 05/20/77C SAR APPL. RESPONSE TO Q'S RECEIVED 03/23/77 02/10/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/18/80 12/18/81C No hearings are assumed.

ISSUE DRAFT SER:

12/30/81 12/30/8tC INPUT TO SER' 06/04/82 06/04/82C ISSUE SER:

07/01/82 07/01/82C ACRS LETTER RECEIVED:

09/00/82 08/16/82C INPUTS TO SE SUPPLEMENT 28 08/27/82 09/03/82C ISSUE SE SUPPLEMENT 2 11/00/83 FEMA LETTER RECEIVED:

09/01/83 CURRENT ANTITRUST:

Complete HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

07/00/83 COMMISSION DECISION:

12/00/83 ISSUE LIC. WITH POWER RESTRICTION: 01/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

03/00/84 FSAR Ho. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

01/00/84 02/25/83 I

,/'

yL

PAGE HO 2-35 HRR LICEHSIHG SY$ TEM WOLF CREEK 1 0L CURRENT STATUS REPORT REPORT AS OF 06/30/83 KEY PERS0HHEL PLANT CHARACTERI5TICSt LIC. PM:

J. HOLONICH ASLB CHAIR J. LAURENSON LIC. BC:

B. YOUNGELOOD MEMBER 1 G. ANDERSON DOCKET NO:

05000482 APPLICANT:

KANSAS GAS & ELECTRIC LOCATION:

3.5 MI HE OF BURLINGTON, KAH LIC. LA.:

M. RUSHBROOK MEMBER 2r

.H.

PAXTOH REGIDH 4

AE BECH COUNSEL:

M. KARMAN CONST. INSP H. ROBERDS REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP S. SCHUN DESIGN PWR 3425 MWT/1150 MWE CONST DAHIEL PM ANALYST S. HEDLUND l

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The SER was issued in April 1982.

SSER-1 was issued in 11/25/80 11/25/80C ER DOCKETED:

August 1982 and SSER-2 in June 1983.

ER SITE VISIT COMPLETE:

07/28/81 04/21/81C INPUT TO DES TO PM:

10/01/81 10/01/81C ISSUE DES:

01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:

05/14/82 05/14/82C l

ISSUE FES:

06/11/82 06/11/82C 1

l l

l l

CURRENT ENV. STATUS:

l The DES was issued in January 1982.

The FES was issued SAFETY / HEARING MILESTONES:

l In June 1982.

APPLICATI0H TENDERED:

02/21/80 02/21/80C SAR DOCKETED:

08/07/80 08/07/80C l

SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

03/12/82 03/12/82C STATUS:

ISSUE DRAFT SER:

CURRENT HRG.

Hotice of Opportunity for Hearing was published in the Federal Register on 12/18/80. Two petitions for INPUT TO SER:

03/19/82 03/19/82C leave to intervene were filed. A special combined ISSUE SER:

04/07/82 04/07/82C prehearing conference was held on 4/15/81.

A second prehearing conference was held on March 10, 1983.

ACRS LETTER RECEIVED:

05/11/82 05/11/82C Hearing is tentatively scheduled for Sept. 20-29, 1983 INPUTS TO SE SUPPLEMENT 32 06/30/83 ISSUE SS SUPPLEMENT 3 08/30/83 l

l and Oct. 18-27, 1983.

FEMA LETTER RECEIVED:

07/15/83 CURRENT ANTITRUST:

HEARING STARTED:

09/20/83 OL antitrust review is in progress.

ASLB IHITIAL DECISIDH:

03/00/84 COMMISSIDH EFFECTIVEHESS DECISIDH 04/00/84 TECH SPECS COMPLETED:

07/00/84 COMMISSIDH DECISIGHz 07/00/84 ISSUE LIC. WITH POWER RESTRICTION: H/S ISSUE FULL POWER LICENSE AMEHD 08/08/84 LATEST AMENDMENT:

SHUPPS FSAR - No. 11; Wolf Creek Site Addendum - Ho. 10; SCHED. DATE RECEIPT DATE ER - Ho. 4.

