we.m c'M OPERATING DATA REPORT
^
DOCKET NO. 50-302 DATE 8/1/83 COMPLETED BY D- %grt.
TELEPHONE (0041 795-6486 OPERATING STATUS Notes Net Electrical Energy
- 1. Unit Name:
Crvstal River Unit #3 generated for July was 7/1/83 - 7/31/83
- 2. Reporting Period:
wrong. Corrections are 2544
- 3. Licensed Thermal Power (MWt):
circled.
890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
850
- 6. Maximum Dependable Capacity (Gross MWe):
811
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 79.92% FP
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,1f Any:
RCP-lC seal is bad.
O This Month Yr..to.Date Cumulative 744 5087 55967 i1. Hours In Reporting Period 170.9 2030.2 34237.4
- 12. Number Of Hours Reactor Was Critical 0
0 1280.3
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 11R 1 1077 4 11444.1
- 15. Unit Re crve Shutdown Hours 0
0 0
122161 4610565 75135520
- 16. Gross Thermal Energy Gencrated (MWH) 37450 1611346 25577963
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
(32573 3 (T534R263 M 970 C
- 19. Unit Service Factor 15.9%
38.9%
59.8%.
15.9%
38.9%
59.8%
- 20. Unit Avai! ability Factor 5.4%
37.2%
55.0%
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 5.3%
36.6%
52.6%
7.1%
0.5%
24.9%
l
- 23. Unit Forced Outage Rate l
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:
Maintenance outace to replace RCP-1C seal package scheduled for October 1 to last 11 days.
S g-l
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
N/A
)
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved l
" INITIAL CRITICALITY l/14/77-n l E INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8309150262 830912 PDR ADOCK 05000302 (9/77)