6 OPERATING DATA REPORT DOCKET NO. 50-302 DATE 9/1/83 COMPLETED BY D. Bocart TELEPHONE (904) 795-6486 OPERATING STATUS

1. Unit Name:

Crystal River Unit #3 NM*5

2. Reporting Period:

8/1/83 - 8/31/83

3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe):

825

6. Maximum Dependable Capacity (Gross MWe):

850 811

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

79.92% FP

10. Reasons For Restrictions,if Any:

RCP-1C seal is bad.

r(,)

This Month Yr. to.Date Cumulative i

11. Hours In Reporting Period 744 5831 56711 I
12. Number Of Hours Reactor Was Critical 711.8 2742 34949.2
13. Reactor Reserve Shutdown Hours 0

0 1280.'3

14. Hous Generator On-Line 694.5 2671.9 34138.8
15. Unit Reserve Shutdown Hours 0

0 C

16. Gross Thermal Energy Generated (MWH) 1282274 5892839 76417794
17. Gross Electrical Energy Generated (MWH) 408946 2020292 25986909
18. Net Electrical Energy Generated (MWH) 373449 1908275 24653155
19. Unit Service Factor 93.3%

45.8%

60.2%

93.3%

45.8%

60.2%

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 61.9%

40.4%

55.1%

22. Unit Cai:acity Factor (Using DER Net) 60.8%

39.7%

52.7%

23. Unit Forced Outage Rate 6.7%

2.1%

24.6%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Maintenance outane to replace RCP-Ic seal packane scheduled for October 1 to last 11 days.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERLIA L OPERATION 3/13/77 8309150264 830912 PDR ADOCK 05000302 (4/77)

K ppg

_,--y

,-,m

-e

  • .-.c e_.

---_.p

,7.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 UNIT FLCRP-3 DATE 9/1/83 COMPLETED BY D. Bogart TELEPHONE (904) 70s_6A96 MONTH August 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 552 17 613 2

577 gg 613 572 607 3

,9 4

523 20 608 5

130 23 608 390 6

g

,,4 3 7

578 23 303 8

585 586 24 9

25 607 10 589 26 313 591 562 yg 27 12 590 28 560 13 595 556 29 600 14 30 577 15 604 33 604 16 611 INSTRUCIlONS On this forrnat, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

)

(9/77)

O O

O DOCKET NO. 3.0-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FirRP-3 DATE 9/1/83 COMPLETED BY n m1ay REPORT MONTH 8/83 TELEPHONE (904) 795-6486 "t.

T o2 c

c_

re Cause & Corrective 1

h$

3 5N W*"***

e

==

o No.

Date b"'

3.3 AC'i"" '"

f Ei 2 0

53*

Eg' 3mj R*P" #

Present Recurri.nce OO 6

83-10 830803 F

25 A

N/A N/A IIC llTEXCll Reduced power to locate leak in condenser water box C.

33-11 830805 F

19 A

2 N/A RB INSTRU Control rod drive circuitry failure caused one group of control rods to drop. Operator manually scrammed the plant.

83-12 830822 F

4 D

N/A N/A ZZ ZZZZZZ Reduced power to prevent exceeding condenser delta-T limits.

33-13 830822 F

21 A

3 N/A WC VALVEX CDV-13, automatic makeup valve to condensate storage tank failed, i

filling the hotwell, causing a turbine trip which tripped the react.or.

[

t 33-14 830821 F

4 A

3 N/A IIII MECFUN Failed linkage on A Main Feed Pump caused pump to overspeed and over feed the A OTSG. Operator tripped the pump and the reactor scrammed on high RCS pressure.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Other (E xplain) 9

/3 r

r kJ DOCKET NO.

50-107 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME F1 N 1 DATE 9/1/81 COMPLETED BY n-m1h REPORT MONTH R /R' TELEPHONE (904) 795-6486 v.

E c

,$?

}

} s$i Licensee

,E r, f'.

Cause & Corrective 2

Event u7 gO8 Action to No.

Date g

3g H

f:

5

~ jj c Report er mO Present Recurrence g

o n

u e

d5 83-15 830826 F

5 G

3 N/A HC PUMPXX During startup the main feedwater pump tripped causing the reactor to scram on high RCS pressure. Cause of pump trip is thought to be excessive condensate being diverted back to the condenser for cleanup creating a low deaerator level.

83-16 830826 F

7 A

N/A N/A IIC IITEXCH Reduced power to locate leak in condenser waterbox D.

83-17 830827 F

61 A

N/A N/A HC IITEXCII Reduced power to locate leak in condenser waterbox A.

83-18 830829 F

22 A

N/A N/A HC llTEXCH Reduced power to locate leak in j

condenser waterbox C.

I l

i 1

2 3

4 F: Forced Reason:

Method:

Exhibit G -Instructions i

S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-1 D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F-Adninistrative 5

i I

G-Operational Error (Explain)

Exhibit ! - Same Source (9/77) 11-01her (Explain) 9

i e

MO:;THLY OPEFeTIO::AL St.Y:'ARY STAiDiE!;T O

DOCKET NO.50-301 UNIT FI.CRP-3 DATE 9/1/83 COMPLETED BY D.

Fields TELEPH0!;E(904) 795-6486 MONTH August'1983 i

SUMMARY

STATDIENT: The unit continues to operate with reactor coolant pump IC r iled seal.

Technical Specifications secured due to a a

limits the unit to 79.92% full pouer.

Four reactor trips were experienced during the month.

Condenser saltwater leaks forced a power reduction on four separate occasions.