NEW SLIPS /HOTES:

CONSTRUCTION COMPLETI0H - APPL.:

08/00/84 08/24/82 L--

HRR L I C E H S-I H G

$YSTEM PAGE N0s 2-36 ZIMMER 1 0L CURREHT STATUS REPORT REPORT AS OF 06/30/83 PLAHT C H A R A C T E R I S T I C 5:

KEY P E R S 0 N N E La DOCKET NO 05000358 LIC. PM L. KINTHER ASLB CHAIR:

J. FRYE APPLICANT:

CINCINNATI GAS 8 ELECTRIC LIC. BC:

B. YOUNGBLOOD MEMBER 18 F. HOOPER LOCATION:

24 MI SE OF CIHCINHATI, OH LIC. LA.:

M. RUSHBROOK MEMBER 28 M. LIVINGSTON REGION:

3 AE

$8L COUNSEL:

C. BARTH CONST. INSP D. HUNTER REAC. TYPE: BWR HSSS: GE ANTITRUST:

S. LEWIS RESID. 1HSP: F. CHRISTIAHSON DESIGN PWR 2436 MWT/0810 MWE CONST: KAISER RM ANALYST B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SE Supplement 81 was issued on 06/04/81 SE Supplement 82 was issued 10/81 SE Supplement 83 issued on 08/23/82.

ER DOCKETED:

09/10/75 09/10/75C NRR is assisting Region IV in its vendor inspection of the ER SITE VISIT COMPLETE:

10/09/75 10/09/75C main steam line and its supporting structures in the INPUT TO DES TO PM:

08/20/76 08/19/76C turbine building. Resolution of open items in the safety ISSUE DES:

10/15/76 10/15/76C review is contlaving.

RESPONSE TO COMMENTS ON DES:

03/25/77 04/01/77C ISSUE FES:

06/10/77 06/10/77C CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/15/75 05/09/75C SAR DOCKETED:

09/15/75 09/1C/75C SAR Q'S RECEIVED BY PM:

10/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/28/77 08/11/77C Hearing completed 3/5/82.

Licensing Board decision rendered ISSUE DRAFT SER:

N/A 6/82, which precludes the HRC staff from issuing a full-INPUT TO SER:

05/20/77 12/07/77C power license and orders additional hearings after FEMA ISSUE SER:

07/29/77 01/31/79C assessment of emergency plans.

On 11/12/82 the Commission issued an order to Show Cause & Order Immediately Suspending ACRS LETTER RECEIVED:

09/16/77 03/13/79C Construction because of quality assurance concerns.

INPUTS TO SE SUPPLEMENT 3:

06/17/82 08/02/82C On 12/8/82, applicant consented to the Order. On 5/2/83, ISSUE SE SUPPLEMENT 3 08/23/82 08/23/82C Appeal Board affirmed Licensing Board's decision with mods.

FEMA LETTER RECEIVED:

04/t5/82 04/15/82C CURRENT ANTITRUST:

Antitrust review is now closed.

HEARING STARTED:

02/26/82 02/26/82C ASLB INITIAL DECISION:

N/S COMMISSIGH EFFECTIVEHESS DECISI0Hz N/S TECH SPECS COMPLETED:

11/00/84 COMMISSIGH DECISIDH 11/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/84 Application amendment 148, FSAR Revision 95 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant letter of 06/01/83 revised estimated construction CONSTRUCTION COMPLETION - APPL.:

12/00/84 060183 AP completion date to the fourth quarter of 1984.

Applicant letter of 01/24/82 requested latest construction completion date of 12/31/84.

HRR LICEH$IHG SYSTEM PAGE NO: 2-37 CLINCH RIVER CP CURREHT STATUS REP 0RT REPORT AS OF: 06/30/83 f

PLA1T CHARACTERIST I C S:

KEY P E R S 0 N N E L:

LIC. PM R. STARK ASLB CHAIR:

M. MILLER APPLICANT:

PROJECT MANAGEMENT CORP.; DOE;TVA LIC. BC:

H.

GRACE MEMBER 1:

G. LINENBERGER DOCKET NO:

05000537 LOCATION:

25 MI W OF KNOXVILLE, TN LIC. LA.:

P. SHUTTLEWORTH MEM*ER 2:

C. HAND REGION:

2 AE:

B8R COUNSEL:

S.

