OE NUREG-0580 Ej Vol.12, No. 4 5
g__
REGULATORY LICENSING l
STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS l
DATA FOR DECISIONS (BLUE BOOK?
april 1 - APRIL 30,1983 UNITED STATES NUCLEAR REGULATORY COMMISSION i
p+** * '"%,,
r..
...../
eg
.f
../
'. '.'s
(,Qd b -
l' AVAILABLE FuGM HRC/GPO SALES PROGRAM SUPERINTENDENT OF DOCUMENTS GOVERNMENT PRINTING OFFICE WASHINGTON, D. C. 20402 A YEARS SUBSCRIPTION CONSISTS OF 12 ISSUES FOR THIS PUBLICATION MICROFICHE OF SINGLE COPIES ARE AVAILABLE FROM HRC/GPO SALES PROGRAM WASHINGTON, D. C. 20555 T
h 6
=,
1 NUREG-0580 Vol.12, No. 4 REGULATORY LICENSING STATUS
SUMMARY
REPORT i
1' NUCLEAR POWER PLANTS
~
DATA FOR DECISIONS.
(BLUE BOOK) 1 APRll 1 - APRIL 30,1983
$atNuNishe a 1983 Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 p.
~.m, s
~
9
/
r:
F0REW0RD
/ '..,
f,,
i
/ :-
' THIS MANAGEFENT REPORT, E19ULATORh LICENSING STATUS
SUMMARY
REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATICM'FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION HUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF HUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION 8 ENFORCEMENT, AND THE NATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATIDM OF THE REGULATORY INFORMATI1M SYSTEM.
1 SECTION I 0F THIS EDITION CONSISTS OF THE THREE
SUMMARY
OF ACCOMPLISHMENTS. THE NEW APPLICATION FORECAST j
FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.
SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NON-POWER REACTOR
SUMMARY
EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.
l l
l P
., -, _. _. ~. -...
m_
-4
-y 4
s
.M= _q
~
j 7:-%
- qY
., f.
.y fjf, '
s
' l,,
}
W,W s
~
x.,-
q
's L I C E'N"5 I N G 0-F MUCLEAR. REACT 0RS z,
- 7<
N[<[
iTHE U.S. HUCLEAR' REGULATORY COMMISSION' REQUIRES-TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER$
i 1TO OPERATE IT.
LISTED BELOW ARE THE STEPS IM.THE PROCESS OF.0BTAINING A CONSTRUCTION PERMIT-AND OPERATING-f,
- LICENSE.
THE UTILITY SUBMITS A FORMAL-APPLICATION DESCRIBING THE DESIGN, LOCATION, AND' ENVIRONMENTAL IMPACT OF THEI PROPOSED PLANT'AND THE SAFEGUARDS-TO BE PROVIDED. THE APPLICATION ALSO COVERS THE. UTILITY'S FINANCIAL..
QUALIFICATIONS.
THE NRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE: ACR$ AND TO THE PUBLIC DOCUMENT ROOM;. TECHNICALL EXPERTS ANALYSE THE APPLICATI0H, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. -THESE DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC' DOCUMENT ROOM.
- c-
' THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S' STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS,'A l
COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN-DETAIL AND HOLDS-CONFERENCES WITH THE=
APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACRS> FINDINGS ARE REPORTED TO,THE. NRC AND MADE PUBLIC.
k A PUBLIC HEARING IS HELD, USUALLY HEAR.THE PROPOSED SITE,'BY AM HRC APPOINTED ATOMIC SAFETY 8 LICENSING I
BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS,.AMD COMMUNITY GROUPS MAY PARTICIPATE.
AFTERREVIEWINGTHEHEARINGRECORDINCLUDINGTHENRCSTAFFANDACRSFINDINGS,THEBOARDDECIDESFOR'ORAGAINST GRANTING A CONSTRUCTION PERMIT.
THE BOARD'S DECISIDH IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY-THE FIVE-MEMBER NUCLEAR REGULATORY COMMISSION.
IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CON'STRUCTION PERMIT. THE DIRECTOR OF THE DIVISION 0F LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TD-DO PRELIMINARY SITE CONSTRUCTICH MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETEPf11NED TO BE SUITABLE BY THE NRC STAFF AND THE.
4 BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. : CONSTRUCTION IS SUBJECT.TO INSPECTION BY THE l
OFFICE OF INSPECTION AND ENFORCEMENT.
AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATI0H IS DEVELOPED AND THE UTILITY APPLIL3 T0 THE NRC FOR AH OPERATING LICENSE. THE SAME CAREFUL ANALYSIS.AS IS MADE AT THE CONSTRUCTIDH PERMIT STAGE IS MADE BY THE HRC IN DECIDING WHETHER OR HOT TO ISSUE THE OPERATING LICENSE.
IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING:IS PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW' PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT T0 THE APPROVAL OF BOTH THE DIRECT 0R'0F THE DIVISION OF LICENSING AND OF THE COMMISSION.
i b
i I
~
~
ll I
illll 1llJ S
TN G G
E N N
1 I
I N
fH K K
O S E E
I I
E E
T L
S S
A P
S C
M S SR I
O TS TA L
C NR NE B
C AA AY U
A LE L P
PY PE SSF V
E S
TTO P, E RI H
NN OV OF T
T EEY FI F D
MMR F
T S
N N E HHA S SX W
I T
H 1
E S IIM EX EN I
T I
LLU TE T V
W S
SMT H
R W
I N R TOOL GE GT
- D S E E
NCCA NH N T E E
W I
0 D ECCC IT IN S S S
E V S R
MAAI S SI A N S U I
E W C O H
R NN N C E W V R E SFFE EI ES E C E S E
I E
IOOM C CT R I
I N
R T V H
L U IS II O L V O I
E S
F T PYYH LE LM F E
I E M R R
MRR S
R G R T S R O
D N OAAD FN FE N N A
N E N T
I CMME OE OP O I
L I
E P G C
W
- 1 CtfN C
I T A V X C I
S A E
D AUUI SI SN T A I
E E
I N S W E I
L O E E R V
T F
M T TI C E E B N
I D
I E
L N OLPO AG AT I
P P B I
G T V R I
R I
O S A N C D E E B R Y
I U P I
T I
U R R W T
E P
R TT TR P N
C T R A O
L A
I A
I E A T
D R P I
P M
GR GS M
J R S N E M
T M
RE RN W M
O E N A H N A
R P O T T O X
N S
TO TC N C
N P D C S O H N
E O
O O
I I
I T
T 1
C C
C E
E E
S S
S L
l llI[l
, g411.5 A
i
=
1 i
e e
Z O
M D==
U LU 44 b
1 1
i
)
i
)
sf O
0.L '
5"U M M A R Y.
O F' 1A C C 0 M P L I S N M E N.T'S
~
AS OF APRIL 30, 1983 APRIL FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL
. FACILITY SCHEDULED ACTUAL 5ER ' S SER ' S
. NOME CATAWBA 1&2
'02/06/83
. 02/09/83C SEABROOK 1 & 2 01/12/83 03/07/83C SSER ' S SSER ' S i.
CALLAWAY 1 04/30/83 BYRON 1 & 2' 12/10/82 01/31/83C CATAWBA 1&2 04/30/83 CALLAWAY 1 04/30/83 CLINTON 1 & 2 04/30/83
-CATAWBA 1 & 2 04/30/83 PERRY 1 82 04/22/83 CLINTON 182~
G4/30/83 ST LUCIE 2 04/06/83 04/06/83C COMANCHE PEAK 1 & 2 03/11/83C WASHINGTON NUCLEAR.2 04/29/83 ENRICO FERMI 2 02/04/83C MCGUIRE 2 02/14/83 02/28/83C MIDLAND'1 4 2 10/06/82 10/06/82C PALO VERDE 1,2,3 03/15/83 03/15/83C PERRY 1-4 2 12/29/82 01/19/83C PERRY 1 & 2 04/22/83 SHORENAM 01/15/83'
' 02/04/83C ST LUCIE 2-04/06/83:
-SUMMER 1 11/12/82
. 04/06/830 11/12/820-SUSQUENANNA 1 03/01/83 SUSQUEHANNA 2 03/01/83' 11/12/82C SUSQUEHANNA 2 03/38/83 03/29/83C-WASHINGTON NUCLEAR 2 12/21/82 12/21/82C WASHINGTON NUCLEAR 2 04/29/83 WATERFORD 3 10/22/82'
. 10/29/82C WATERFORD 3 03/31/83 DES ' S DES ' S HARRIS 1 8 2 04/00/83.
HARRIS 1 & 2 04/08/83-l FES
'S FES ' S I
NONE CATAWBA 1 8 2 01/07/83
'O1/07/83C' SEABROOK 1 & 2 12/08/82-12/08/82C
{
0L
'S ISSUEDM 0L ' S I S S U'E DM.
HONE
-SUMMER 1-11/12/82 11/12/82C.
.SUSQUENANNA 1 11/12/82C l
0 -FULL POWER 4
r v-1-
-m s.
_- +,
-- s v-
~
++'
C C
3 2
L 8
8 A
/
/
U 1
0 T
1 3
C
/
/
A 3
2 0
1 D
E E
3 2
T L
8 8
A U
/
/
D D
1 0
E 1
3 O
H
/
/
T C
3 1
S 0
1 R
A E
Y S
L A
T C
S N
I F
2 E
8 1
D M
Y T
D E
H I
R L
R O
U S
I E
F C
V N
S I
A I
A F
R H
S L
/
H S
T I
P 3 C
I 8
S N
G S
E S
E E
M 9 I
A N
N N
1 L
R K
O O
S O
0 C
S N
H H
R E
S S
C 0
3 E
S E
E P
C L
S S
D F
C A
I R
P A
F F
0 O S
A Y
L R
A U
A T
C M
A M
U S
D E
L U
P D
E C
H C
S L
I R
P A
D Y
T E
I L
U I
C S
A F
S S
I s
E E
S E
S E
E N
N N
N N
O R
O O
O S
O H
N H
N H
R E
S S
E S
E E
P S
S D
F C
1!
SUMMARY
0F ACC0MPLISHMENT5 AS OF APRIL 30, 1983 APRIL FISCAL YEAR TO DATE SCHEDULED ACTUAL SCHEDULED ACTUAL SER'S( 0L)'
0 0
SER'S( 0L) 2 2
$ER'S( CP) 1 1
e SSER'S( 0L) 6 1
SSER'S( 0L) 19 14 SSER'S( CP) 0 0
SSER'S( CP) l' 1
DES'S( 0L) 1 0
DES'S( 0L) 1 0
DES'S( CP) 0 0
DES'S( CP) 0 0
FES'S( 0L) 0 0
FES'S( 0L) 2 2
FES'S( CP) 0 0
FES'S( CP) 0 0
0L'S ISSUEDM 0
0 0L'S I$SUEDM 1
2 CP'S ISSUED 0
0 CP'S I55UED 0
0 0 FULL POWER 4
LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIDMS REPORT AS OF8 04/30/83 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1983-1984)
(LISTED IN ORDER OF FACILITY HAME) l SER SSER EST.
STAFF TECH STAFF TECH ASLB COMMM-APPL.
DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE.
START INITIAL DEC.
CONST.
PLANT (MONTHS) R11 TO DL 1ER 519 fil.
TO DL 111R OF HRG DECISION RAlg COMPL.
BYRON - 1 0
11/8tC 01/82C 02/82C 33/82C 04/82C 08/82C 01/83C~ 03/83C-11/83' 11/83 11/83 BYRON 2 0
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 02/84 03/83C 11/83 03/84
-04/84 CALLAWAY 1 0
09/81C 09/81C 10/81C 11/81C 01/82C 01/82C 05/83 11/81C-10/83 03/84 04/84 CATAWBA 1 O
08/82C 01/83C 02/83C 03/83C 01/83C-04/83C 04/83 10/83 05/84 05/84 05/84 CLINTON 1 0
12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 04/83 08/83 12/83 12/83 01/84 CDMANCHE PEAK 1 2
05/81C 07/8tC 07/81C 11/81C 09/81C 02/83C
,10/83 12/81C 11/83 11/83
-09/83 COMANCHE PEAK 2 0
05/81C 07/81C 07/81C
,11/81C 09/81C 02/83C 11/84 12/81C
'11/83 11/84 12/84 DIABLO CANYON 1 0
12/72C Of/75C 10/74C 07/76C 05/76C 02/83C 05/83 12/76C 07/81C DIABLO CANYON 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 02/83C
-N/S 12/76C 07/8tc ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C
.09/81C 01/83C 02/83C' 03/82C 10/82C 07/83 v8/83 GRAND GULF 1 13 05/8tC 08/8tC 09/8tC 10/81C 10/81C 03/83C 05/83 N/A N/A 07/83 06/82C LASALLE 2 0
03/78C 02/81C 03/81C 04/81C 11/78C 05/83 06/83 N/A' N/A 07/83 98/83 4
.MCGUIRE 2 2
10/75C 01/78C 03/78C 04/78C 04/76C 02/83C 02/83C 03//7C 06/81C 05/83 03/83C MIDLAND 2 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C ti/82C 10/83 09/84 10/84 PALO VERDE 1 0
10/81C 10/8tc 11/81C
-12/81C 03/82C 02/83C 03/83C 04/82C 12/82C 07/83 08/83 PALO VERDE 2 0
10/81C.
10/81C 11/81C 12/81C 03/82C 02/83C-10/83 04/82C 12/82C- 07/84 08/84 PERRY t 0
02/82C 05/82C 05/82C 07/82C 08/82C N/S 04/83' 05/83 03/84 05/84 12/84 SAN ONOFRE 3 8
01/81C 01/81C 02/81C 02/81C 04/81C 04/83 05/83 06/81C 05/82C 11/82C SEABROOK 1 0
05/82C 12/82C -83/83C 04/83C 12/82C 05/83 06/83 08/83 06/84 08/84 09/84 SHORENAM 2
03/77C 03/81C 04/81C 10/81C 10/77C N/S 06/83 05/82C 07/83 08/83 ST LUCIE 2 2
10/81C 09/81C 10/81C 11/81C 44/82C 03/83C 04/83C N/A N/A 95/83
'03/83C SUSQUEHANNA 2 0
03/81C 03/8tC 09/81C~ 08/81C 07/81C 02/83C 11/83 10/81C 04/82C 12/83 01/84 WA3HINGTON NUCLEAR 2 0
07/8tC 05/82C 03/82C 10/82C 12/81C 11/82C 04/83 N/A N/A 08/83 09/83 WATERFORD 3 0
05/81C 05/81C 07/81C 08/8tC 09/81C 03/83 03/83 03/82C 04/83C 05/83-05/83 WATTS BAR 1 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 11/83 N/A N/A 12/83 01/84 WATTS BAR 2 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 06/84 N/A*
N/A- -
09/84 10/84 12/84 01/85 WOLF CREEK 1 0
01/82C 03/82C 04/82C *05/82C 06/82C 08/82C 04/83 09/83 03/84 ZIMMER 1 0
10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C' 02/82C N/S-08/83 09/83 CLICCHSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.
l 1
I
LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1984 ISSUE APPL. CONST.
PLANT 111g COMPLETF BEAVER VALLEY 2 02/85 12/85 BELLEFONTE 1 12/84 05/85 BELLEFONTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 N/S 04/86 CATAWBA 2 N/S 10/86 CLINTON 2 N/S FERMI 2 (FSAR RESUB)
GRAND GULF 2 N/S N/S HARRIS 1 04/84 06/85 HARRIS 2 N/S 06/89 HOPE CREEK 1 01/86 LIMERICK 1 N/S 08/84 LIMERICK 2 04/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 N/S 12/87 hIDLAND 1 10/82C 02/85 MILLSTONE 3 11/84 11/85 NINE MILE POINT 2 N/S 03/86 PALO VERDE 3 09/85 11/85 PERRY 2 N/S 05/87 RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 2 N/S 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/8(
WASHINGTON NUCLEAR 1 N/S N/S WASHINGTON NUCLEAR 3 12/84 12/85
LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS REPORT AS OF 04/30/83 (LISTED IN ORDER OF FACILITY HAME)
SER SSER STAFF TECH STAFF TECH ASLB
. COMM ISSUE INPUT ISSUE
.ACRS ISSUE INPUT ISSUE START INITIAL DEC.
PLANT Rf1 TO DL 31E tila fli TO DL lifS OF HRG DECISION pjAlg.
CLINCH RIVER
'02/76C 02/83C 03/83C 04/83C 02/77C 04/83C 05/83 08/82C 09/83 N/S SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 02/83C 06/83 11/82C.12/82C N/S N/S N/S i
NEW APPLICATION F 0 R E C A S T --- O P E R A T I N G LICENSE REVIEW 5 (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)
AS OF WEEK ENDING: 04/30/83 LICENSING APPL.
APPL.
1ST UNIT DOCKET PROJECT SUBMITS SUBMITS CONST.
FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL
............---...........-----=
FY83 MILLSTONE 3 050-00423 NORTHEAST.HUCLEAR ENERGY E.D00LITTLE 10/29/82C 10/29/82C 11/01/85 M.ROTHSCHILD MARBLE HILL 1 82 054680547 PUBLIC SERVICE OF INDIANA P.0 CONNOR t t/23/82C 11/23/82C 06/00/86 E.CHEN BEAVER VALLEY 2 050-00412 DUQUESNE LIGHT L.LAZO Ot/26/83C 01/26/83C 12/31/85 J.GUTEIRREZ NINE MILE POINT 2 050-00410 NIAGARA MOHAWK POWER M.HAUGHEY 01/31/83C 01/31/83C 03/01/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC & GAS D. WAGNER 03/02/83C 03/02/83C 01/14/86 R. GODDARD V0GTLE 1 82 0424-0425 GEORGIA POWER M. MILLER 07/00/83 09/00/83 09/00/86 B.BORDEHICK
---.............-. -_ _....--. ----....-- ----..------------=-
_. - - - - = = = - - - - _ _ _ _ _--..
