ML20076K762

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1983
ML20076K762
Person / Time
Site: Crystal River 
Issue date: 08/01/1983
From: Bogart D
FLORIDA POWER CORP.
To:
Shared Package
ML20076K758 List:
References
NUDOCS 8309150262
Download: ML20076K762 (1)


Text

-

we.m c'M OPERATING DATA REPORT

^

DOCKET NO. 50-302 DATE 8/1/83 COMPLETED BY D- %grt.

TELEPHONE (0041 795-6486 OPERATING STATUS Notes Net Electrical Energy

1. Unit Name:

Crvstal River Unit #3 generated for July was 7/1/83 - 7/31/83

2. Reporting Period:

wrong. Corrections are 2544

3. Licensed Thermal Power (MWt):

circled.

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

850

6. Maximum Dependable Capacity (Gross MWe):

811

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 79.92% FP

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,1f Any:

RCP-lC seal is bad.

O This Month Yr..to.Date Cumulative 744 5087 55967 i1. Hours In Reporting Period 170.9 2030.2 34237.4

12. Number Of Hours Reactor Was Critical 0

0 1280.3

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 11R 1 1077 4 11444.1
15. Unit Re crve Shutdown Hours 0

0 0

122161 4610565 75135520

16. Gross Thermal Energy Gencrated (MWH) 37450 1611346 25577963
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)

(32573 3 (T534R263 M 970 C

19. Unit Service Factor 15.9%

38.9%

59.8%.

15.9%

38.9%

59.8%

20. Unit Avai! ability Factor 5.4%

37.2%

55.0%

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 5.3%

36.6%

52.6%

7.1%

0.5%

24.9%

l

23. Unit Forced Outage Rate l
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:

Maintenance outace to replace RCP-1C seal package scheduled for October 1 to last 11 days.

S g-l

25. If Shut Down At End Of Report Period Estimated Date of Startup:

N/A

)

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved l

" INITIAL CRITICALITY l/14/77-n l E INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8309150262 830912 PDR ADOCK 05000302 (9/77)

R PDR c

i

]k h

-h )"

A P

,a E

, ^ w yr aqsp.