TREBY CONST. INSP:

REAC. TYPE: LMFBR HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP:

{

DESIGN PWR: 0975 MWT/0350 MWE CONST: 58W Rf1 ANALYST B. ST MARY j

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Safety review was reinitiated in October 1981.

A revision to the Site Suitability Report was issued June 11, 1982.

ER DOCKETED:

04/11/75 04/11/75C On August 17, 1982, NRC issued an order granting Clinch ER SITE VISIT COMPLETE:

l INPUT TO DES TO PM:

River's request to begin site preparation activities.

02/12/76C ISSUE DES:

i l

The Site Suitability Report heari'nq sessions were held RESPONSE TO COMMENTS OH DES:

in Oak Ridge during the week of August 23, 1982.

SER was i ssued 3/11/83.

The ACRS meeting was held 4/14/83.

LWA-2 ISSUE FES:

02/07/77 02/07/77C l

will not be requested. Safety hearing i s to commence July 18, 1983.

Supplement No. I was issued on 5/2/83 and Supplement No. 2 was i ssued on 5/20/83.

CURRENT ENV. STATUS:

The FES was issued in February 1977.

A draft supplement to the FES was issued on July 19, 1982.

A final supplement SAFETY / HEARING MILESTONES:

was issued on October 29, 1982.

APPLICATION TENDERED:

10/15/74 10/15/74C SAR DOCKETED:

06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:

04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED 05/15/82 05/15/d2C INPUT TO DRAFT SER TD PM:

07/16/82 07/16/82C ISSUE DRAFT SER:

09/27/82 09/27/82C CURRENT HRG. STATUS:

Hearing sessions on the SSR took place on August 23-27, 1982.

The FES hearings were held November 15-19, 1982, INPUT TO SER:

01/14/83 02/04/83C December 13-17, 1982, and on January 4-5, 1983.

The safety ISSUE SER:

03/11/83 03/11/83C hearings are forecasted for July 18, 1983.

PID was issued ACRS LETTER RECEIVED:

04/19/83 04/19/83C on 02/28/83 on the FES hearing.

IHPUTS TO SE SUPPLEMENT 18 04/22/83 04/22/81C ISSUE SE SUPPLEMENT 2:

05/20/83C CURRENT ANTITRUST:

HEARING STARTED:

08/23/82 08/23/82C ASLB INITIAL DECISI0H:

04/01/84 COMMISSIDH EFFECTIVEHESS DECISIDH 06/00/84 TECH SPECS COMPLETED:

COMMISSIDH DECISION:

06/00/84 CP ISSUED:

06/00/84 LATEST AMENDMENT:

HEW SLIPS /HOTES:

I

NRR LICENSING SYSTEN PAGE NO: 2-38 SKAGIT/HANFORD 182 CP CURRENT STATUS REP 0RT REPORT AS OF 06/30/83 PLANT CHARACTERISTICS KEY P E R S O N N E L:

DOCKET NO:

052280523 LIC. PM:

M.

THADANI ASLB CHAIR:

J. WOLF APPLICANT:

PUGET SOUND POWER 8 LIGHT LIC. BC:

E. ADENSAN MEMBER 18 F. HOOPER LOCATION:

12 MI. NW OF RICHLAND, WA.

LIC. LA.:

M. DUNCAN MEMBER 2:

G. LINENBERGER REGIDH2 5

AE BECH COUNSEL:

L. DEWEY CONST. INSP REAC. TYPE: BWR HS$$8 GE ANTITRUST:

b. V0GLER RESID. INSP:

DESIGN PWR 3833 MWT/1277 MWE CONST BECH RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI related action items.

Site relocation ER amendment and PSAR ER DOCKETED:

09/30/74 09/30/74C amendment were submitted on 12/31/81 The applicant is ER SITE VISIT COMPLETE:

02/05/82 02/05/82C relocating the site to the Hanford Reservation.

INPUT TO DES TC PM:

04/09/82 04/09/82C Supplement 3 to the SER was issued in 12/82.

The staff ISSUE DES:

05/04/E2 05/04/82C recommends additional investigations of the May Junction RESPONSE TO COMMENTS ON DES:

08/06/82 09/30/82C Monocline. An ACRS subcommittee site visit and meeting ISSUE FES:

06/30/83 was complete on 01/24-25/83.