A t
s
-i NEW APPLICATION F0R.ECAST-SPECIAL REVIEW
.AS OF WEEK ENDING:
04/30/83 STANDARDIZATION REVIENS' PROJ PROJECT TENDER LR0 JECT HO APPLIgMI.
t1MA.MR DATE (HSS)WAPWR 668 WESTINGHOUSE G.MEYER 03/00/83 a
i t
i 1
1 1
l
C0MM0N ABBREVIATION'S USED WITHIN T.H E P U B L I C A T-I O N~
~
ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:
. LICENSING ASSISTANT AE ARCHITECT / ENGINEER LESRs LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)-
AEB ACCIDENT EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH ASB AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB ATOMIC SAFETY LICENSING BOARD LQB:
LICENSEE QUALIFICATIONS BRANCH 88R BURNS & ROE
.MEB MECHANICAL ENGINEERING BRANCH 58V BLACK & VEACH MPA:
MANAGEMENT AND PROGRAM ANALYSIS B8W:
BABCOCK & WILCOX MTEB MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BROWN & ROOT MWT:
MEGAWATTS THERMAL BWR:
BOILING WATER REACTOR NSSS: HUCLEAR STEAM SYSTEMS SUPPLIER CEB:
CHEMICAL ENGINEERING BRANCH OL:
OPERATING LICENSE' COMB COMBUSTION ENGINEERING OLB OPERATOR LICENSING' BRANCH CP:
CONSTRUCTIDH PERMIT OPS:
OFFSHORE POWER SYSTEMS CPB CORE PERFORMANCE BRANCH CSB CONTAINMENT SYSTEMS BRANCH CWE COMMONWEALTH EDISON PDA PRELIMINARY DESIGN APPROVAL l
PG8E: PACIFIC GAS & ELECTRIC l
DES:
DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISION I
PM:
PROJECT MANAGER PS:
POWER SYSTEMS BRANCH EEB:
ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:
ENVIRONMENTAL PROTECTION AGENCY PTRBs PROCEDURES AND TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDHESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR l
ER:
ENVIRONMENTAL REPORT EQB:
EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH
'l ETSB E" FLUENT TREATMENT SYSTEMS BRANCH i
RAB RADIOLOGICAL ASSESSMENT BRANCH F.R.:
FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA:
FINAL DESIGN APPROVAL FES:
FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT
$8La SARGENT & LUNDY 58W:
STONE 8 WEBSTER l
SAB SITING AHiLYSIS BRANCH l
G8H:
GIBBS & HILL SAR:
SAFETY ANALYSIS REPORT l
I GHDR: GIBBS & HILL SDA STANDARD DESIGN APPROVAL GIL:
GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB:
GEOSCIENCES BRANCH SER:
SAFETY EVALUATION REPORT SIB:
SYSTEMS INTERACTION BRANCH SP:
SPECIAL PROJECT HGB:
HYDROLOGIC AND GE0 TECHNICAL 3 RANCH SSC
' SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY. EVALUATION TVA TENNESSEE VALLEY AUTHORITY ICB:
INSTRUMENTATION AND CONTROL BRANCH UEC:
UNITED ENG. & CONSTRUCTORS UFB
-UTILITY FINANCE BRANCH WEST WESTINGHOUSE
j
_.m
{
6.
1
(
I k
i.
r M
M Z
i o
M U
IM M
1 k
5
~
PR0 JECT INDEX SECTION II OPERATING LICENSE REVIEW-CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 BEAVER VALLEY 2 2-38 CLINCH RIVER 2-40 (NSS)CESSAR SYSTEM 80 2-2 BELLEFONTE 1 8 2 2-39 SKAGIT/HANFORD 182 9.- 41 (HSS)GESSAR SEVERE ACC 2-3 BRAIDWOOD 1 & 2 2-42 (NSS)GESSAR-238 NI 2-4 BYRON 1&2 2-5 CALLAWAY 1 2-6 CATAWBA 1 &2 2-7 CLINTON 1 &2 2-8 COMANCHE PEAK 1&2 2-9 DIABLO-CANYON 1 &2 2-10 ENRICO FERMI 2 2-11 FERMI 2 (FSAR RESUB) 2-12 GRAND GULF 1 &2 2-13 HARRIS 1 82 2-14 HOPE CREEK 1 2-15 LASALLE 2 2-16 LIMERICK 1&2 2-17 MARBLE HILL 1 & 2
-l 2-18 MCGUIRE 2 2-19 MIDLAND 1 82 2-20 MILLSTONE 3 2-21 NINE MILE POINT 2 2-22 PALO VERDE 1,2,3 2-23 PERRY 1 82 2-24 RIVER BEND 1 &2 2-25 SAN ONOFRE 3 2-26 SEABROOK 1 3 2 2-27 SHOREHAM 2-23 SOUTH TEXAS 1 &2 2-29 ST LUCIE 2 2-30 SUSQUEHANNA 2 2-31 WASHINGTON NUCLEAR 1 2-32 WASHINGTON NUCLEAR 2 2-33 WASHINGTON NUCLEAR 3 2-34 WATERFORD 3 2-35 WATTS BAR 1 82 2-36 WOLF CREEK 1 2-37 ZIMMER 1 J
'8 I
l l
i NRR LICEN5ING SYSTEM PAGE HO 2-1 BEAVER VALLEY 2 0L CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLAHT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000412 LIC. PM:
L. LAZO ASLB CHAIR N/A APPLICANT:
DUQUESNE LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
LOCATIDH 5 MI E OF E. LIVERPOOL, OH LIC. LA.:
'E.
HYLTON MEMBER 2 REGION:
1 AE S8W COUNSEL:
J. GUTEIRREZ CONST. INSP: S. FOLSON REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP:
DESIGN PWR: 2774 MWT/0852 MWE CONST: S&W RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Tha FSAR was tendered on 01-26-83.
ER DOCKETED:
04/31/83 ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
05/31/84 ISSUE DES:
07/31/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
12/31/84 CURRENT ENV. STATUS:
The ER was tendered on 01-26-83.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
01/26/83 01/26/83C SAR DOCKETED:
04/31/83 SAR Q'S RECEIVED BY PM:
07/31/83 SAR APPL. RESPONSE TO Q:S RECEIVED: 10/31/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/31/84 Opportunity for Hearing will be published in the Federal ISSUE DRAFT SER:
02/28/84 Register.
INPUT TO SER:
08/31/84 ISSUE SER:
10/31/84 ACRS FULL COMMITTEE MEETING:
12/31/84 INPUTS TO SE SUPPLEMENT 1:
ISSUE SE SUPPLEMENT 1:
02/28/85 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
The information for antitrust review of operating HEARING STARTED:
04/30/85 license application was tendered 12/15/82.
ASLB INITIAL DECISION:
11/30/85 COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
COMMISSION DECISION:
02/28/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:
CONSTRUCTION COMPLETION - APPL.:
12/31/85 07/30/82
'E
\\
NRR.LICEN5ING SYSTEM PAGE NO: 2-2 lBELLEFONTE 1 & 2 0L CURRENT STATUS REP 0RT REPORT AS'0F 04/30/83 P L:A N T C H A R A C T E R I S T I C S:
KEY PERSONNELa DOCKET NO:
043880439 LIC. PMs R. NERNAN ASLB CHAIR N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC
-E.iADENSAM MEMBER 1 N/A l
LOCATION:
6 MI NE OF SCOTTSBORO, ALA LIC. LA.:
M. DUNCAN MEMBER 2:.
H/A REGION:
2 AE:
TVA COUNSEL:
B. PATON CONST. INSP: R. CRLENJAK REAC. TYPE: PWR NSSS: B8W ANTITRUST:
J. RUTBERG RESID. INSP: J. WILCOX DESIGN PWR: 3760 MWT/1235 MWE CONST TVA RM ANALYST M. KING CURRENT SAF. STATUS '
ENVIRONMENTAL MILESTONES:
SCHED.'DATE ACTUAL DATE As a result of applicant's construction delay, the review schedule has been delayed. The applicant has ER DOCKETED:
06/12/78 06/12/78C staff has evaluated the impacts of this delay on the ER. SITE VISIT COMPLETE:
02/20/82 06/17/82C announced a delay in loading fuel to 05/85.
The INPUT TO DES TO PM:
11/04/83 safety and environmental review schedules and issued ISSUE DES:
12/16/83 1
new schedule on 01/25/83.
RESPONSE TO COMMENTS ON DES:
03/05/84 ISSUE FES:
05/18/84 CURRENT ENV. STATUS:
As a result of appilcant's construction delay, the L -
[
review schedule was delayed, and has been re-evaluated.
SAFETY / NEARING: MILESTONES:
The environmental site visit was completed on 6/17/82.
' 7
APPLICATION TENDERED:
02/03/78 02/03/78C SAR DOCKETED:
06/12/78C SAR Q'S RECEIVED BY PM:
07/03/80 11/01/82C
.,.e, at SAR APPL. RESPONSE.TO Q'S RECEIVED: 12/02/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/20/84 No hearing is anticipated.
ISSUE DRAFT SER:
03/16/84 INPUT TO SER:
06/15/84 ISSUE SER:
08/17/84
)-
ACRS FULL COMMITTEE MEETING:
09/28/84 INPUTS TO SE SUPPLEMENT 1 10/05/84 ISSUE SE SUPPLEMENT 1:
12/14/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Pending determination NEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A E
COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
02/01/85 COMMISSION DECISION:
04/15/85 i
ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/85 No. 23 ( 12/17/82).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
On 07/06/82 TVA revised fuel load date to 5/85.
Staff has CONSTRUCTION COMPLETION - APPL.:
05/00/85 07/06/82 i
evaluated impact on safety and environmental review schedules and issued new schedule on 01/25/83.
2
~ ^ ' '
1 NRR LICEHSIHG SYSTEM PAGE HO: 2-3 BRAIDWOOD 1&2 0L CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLANT C H A R A C T E R I S T I C S:
KEY PERS0HHEL DOCKET NO 045620457 LIC. PM:
J. STEVENS ASLB CHAIR M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1 R. COLE LOCATION:
24 MI SSW OF JOLIET, ILL LIC. LA.:
M. RUSHBROOK MEMBER 2 D. CALLIHAN REGIDH 3
AE 58L COUNSEL:
D. HASSELL CONST. INSP J. NEISLER REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: L. MCGREGOR DESIGH PWR: 3425 MWT/1120 MWE CONST: CWE RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several portions are under contract review.
ER DOCKETED:
11/30/78C ER SITE VISIT COMPLETE:
05/31/83 INPUT TO DES TO PM:
11/01/83 ISSUE DES:
01/01/84 RESPONSE TO COMMENTS OH DES:
04/15/84 ISSUE FES:
06/d0/84 CURRENT ENV. STATUS:
Sito visit to be conducted late May.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/26/78 06/26/78C S AR DOCKETED :. -- ~
11/00/78 11/30/78C
~, - -
SAR Q'S RECEIVED'BY PM:
12/31/82 12/31/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/29/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
06/15/83 Opportunity for Hearing was published in the Federal ISSUE DRAFT SER:
07/15/83 Register on 06/13/79. There will be a contested hearing.
IHPUT TO SER:
11/01/83 ISSUE SER:
12/01/83 ACRS FULL COMMITTEE MEETING:
01/00/84 INPUTS TO SE SUPPLEMENT 18 04/01/84 ISSUE SE SUPPLEMENT 18 05/00/84 FEMA LETTER RECEIVED:
.H/S CURRENT ANTITRUST Applicant has submitted antitrust information pursuant to HEARING STARTED:
10/00/84 Reg. Guide 9.3.
ASLB INITIAL DECISIDH 03/00/85 COMMISSION EFFECTIVENESS DECISICH: 04/00/85 TECH SPECS COMPLETED:
04/00/85 COMMISSIDH DECISI0H:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 FSAR Amendment No. 38 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:
CONSTRUCTIDH COMPLETION - APPL.:
04/00/85 04/14/82
4 HRR LICENSING SYSTEM
'PAGE N0 J 2
.4 i
BYROM 18.2 0L CURRENT STATUS REP 0RT REPORT AS OF ' 04/30/83' PLANT C H A R A C T E R I S T I C S:
KEY
.P E R S 0 N N E L DOCKET NO:
045480455 LIC. PM:
L. OLSHAN ASLB CHAIR I. SMITH APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 18
-R.
COLE LOCATION:
17 MI SW OF ROCKFORD, ILL LIC. LA.:
M. RUSMBROOK MEMBER 2:
D. CALLINAN REGION:
3 AE S8L COUNSEL:
S. GOLDBERG CONST. INSP M. RING REAC. TYPE: PWR MSSS: WEST ANTITRUST:
.B.
V0GLER-RESID. INSP W. FORNEY' DESIGN PWR 3425 MWT/1120 MWE CONST: CME RM ANALYST:
-M.
KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER and Supplements 1 and 2 have been issued. Several ER DOCKETED:
11/30/78C outstanding and confirmatory issues remain to be i
resolved prior to licensing.
ER SITE VISIT COMPLETE:
..05/31/81 05/31/81C 1
INPUT TO DES-T0 PM:
08/15/81 08/15/81C ISSUE DES:.
11/05/81 11/05/81C RESPONSE TO COMMENTS CH DES:
03/01/82 03/01/82C ISSUE FES:
04/05/82 04/05/82C CURRENT ENV. STATUS:
Environmental review completed and FES (HUREG-0848) published in April 1982.
SAFETY / NEARING MILESTONES:
APPLICATION" TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78-11/30/78C SAR 4'S RECEIVED BY PM:
08/15/81 08/15/81C SAR APPL. RESPONSE TO 4'S RECEIVED: 10/15/81 10/15/81C buRRENTMRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/07/81 11/07/81C Hearing began March 1, 1983.
ISSUE DRAFT SER:
INPUT TO SER:
01/07/82 01/07/82C ISSUE,SER:
02/07/82 02/07/82C ACRS LETTER RECEIVED:
03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 28 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 2r
.12/10/82 01/31/83C FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
l Applicant has. submitted antitrust information pursuant HEARING STARTED:
03/00/83 03/01/83C to Reg. Guide 9.3.
ASLB INITIAL DECISIDH:.
11/G0/33 COMMISSION EFFECTIVEMESS DECISION:
11/00/83-TECM SPECS COMPLETED:
11/00/83 COMMISSION DECISION:
11/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LAT'EST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/83 FSAR - Amendment 41 ER - Amendment 3 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
11/00/83' 07/14/82 i
4 e m m
..h-
~~ --
W -
HRR LICEHSIHG SYSTEM PAGE NO: 2-5 CALLAWAY 1 0L CURREHT STATUS REPQRT REPORT AS OF: 04/30/83 PLANT CHARACTERISTICSt KEY PERS0HHEL DOCKET NO:
05000483 LIC. PM:
G. EDISON ASLB CHAIR:
J. GLEASON APPLICANT:
UNION ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G. BRIGHT LOCATION:
10 MI SE OF FULTON, M0 LIC. LA.:
M. RUSHBROOK MEMBER 28 J. KLINE I
REGION:
3 AE2 BECH COUNSEL:
B. PERLESS CONST. INSP J. KONKLIH l
REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP J. NEISLER DESIGN PWR 3425 MWT/1188 MWE CONST DANIEL RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80. The SER was issued by HRC on 10/07/81 and the SER Supplement No. 1 was issued on ER DOCKETED:
12/12/80 12/12/80C
)
01/15/82. SSER 2 is scheduled for 5/83.
ER SITE VISIT COMPLETE:
12/00/81 12/00/81C INPUT l'U DES TO PM:
08/01/81 08/01/81C ISSUE DES:
09/29/81 09/29/81C RESPONSE TO COMMENTS OH DES:
12/01/81 12/ 01/81C ISSUE FES:
01/29/82 01/29/82C CURRENT ENV. STATUS:
ER was docketed 12/12/80. The DES was issued by HRC on f
09/29/81 and the FES was issued on 01/29/82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/25/79 10/25/79C SAR DOCKETED:
08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:
12/18/80 12/18/80 C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hearings were held on limited issues during Hovember 1981.
ISSUE DRAFT SER:
N/A The hearing on the one remaining contention, emergency INPUT TO SER:
09/11/81 0 9/11/81C preparedness, is scheduled for 8/31/83. A decision on ISSUE SER:
10/07/81 10/07/81C these limited issues was rendered by the licensing board on 12/13/82. Joint intervenors have appealed the initial ACRS LETTER RECEIVED:
11/19/81 11/19/81C decision. All exceptions, briefs, and responses are INPUTS TO SE SUPPLEMENT 2:
01/01/82 01/01/82C expected to be complete by 5/1/83 with an appeal board IS?UE SE SUPPLEMENT 28 05/00/83 deci sion soon thereaf ter.
FEMA LETTER RECEIVED:
11/00/83 CURRENT ANTITRUST:
OL review is in progress.
HEARING STARTED:
11/17/81 11/17/81C ASLB INITIAL DECISION:
10/00/83 COMMISSIGH EFFECTIVENESS DECISION: 11/00/83 TECH SPECS COMPLETED:
02/00/84 COMMISSIGH DECISI0H:
03/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 ISSUE FULL POWER LICENSE AMEND:
07/00/84 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:
The Caseload Forecast Panel is reviewing construction CONSTRUCTIDH COMPLETION - APPL.:
04/00/84 08/23/82 progress in order to make a new construction completion schedule estimate. An April 1984 estimate is based on the aoolicant's rncentiv revised fuel load date.