The ACRS completed its review in a meeting on 02/10/83 and reported the results of its review in a letter to the chairman on 02/16/83.

CURRENT ENV. STATUS:

Site relocation (to Hanford) DES was issued on 5/4/82.

In response to the applicant's request of 2/4/83, issuance of SAFETY / HEARING MILESTONES:

l the FES had been defered until issuance of the Northwest Conservation and Electric Power Plan by the Northwest Pcwer APPLICATION TENDERED:

08/06/74 08/06/74C Council. On 4/27/83 Council adopted its first plan.

The SAR DOCKETED:

01/15/75 OS/15/75C proposed portfolio of electrical resources for the next 20 SAR Q'S RECEIVED BY PM:

02/10/82 02/10/82C years did not include S/HNP.

SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/82 10/01/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A prehearing schedule on safety matters was established on ISSUE DRAFT SER:

1/18/83 including a tentative date of 5/17/83 for beginning INPUT TO SER:

07/11/77 07/11/77C of hearing.

Applicants on 2/4/83 and the intervenors on ISSUE SER:

08/31/77 08/31/77C 2/10/83 submitted motions to suspend the safety prehearing schedule. On 2/18/83 the Board suspended the prehearing ACRS LETTER RECEIVED:

01/00/83 02/16/83C schedule (Safety) including the filing of new contentions INPUTS TO SE SUPPLEMENT 3:

11/30/82 ft/30/82C pending adoption of the Final Regional Power Plan and until ISSUE SE SUPPLEMENT 32 11/30/82 12/30/82C the conclusion of hearings on "Need for Power".

CURRENT ANTITRUST:

Complete HEARING STARTED:

07/15/73 07/15/75C ASLB INITIAL DECISION:

N/$

COMMISSION EFFECTIVENESS DECISIDH: N/S TECH SPECS COMPLETED:

N/A COMMISSION DECISIDH N/S CP ISSUED:

N/S l

LATEST AMENDMENT:

HEW SLIPS / NOTES:

I o

HRR LICEHSING

$YSTEM PAGE HO: 2-39 (HSS)CESSAR SYSTEM 80 FDA CURREHT STATUS REP 0RT REPORT AS OF 06/30/83 PLAHT CHARACTERISTICSt KEY PERS0HHELa i

DOCKET HO 05000470 LIC. PM:

G. MEYER ASLB CHAIR:

}

APPLICANT:

COMBUSTION ENGINEERING LIC. BC:

C. THOMAS MEMBER 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 28 REGION:

C AE COUNSEL:

M. WAGNER CONST. INSP:

f REAC. TYPE: PWR NSSS: COMB ANTITRUST:

RESID. INSP DESIGN PWR 3800 MWT/1295 MWE CONST:

RM ANALYST S. HEDLUND ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER (NUREG-0852) issued 11/81.

Awaiting documentation to resolve ACRS, open, and confirmatory issues. SSER-1 was ER DOCKETED:

issued 03/30/83. SSER-2 is scheduled to be issued on ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

07/29/83.

scheduled for May 31, 1983.

ISSUE DES:

RESPONSE TO COMMENTS OH DES:

ISSUE FES:

1 CURRENT ENV. STATUS:

N/A.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

10/27/78 10/27/78C SAR DOCKETED 12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:

09/01/80 09/01/81C SAR APPL. RESPONSE TD Q'S RECEIVED: 01/01/81 07/15/81C INPUT TO DRAFT SER TO PM:

H/S CURRENT HRG. STATUS:

ISSUE DRAFT SER:

N/S N/A.

INPUT TO SER:

11/01/81 11/13/81C ISSUE SER:

05/01/82 11/10/81C ACR$ LETTER RECEIVED:

06/21/82 12/15/81C I

l INPUTS TO SE SUPPLEMENT 2 07/15/83 ISSUE SE SUPPLEMENT 2:

07/29/83 CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISIDH N/A COMMISSIDH DECISIDH SPECIAL PROJECT COMPLETE:

07/29/83 LAIEST AMENDMENT:

NEW SLIPS / NOTES:

NRR LICEHSIHG SYSTEM PAGE HO 2-40 (NSS)GESSAR SEVERE ACC FDA CURREHT STATUS REPORT REPORT AS OF: 06/30/83 PLAHT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E La DOCKET NO:

00007447 LIC. PM:

D. SCALLETTI ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

C.

THOMAS MEMBER 1:

N/A LOCATION:

N/A LIC. LA.:

P.

ANDERSON MEMBER 2:

N/A REGION:

0 AE:

BRAUN COUNSEL:

B. BORDENICK CONST. INSP:

REAC. TYPE: BWR HSSS: GE ANTITRUST:

RESID. INSP DESIGH PWR: 3579 MWT/f220 MWE CONST*

RM ANALYCT:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Dates shown reflect review for the severe accident ER DOCKETED:

design.

ER SITE VISIT COMPLETE:

INPUT TO DES 10 PM:

ISSUE DES:

< RESPONSE TO COMMENTS QM DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

05/31/80 03/31/80C S4R LCCrEYED:

02/22/82 02/22/82C SAR Q'S kdCEIVED BY PM:

09/01/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 02/01/83C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT TO SER:

02/01/84 ISSUE SER:

03/01/84 ACRS FULL COMMITTEE MEETING:

04/06/84 INPUTS TO SE SUPPLEMENT 1:

04/21/84 ISSUE SE SUPPLEMENT 1 05/25/84 CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB IHITIAL DECISI0H:

N/A COMMISSION DECISION:

N/A SPECIAL PROJECT COMPLETE:

05/00/34 LATEST AMENDMENT:

FSAR Amendment No. 14 was received in April, 1983.

s NEW SLIPS /H01ES:

t

T HRR LICEH$IHG SYSTEM PAGE HO: 2-41

'(HSS)GESSAR-238 HI FDA CURREHT STATUS REP 0RT REPORT AS OF 06/30/83 PLAHT C H A R A C T E R I 5 T I C S:

KEY PERS0HHEL3 LIC. PM:

D. SCALETTI ASLB CHAIR N/A DOCKET HO:

05000447 A.P P L I C AN T :

GENERAL ELECTRIC COMPANY LIC. BC:

C.

THOMAS MEMBER 1 N/A LIC. LA.:

P.

ANDERSON MEMBER 2 N/A t

LOCATION:

N/A REGIDH:

0 AE:

BPAUH COUNSEL:

B. BORDENICK CONST. INSP f

REAC. TYPE 4 CWR HSSS: GE ANTITRUST:

RESID. INSP DESIGN PWR 3579 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

GESSAR II was docketed 02/82.

The foundation analysis issue will reouire special attention. PRA for severe ER DOCKETED:

accident design was submitted 4/82.

Severe accident ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

design modifications were submitted 6/82 in Amendment Ho.

4.

GE.has requested the EDO to accelerate the ISSUE DES:

RESPONSE TO COMMENTS ON DES:

PRA review schedule to coincida with the FDA.

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR O'S RECEIVED BY PM:

10/15/82 10/08/820 SAR APPL. RESPONSE TO Q'S RECEIVED: 11/12/82 02/11/83C INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

ISSUE DRAFT SER:

INPUT TO SER:

03/25/83 03/25/83C ISSUE SER:

04/01/83 04/08/83C ACRS LETTER RECEIVED:

06/15/83-06/15/83C INPdTS 10 SE SUPPLEMENT 18 05/24/83 ISSUE SE SUPPLEMENT 18 06/30/83 CURRENT ANTITRUST:

HEARING STARTED:

N/A FDA antitrust review is in progress.

ASLB IHITIAL DECISI0H:

N/A COMMISSIGH DECISIGHz 07/00/83 SPECIAL PROJECT COMPLETE:

07/00/83 LATEST AMENDMENT:

FSAR Amendment Ho. 14 was received in April, 1983.

NEW SLIPS /HOTES:

  • v NRR LICEN$2NG SYSTEM AS oft 06/30/83 NON-POWER RENEWAL $

INPUT ISSUE' DOCKET EARLIEST ISSUEN TER ISSUE FES OR STARf ISSUE NON-POWER FACILITY NUMBER DOCKET 211 TO PM 1ER 11A NEARING AL COMMENTS AFRRI 05000170 10/80C N/A 09/81C 01/82C N/A 06/83 N/S CONTESTED CASE 1000.0000KW TRIGA e-- -

CORNELL U.