N R:R LICENSING S'Y S T.E M-PAGE NO: 2-6
~
CATAWBA 1 8 2' OL CURRENT
~ STATUS R E P 0'R T REPORT AS OF 04/30/83 P L'A N T CHARACTERISTICSt KEY PERS0NNEL l
l DOCKET NO:
041380414 LIC. PM:
K.'JABBOUR ASLB CHAIR:
J. KELLEY APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1:
D. CALLIHAN LOCATION:
6 MI HNW OF ROCK HILL, SC LIC. LA.:
M. DUNCAN MEMBER 2:
R. FOSTER REGION:
2 AE DUKE COUNSEL:
G. JOHNSON CONST..INSP P. VAND00RN l
REAC. TYPE: PWR
.NSSS: WEST ANTITRUST
'B.
V0GLER RESID. INSP P. VAND00RN l
DESIGN PWR 3582 MWT/1145 MWE CONST DUKE RM ANALYST:
'L.
LANIER CURRENT SAF. STATUS:
-ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE-SER was issued on February 9, 1983.
ER DOCKETED:
'06/11/81 06/11/81C ER SITE VISIT COMPLETE:
10/15/81
.10/15/81C
- INPUT.TIO DES TO PM:
06/25/82 07/29/82C-ISSUE DES:
88/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:
11/30/82 11/30/82C ISSUE FES:
01/07/83 01/07/83C' CURRENT ENV. STATUS:
DES was issued on 08/11/82. FES was issued on 1/7/83.
St.FETY/EEARING MILESTONES:
APPLICATION iEND'ER55:
03/26/79 03/26/79C
~SAR DOCKETED:
06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:
12/15/81 12/15/81C SAR APPL. RESPONSE To q'S RECEIVED: 12/10/82 12/10/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/02/82 12/30/82C Combined hearing anticipated.to start 10/83.
ISSUE DRAFT SER:
11/19/82 11/19/82C INPUT TO SER:
01/09/83 01/19/83C ISSUE SER:
02/06/83 02/09/83C ACRS LETTER RECEIVED:
03/18/83 03/18/83C INPUTS TO SE SUPPLEMENT 18 04/12/83 04/12/83C ISSUE SE SUPPLEMENT 1:
04/30/83 FEMA LETTER RECEIVED:
04/30/83 CURRENT ANTITRUST:
Operating Ilconse antitrust review is in progress.
HEARING STARTED:
-10/00/83 ASLB INITIAL DECISION:
'05/00/84 COMMISSION EFFECTIVENESS DECISIDH 05/00/84-TECH SPECS COMPLETED:
05/00/84 COMMISSION DECISIDH 05/00/84-ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
'05/00/84 Revision 7 dated 02/22/83.
SCHED. DATE-RECEIPT DATE NEW SLIPS / NOTES:
CP Amend. issued 12/23/80 indicating change in ownership.
CONSTRUCTION COMPLETION - APPL.:
05/00/84 05/00/82 w-y -~
=- _-
A
'vg HRR LICEHSING SYSTEM PAGE NO: 2-7 CLINTON 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 04/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET h3:
046f30462 LIC. PM:
H. ABELSON ASLB CHAIR:
H. CLARK APPLICANT:
ILLINDIS POWER LIC. BC A. SCHWENCER MEM3ER 1 G. FERGUSON LOCATION:
6 MI E OF CLINTON, 'LL LIC. LA.:
E. H'JLTON MEMBER 2:
O. PARIS REGION:
3 AE SAL COUNSEL:
R. GODDARD CONST. INSP F. JABLONSKI REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP: H. LIVERMORE DESIGH PWR: 2894 MWT/0950 MWE CONST: BALDWIN RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80. SER was issued 02/17/82.
Supplement No. I was issued 07/22/82. SSER Ho. 2 is ER DOCKETED:
03/01/81 09/08/80C scheduled for end of April 1983.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
12/08/81 12/08/51C ISSUE DES:
12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:
02/22/82 03/2S/82C ISSUE FES:
05/20/82 05/20/82C CURRENT ENV. STATUS:
The draft environmental statement was completed December 1981.
The FES was completed May 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/01/79 12/01/79C SAR DOCKETED:.
09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO 4'S kECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Prehearing conferences were held 4/14/81 and 5/4/82.
ISSUE DRAFT SER:
ASLB Memorandum and Order was issued 11/12/82. Six INPUT TO SER:
12/05/81 12/05/81C contentions have been admitted. Hearing start currently ISSUE SER:
01/05/82 02/17/82C estimated for 8/83 at the earliest.
ACRS LETTER RECEIVED:
02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 28 06/30/82 06/30/82C ISSUE SE SUPPLEMENT 28 04/30/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Operating license antitrust review completed HEARING STARTED:
08/00/83 March 18, 1982 (SECY-82-120).
ASLB INITIAL DECISION:
12/00/83 COMMISSION EFFECTIVENESS DECISION: 12/00/83 TECH SPECS COMPLETED:
11/00/83 COMMISSION DECISIGH:
12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/84 FSAR Amendment 824, 03/83.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Stop work orders associated with construction QA expected CONSTRUCTION COMPLETION - APPL.:
01/00/84 01/24/83 to delay fuel load by at least one year from current IPC date of 1/84.
IPC will provide revised fuel load date in 6/83.
~ -. -
-n
..u 5
NRR LICENSING S Y'S T E M PAGE HO's 2-COMANCHE PEAK 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 04/30/83 PLA T
CHARACTERISTICSt KEY PERSONHEL:
DOCKET NO:
044580446 LIC. PM:
S. BURWELL ASLB CHAIR:
P. BLOCH APPLICANT:
TEXAS UTILITIES GENERATING LIC. BC:
- 8. YOUNGBLOOD MEMBER 1 W. JORDAN LOCATION:
4 MI N OF GLEN P.0SE, TEX LIC. LA.:
M. RUSHBROOK MEMBER 2 K. MCCOLLOM t
REGION:
4' AE G8N COUNSEL:
M. ROTHSCHILD CONST. INSP: R.
TAYLOR REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSPs.D. KELLY DESIGN PWR 3411 MWT/1150 MWE CONST: BRRT RM ANALYST:
M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued 07/14/81. The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:
01/19/79 01/19/79C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:
06/20/80 08/07/80C i
issues. SSER of was issued 10/16/81. Application was INPUT TO DES TO PM:
'08/15/80
'04/27/81C reviewed by the ACRS on 11/13/81. SSER 02 responding to ISSUE DES:
04/30/81 05/22/81C the ACRS was issued on 01/20/82. _SSER 03 containing RESPONSE TO COMMENTS ON DES:
07/19/81 08/28/81C emergency preparedness was issued 03/11/83.
ISSUE FES:
09/18/81 09/24/81C CURRENT ENV. STATUS:
The DES was issued on 05/22/81. The EPA Federal Register Notice was printed on 05/29/81-and the comment period SAFETY / HEARING MILESTONES:
ended 07/13/81 The FES was issued on 09/24/81.
APPLICATION TENDERED:
03/01/78 03/01/78C
'SAR DOCKETED:
05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:
12/30/78 02/22/79C
(
SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/13/79 03/11/81C The first hearing session was held 12/02/81-in Fort Worth.
ISSUE DRAFT SER:
03/31/81 03/31/81C Issues heard were financial qualifications and the INPUT TO SER:
operating QA program.
A second, third, and fourth hearing ISSUE SER:
- 05/22/81 07/08/81C 07/14/81 07/14/81C sessions on QA/QC during construction were held 06/07-11/82, 07/26-30/82, and 09/13-17/82.
The fifth hearing session ACRS LETTER RECEIVED:
11/17/81 11/17/81C continuing testimony on QA/QC during construction and INPUTS TO SE SUPPLEMENT 4:
07/02/82 02/22/83C emergency preparedness is scheduled for 5/16-20/83.
ISSUE SE SUPPLEMENT 48 07/00/83 FEMA LETTER RECEIVED:
06/00/83 CURRENT ANTITRUST:
ALJ appointed on 02/23/82 to replace ASLB. Prehearing HEARING STARTED:
12/02/81 12/02/81C conference held 04/13/82 to determine status of parties.
ASLB INITIAL. DECISION:
11/00/83 Briefs filed 05/04/82 request immediate imposition of COMMISSION EFFECTIVENESS DECISION:
11/00/83 settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:
09/01/83 approving settlement agreements 8 proposed license COMMISSION DECISION:
11/00/83 conditions 8 dismissing proceedings was issued 05/06/82.
ISSUE LIC. WITH POWER RESTRICTION:
12/00/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/83^
39 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
SSER-4 is slipped 2 months due to applicant delays in'sub-CONSTRUCTION COMPLETION - APPL.:
09/00/83 03/03/83 mittal of information. The fifth hearing session scheduled for 4/4-8/83 was cancelled and has now been rescheduled for 5/16-20/83.
No imoact on fuel load date is croiected.
7
NRR LICENSING SYSTEM PAGE NO: 2-9 DIABLO-CANYON 182 0L CURRENT STATUS REP 0RT REPORT AS OF: 04/30/83 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL:
DOCKET NO:
027580323 LIC. PM:
B. BUCKLEY ASLB CHAIR J. WOLF APPLICANT:
PACIFIC GAS & ELECTRIC LIC. BC:
G. KNIGHTON MEMBER 1:
J. KLINE LOCATION:
12 MI WSW OF SAN LUIS OBISPO LIC. LA.:
J.
LEE MEMBER 2:
G. BRIGHT REGION:
5 AE:
PG8E COUNSEL:
L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP: J. CARLSON DESIGN PWR: 3338 MWT/1084 MWE CONST: PG8E RM ANALYST:
B. ST MARY l
l ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SSER 15 (Equip. Qualification) was issued on 10-02-81 SSER 16 is estimated for 05/15/83 (indicated as SSER9 ER DOCKETED:
11/09/71 11/09/71C on schedule). Favorable ASLB Initial Decision on a ER SITE VISIT COMPLETE:
full-power license was i ssued on August 31, 1982.
Low INPUT TO DES TO PM:
10/09/72 10/09/72C Power license was issued on 09-22-81 and suspended on ISSUE DES:
12/12/72 12/12/72C RESPONSE TO COMMENTS ON DES:
04/27/73 04/27/73C November 19, 1981.
ISSUE FES:
09/15/75 05/28/76C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED.
07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:
01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/01/74C INPUT TO DRAFT SER TO PM:
01/24/75 01/24/75C CURRENT NRG. STATUS:
LP hearings were held 05-19-81 through 05-22-81.
A ISSUE DRAFT SER:
favorable PID on low power operation was issued July INPUT TO SER:
01/24/75 01/24/75C 17, 1981.
A full-power hearing was completed on January ISSUE SER:
10/04/74 10/16/74C 26, 1982.
In August 1982 an Initial Decision was issued authorizing issuance of a full power operating license.
ACRS LETTER RECEIVED:
05/00/78 07/18/78C INPUTS TO SE SUPPLEMENT 9:
02/18/83 02/18/83C ISSUE SE SUPPLEMENT 9:
05/15/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
HEARING STARTED:
10/29/75 12/07/76C Not required ASLB INITIAL DECISI0H:
07/17/81 07/17/81C COMMISSION EFFECTIVENESS DECISION: 06/00/83 TECH SPECS COMPLETED:
09/15/81 09/15/81C COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION: 09/22/81 09/22/81C ISSUE FULL POWER LICENSE AMEND:
08/30/83 l
LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Estimate of dates from and of LP hrq to lic. complete CONSTRUCTION COMPLETION - APPL.:
dependent upon dev./ approval of State and local Emergency Plans. Ongoing Design Verif. Program likely to identify olant modifications.
Const. comoletion docondent on mods.
^ " ". m# "
NRR LICENSING SYSTEM PAGE N0: 2-10
?
e ENRIC0_ FERMI 2 0L CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000341 LIC. PM:
D. LYNCH ASLB CHAIR G. MILLHOLLIN APPLICANT:
DETROIT EDISDN LIC. BC:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 2 D. SCHINK REGION:
3 AE:
58L COUNSEL:
C. WOODHEAD CONST. INSP: P. PELKE REAC. TYPE BWR NSSS: GE ANTITRUST A. HODGDON RESID. INSP B. LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81.
(See second page for milestone ER DOCKETED:
04/04/75 04/04/75C summary.) SSER No. I was issued 09-25-81.
SSER No. 2 was ER SITE VISIT COMPLETE:
09/27/78 10/31/78C issued 01-29-82 with 7 prelicensing issues outstanding.
INPUT TO DES TO PM:
07/31/81 04/24/81C SSER No. 3 was issued on 02-04-83.
ISSUE DES:
05/01/81 04/30/81C RESPONSE TO COMMENTS ON DES:
07/31/81-06/29/81C j
ISSUE FES:
08/31/81 09/04/81C CURRENT ENV STATUS:
Addendum No. 1 to the FES was issued 03-03-82.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/22/74.
10/22/74C SAR DOCKETED:
04/05/75 04/05/75C SAR 4'S RECEIVED BY PM:
06/13/75 08/11/75C SAR APPL. RESPONSE TO 485 RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PM:
10/24/75-03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:
04-02-82.
The two contentions were: (1) 4A/4C during INPUT TO SER:
03/05/76 C5/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:
08/01/77 09/29/77C the local community. Monroe County, Michigan petitioned for leave to reopen hearings on the svacuation issue.
ACRS LETTER RECEIVEDs 08/20/81 08/11/81C ASLB issued initial decision on 10/29/82 authorizing INPUTS TO SE SUPPLEMENT 38 08/22/82 01/05/83C operating licens6 issuance.
ISSUE SE SUPPLEMENT-38 09/01/82 02/04/83C FEMA LETTER RECEIVED:
05/01/83 CURRENT ANTITRUST An ASLB decision on antitrust matters was issued on HEARING STARTED:
12/02/81 03/31/82C 04-25-78.
ASLB INITIAL DECISION:
10/00/82 10/29/82C COMMISSION EFFECTIVENESS DECISION:
12/22/82C TECH SPECS COMPLETED:
05/01/83.
COMMISSION DECISI0Hz 07/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/01/83 The latest final Safety Analysis Report Amendment is number 46.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/01/83 10/01/82
-~
NRR LICENSING S Y S T E l1 PAGE NO: 2-11 l
FERMI 2 (FSAR RESUB)
OL CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET ND:
00007341 LIC, PM:
D. LYNCH ASLB CHAIR G. MILLHOLLIN APPLICANT:
DETROIT EDISON LIC. BC:
J. YOUNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M. RUSHBROOK MEMBER 28 D. SCHINK.
REGION:
3 AE S8L COUNSEL:
C. WOODHEAD CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST A. HODGDON RESID. INSP B. LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST DANIEL RM ANALYST:
S. HEDLUND SCHED.'DATE ACTUAL DATE CURRENT SAF. STATUS:
All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81.
Summary of later milestones is on previous page.
l l
CURRENT ENV. STATUS:
SAFETY / HEARING MILESTONES:
.t i r > f a 2:
APPLICATI0H TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:
07/01/78 08/02/78C SAR APPL. RESPONSE TO 4'S RECEIVED: 08/08/78 20/02/78C INPUT TO DRAFT SER TO PM:
09/08/78 03/27/81C CURRENT HRG. STATUS:
ISSUE DRAFT SER:
INPUT TO SER:
06/10/81 06/23/81C ISSUE SERs, 06/30/81 07/10/81C CURRENT ANTITRUST:
LATEST AMENDMENT:
NEW SLIPS / MOTES:
All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped.
j due to slippage in the fuel load date because of.TMI cause.
i._
xcja NRR LICENSING SYSTEM PAGE NO: 2-12
~
CRAND GULF 1 3 2 LIC CURREdT STATUS REPORT REPORT AS OF 04/30/83 PLANT CHARACTERISTIC 5:
KEY PERS0NNEL DOCKET NO:
041680417 LIC. PM:
D. HOUSTON ASLB CHAIR J. LAURENSON APPLICANT:
MISSISSIPPI POWER & LIGHT COMPANY LIC. BC A. SCHWENCER MEMBER 1:
G. BRIGHT LOCATION:
25 MI S OF VICKSBURG, MISS LIC. LA.:
E. HYLTON MEMBER 2:
J. HARBOUR REGION:
2 AE:
BECH COUNSEL:
M. WAGNER CONST. INSP R. VANDORN REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST: BECH RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981._ SSERs were issued in December 1981 and in June and July 1982..The ACRS ER DOCKETED:
06/05/78 06/30/78C I
report on full power operation for Unit I was i ssued ER SITE VISIT COMPLETE:
12/14/79C l
August 18, 1982.
Interim FEMA letter was received INPUT TO DES TO PM:
04/30/81 04/30/81C 12/17/82.
Final letter is expected in April.
ISSUE DES:
05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:
08/15/81 08/15/81C ISSUE FES:
09/15/81 10/09/81C CURRENT ENV. STATUS:
DES was issued in May 1981 FES was issued October 9, 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/28/78 04/28/78C SAR DOCKETED:
06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:
04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S No hearing. Petition was filed by the State ISSUE DRAFT SER:
09/18/81C of Louisiana on basis of Court of Appeals, District of INPUT TO SER:
04/01/81 08/14/81C Columbia, opinion on S-3 Table issue.
Board denied petition ISSUE SER:
06/00/81 09/10/81C for intervention on October 20, 1982.
The State of Louisiana filed an appeal to the Board's denial. Appeal ACRS LETTER RECEIVED:
07/00/81 08/18/82C Board upheld the denial for intervention in a decision INPUTS TO SE SUPPLEMENT 4:
04/01/82 03/15/83C issued December 8, 1982.
ISSUE SE SUPPLEMENT 48 05/13/83 l
FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
OL review is in progress. No significant changes have HEARING STARTED:
N/A cccurred since the CP.