05000157 05/80C M/A 02/83C 07/83 07/83 N/A 07/83 100.0000KW TRIGA CORNELL UNIVERSITY' 05000097 10/78C N/A 02/83C 08/83 08/83 N/A 08/83

.1000KW CRITI GE TEST REACTOR 05000070 07/77C N/S N/S N/S N/S N/S N/S ORDER TO SHOW CAUSE.

50.0000KW TANK ASLAB HEARINGS.

GE, NTR 05000073 11/79C N/A 06/84 09/84 09/84 N/A 09/84 100.0000KW POOL IOWA STATE 05000116 09/79C N/A 09/83 09/83 09/83 N/A 09/83 10.0000KW ARGNT

- MANHATTAN COLLEGE 05000199 08/83 N/A 08/84 10/84 10/84 N/A 10/84

.0001KW CRITI MICHIGAN STATE 05000294 09/77C N/A 12/83 12/83 N/A N/A 12/83 250.0000KW TRIGA NBSR 05000184 12/80C 02/82C 09/82C 08/83 09/82C M/A G8/83 POWER INCREASE TO 20 MW 10.0000KW TANK INCLUDED IN RENEWAL RENSSELAER 05000225 05/79C N/A 05/83 09/83 09/83 N/A 09/83

.0000KW CRITI STATE U OF NEW YORK 05000057 06/79C N/A 12/82C 05/83C N/A N/A 07/83C 2000.0000KW PULSR U. OF KANSAS 05000148 03/80C N/A 02/84 04/84 04/84 N/A 04/84 250.0000KW POOL U. OF MD.

05000166 05/80C N/A 10/83 12/83 N/A N/A 12/83 250.0000KW TRIGA U. OF MO., ROLLA 05000123 10/79C N/A 04/84 06/84 N/A N/A 06/04 200.0000KW POOL U. OF OKLA.

05000112 10/78C N/A 05/83C 08/83 08/83 N/A 08/83

.0150KW AGN U. OF TEXAS 05000192 05/80C N/A 03/83C 06/83C 07/83 N/A 07/83 250.0000KW TRIGA

HRR LICENSING SYSTEM AS OF206/30/83 NON-POWER RE9EWALS INPUT ISSHE DOCKET EARLIEST ISSUEN TER ISSUE FES OR START ISSUE HON-POWER FACILITY NUMBER DOCKET Dfi TO PM IIR EIA NEARING AL COMMENTS U. OF UTAN 05000407 05/83 N/A 11/83 02/84 N/A N/A 02/84 100.0000KW TRIGA U. OF VA.. CAVALIER 05000396 06/84 N/A 07/84 09/84 N/A N/A 09/84

.1000KW POOL UCLA, ARGONAUT 05000142 02/80C N/A 19/82C 06/81C 06/81C 09/80C N/S CONTESTED CASE 100.0000KW ARGHT UNION CARBIDE 05000054 05/80C N/A 10/82C 09/83 09/83 N/A 09/83 5000.0000KW POOL VA N0 SPITAL 05000131 01/80C N/A 07/83 07/83 N/A N/A 07/83 18.0000KW POOL VA. POLY. INSTITUTE 05000124

~;0/79C N/A 10/83 12/83 12/83 N/A 12/83 100.0000KW ARGHT WEST., TRAINING REACTOR 05000087 12/81C N/A 11/83 02/84 02/84 N/A 02/84 10.0000KW TANK M FOR TEST REACTORS ONLY

i e

M M

M E

O M

U uJ to t

l NRR LICENSING SYSTEM PAGE HO: 2-0L CURREHT STATUS REPORT REPORT AS OF PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET HO:

Docke_t No.or Project No.,if not docketed LIC. PM:

Licensing Project Manager ASL8 CHAIR: ASLB Chairman APPLICAHT:

Utility LIC.-BC:

Licensing Branch Chief MEMBER t on panel LOCATION:

Miles and direction from nearest major town.

LIC. LA.:

Licensing Assistant MEMBER 2*

.on panel REGIDH:

1 through 5 AE:

Architect / Engineer COUNSEL:

Attorney assiyted to case CONST. INSP: Construction inspector REAC. TYPE: PWR,BWR, HTGR or LMFBR HSSS: Nuclear Steam Systems Supplier AHTITRUST:

Antitrust Attorney RESID INSP: Resident inspector DESIGH PWR: Megawatts electric 8:' thermal CONST: Constructor MP A AH A LYST : MPA analyst assigned to track prog,ect CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outsteriding issues and late input from ER DOCKETED:

Environmental Report review branches should be indicated, along with indication of the critical path.