ASLB INITIAL DECISION:
N/A COMMISSIDH EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
09/01/81 06/16/82C COMMISSION DECISION:
07/00/83 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/15/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Unit 1 OL for fuel load to 5% power issued 06/16/82. FP.de-CONSTRUCTION COMPLETION - APPL.:
06/16/32C OL ISSUED layed by Region II CDA on TS surveillance procedure defic-iencies & outstanding items, maint. 3 mods for 1st refueling outaac.
Aon1. not readv to ao above 5% until 7 or 8/83.
___m
~
~
s
-H R R L I:C E N S I N G SYSTEM PAGE NO: 2-13 NARRIS 1 & 2 0 L-CURRENT STATUS REPORT REPORT AS OF 04/30/83' p,
.l PLANT CHARACTERI5TICSt KEY PERS0NNEL j
ASLB CHAIR P J. KELLEY'-
DOCKET NO:
6400-0A01 LIC. PM:
P. KADAMBI MEMBER is
( G. BRTGHT-APPLICANT:
CAROLINA POWER & LIGHT LIC. BC:
G. KNIGitTO:1 LOCATION:
20 MI SW OF RALEIGH, NC LIC. LA.8-J. LEE
1MEM8ER 2:
J. CARPENTER REGION:
2 AE EBASCO.
COUNSEL:
C. BARTH CONST. INSP f-REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG f RESID. INSP: G. MAXWELL
- DESIGN PWR 2775 MWT/0915 MWE CONST: DANIEL RM ANALYST:
M. KING CUhRENTSAF. STATUS:
ENVIRONMENTAL MILESTONES:
j[.
SCHED. DATC ACTUALiDATE FSAR was docketed on 12/22/81 Questions were sent
,S 12/22/81 12 ),:2/81C
?
to the applicant between 4/26/82 and 7/30/82. Most of ER DOCKETED:
ER SITE VISIT COMPLETE:
'k 04/08/82 04r08/82C V,,/?
applicant's responses were received by 08/31/82. Draft t
01/14/83 02/08/83C I L.
INPUT TO DES TO PM:
- /
SER i ssued 2/1/83.
ISSUE DES:
4 'fr I
04/06/83 r1
" l RESPONSE TO COMMENTS ON DESi 06/10/83 f
ISSUE FES:
08/15/83 l
j t'
e i
y CURRENT ENV. STATUS - ~" ' /
F ER was docketed on 12/22/81. The site visit was completa
)
an'34/08/82 and questions were sent to applicant on SAFETY / NEARING MILESTONES:
04/28/82. Most of the applicant's responses wara 'eceived by October 15, 1982.
~
SAR DOCKETED -
06/26/80 06/26/80C APPLICATION 'iENDERED:
12/22/81 12/22/81C SAR O'S RECEIVEB BY PM:
07/09/82 07/09/82C
~
SAR APPL. RESPOWy} TO O'S RECEIVED: 11/08/82 11/08/82C C
09/01/83 INPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
ji ISSUE DRAFT SER:
01/03/83 02/01/83C Notice for Opportunity for Hearing was p' 311shed in the j
Federal Register on January 27, 1982.'*Several. petitions INPUT TO SER:
09/01/83 4
to intervene were filed. Prehearing conferenceiun ~getitions ISSUE SER:
11/31/83 I
f f'
was held on July 13-14, 1982. Board decision ei contentishs I.
ACRS. FULL COMMITTEE MEETING:
01/02/84-l issued September 23, 1982.
Further clarificabien lusued 4 February 24, 1983 on discovery and echeduding.
ISSUE SE, SUPPLEMENT 1 03/01/84 January 11, 1983.
A pre-hearing confeece.ce was 'nelo on INPUij TO St ZUPPLEMENT 's s
04/02/84 i, #' I[ t-FEMA LETTER RECEIVED:
04/00/84
[
CURRENT ANTITRUST th
- NEARING STARTED:
01/04/84 g
Status to be determined.
=
((NJ' a A *s ASLB INITIAL DECISION:
05/01/85 J'.
COMMISSION EFFECTIVENESS DECISION: 05/00/85
[ f i / ' '
[,
TECH SPECS COMPLETED:
05/01/85 l'
COMMISSIDH DECISION:
05/00/85
/
ISSUE LIC. WITH POWER REST 2:CTION: 12/01/84 ISSUE FULL POWER LICENSE AMEND:
06/03/85 LATEST AMENDMENT:
FSAR No. 4 ER No. 5 SCHED. DATE RECEIPT DATE-NEW SLIPS / NOTES:
Staff' schedule based on fuel load date of 06/03/85.
CONSTRUCTION COMPLETION - APPL.:
06/03/85 10/06/82 f
4
-9 7-g
<p,
=.',s i
\\
/
2,~
s r
s'
, jl ~',)
,- n y
- r NRR LICENSING SYSTEM PAGE NO: 2-14 I
t 0L CURRENT 5 T,A T U S
- REPORT, REPORT AS OF 04/30/83 HDTE CREEKj,)r j
f
~
' PLANT C H A R 5 C T,E R I S T I C St K E Y-PERS0NNEL:
4 4
p,-
n
.~,,
'DQCKETW.0:
050003S4 LIC. PM:
D. WAGNER ASLB CHAIR: N/A
, ArPi.ICAN T !
PUBLIC SERVICE ELECTRIC 8 GAS LIC. BC:
A. SCHWENCER MEMBER 18 L
f p
LOCATION:
18 MI SE OF WILNINGTON, DEL LIC. LA.:
J. LEE MEMBER 28
,REGIDH I
AE BECH COUNSEL:
R. GODDARD CONST. INSP S. FOLSOM f '.
NSSS: GE ANTITRUST:
RESID. INSP r
REAC. TYPE: BWR
" DESIGN PWR:, 3440 MWT/1067 MWE CONST: BECH RM ANALYST:
B. ST MARY CURRENT SAF.' STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was tendered on March 2, 1983.
ER DOCKETED: -
ER SITE VISIT COMPLETE:
l INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
i i
CURRENT ENV. STATUS:
ER was tendered.on March 2, 1983.
"'*'dt';
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/83 03/02/83C SAR DOCKETED:
SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO 4'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hotice of Opportunity for Hearing is to be published in ISSUE DRAFT SER:
the Federal Register.
INPUT TO SER:
ISSUE SER:
ACRS FULL COMMITTEE MEETING:
INPUTS TO SE SUPPLEMENT ISSUE SE SUPPLEMENT FEMA LETTER RECEIVED:
1 CURRENT ANTITRUST:
l Status to be determined.
HEARING STARTED:
ASLB INITIAL DECISION:
COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
COMMISSIDH DECISION:
01/08/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
01/14/86 06/30/82
c-e v:
w.M NRR LICEN5ING SY$ TEM PAGE N0s.2-15 '
. 1 LASALLE 2 OL C.U R R E N T STATUS- ' REP 0RT REPORT AS: Ors. 04/30/83 s
PLANT CHARACTERI$TICSt KEY PERS0NNELa DOCKET NO:
05000374 LIC PM:
A. BOURNIA ASLS CHAIR:
M. MILLER APPLICANT:
COMMONWEALTH EDISDN LIC. BC '
A. SCHWENCER MEMBER 1 F. SHON LOCATION:
11 MI SE OF OTTAWA, ILL LIC. LA.:
E. NYLTON MEMBER 28
- 0. PARIS REGION:
3 AE 58L COUNSEL:
C. WOODHEAD CONST. INSP: H. WESCOTT REAC. TYPE
- BWR HSSS: GE ANTITRUST B. V0GLER RESID. INSP,W.-G"LDEMOND DESIGN PWR 3293 MWT/1978 MWE CONST: CWE RM ANALYST S. HEDLUND 4 7 -.
(
~
CURRENT SAF. STATUS:
ENVIRONMENTA1. MILESTONES:
SCHED.. DATs ACTUAL DATE SSER-1 was issued in June 1981 SSER-2 was issued in
.y< 05/12/77C February 1982. SSER-3 was issued on April 16, 1982.
E2 DOCKETED:
01/17/77 i
SSER-4 was issued on July 14, 1982. SSER-5 is scheduled ER SITE VISIT COMPLETE:
N for 06/83.
INPUT TO DES TO PM:
-02/17/78
'02/17/78C ISSUE DES:
03/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:
07/14/78 07/14/78C ISSUE FES:
09/22/78 11/03/78C-4 CURRENT ENV. STATUS:
Environmental Protection Plan has been issued with 1
Unit 1 Ilconse.
SAFETY / NEARING MILESTONES:
a. %.-
-I l
APPLICATION TENDERED:
09/01/76 99/01/76C SAR DOCKETED:
04/08/77 05/12/77C l
,$AR O'S RECEIVED BY PM:
07/22/77 37/27/77C
, SAR APPL. RESPONSE TO C'S RECEIVED: 12/15/77 08/18/78C I
CURRENT HRG. STATUS:
- INPUT TO DRAFT SER TO PM:
10/06/78 11/08/78C No hearing.
ISSUE DRAFT SER:
IMPUT TO SER:
12/29/78 02/27/81C i
l ISSUE SER:
09/05/80 03/05/81C
.. a ACRS' LETTER RECEIVED:
04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 58 05/00/E1 ISSUE SE SUPPLEMENT 58 06/09/84 FEMA LETTER RECEIVED -
CURRENT ANTITRUST:
Complete.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVEMESS DECISION:
TECH SPECS COMPLETED:
04/12/82 04/12/82C COMMISSION DECISION:
07/09/83-ISSUE LIC.-WITH POWER RE3TRICTION: N/S i
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/08/83 SCHED. DATE REC 5IPT DATE NEW SLIPS / NOTES:
Lasalle Unit 1 criticality was achieved on June 21, 1982.
CONSTRUCTION CDMPLETION - APPL.:
'88/08/83 02/01/83 Construction completion date for Unit 2 has been reassessed w
by applicant and has slipped to 08/83.
A-w.o.a-a_.,
<~=-.n-.
.-..- ~~ 2
..... w ?
NRR LICEN5ING SYSTEM PAGE KJ: 2-16 LIMERICK 1 8 2 0L CURRENT STATUS REPQRT REPORT AS OF 04/30/83 PLANT CHARACTERI5 TICS:
KEY PERSONNEL DOCKET ND:
035210353 LIC. PM:
R. MARTIN ASLB CHAIR:
L. BRENNER APPLICANT:
PHILADELPHIA ELECTRIC LIC. BC:
A. SCHWENCER MEMBER 1 R. COLE LOCATION:
35 MI NW OF PHILADELPHIA, PA LIC. LA.:
E. HYLTON MEMBER 2:
P. MORRIS REGION:
1 AE:
BECH COUNSEL:
A.
HODGDON CONST. INSP REAC. TYPE 8 BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP
- 5. CHAUDHARY DESIGN PWR: 3440 MWT/1065 MWE CONST BECH RM ANALYST:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant submitted P'robabilistic Risk Assessment with FSAR on March 17, 1981.
SAR was docketed on 07/27/81.
ER DOCKETED:
07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; ER SITE VISIT COMPLETE:
08/20/82 08/20/82C NUREG/CR on PRA issued by Moard Notification on 03/04/83.
INPUT TO DES TO PM:
04/15/83 ISSUE DES:
05/27/83 RESPONSE TO COMMENTS ON DES:
t9/06/83 ISSUE FES:
10/31/83 1
CURRENT ENV. STATUS:
ER was tendered with the FSAR on March 17, 1981 and was docketed on 07/27/81 ER site visit was completed SAFETY / HEARING MILESTONES:
on 8/i0/82. DES inputs are expected by 4/15/83.
APPLICATION TENDERED:
01/08/81 03/17/81C SAR DOCKETED:
07/27/81 07/27/81C SAR 4'S RECEIVED BY PM:
07/08/82 02/01/83C SAR APPL. RESPONSE TO 4'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO.PM:
N/S Notice af Opportunity of Hearing was published in the ISSUE DRAFT SER:
N/S i
Federal Register on August 21, 1981.
Early hearings on INPUT TO SER:
07/01/83 three contentions related to Point Pleasant diversion ISSUE SER:
08/08/83 were held 10/04/82. A pa-tial initial decision was issued on these contentions on March 8, 1983.
A special ACRS FULL COMMITTEE MEETING:
09/08/83 prehearing conference for the purpose of further INPUTS TO SE SUPPLEMENT 1 10/07/83 specifying conditionally admitted contentions is scheduled ISSUE SE SUPPLEMENT 18 N/S for May 9, 1983.
FEMA LETTER RECEIVED:
10/07/83 CURRENT ANTITRUST Status to be determined.
HEARING STARTED:
01/00/84 ASLB INITIAL DFCISION:
03/00/85 COMt1ISSION EFFECTIVENESS DECISION: 03/00/85 TECH SPECS COMPLETED:
03/00/85 COMMISSION DECISION:
03/00/85 ISSUE LIC. WITH POWER RESTRICTION: 03/00/85 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
03/00/85 Rev. 11, March 31, 1983 (ER OL); Rev. 18, March 31, 1983 (FSAR); Rev. 5, March 31, 1983 (EP).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Several inputs to Draft SER have been delayed. Appilcant CONSTRUCTION COMPLETION - APPL.:
08/00/84 12/27/82 estimates 2 month improvement in construction completion schedule. ASLB estimates that 17 months are necessary for hearino.
l l
J
~ _ _... _. _.
NRR LICEN$ING SYSTEM PAGE NO: 2-17 MARBLE HILL 182 0L CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLANT C H A R A C T E R I S T I C 5:
KEY PERS0NNEL:
DOCKET NO:
054680547 LIC. PM:
P. O CONNOR ASLB CHAIR APPLICANT:
PUBLIC SERVICE OF INDIANA LIC. BC:
J. YOUNGBLOOD MEMBER 1:
LOCATION:
10 MI S OF MADISON, IN LIC. LA.:
M. RUfHBROOK MEMBER 2 REGION:
3 AE:
SSL COUNSEL:
E. CHEN CONST. INSP P. PELKE REAC. TYPE PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP J. SCHAPKER I
DESIGN PWR 3415 MWT/1130 MWE CONST PSI RM ANALYST S. HEDLUND CURRdNT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was docketed on 02/25/83.
ER DOCKETED:
03/01/83 02/25/83C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
05/30/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
11/30/84 CURRENT ENV. STATUS:
Application was docketed on 02/25/83.
SAFETY / HEARING MILESTONES:
APPLICATIDW TENDEREDi' 12/01/82 11/23/82C SAR DOCKETED:
03/01/83 02/25/83C SAR O'S RECEIVED BY PM:
SAR APPL. RESPONSE TD Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Notice of Opportunity for Hearing will be published in the ISSUE D1 AFT SER:
04/06/84 Federal Register.
INPilT TO SER:
10/00/84 ISSUE SER:
12/07/84 ACRS FULL COMMITTEE MEETING 01/10/85 INPUTS TO SE SUPPLEMENT 18 03/00/85 ISSUE SE SUPPLEMENT 18 04/15/85 FEMA LETTER RECEIVED:
CURRENT ANTITRdST Tendered 2/25/83. Under acceptance review.
HEARING STARTED:
09/15/85 ASLB INITIAL DECISION:
05/15/86 COMMISSION EFFECTIVENESS DECISIDH N/S TECH SPECS COMPLETED:
COMMISSION DECISION 06/00/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
06/08/86 12/15/82
U NRR L I C E'N 5 I N G S Y,.S T E M' PAGE MO: 2-la MCGUIRE 2-LIC CURRENT STATU$
REPORT-REPORT AS OFr 04/30/83
~
P'L A N T C H A R A C T E R I'S T I C St KEY P E R S 0 N N E Lt DOCKET N0s.
05000370 LIC. PMt.
R. BIRKEL>
ASLB CHAIR:
R. LAZO APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER-12 X. HAND LOCATION 8 17 MI N OF CHARLOTTE, NC LIC. LA.8 M. DUNCAN-MEMBER 2:
E. LUEBKE REGION:
2 AE DUKE COUNSEL:
J. CUTCHIM-CONST. INSP8 M. HUNT REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID.-INSP: W. ORDERS DESIGN PWR: 3411 MWT/1180 MWE CONST: DUKE RM ANALYSTS
- 8. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES
- SCHED. DATE ACTUAL DATE SSER No. 6 was issued 02/28/83. NPF-17 was issued on 03/03/83 restricted to 5% pending Cammission final ER DOCKETED:
05/31/74 05/31/74C approval.
ER SITE VISIT COMPLETE:
01/30/75 01/30/75C INPUT TO DES TO PMs 08/29/75 08/29/75C ISSUE DES:
11/07/75 10/29/75C RESPONSE To COMMENTS ON DES:
. 04/20/76C ISSUE FESt.
-05/07/76' CURRENT ENV. STATUS:
Complete.
SAFETY / NEARING MILESTONES:
-.t r F > > mq u APPLICATION TENDERED:
5,/05/74 04/05/74C-SAR DOCKETED -
34/29/75 05/05/75C SAR e'$ RECEIVED BY PM SAR APPL. RESPONSE TO 4'S RECEIVED:
CURRENT HRG. STATUSS INPUT TO DRAFT SER TO PMt Complete.
ISSUE DRAFT SER:
INPUT TO SER:
06/01/77-01/16/78C ISSUE SER*
02/21/78 93/01/78C ACRS LETTER RECEIVED 04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6:
12/01/82 02/28/83C ISSUE SE SUPPLEMENT 6 02/14/83 02/28/83C FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Complete.
HEARING STARTED:
03/15/77 03/28/77C ASLB INITIAL DECISION 06/08/81 06/08/81C COMMISSION EFFECTIVENESS DECISION:
TECM SPECS COMPLETED:
33/03/83 03/03/83C COMMISSION DECISION:
05/08/83 ISSUE LIC. WITH POWER RESTRICTION: 03/03/83 63/03/83C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/02/83 No. 70 (December 15, 1982)
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CGNSTRUCTION COMPLETION - APPL.:
03/03/83C 05/20/82 u%'w ti T
T 3
N
%4 m?
"-"D t
_,,,,,W
=*ggg---m se'
- %$=
$W D'
+Y g'
'w-e-
- 9 q
T$"
pw-,
i
....-. _. _. _ w _._ _ _ _ m NRR LICENSING. 5YSTEM PAGE NO: 2-19I MIDLAND 1 1 2 0L CURRENT-STATUS R E P 0.R T REPORT AS OF 04/30/83 PLANT
.C H A R A C T E R I $ T I C St KEY PERS0NNELa DOCKET NO:
033080329 LIC. PM:
D. NOOD-ASLB CHAIR C. BECHNOEFER APPLICANT:
CONSUf3ERS POWER LIC. BC:
E. ADENSAM MEMIER 18
-F. COWAN LOCATION:
SW BOUNDARY OF MIDLAND, MICN.
'LIC. LA.:
M. DUNCAN MEMBER 22 J. HARBOUR REGION:
3 AE2 BECH COUNSEL:
W. PATON CONST. INSP R. LANDSMAN REAC. TYPE: PWR NSSS: 88W ANTITRUST:
- 8. V0GLER RESID. INSP R. COOK DESIGN PWR 2452 MWT/0814 MWE CONST: BECH RM ANALYST B. ST MARY-CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete some review areas is currently ER DOCKETED -
04/01/78 04/14/78C in progress.
CP extension was issued 12/23/81. ACRS ER SITE VISIT COMPLETE:
09/08/78-09/08/78C Full Committee Meeting was held 06/04/82. SSER 81 INPUT TO DES TO PM:
02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82. SSER 82 ISSUE DES:
02/05/82 02/05/82C cn soils settlement problems was issued 10/06/82.
RESPONSE TO COMMENTS ON DES:
07/08/82 07/08/82C ISSUE FES:
07/30/82-07/30/82C CURRENT ENV. STATUS:
The DES was issued 02/05/82. The FES was issued on July 30, 1982.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
08/31/77-08/31/77C SAR DOCKETED:
09/30/77 11/18/77C SAR O'S RECEIVED BY PM:
03/20/74 10/02/78C SAR APPL. RESPONSE TO 4'S RECEIVED 12/08/78 12/04/78C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/78 -
12/01/78C Three prehearings ending- 04/27-28/81 were held for a ISSUE DRAFT SER:
N/A-separate hearing on soils settlement. Hearing on soils INPUT TO SER:
04/23/82 04/23/82C settlement began July 7, 1981 and is continuing. Combined ISSUE SER 05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.
ACR$ LETTER RECEIVED:
06/15/82 06/08/82C t
INPUTS TO SE SUPPLEMENT 28 88/16/82 08/16/82C ISSUE SE SUPPLEMENT 28 10/06/82 10/06/82C FEMA LETTER RECEIVED:
01/14/83 01/14/83C CURRENT ANTITPUST:
Proceeding completed. License was amended 10/20/80.
HEARING STARTED:
11/15/82 11/15/82C ASLB INITIAL DECISION:
10/08/83 COMMISSION EFFECTIVENESS DECISION: 10/00/83 TECH SPECS C0f!PLETED:
08/00/83 COMMISSION DECISION:
09/00/84 ISSUE LIC. WITH POWER RESTRICTION: 09/00/83 t
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/08/83.
110 t
SCHED. DATE RECEIPT DATE FEW SLIPS / NOTES:
Applicant announced revised completion schedule on 4/12/83.
CONSTRUCTION COMPLETION - APPL.:
10/00/84 04/12/83 Unit 2 slipped 14 mos. to 10/84, and unit 1 slipped 13 mos.
to February 1985.
NRC caseload visit scheduled for April i
19-21, 1983.
r
-. ~ _ -
.-=
t NRR LICEN$ING SYSTEM PAGE NO: 2-20' ep,"
MILLSTONE 3.
0L CURRENT ST.ATUS R E P 0 R T-REPORT AS OF 04/30/83.
l
'P.L A N T CHARACTERISTIC 5:
~ KEY PERS0NNEL:
DOCKET NO:
65003423 LIC. PM:
E. D0OLITTLE~
ASLB CNAIR i
APPLICANT:
NORTNEAST NUCLEAR ENERGY LIC. BC:
B. YOUNGBLOOD MEMBER 1 LOCATION:
3.2 MI WSW OF NEW LONDON CT.
LIC..LA.:
M. RUSMBROOK MEMBER 2:
REGION:
1 AE2 SSW COUNSEL:
M. ROTNSCNILD CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP J. MATTIA DESIGN PWR 3565 MWT/1156 MWE CONST: 58W RM ANALYST
'L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on 10/29/82, and was docketed en 02/03/83.
ER DOCKETED:
02/01/83 02/03/83C ER SITE VISIT COMPLETE:
07/08/83 INPUT TO DES TO PM:
ISSUE DES:
04/17/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
11/16/84 4
CURRENT ENV. STAlas.
ER was docketed on February 3, 1983.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
11/01/82-10/29/82C 4
SAR DOCKETED:
02/01/83 02/03/83C SAR 4'S RECEIVED BY PM:
04/15/83 SAR APPL. RESPONSE TO 4'S RECEIVED: 08/01/83 CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/83 Notice of Opportunity for Hearing was pubilshed in the ISSUE DRAFT SER:
12/01/83 Federal Register.
INPUT TO SER:
05/15/84 ISSUE SER:
07/15/84 ACRS FULL COMMITTEE MEETING:
08/15/84 INPUTS TO SE SUPPLEMENT 18 10/15/84 ISSUE SE SUPPLEMENT 18 11/15/84 FEMA LETTER RECEIVED:
i' CURRENT ANTITRUST:
HEARING STARTED-04/15/85 i
ASLB INITIAL DECISION:
10/15/85 COMMISSION EFFECTIVENESS DECISION:
11/08/85-j TECH SPECS COMPLETED:
COMMISSION DECISION:
11/01/85 ISSUE LIC. WITN POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
Amendeent 1 to FSAR received 03/04/83. Amendment 1 to ER received 03/04/83.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Environmental Review schedule revised.
CONSTRUCTION COMPLETION - APPL.
11/01/85 09/30/82 i
i n
er,
HRR LICENSING SYSTEM PAGE NO: 2-21 NINE MILE POINT 2 0L CURRENT STATUS REPQRT REPCRT AS OF 04/30/83 PLANT CHARACTERI5TICSt KEY PERS0NNELa l
DOCKET NO:
05000410 LIC, PM:
M. HAUGNEY ASLB CHAIR APPLICANT:
NIAGARA MOHAWK POWER LIC. BC:
A. SCHWENCER MEMBER 1:
LOCATIOM:
8 MI NE OF OSWEGO, NY LIC. LA.:
E. HYLTON MEMBER 2:
REGION:
1 AE2
$8W COUNSEL:
B. BORDENICK CONST. INSP: L. N.RROW REAC. TYPE: BWR HSSS: GE ANTITRUST:
L. DEWEY RESID. INSP DESIGN PWRs. 3489 MWT/1080 MWE CONST S8H RM ANALYST B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-31-83 and docketed on 04/12/83.
ER DOCKETED:
03/31/83 04/12/83C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM ISSUE DES:
03/16/84 RESPONSE TO CCMMENTS ON DES:
ISSUE FES:
07/16/84 CURRENT ENV. STATUS:
The ER was tendered on 01-31-83 and docketed on 04/12/83.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
01/31/83 01/31/83C SAR DOCKETED:
03/31/83 04/12/83C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TD DRAFT SER TO PM:
Opportunity for Hearing will be published in the Federal ISSUE DRAFT SER:
02/16/84 Ragister.
INPUT T3-SER:
ISSUE'SER:
10/05/84.
l ACRS FULL COMMITTEE MEETING:
11/08/84 INPUTS TO SE SUPPLEMENT 1 ISSUE SE SUPPLEMENT 13 N/S FEMA LETTER RECEIVED:
CURRENT ANTITRUST HEARING STARTED:
06/17/85 i
ASLB INITIAL DECISION:
02/14/86 COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:
COMMISSIDH DECISION:
02/28/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE HEN SLIPS / NOTES:
A tentative schedule has been established. Following CONSTRUCTION COMPLETION - APPL.:
03/01/86 01/31/83 the acceptance review, an approved schedule will be cttablished.
....s
HRR LICEN5ING SYSTEM PAGE NO: 2-22 PALO VERDE 1,2,3 '
OL CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLANT CHARACTERISTICSt KEY PERSONNEL LIC. PM:
E. LICITRA ASLB CHAIR:
R. LAZO DOCKET NO:
0528-0530 LIC. BC:
G. KNIGHTON MEMBER 1:
R. COLE APPLICANT:
ARIZONA PUBLIC SERVICE LOCATION:
36 MI H OF PHOENIX, AZ LIC. LA.:
J. LEE MEMBER 2:
D. CALLIHAN REGION:
5 AE:
BECH COUNSEL:
L. DEWEY CONST. INSP L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. VUGLER RESID. INSP G. FIORELLI DESIGN PWR 3817 MWT/1304 MWE CONST: BECH RM ANALYST S. HEDLUND j
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
CURRENT SAF. STATUS:
Several " Independent Design Review" meetings have been completed. The SER was issued on November 11, 1981.
SER ER DOCKETED:
07/01/80 06/20/80C cupplement Hos. 1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:
01/33/81 01/30/81C and May 17, 1982, and September 23, 1982 respectively.
INPUT-TO DES TO PM:
10/05/81 10/05/81C l
Supplement No. 4 was issued on March 15, 1983.
ISSUE DES:
10/26/81 10/26/81C RESPONSE TO COMMENTS ON DES:
02/25/82 02/25/82C ISSUE FES:
03/11/82 03/11/82C CURRENT ENV. STATUS:
The ER (OL) review is complete. A site visit was completed on January 30, 1981.
The DES was issued on SAFETY / NEARING MILESTONES:
m October 26, 1981 and the FES was issued on March 11 APPLICATION TENDERED:
10/05/79 10/05/79C 1982.
SAR DOCKETED:
06/20/80 96/20/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
INPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:
The hearing started 4/27-30, 1982, resumed on 5/25-28 and ISSUE DRAFT SER:
en 6-22.
Hearing record was closed on 6-25-82.
A late IMPUT TO SER:
10/30/81 10/30/81C petition, dated 10-13-82 dealing with salt drift on ISSUE SER:
11/11/81 11/11/81C farm crops, was filed by W. Valley Agri. Protection Council. On 12-30-82, the Board issued a favorable ID ACRS LETTER RECEIVED:
12/18/81 12/18/81C but reopened the hearing on Units 2 and 3 to consider INPUTS TO SE SUPPLEMENT 48 02/14/C.
02/14/83C late petition by W. Valley. Board's decision authorizes ISSUE SE SUPPLEMENT 48 03/15'33 03/15/83C FEMA LETTER RECEIVED:
N/S full power license for Unit 1.
Antitrust OL review has resulted in a finding of no HEARING STARTED:
04/27/82 04/27/82C CURRENT ANTITRUST:
significant antitrust changes since CP review. A ASLB INITIAL DECISION:
12/30/82 12/30/82C COMMISSION EFFECTIVENESS DECISIDH 05/00/84 Federal Register of the finding was published 2-9-83.
TECH SPECS COMPLETED:
08/01/83 COMMISSION DECISIDH:
07/00/83 ISSUE LIC. MITH POWER RESTRICTIDH: 08/01/83 ISSUE FULL POWER LICENSE AMEND:
08/20/83 i
LATEST AMENDMENT:
j FSAR Amendment No. 10 SCHED. DATE RECEIPT DATE I
ER Supplement No. 4 NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
08/08/83 07/13/82
)
c____
~
w NRR LICEN$ING SYSTEM PAGE NO: 2-23 PERRY 112 0L CURRENT STATUS REPORT REPORT A% OF 04/30/83 PLANT C H A R A C T E R I S T I C 5:
KEY PERS0NNEL DOCKET NO:
044080441 LIC. PM:
J. STEFAND ASLB CHAIR:
P. B*0CH APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING LIC. BC:
J. YOUNGBLOOD MEMBER 18 J. KLINE LOCATION:
7 MI NE OF PAINESVILLE, OHIO LIC. LA.:
M. RUSHBROOK MEMBER 28 G. BRIGHT REGIDH:
3 AE GIL COUNSEL:
J. CUTCHIM CONST. INSP P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST:
J. CUTCHIN RESID. INSP: M. GILDNER DESIGN PWR 3759 MWT/1205 MWE CONST: KAISER RM ANALYST S. EEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.
The ACRS Report was issued on July 13, 1982.
SSER No. 1 ER DOCKETED:
06/26/81 06/19/8tC was issued in August 1982.
SSER No. 2 was issued in ER SITE VISIT COMPLETE:
Jan. 1983.
SSER No. 3 targeted for 4/83.
INPUT TO DES TO PM:
01/01/82 01/01/82C ISSUE DES:
02/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:
06/30/82 06/30/82C ISSUE FES:
08/13/82 08/13/82C l
l CURRENT ENV. STATUS:
Environmental acceptance review was completed on June 9,
1981 The ER was docketed June 19, 1981.
FES SAFETY / HEARING MILESTONES:
issued in August 1982.
APPLICATION TENDERED:
06/26/80 06/26/800 SAR DOCKETED:
01/09/81 01/30/854 SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C Conference call between Board, intervenor, applicant, and ISSUE DRAFT SER:
02/26/82 02/26/82C staff attorneys on 1/5/83 targeted start of hearing for INPUT TO SER:
04/10/82 05/10/82C 5/23/83.
Issue 3 (QA Const. prog.) scheduled. Issues 1 ISSUE SER:
05/10/82 05/24/82C (Emergency Plan), 13 (Turbine Missiles), 14 (In-core T/C's),
and 15 (Steam Erosion) not scheduled. Issue 6 (ATWS-auto ACRS LETTER RECEIVED:
07/13/82 07/93/82C SLCS) and 8 (H2 control for degraded core accident) deferred INPUTS TO SE SUrPLEMENT 3:
N/S pending Commission rulings. All other issues deleted by ISSUE SE SUPPLEMENT 3:
04/22/83 summary disposition.
FEMA LETTER RECEIVED:
04/00/83 CURRENT ANTITRUST:
CP antitrust review has been completed. OL at.51 trust HE'.AInf STARTED:
05/23/83 status is under review.
- nLB IN1!IP. DECISION:
03/00/84 COMMISSION EFFECTIVENESS DECISIDH: 04/00/84 TECH SPECS COMPLETED:
05/00/84 COMMISSION DECISION:
05/00/84 ISSUE LIC. WITH POWER RESTRICTION: N/S j
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/84 Number 11 (2-15-83).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Start of hearing has slipped to 5/83.
FEMA letter has CONSTRUCTION COMPLETION - APPL.
12/00/84 03/08/83 slipped to 4/83 due to incomplete offsite plans.
a PAGE N0: ~ 2-24.
NRR -LICEN$ING
..S Y S T E M RIVER BEND 1 8 2 0lL. CURRENT S.T A'T.U S REP 0RT REPORT.AS OF 04/30/83 C'N A R A'C.T'E R I 5 T I C'S '
KEY P E R S 0 N.N E L:
PLANT.
LIC. PM:
E. WEINKAM.
ASLB CHAIR:
B. COTTER
. DOCKET NO: :045880459 LIC. BC:
-A.
SCHWENCER-MEMBER 1 G. LINENBERGER.
LIC. LA.:
-E..HYLTON MEMBER 28-R. COLE APPLICANT: ' GULF STATES UTILITIES-i REGION:
4- '
AE 58W COUNSEL:
D. REPKA CONST. INSP
. UNASSIGNED-l LOCATION:
24 MI NNW OF BATON ROUGE, LA REAC. TYPE: BWR NS$$r GE ANTITRUST:
B. V0GLER RESID. INSP R. BROWN DESIGN PWR 3015 MWT/0934 MWE CONST: 58W
'RM ANALYST:
M. KING-
~
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
04/24/81.
08/25/81 08/25/81C Applicant tendered FSAR for docketing on 08/25/81 Draft SER targeted for ER DOCKETED:
04/83.
Construction permit extension requested and granted ER SITE VISIT COMPLETE:
01/22/82 01/22/82C FSAR was docketed on INPUT TO DES TO PM:
12/09/83 01/09/84 from 03/83 to 12/85.
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE-FES:
06/08/84 j
1 I
l CURRENT ENV. STATUS:
Appilcant tendered ER for docketing on 04/24/81.
ER was docketed on 08/25/81 DES targeted for 01/C9/84.
SAf'ETY/ NEARING MILESTONES:
. 1 APPLICATION TENDERED *,
04/24/81 04/24/81C 08/25/81 08/25/81C SAR DOCKETED:
SAR O'S RECEIVED BY PM:
12/07/81 06/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/14/82 12/01/82C IN?UT TO DRAFT SER TO PM:
03/30/83 04/30/83-CURRENT HRG. STATUS:
. ISSUE DRAFT:SER:
Notice of Opportunity for Hearing was published in the INPUT TO SER:
11/04/83' Federal Register on 09/04/81. Prehearing conference 12/02/83 scheduled for 02/08/83, rescheduled to 05/24/83, now ISSUE SER:
scheduled for 06/07/83 at State of Louisiana's request.
'ACRS FULL COMMITTEE MEETING:
01/13/84 INPUTS TO SE SUPPLEMENT 18.