P O

T Project Manager

-ISSUE DES:

Draftinvironmental Statement RESPONSE TO COMMENTS ON DES:

ISSUE FES Final Environmental Statement CURRENT ENV. STATUS:

Environmental status for this reporting period only, it consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:

input from review branches should be indicated.

APPLICATION TENDERED:

SAR DOCKETED:

Safety Analysis Report SAR Q'S RECEIVED BY PM:

SAR APPL. RESPCHSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Changes in the hear:ng ustes since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER:

Safety Evaluation Report contentions should be indicated.

R i

ACRS LETTER RECEIVED:

Advisory Committee INPUTS TO SE SUPPLEMENT 3:

on Reactor Safeguards ISSUE SE SUPPLEMENT 3:

FEMA LETTER RECEIVED:

Safety Evaluation Supplement CURRENT ANTITRUST:

Changes in the antitrust status since the last issue of Blue Book.

HEARING STARTED:

ASLB INITIAL DECISION:

Atomic Safety 8: Licensing Board ASLB FINAL DECISIDH:

TECH SPECS COMPLETED:

C0ftMISSION DECISION:

ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

The latest amendment submitted by the applicant.

SCHED. DATE RECEIPT DATE Slips t t a problems that should be brought to management's attention.

CONSTRUCTION COMPLETIDH - APPL :

[

'g*e,'I,f g

construction in construction completion completion

  • U.S. cOVERNMENT PRINTING OFFICE: 1983-381-299:143

O #

e Oxu 335 f,R U S NUCLE AR REGUL ATORY COMMISSION BIBLIOGRAPHIC DATA SHEET NUREG-0580 vol luo. #;

4 TIT LE AND SUBTITLE (Add Ves me No,et apprme.are) 2 flroar tuashI u

Regulatory Licensing Status Summary Report (Bluebook) a recipient S ACCESSION NO.

7. AUTHORIS)
5. DATE REPORT COMPLETED MONTH l YEAR July

'1983

9. PE RFORMING ORGANIZATION NAME AND M AILING ADDRESS finciude I,a code /

DATE REPORT ISSUED MONTH l YEAR Office 9f Resource Management July 1983 Management Information Branch

s. g,,,u,.*,

U. S. Nuclear Regulatory Commission Washington, D. C.

20555

a. nen, u.a=>
12. SPONSORING ORGANIZATION NAME AND M AILING ADDRESS tsactuar Isa Codel lo. PROJECT /T ASK/ WORK UNIT NO Office of Resource Management Management Information Branch
11. CONTRACT NO U. S. Nuclear Regulatory Commission Washington, D.C.

20555 13 TYPE OF REPORT

, t RsOO COVE RE O fonclus.v, cases 9 r

June 1.1983 - Jungt3b.1QR1 f15 SUPPLEMENTARY NOTES 14 Ittare o'ana, iW l 16 ARS T R ACT (200.*oros or i,ssi Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special projects and non-power reactor renewals under review, as reported to Congress.

17a DESCRIPTORS 17 *,E Y WORDS AND DOCUME NT AN ALYSts t

17e IDEivTIFIE RS OPE N EN DE D TE RMS 19 SE CURITY CL ASS #Tna.coorrs 21 f O OF P AGES IS AV AIL ABILITY ST ATE MENT Unclassified Unlimited Sureso ws 22 PR,cE 2c$Cg

UNITE 3 STATES nas ctassunit NUCLEAR REGULATORY COMMISSION Posf *GE S 'ac ess raio esa WASHINGTON. D.C. 20565 masm 3 C OF. lCIAL BUSINESS

'e PENALTY FOR PRIVATE USE $3X)

s 43 5

l e

120555078877 1 1Ahikr US Nor A J.v - C I V CF T11C FLILY f.

f' U *,

V','

Pk-PTC N U. r ',

e-Sal W A;6 INGT f B C (.

>>S C

M 4

9 O

e l

1

-