04/00/84 ISSUE SE SUPPLEMENT 1:
05/06/84 FEMA LETTER RECEIVED:
05/01/84
~10/00/84 CURRENT ANTITRUST HEARING STARTED:
Status to be determined.
ASLS INITIAL DECISION:
03/C0/85 COMMISSION EFFECTIVENESS DECISION: 04/00/85 TECH SPECS COMPLETED:
10/08/84 COMMISSION DECISION:
04/08/85 ISSUE LIC. WITN POWER RESTRICTION:
ISSUE FULL POWER LICENSE 4 MEND:
04/08/85 LATEST AMENDMENT:
Humber 7.
SCHED. DATE RECEIPT.DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
04/09/85' 01/14/83 NRR/0L revised the priority of _ the review on this casa due to 18-month slip in construction schedule.
_e w --
NRR LICENSING SYSTEM PAGE NO: 2-25 SAN ONOFRE 3 LIC CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNELa DOCKET NO:
05000362 LIC. PM:
H. ROOD ASLB CHAIR:
J. KELLEY APPLICANT:
SOUTHERN CALIFORNIA EDISON LIC. BC:
G. KNIGHTON MEMBER 8:
C. HAND LOCATION:
5 MI S OF SAN CLEMENTE, CA LIC. LA.:
J. LEE MEMBER 2:
E. JOHNSON REGION:
5 AE:
BECH COUNSEL:
L. CHANDLER CONST. INSP: D. KIRSCH REAC. TYPE: PWR HSSS: COMB ANTITRUST:
J. GOLDBERG RESID. INSP:
A. CHAFFEE DESIGN PWR: 3410 MWT/1100 MWE CONST BECH RM ANALYSI:
L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER on geological and seismological matters was issued on 12/31/80.
ACRS subcommittee meetings were held 01/30/88 and ER DOCKETED:
03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:
05/20/77 05/20/77C 03/12/81.
SER (Non-TMI matters), was issued on 02/06/81.
INPUT TO DES TO PM:
10/01/77 12/01/80C SER supplement on TMI issues was issued on 02/25/81 SER ISSUE DES:
01/27/78 01/20/81C supplement No. 2, 3, 4, 5, and 6 addressing open items were RESPONSE TO COMMENTS ON DES:
issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.
ISSUE FES:
04/00/81 04/29/81C CURRENT ENV. STATUS:
DES addressing class 9 accidents was issued 01-20-81, FES was issued 04-29-81 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/29/76 C SAR DOCKETED:
03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:
08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED 11/18/77 12/08/77C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO.PM:
02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.
ISSUE DRAFT SER:
01/15/81 01/15/81C Hearing started 06/22/81 and ended 39/31/81.
06/23/78 01/15/81C was rendered on 01/11/82 and ID on 05/14/82. ASLAB ISSUE SER:
08/01/80 02/06/81C Decision (ALAB-717) was issued on 03/04/83.
ACRS LETTER RECEIVED:
03/17/88 03/17/81C INPUTS TO SE SUPPLEMENT 7 04/21/83 ISSUE SE SUPPLEMENT 7:
05/01/83 FEMA LETTER RECEIVED:
12/01/81 12/01/8tC CURRENT ANTITRUST:
The antitrust review is complete.
HEARING STARTED:
06/22/81 06/22/8tC ASLB INITIAL DECISION:
05/14/82 05/14/82C COMMISSION EFFECTIVENESS DECISION: 05/14/82 05/14/82C TECH SPECS COMPLETED:
11/15/82 11/15/82C COMMISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTION:
11/15/82 11/15/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION CCMPLETION - APPL.:
11/15/82C 09/27/82
NRR LICENSING SYSTEM PAGE NO: 2-26 SEABROOK 1 &2 0L CURRENT STATUS REP 0RT REPORT AS OF 04/30/83 PLANT CHARACTERISTICS:
KEY P E R S 0 N N E La DOCKET NO:
044380444 LIC. PM:
L. WHEELER ASLB CHAIR:
H. H0YT APPLICANT:
PUBLIC SERVICE OF NEW HAMPSHIRE LIC. BC:
G. KNIGHTON MEMBER 1:
E. LUEBKE LOCATION:
13 MI S OR Poe.TSMOUTH, NH LIC. LA.:
J. LEE MEMBER 2 J. HARBOUR REGION:
1 AE:
UEC COUNSEL:
R.
LES3Y CONST. INSP A.
TOTH REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP:
A. CERNE DESIGN PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST B. ST MARY ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
The FSAR acceptance review was completed in September 1981.
The FSAR was docketed October 5, 1981.
Applicant has ER DOCKETED:
10/05/81 10/05/81C I
responded to round 1 Q's.
SER was issued 03/07/83. ACRS ER SITE VISIT COMPLETE:
12/02/81 12/02/81C subcommittee meeting was held April 1-2, 1983.
ACRS INPUT TO DES TO PM:
03/01/82 03/01/82C l
full committee meeting was held on April 15, 1983.
ISSUE DES:
05/14/82 05/14/82C i
RESPONSE TO COMMENTS ON DES:
08/18/82 09/15/82C ISSUE FES:
12/08/82 12/08/82C l
CURRENT ENV. STATUS:
ER was tendered June 1981.
ER acceptance review was completed September 1981.
The ER was docketed SAFETY / HEARING MILESTONES:
October 5, 1981.
DES was issued in May, 1982.
FES APPLICATION TENDERED:
06/29/81 06/29/81C was issued in December 1982.
SAR DOCKETED 10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:
01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C INPUT TO DRAFT CED TO PM:
05/07/82 10/08/82C CURRENT HRG. STATUS:
Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:
07/30/82 08/13/82C the Federal Register on October 19, 1981 Prehearing INPUT TO SER:
11/30/82 12/29/82C conferences were held May 6-7, 1982, July 15-16, 1982 ISSUE SER:
01/12/83 03/07/83C and April 7-8, 1983.
ASLB Order identifying parties, contentions and prehearing schedule was issued September ACRS LETTER RECEIVED:
04/00/83 INPUTS TO SE SUPPLEMENT 1:
05/00/83 13, 1982.
Di scovery is in progress.
ISSUE SE SUPPLEMENT 18 06/00/83 FEMA LETTER RECEIVED:
09/00/83 CURRENT ANTITRUST:
HEARING STARTED:
08/00/83 Status to be determined.
ASLB INITIAL DECISION:
06/00/84 COMMISSION EFFECTIVENESS DECISIDH N/S TECH SPECS COMPLETED:
07/00/84 COMMISSION DECISION:
08/00/84 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
09/00/84 LATEST AMENDMENT:
48 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Fuel load slipped to 9/84 per applicant letter of I4/02/82.
CONSTRUCTIDH COMPLETION - APPL.:
09/30/84 12/02/82
=
%%~,.~_
m---
NRR LICENSING SYSTEM _
PAGE NO: 2-27I
'SNORENAM
.0 L CURRENT S T A.T U S.
R E P-0 R T REPORT AS OF 04/30/83 1' PLANT-CNARACTERISTICSt-KEY PERSONNELa DOCKET NO:
05000322 LIC. PM:
R. CARUSO
- ASLB CHAIR L. BRENNERc APPLICANT:
LONG ISLAND LIGHTING CD.
LIC. BC:
A. SCHWENCER MEMBER 18' P. MORRIS LOCATION:
BR00KNAVEN, NY (LI)
LIC. LA.:
E. NYLTON MEMBER 28 J. CARPENTER REGION:
1 AE
$8W COUNSEL:.
J. RUTBERG-RESID. INSP J. HIGGINS
,d B. BORDENICK
.CONST. INSP L. MARROW REAC. TYPE: BWR HSSS: GE ANTITRUST DESIGN PWR: 2436 MWT/0820 MWE CONST S8W RM ANALYST L. LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.
SER Supplement 2 was issued in March-1982. SER 83 was ER DOCKETED:
01/26/76 01/26/76C issued 02/04/83.
ER SITE VISIT COMPLETE:
08/06/76 08/03/76C INPUT TO DES 70 PM:
18/22/76 11/29/76C ISSUE DES:
03/11/77-03/24/77C RESPONSE To COMMENTS ON DES:
07/22/77 07/22/77C ISSUE FES:
10/21/77 10/18/77C CURRENT ENV. STATUS:
The environmental review is complete.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
09/08/75 09/04/75C.
SAR DOCKETED 12/15/77 01/26/76C SAR O'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO 4'S RECEIVED: 07/23/76 07/23/76C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/15/77.
08/01/77C The Board concluded hearings regarding all issues ISSUE DRAFT SER:
except emergency planning on April 8, 1983. No INPUT TO SER:
03/10/81 03/10/81C schedule has been established for emergency planning ISSUE SER:
04/10/81 04/1C/81C contentions.
ACRS LETTER RECEIVED:
09/18/81-10/19/81C INPUTS TO SE SUPPLEMENT 48 N/$
ISSUE SE SUPPLEMENT 48 06/01/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Not required.
NEARING STARTED:
85/04/82
'05/04/82C ASLB INITIAL DECISION:
. 07/00/83 COMMISSION EFFECTIVENESS DECISION: 10/08/83 TECN SPECS COMPLETED:
- 08/08/83 COMMISSION DECISION:
ISSUE LIC. WITN POWER RESTRICTION: ~08/08/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/08/83 FSAR Amendment 27 SCHED..DATE-RECEIPT DATE NEW SLIPS / NOTES:
The current estimate for a partial initial ASLB decision CONSTRUCTION CDMPLETION - APPL.8-08/08/83-
'3/31/83 A-on all matters except offsite emergency planning is July, 1983.
A complete initial decision may not be available orlor to Detober. 1985.
c--__--
HRR LICENSIHG SYSTEM PAIE HO 2 SOUTH TEXAS 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLAHT CHARACTERISTICSt KEY PERSOHHELa LIC. PM:
H. SCHIERLING ASLB CHAIR:
C. BECHHOEFER DOCKET HO 049880499 APPLICANT:
HOUSTON LIGHTING 8 POWER COMPANY LIC. BC G. KNIGHTON MEMBER 13 J. LAMB LOCATION:
12 MI SSW OF BAY CITY, TEX LIC. LA.:
J. LEE MEMBER 22
.E.
HILL REGI0Hz 4
AE BECH COUNSEL:
R. PERLIS CONST. INSP REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP W. HILL DESIGH PWR: 3800 NAT/1250 MWE CONST EBASCO RM ANALYST:
L. LAHIER ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
BRRT has been replaced by Bechtel as the A/E.
BRRT 07/17/78C has been replaced by Ebasco as the constructor.
ER DOCKETED:
Hon-safety related construction restarted on June 15, 1982.
ER SITE VISIT COMPLETE:
09/26/78 09/26/78C Safety related construction restarted on August 15, 1982.
INPUT TO DES TO PMs.
08/00/85 Current FLD is 12/86. Milestones now reflect a 12/86 FLD.
ISSUE DES:.
09/00/85 RESPONSE TO COMMENTS ON DES:
01/00/86 ISSUE FES:
02/00/86 CURRENT ENV. STATUS:
Schedule revised to reflect new 12/86 FLD.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
05/10/78 05/10/78C SAR DOCKETED: '
~
07/17/78C SAR Q'S RECEIVED BY PM:
01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:
02/01/85 CURRENT HRG. STATUS:
ISSUE DRAFT SER:
02/01/85 As provided in a Commission Order of 9/22/80, an INPUT TO SER:
11/01/85 expedited hearing on QA programs and management was 12/01/85 held.
The record of this phase of the hearing ISSUE SER:
was closed on June 17, 1982.
Phase II of hearing will consider all aspects of Quadrex Report.
ACRS FULL COMMITTEE MEETING:
01/00/86 Phase II is expected to begin in the Spring of '83.
INPUTS TO SE SUPPLEMENT 12 01/00/86 ISSUE SE SUPPLEMENT 12 01/00/86 CURRENT ANTITRUST:
Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:
06/G0/86 proposed license conditions and dismissing proceeding.
ASLB INITIAL DECISION:
11/00/86 COMMISSION EFFECTIVENESS DECISICH:
12/00/86 TECH SPECS COMPLETED:
12/00/86 COMMISSION DECISIDH:
12/00/86 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
12/00/86 LATEST AMENDMENT:
FSAR amendment 030 was issued 03/11/83.
SCHED. DATE RECEIPT DATE ER amendmont 86 was issued 12/01/82.
NEW SLIPS / NOTES:
CONSTRUCTICH COMPLETION - APPL.:
12/00/86 03/00/82 All schedules now reflect new official FLD of 12/86.
^ ^ ~
^~y 4
NRR L I C E N S'I N G SYSTEM PAGE N08 2-29
- ST LUCIE 2 0L CURRENT STATUS R E P O R T-
-REPORT AS OF 04/30/83 1
j_
PLANT CHARACTERISTICS KEY P E R.S 0 N N E La i
DOCKET NO:
05000389 LIC. PM:
V. MERSES ASLB CHAIR E.-BOWERS APPLICANT:
FLORIDA POWER 8 LIGHT LIC. BC G. KNIGHTON MEMBER 1 P. MORRIS LOCATIONt, 12 MI SE OF FT. PIERCE, FLA LIC. LA.
J. LEE MEMOER 28
.0.
PARIS REGIDH:
2 AEt ESASCO COUNSEL:
W. PATTON CONST. INSP8 R. WRIGNT r
A REAC. TYPE PWR MSS 58 COMB ANTITRUST B. V0GLER
-RESID. INSPs S. ELROD DESIGN PWR 2700 MWT/0842 MWE CONST8 EBASCO RM ANALYST 8 S. MEDLUND CURRENT SAF. STATUS ENVIRONMENTAL MILESTONESs SCHED. DATE ACTUAL DATE.
4 Status of 4-1 and 4-2 review is complete. The SER was issued on 10/09/81 SE Supplement No. 1 was issued ER DOCKETED:
02/17/81C on 12/30/81. SE Supplement No. 2 was issued on 09/30/82.
ER SITE VISIT COMPLETE:
02/18/81 02/18/81C SE Supplement No. 3 was issued in 4/83.
On 04/06/83 INPUT TO DES TO PM:
88/07/81 08/07/81C Ilcensee was issued a full power license limited to low ISSUE DES:
10/16/31 10/16/81C power testing.
RESPONSE TO COMMENTS ON DES:
02/08/82 02/08/82C ISSUE FES:
04/23/82 04/23/82C j
CURRENT ENV. STATUS:
The DES was issued on 10/16/81 and the FR Notice was published 10/30/81 The FES was issued on 04/23/82.
SAFETY / NEARING MILESTONES:
APPLICATIONJTENDERED8 03/31/80 03/31/80C SAR DOCKETED:
02/17/81C SAR-Q'S RECEIVED BY PM:
06/15/81 06/15/81C 3
SAR APPL. RESPONSE TO 4'S RECEIVED:
CURRENT HRG. STATUS:
IMPUT TO DRAFT SER TO PMt 08/03/81 08/03/81C i
There have been no petitioners on matters dealing with ISSUE DRAFT SER:
08/10/81 08/10/81C health, safety and environment.
IMPUT TO SER:
09/11/81 09/11/81C -
ISSUE SER:
10/09/81 10/09/81C ACR$ FULL COMMITTEE MEETING 11/12/81 II/12/81C INPUTS TO SE SUPPLEMENT 38 03/31/83 03/31/83C ISSUE SE SUPPLEMENT 38 04/06/83 04/06/83C CURRENT ANTITRUST FEMA LETTER RECEIVED:
08/20/82 08/20/82C Settlement among the Department of Justice, the NRC Staff MEARING STARTED:
N/A and the licensee has been agreed upon.
Case dismissed ASLB IMITIAL DECISION:
N/A 3/82 following summary disposition and settlement agreement.
COMMISSION EFFECTIVEMESS DECISION:
TECH SPECS COMPLETED:
03/31/83 03/31/83C COMMISSION DECISION:
05/08/83 LATEST AMENDMENT 8 ISSUE LIC. WITH POWER RESTRICTION 8 04/06/83-04/06/83C-ISSUE FULL POWER LICENSE AMEND:
06/01/83 No. 13 (FSAR)3 No. 5 (ER)
NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE-CONSTRUCTION COMPLETION - APPL.s 03/31/83C
t MRR LICENSING ~ SYSTEM PAtE K0s 2-30
.SUSQUEHAdNA 2 OL CURRENT' STATUS R E P 0 R T-REPORT AS~0Fs 04/30/83 PLANT-C H A'R'A C T E R I'S T I C St K E Y.
P E R S O N N E L:
' DOCKET Nor
~05000388 LIC. PM:
R. PERCH ASLB CHAIR 8 J. GLEASON-APPLICANT: ' PENNSYLVANIA POWER & LIGHT LIC. BC:
A. SCHWENCER
' MEMBER 18 j
LOCATION:
7 MI NE OF BERWICK, PA LIC. LA.:
E. HYLTON MEMBER 2:'
P. PURDOM REGION:
1 AE.
BECH COUNSEL:
J. CUTCHIN CONST. INSPs L. MARROW l
REAC. TYPE BWR HSSS: GE ANTITRUST A..H0DGDON RESID. INSP
'G.
RHOADS DESIGN PWRs. 3440 MWT/1052 MWE CONST8 BECH RM ANALYST
- L. LAMIER 1
4 CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE -ACTUAL DATE SSER 95 is scheduled for 03/01/83.
SER was issued 04/06/81 SSER 81 was issued 07/07/81.
ER DOCKETED:
06/10/78C t
Post ACRS SSER 82 was issued 09/10/81. SSER 83 was.
ER SITE VISIT COMPLETE 8 10/20/78 10/20/78C issued 07/17/82. SSER 84 was i ssued 11/12/82. SSER 95 IMPUT TO DES TO PM:
was i ssued 3/29/83. SSER 86 i s scheduled for 11/83.
ISSUE DES 8-03/30/81 83/30/8tC RESPONSE TO COMMENTS ON DES 8 05/21/81 05/21/81C
~
ISSUE FES:
06/15/81 07/02/81C I
CURRENT ENV. STATUS:
DES was issued on 03-30-81 FES was issued 07-02-81.
SAFETY / HEARING MILESTONES APPLICATION + TENDERED:
06/05/78 04/10/78C -
SAR DOCKETED
- 07/31/78 07/31/78C I
SAR 9'S RECEIVED BY PMt SAR APPL. RESPONSE TO 4'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT.TO DRAFT SER TO PM:
04/07/80 04/07/80C The OL hearing is completes Initial Decision issued on ISSUE DRAFT SER:
04-12-82.
. INPUT TO SER:
03/23/81 03/23/81C ISSUE SER:
04/06/81-04/06/81C ACRS LETTER RECEIVED:
88/15/81C INPUTS TO SE SUPPLEMENT 68 02/01/83 02/03/83C ISSUE SE SUPPLEMENT 68 11/08/83 FEMA LETTER RECEIVED:
06/08/82 06/00/82C CURRENT ANTITRUST HEARING STARTED:
10/06/81 10/06/81C Complete.
ASLB INITIAL DECISION:
04/12/82 04/12/82C COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
12/09/83 COMMISSION DECISIGHz 12/08/83 ISSUE LIC. WITH POWER RESTRICT!0Ns LATEST AMENDMENT 8 ISSUE FULL POWER LICENSE AMEND
- 01/09/84 FSAR:
No. 30; ER:
No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.*
01/08/84 i
t
m mn,_ f m an.amm NRR LICENSING SYSTEM PAGE NO: 2-31 WASHINGTON NUCLEAR 1 0L CURRENT STATUS REP 0RT REPORT AS OFs 04/30/83 PLANT CHARACTERISTICSt KEY PERS0NNEL8 DOCKET NO:
05000460 LIC. PM:
M. THADANI ASLB CHAIRS H. GROSSMAN APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
E. ACENSAM MEMBER 1:
G. BRIGHT LOCATION:
10 MI N OF RICHLAND, WA LIC.
LA.*
M. DUNCAN MEMBER 28 J. HARBOUR
(
REGION:
5 AEt UEC COUNSEL M. YOUNG CONST. INSP J. OLIN REAC. TYPEt PWR NS$$t 28W ANTITRUST:
J. RUTBERG RESID. INSPs A.
TOTH DESIGN PWR 3760 MWT/1266 MWE CONST BECH RM ANALYST L. LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81.
Application was docketed on July 16, 1982.
The staff reviews will be ER DOCKETED:
07/00/82 07/16/62C performed on " manpower available" basis.
Appl.
ER SITE VISIT COMPLETE 8 has requested an amendment to construction permit INPUT TO DES TO PM:
extending the construction completion date from 01/01/82 ISSUE DES:
N/S to 06/01/91.
Staff is reviewing the applicant's basis RESPONSE TO COMMENTS ON DES 8 for requested amendments.
ISSUE FES:
N/S CURRENT ENV. STATUS:
The staff reviews will be performed on " Manpower available" basis.
SAFETY / HEARING MILESTONES:
APPLICATION'TENDEREDE:
11/25/81 11/25/81C SAR DOCKETED
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM8 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER8 Federal Register on August 16, 1982.
A petition to INPUT TO SER*
Intervene has been received from the Coalition for ISSUE SER:
N/S Safe Power.
A prehearing conference was held in Richland, Wa., on January 26 and 27, 1983.
ASLB ACRS FULL COMMITTEE MEETING:
N/S denied CP amended hearing contention 51,' and admitted INPUTS TO SE SUPPLEMENT 18 CP contention 82.
ISSUE SE SUPPLEMENT 13 N/S FEMA LETTER RECEIVED:
CURRENT ANTITRUST 8 HEARING STARTED:
N/S ASLB INITIAL DECISION:
N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:
COMMISSION DECISION:
ISSUE LIC. WITH POWER RESTRICTION 8 LATEST AMENDMENT 8 ISSUE FULL POWER LICENSE AMEND:
N/S FSAR amendment 1, dated Oct. 18, 1982 received in Document Control System Nev.
1, 1982.
ER amend. I was rec'd 2/11/83.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.*
N/S 04/29/82 on 4/29/82.
PAGE N0s 2-32 NRR L I C E M S.I N G'.
'S Y S T E M WASHINGTON NUCLEAR 2 0L CURRENT STATUS REPORT PEPORT AS OF8 04/30/83-KEY PERS0NNELt PLANT CNARACTERISTIC$8 LIC. PM:
R. AULUCK ASLB CHAIRS E. BOWERS DOCKET NO 05000397 LIC. BCt A. SCHWENCER-MEMBER is R. COLE APPLICANT 8 WASHINGTON PUBLIC POWER SUPPLY SYSTEM' LIC. LA.:
E. NYLTUM MEMBER.28 E.-HILL LOCATION:
'30 MI NW OF RICMLAND, WASH REGION:
S AE8 58R COUNSELt W. PATON CONST. INSP8 A. TOTH REAC. TYPE: BWR NSSSs GE ANTITRUST B.'V0GLER RESID. INSPs R. FEIL DESIGN PWRs 3323 MWT/1103 MWE CONST: BECM RM ANALYST:
L. LANIER ENVIRONMENTAL MILESTONES:
'SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER was issued 3/31/82. Geology / Seismology reviews were meeting was held on October 7, 1982.
SSER No. 2 was ER SITE VISIT COMPLETE:,
02/28/77 04/20/77C included in SSER No. 1 issued. August it. 1982.
ACRS ER DOCKETED:
07/13/77 07/t4/77C issued 12/21/82. SSER 83 scheduled for 04/29/83.
INPUT TO DES TO PM 06/30/81
.06/30/81C 07/31/81 07/3t/8tc ISSUE DES:
RESPONSE TO COMMENTS ON DES:
09/28/81 09/28/81C 12/31/81 12/31/81C ISSUE FES:
CURRENT ENV. STATUS:
FES was issued 12-31-81.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
12/30/76 12/30/76C 04/01/78 06/22/78C SAR DOCKETED 8 SAR.9'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE To t's RECEIVED: 05/11/79 07/26/79C INPUT-TO DRAFT SER TO PM:
10/12/81 10/12/81C 11/17/81 11/17/81C CURRENT NRG. STATUS 8-ISSUE DRAFT SER:
A prehearing conference on CP extension order was held INPUT TO SER:
05/30/82 05/30/82C on January 26, 1983, in Richland, Wa.
On February 22, 03/31/82.
03/31/82C l
ISSUE SER:
1983, the ASLB denied the request for hearing filed by the Coalition for Safer Power and dismissed the proceeding.
ACRS LETTER RECEIVED:
11/13/82 11/13/82C No OL hearings scheduled.
INPUTS TO SE SUPPLEMENT 38 11/22/82 11/22/82C ISSUE SE SUPPLEMENT 3 04/29/83 FEMA LETTER RECEIVED:
05/08/83 r
I CURRENT ANTITRUST NEARING STARTED:
N/A i
Not required ASLB INITIAL DECISION:
N/A I
COMMISSION EFFECTIVENESS DECISION l
TECM SPECS COMPLETED:
07/06/83 COMMISSION DECISIDH 08/06/83 ISSUE LIC. WITN POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
09/00/83 LATEST AMENDMENT SCHED. DATE RECEIPT DATE 1
NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.*
09/06/83 05/07/82-I
HRR LICENSING SYSTEM PAGE NO: 2-33 WASHINGTON NUCLEAR 3 0L CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLANT C N A R A C T,E R I S T I C St KEY P E R S 0 N N E La DOCKET NO:
05000508 LIC. PM:
A. VIETTI ASLB CHAIR R. LAZO APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC G. KNIGHTON MEMBER 1:
E. LUEBKE LOCATION:
26 MI W OF OLYMPIA, WA LIC. LA.:
J. LEE MEMBER 2 D. SCHINK REGIDH 5
AE EBASCO COUNSEL:
D. SWANSON CONST. INSP D. KIRSCH REAC. TYPE: PWR HSSS: COMB ANTITRUST B. V0GLER RESID. INSP W. ALBERT DESIGN PWR 3800 MWT/1242 MWE CONST: EBASCO RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on June 2, 1982, and was docketed on 08/27/82.
ER DOCKETED:
08/27/82 08/27/82C ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
07/08/83 ISSUE DES:
09/07/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
04/06/84 CURRENT ENV. STATUS:
Application was tendered on June 2, 1982, and was docketed on 08/27/82.
SAFETY / NEARING MILESTONES:
APPLICATI0H TENDERED:
06/02/82 06/02/82C SAR. DOCKETED:
08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:
04/05/83 SAR APPL. RESPONSE TO 9'S RECEIVED: 07/13/83 CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/28/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01/83 Federal Register on 09/15/82.
INPUT TO SER:
06/05/84 ISSUE SER:
08/09/84 I
ACRS FULL COMMITTEE MEETING:
09/00/84 INPUTS TO SE SUPPLEMENT 1 11/06/84 ISSUE SE SUPPLEMENT 18 12/13/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Hotice of Opportunity for Hearing was published in the NEARING STARTED:
05/00/85 Federal Register on October 15, 1982.
ASLB INITIAL DECISION:
11/00/85 COMMISSION EFFECTIVENESS DECISION: -12/00/85 TECH SPECS COMPLETED:
12/00/85 COMMISSIDH DECISION:
12/00/85 ISSUE LIC. WITN POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S SCHED. DATE RECEIPT CATE NEW SLIPS / MOTES:
Detailed review schedule has been approved.
CONSTRUCTION COMPLETI0h - APPL.
12/00/85 10/01/82
NRR LICENSING SYSTEM PAGE NO: 2-34 WATERFORD 3 0 L.
CURRENT S T A T_U S.
REPORT REPORT AS OF8 Sa/30/33 PLANT CNARACTERISTIC58 KEY PERS0NNEL8 i
I DOCKET N08 05000382 LIC. PM:
J. WILSON ASLS CHAIRS S. WOLFE APPLICANT:
LOUISIANA POWER & LIGHT LIC. BC G. KNIGHTON
. MEMBER 18 W. JORDAN LOCATION:
20 MI W OF NEW ORLEANS, LA LIC. LA.:
J. LEE MEMBER 28 H. FOREMAN REGION:
4 AEt EBASCO COUNSEL:
S. TURK CONST. INSP:. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP8 L. CONSTABLE 7
DESIGN PWR8 3560 MWT/1151 MWE CUNST EBASCO RM ANALYST M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The safety review was expedited. Fuel load date delayed until 05/83 by applicant. $$ER 94 issued ER DOCRETED:
12/09/78 12/09/78C 10/29/82.
ER SITE VISIT COMPLETE 8 12/05/80
,12/05/40C i
IMPUT TO DES TO PM:
04/06/81 04/06/81C ISSUE DES:
05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:
07/24/81 08/19/8tc ISSUE FES:
09/30/81 09/30/81C i
i CURRENT ENV. OTATUS:
The DES was completed in May 1981.
FES was completed i
September 1981 SAFETY / NEARING MILESTONES:
f APPLICATION TENDERED:
09/28/78 09/28/78C l
SAR DOCKETED
- 12/18/78C
.SAR 0'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO 0'S RECEIVED 88/08/80 12/15/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM 10/03/80 05/15/81C contested hearing started 03/82. Partial initial ISSUE DRAFT SER:
1 decision issued 11/03/82. Nearing for remaining item INPUT TO SER:
05/08/81 05/15/81C (emergency preparedness) was held February 7-11, 1983.
ISSUE SER:
07/09/81 07/09/81C Record closed February 11, 1983.
Appeal Board hearing scheduled for April 19, 1983 to hear rebuttal of 11/03/82 ACRS LETTER RECEIVED 88/08/81 08/08/81C PID.
INPUTS TO SE SUPPLEMENT 58 03/31/83 ISSUE SE SUPPLEMENT 58 03/31/83 FEMA LETTER RECEIVED:
03/31/83 CURRENT ANTITRUST:
Staff is reviewing OL antitrust information.
HEARING STARTED:
03/09/82 03/23/82C l
ASLB INITIAL DECISIDH 10/00/82 04/06/83C COMMISSION EFFECTIVENESS DECISION: 05/09/83 TECH SPECS COMPLETED:
03/31/83 i
COMMISSION DECISION:
05/08/83-ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/08/83 ER 83 - 8/81 FSAR 931 - 3/83.
SCHED. DATE RECEIPT DATE i
HEW SLIPS / NOTES:
i To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.:
05/08/83 08/24/82 l
i I
NRR LICEN$ING SYSTEM PAGE NO: 2-3S WATTS BAR 1 4 2 0L CURRENT STATU$
REPORT REPORT AS OFs 04/30/83 P L'A N T CHARACTERI$ TIC 58 KEY PERS0NNEL8 DOCKET NO:
039080391 LIC. PM:
T. KENYPN ASLB CHAIRS N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 18 N/A LOCATION:
.10 MI S OF SPRING CITY, TENN LIC. LA.:
M.
DUNCAN MEMBER 2:
N/A REGION:
2 AE TVA COUNSEL:
M. YOUNG CONST. INSP W. SWAN REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSPs-T. HEATHERLY DESIGN PWR 3411 MWT/tt65 MWE CONSTs TVA RM ANALYSTS M.' KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 06/84.
SER published 07/82. ACRS subcommittee meetings held ER DOCKETEDs 01/05/77 ft/23/76C 04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE 8 03/18/77 02/25/77C held 08/13/82. ACRS letter received 08/16/82. Supplement IMPUT TO DES TO PMs 07/06/77 08/18/77C el to SER published 09/22/82. Supplement 02 to SER ISSUE DES:
11/29/77 06/02/78C tcheduled 11/83.
RESPONSE TO COMMENTS ON DES:
N/A ISSUE FES:
ft/24/78 12/29/78C 1
-CURRENT ENV. STATUS:
l Complete except for environmental toch specs.
1 SAFETY / NEARING MILESTONES:
APPLICATION TENDERED 06/30/76 06/30/76C I
SAR DOCKETEDs 10/04/76 10/04/76C SAR 4'S RECEIVED BY PM:
12/15/76 05/20/77C SAR APPL. RESPONSE To t'S RECEIVED 03/23/77 02/10/78C CURRENT NRG. STATU$s INPUT TO DRAFT SER TO PM:
06/18/80 12/ts/ SIC No hearings are assumed.
ISSUE DRAFT SER:
12/30/81 12/30/ Sic INPUT TO SER:
06/04/82 06/04/82C ISSUE SER:
07/09/82 07/05/82C ACRS LETTER RECEIVED:
09/08/82 08/16/82C IMPUTS TO SE SUPPLEMENT 28 08/27/82.
09/03/82C ISSUE SE SUPPLEMENT 2:
11/08/83 FEMA LETTER RECEIVED:
04/08/83 CURRENT ANTITRUSTs Complete NEARING STARTED:
N/A ASLB IMITIAL DECISION 8 N/A COMMISSION EFFECTIVENESS DECISION:
TECM SPECS COMPLETED:
07/08/83 COMMISSION DECISIOMs 12/08/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
03/08/84 FSAR No. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.s 01/08/84 02/25/83
NRR LICENSIHG SYSTEM PAGE NO: 2-36 WOLF CREEK 1 0L CURREHT STATUS REPORT REPORT AS OF 04/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET HO 05000482 LIC, PM:
J. HOLONICH ASLB CHAIR:
J. LAURENSON APPLICANT:
KANSAS GAS 8 ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G. ANDERSON LOCATION:
3.5 MI ME OF BURLINGTON, KAN LIC. LA.:
M. RUSHBROOK MEMBER 2:
H. PAXTOM REGION:
4 AE BECH COUNSEL:
M. KARMAH CONST. INSPs H. ROBERDS REAC. TYPE: PWR NSSS: WEST ANTITRUST:
- 5. V0GLER RESID. INSP S. SCHDM DESIGN PWR: 3425 MWT/ttSO MWE CONST DANIEL RM ANALYST S. HEDLUND ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
The SER was issued in AprlI 1982.
SSER-1 was issued in August 1982. SSER is schedJ1ed for 4/83.
ER DOCKETED:
11/25/80 11/25/8cc ER SITE VISIT COMPLETE:
07/28/81 04/21/ SIC INPUT TO DES TO PM:
10/01/81 10/05/8tc ISSUE DES:
01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C ISSUE FES:
06/11/82 06/tt/82C CURRENT ENV. STATUS:
The DES was issued in January 1982.
The FES was issued SAFETY / HEARING MILESTONES:
in June 1982.
APPLICATION TENDERED:
02/21/80 02/21/80C SAR DOCKETED:
08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TD Q'S RECEIVED:
INPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C CURRENT HRG. STATUS:
Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
Federal Register on 12/18/80. Two petitions for IMPUT TO SER:
03/19/82 03/19/82C leave to intervene were filed. A special combined ISSUE SER:
04/07/82 04/07/82C prehearing conference was held on 4/15/81.
A second prehearing conference was held on March 10, 1983.
ACRS LETTER RECEIVED:
05/11/82 05/11/82C Hearing is tentatively scheduled for sept. 20-26, 1983 INPUTS TO SE SUPPLEMENT 28 08/10/82 08/10/82C ISSUE SE SUPPLEMENT 28 04/00/83 and Oct. 18-27, 1983.
FEMA LETTER RECEIVED:
07/15/83 CURRENT ANTITRUST OL antitrust review is in progress.
HEARING STARTED:
09/20/83 ASLB INITIAL DECISIGHz 03/00/84 COMMISSION EFFECTIVENESS DECISIDH 12/00/83 TECH SPECS COMPLETED:
09/08/84 COMMISSION DECISIDH 09/09/84 ISSUE LIC. WITH POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:
10/06/84 LATEST AMENDMENT:
SNUPPS FSAR - No. Its Wolf Creek Site Addendum - No. 9; SCHED. DATE RECEIPT DATE ER - No. 4.
NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.:
10/08/84 08/24/82
^
n
.i ii e
n
,}
NRR LICENSING SYSTEM PAGE NO: 2-37 ZIMMER 1 0L CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLANT CHARACTERI$ TIC $8 KEY PERS0NNEL:
DOCKET NO:
05000558 LIC. PM:
L. KINTHER ASLB CHAIR:
J. FRYE APPLICANT:
CINCINNATI CAS 8 ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
F. HOOPER LOCATION:
24 MI SE OF CINCINNATI, ON LIC. LA.:
M.
RUSHDROOK MEMBER 2 M.
LIVINGSTON REGION:
3 AE 58L COUNSEL:
C. BARTH CONST. INSP D. HUNTER REAC. TYPE: BWR HSSS: GE ANTITRUST S.
LEWIS RESID. INSP F. CHRISTIANSON DESIGN PWR: 2436 MWT/0810 MWE CONST: KAISER RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SE Supplement 01 was issued on 06/04/81. SE Supplement 82 was issued 10/81 SE Supplement 83 issued on 08/23/82.
ER DOCKETED:
09/10/75 09/10/75C NRR is assisting Region IV in its vendor inspection of the ER SITE VISIT COMPLETE:
10/09/75 10/J9/75C main steam line and its supporting structures in the INPUT TO DES TO PM:
08/20/76 08/19/76C turbine building. Resolution of open items in the safety ISSUE DES:
10/15/76 10/15/76C review is continuing.
RESPONSE TO COMMENTS ON DES:
03/25/77 04/01/77C ISSUE FES:
06/10/77 06/10/77C CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/15/75 05/09/75C SAR DOCKETED:
09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:
10/29/76 01/06/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/28/77 08/11/77C Hearing completed 3/5/82. Board decision was rendered in ISSUE DRAFT SER:
N/A June, 1982.
The Board exercised sua sponte authority to INPUT TO SER:
05/20/77 12/07/77C admit as Board issues 8 new contentions. The Con.mi ssion ISSUE SER:
07/29/77 01/31/79C reviewed the action and directed the Board to issue an appropriate order dismissing the 8 contentions from the ACRS LETTER RECEIVED:
09/16/77 03/13/79C proceeding. On 11/12/82 the Commission issued an order to INPUTS TO SE SUPPLEMENT 38 06/17/82 08/02/82C Show Cause and Order Immediately Suspending Construction.
ISSUE SE SUPPLEMENT 38 08/23/82 08/23/82C On 12/8/82, appilcant consented to the Order.
FEMA LETTER RECEIVED:
04/15/82 04/15/82C CURRENT ANTITRUST:
Antitrust review is now closed.
HEARING STARTED:
02/26/82 02/26/82C ASLB INITIAL DECISIDH N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:
08/00/83 COMMISSION DECISION:
08/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
09/00/83 Application amendment 143, FSAR Revision 92 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Applicant letter of 09/24/82 revised construction completion CONSTRUCTION COMPLETION - APPL.:
09/00/83 09.*t???
date to the third quarter of 1983.
Applicant letter of 01/24/82 requested latest construction completion date of 12/31/84.
m um
HRR LICEHSIHG SYSTEM PAGE HO: 2.38 CLINCH RIVER CP CURRENT STATUS REPORT REPORT AS OF 04/30/83 PLAHT CHARACTERISTICSt KEY PERS0HHEL8 DOCKET NO:
05000537 LIC. PM R. STARK ASLB CHAIRS M. MILLER APPLICANT:
PROJECT MANAGEMENT CORP.3 DOE;TVA LIC. BC:
N. GRACE MEMBER 1 G. LIHENBERGER LOCATION 25 MI W OF KNOXVILLE, TN LIC. LA.8 P. SHUTTLEWORTH MEMBER 2:
C. HAND REG 10Hs-2 AE B8R COUNSEL:
S. TREBY CONST. INSP REAC. TYPE LMFBR NSSS: WEST ANTITRUST J. RUTBERG RESID. INSP8 DESIGN PWR 0975 MWT/0350 MWE CONSTs $8W RM ANALYST:
B. ST MARY CURRENT SAF. STATUSS ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safaty review was reinitiated in October 1981 A revision to the Site Sultability Report was issued June it. 1982.
ER DOCKETED:
04/11/75 04/11/75C On August 17, 1982, HRC issued an order granting Clinch ER SITE VISIT COMPLETE River's request to begin site preparation activities.
INPUT TO DES TO PM:
The Site Suitability Report hearing sessions were held ISSUE DES:
02/12/76C in Oak Ridge during the week of August 23, 1982.
SER was RESPONSE TO COMMENTS ON D'ES:
Issued 3/11/83.
The ACRS meeting was held 4/14/83.
ISSUE FES 02/07/77 02/07/77C LWA-2 will not be requested. Safety hearing is to commence July 18, 1983.
CURRENT ENV. STATUS The FES was issued in February 1977.
A draft supplement to the FES was issued on July 19, 1982.
A final supplement SAFETY / HEARING MILESTONES:
was issued on October 29, 1982.
APPLICATION TENDERED:
10/15/74 10/15/74C SAR DOCKETED:
06/13/75 06/13/75C SAR 4'S RECEIVED BY PM 04/09/82 04/09/82C SAR APPL. RESPONSE TO 4'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUSS INPUT TO DRAFT SER TO PM:
07/16/82 07/16/82C Hearing sessions on the SSR took place en August 23-27, ISSUE DRAFT SER:
09/27/82 09/27/82C 1982.
The FES hearings were held November 15-19, 1982, INPUT TO SER:
01/14/83 02/04/83C December 13-17, 1982, and on January 4-Se 1983.
The safety ISSUE SER:
03/11/83 03/11/83C hearings are forecasted Jor July 18, 1983.
PID was issued on 02/28/83 on the FES hearing.
ACRS LETTER RECEIVED:
04/19/83 04/19/83C INPUTS TO SE SUPPLEMENT 18 04/22/83 04/22/83C ISSUE SE SUPPLEMENT 18 05/02/83 CURRENT ANTITRUST 8 HEARING STARTEDr 08/23/82 08/23/82C ASLB~ INITIAL DECISIDHs 09/00/83 COMMISSICH EFFECTIVEMESS DECISION 8 06/00/84 TECH SPECS COMPLETED:
COMMISSION DECISION:
N/S CP ISSUED 8 12/08/83 LATEST AMENDMENT:
HEW SLIPS / MOTES:
I r.
NRR LICENSING SYSTEM PAGE NO: 2-39 SKAGIT/HANFORD 182 CP CURRENT STATUS R E P O R.T REPORT AS OF 04/30/83 P L.A N T CHARACTERISTIC 5:
KEY PERS0NNELa DOCKET N0s 052280523 LIC. PM:
C. MOON ASLB CHAIR:
J. WOLF APPLICANT:
PUGET SOUND POWER 8 LIGHT LIC. BCs E. ADENSAM MEMBER la F. HOOTER LOCATION:
12 MI. NW OF RICHLAND, WA.
LIC. LA.:
M.
DUNCAN MEMBER 2:
G. LINENBERGER REGION:
S AE2 3ECH COUNSEL:
L. DEWEY CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST B. V0GLER RESID. INSP DESIGN PWR 3833 MWT/1277 MWE CONST: BECH RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI related action items.
Site relocation ER amendment and PSAR ER DOCKETED 09/30/74 09/30/74C tmendment were submitted on 12/31/81 The applicant is ER SITE VISIT COMPLETE:
02/05/82 02/05/82C ralocating the site to the Hanford Reservation.
INPUT TO DES TO PM:
04/09/82 04/09/82C Supplement 3 to the SER was issued in 12/82.
The staff ISSUE DES:
05/04/82 05/04/82C recommends additional investigations of the May Junction RESPONSE TO COMMENTS ON DES:
08/06/82 09/30/82C M:nocline. An ACRS subcommittee site visit and meeting ISSUE FES:
06/00/83 was complete on 01/24-25/83.
The ACRS completed its review in a meeting on 02/10/83 and reported the results of its review in a letter to the chairman on 02/16/83.
CURRENT ENV. STATUS:
Site relocation (to Hanford) DES was issued on 5/4/82. FES wms delayed to 2/83 to follow issuance of the draft report SAFETY / HEARING MILESTONES:
en need for power by the Regional Power Council (RPC).
The RPC's draft report of 1/26/83 did not include Skagit/
APPLICATI0H TENDERED:
88/06/74 08/06/74C Hanford as a generating unit needed in the next 20 years.
SAR DOCKETED:
01/15/75 01/15/75C In response to the appilcant's request of 2/4/83, issuance SAR Q'S RECEIVED BY PM:
02/10/82 02/10/82C of the FES has been defered until after issuance of the SAR APPL. RESPONSE TO 4'S RECEIVED: 10/01/82 18/01/82C the Final Plan by the RPC in April 1983.
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
A prehearing schedule on safety matters was established on ISSUE DRAFT SER:
1/18/83 including a tentative date of 5/17/83 for beginning INPUT TO SER:
07/11/77 07/11/77C of hearing. Appilcants en 2/4/83 and the intervenors on ISSUE SER:
08/31/77 08/31/77C 2/10/83 submitted motions to suspend the safety prehearing schedule. On 2/18/83 the Board suspended the prehearing ACRS LETTER RECEIVED:
01/08/83 02/16/83C schedule (Safety) including the filing of new contentions INPUTS TO SE SUPPLEMENT 3:
11/30/82 11/30/82C psnding adoption of the Final Regional Power Plan and until ISSUE SE SUPPLEMENT 38 11/30/82 12/30/82C the conclusion of hearings on "Need for Power".
CURRENT ANTITRUST:
Crmplete HEARING STARTED:
07/15/75 07/15/75C ASLB INITIAL DECISION:
N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:
N/A COMMISSIDH DECISION:
N/S CP ISSUED:
N/S LATEST AMENDMENT:
NEW SLIPS / NOTES:
-~
i MRR LICEN5ING SY$ TEM PAGE Nos 2-40 (NSS)CESSAR SYSTEM 80 FDA CURRENT STATUS REPORT REPORT AS OFs 04/30/83 PLANT CHARACTERI5 TICS:
KEY PERSONNEL DOCKET Nos 05000470 LIC. PM:
G. MEYER ASLB CHAIR:
APPLICANT 8 COMSUSTIDH ENGINEERING LIC. BCs C. THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 28
. REGION:
0 AEs COUNSEL:
M. WAGNER CONST. INSPs REAC. TYPE 8 PWR NSS$8 COMB ANTITRUST:
RESID. INSP8 DESIGN PWRs 3800 MWT/1295 MWE CONST RM ANALYSTS M. KING CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81 Awaiting documentation to rcsolve ACRS, open, and confirmatory issues. SSERI was ER DOCKETED:
issued 03/30/83. A revision to the supplement is ER SITE VISIT COMPLETE:
Echeduled for May 31, 1983.
INPUT TO DES TO PM8 ISSUE DES 8 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
N/A.
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
10/27/78 10/27/78C SAR DOCKETEDs 12/21/79 12/21/79C SAR 4'S RECEIVED SY PM:
09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/88 07/IS/8tC CURRENT HRG. STATUS:
INPUT TO DRAri SER TO PM:
N/S N/A.
ISSUE DRAFT SER:
N/S INPUT TO SER:
11/01/88 11/13/81C ISSUE SER 05/01/82 11/10/8tC ACRS LETTER RECEIVED:
06/28/82
- 12.* t5/S IC
(
INPUTS TO SE SUPPLEMENT 28 04/29/83 ISSUE SE SUPPLEMENT 28 0S/31/83 CUJ. RENT ANTITRUST NEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION DECISIGHs SPECIAL PROJECT COMPLETE 8 07/29/83 LATEST AMENDMENT NEW SLIPS / NOTES:
j' f.
m s
a
-.iy
_b_
f i N g,-
O
,6
- -'., +
9 +
j 3N1 NRR LICEN ING SYSTEM PAGE Nor 41 (NSSIGESSARSEVEREACC FDA CURRENT S T'A T U S REPORT REPORT AS OF8 84/30/83 t
?.
t ea-P L, A N T CHARACTERISTI.C5
-r-
.t K E Y fiP E R S 0 N N E L3 t
, }4 g
3 r-d _}i f
'L.IC. PM:
D. SCALLETTI ASLB CHAIR N/A DOCKET NO:
00007447 l
LOCATION 8 N/A f
LIC. BC:
C. TM0t95 MEMBER is
,M/A l
APPLICANT:
GENERAL ELECTRIC COMPANY
+. "
LIC. L A.8 1 P. AHr;aSON MEMBER 2:
N/A i
AEs BRAUN ' /, O C0lsASEL B..BORDE' LICK CONST. INSP8 REGION 8 8
ANTITRUST 8 f~
RESID. INSP REAC. TYPE: BWR HSSS: GE
.,l.,
-~ ( 6, RM ANALYST *.
- 5. ST MfRY:
DESIOM PWR8 3579 MWT/1220 MWE CONST:
o u "' ?
f_
{
^
CURRhhlilSAF. STATUS:
te ' l' '
ENVIRONMENTAL MILES 10NES:
SCHED. DATE ACTUSL DATE GESS AR II was docketed 02/82; review is in progr'es?'.. '
i Dates,pown reflect review for the severe acci dent ER DOCRETED desi ge,.?
e g ~-
ER SITE VISIT COMPLETE:
INPUT TF) DES TO PM:
ISSUE DESs 5
,f RESPONSI TO C0fffENTS ON DES 8 4
ISSUE rES*
O
_}
f
/
CURRENT ENV. STATUS
- J.
-9 I
p f,,,
v SAFETY <ttEARIM MILESTOME,58 J
,4
' x-~ ;
'y
!( 85/31% 8,.
43/31/Stc, j i
y 4
1 c+e" A
APPLICD s0M TENDERED 3
W " " W 2
'J:.-
SAR Der m ED:
~,/ 82/22/s2 02/22/82Ce t
m SAR t's A!CEIVED BY MM te/of/82 18/es/82C
~~
- ^
SAR APPL. RESPONSE T.3 t's RECEIVED: 42/01/83,
02/91/93C
)
./
~ f/.
~
o.
~
e r
IMPUT TO DRAFT SER'TO Pf1~8 CURRENT HRG. STATUS:
J i.-
1
- ISSUE DRAFT SER 4 i
02/01/84 1
U f
INPUT TO SER
+ 43/01/84 3$
//.
ISSUE SER8 4
7 g
ACRS FULL C0fftITTEC NEETING:
,84/06/84 IQ
'/
?
6 f.f [ '~,
INPUTS TO SE SUPPLEMLHT 18 734/21/84
,C.,4* A5/25/84 ISSUE SE SUPPLEMENT 18,
I v
p-y t
p',
r
~
e
.)?'
,N/A f1 f?
CURRENT ANTITRUST:
t.,, 4 8
NEARING STARTED:
6 FDA antitrust reMsw is +y progress.s g'
/,' 'ASLB INITIAL DECISION:
46.s n ur f
' /),,e - y /a ' A
- f
?. -
^
,J COMMISSION DECISION p
N/A
/ t-4, e-T t
4
~
- 'k C
/.
SPECIAL PROJECT COMPLETES 15/09/,84 I
8 e
,/$,
r ct.
v ;5
[,
^
s
/ l. LATEST AMENDMENT:
.j.(
['
r4 s
M*
C
FDA Amendment No. 9 me received in 18oienber, 1982.
f M r ~~
~ ff rr
,.R,-
l s ~
w
,s, i ;',
PMW SLIPS /HDTES*
? l f/
u y
j 3
L
)
-"F
,. <l E i;-
y
.r --ra Onf y[t
~
e' s
ff[ _ s
.'i W
r.)
gs
,s
- s 'O-
- F
,r (~
f d
g
/ 1 N
j$ ~ g j'NI gh 4
,+j rf
~
.7. 3 (
4 %
~..t.<.
x$, T
-s a-r,a-o m,t a,;_. C
---W
.n.
- Y..
__;/
w vf
,A
~
.)3 z
/
31',
i ' r NRR LICEN$ING. S_Y S T E M PAGE Nos 2-42
,1 Jj r
.y 4
~(NSS)GESSAR-238 NI FDA CURRENT S7ATUS R E P O R T;,
' REPORT AS OFs 04/30/83 1
I PLANT CHARACTERISTIC 58 KEY P E R.S,9 N.M E.Ls I
DOCKET NO:
85008447:
LIC, PM
.D..SCALETTI ASLB CHAIRS N/A APPLICANT:
GENERAL ELECTRIC COMPANY L I C. B C i~
C.
THOMAS MEMSER 18 N/A LOCATION:
N/A LIC y rt A!:
P. ANDERSON MEMBER 2:
N/A I
REGION:
0
, HSSS: GE ANTITRUSTt RESID. INSPs AE8 BRAUN COUNtEL:
,5.
BORDENICK CONST. INSPs t '$
REAC. TYPE BWR DESIGN PWR 3579 MWT/1220 MWE CONST8 RM ANALYST *
- 5. ST MARY r
CURRENT SAF. STATUS:
'ENhfRONMENTALMILESTONES:
r SCNED. DATE GESSAR II was docketed 02/82. The foundation analysis ACTUAL DATE issue will require special attention. FRA for severe ER DOCKETED:
'secident design was submitted 4/82.
Severe accident
'ER SITE VISIT COMPLETE:
d2 sign modifications were submitted 6/82 in Amendeent INPUT TO DES TO PM -
Ha. 4.
GE has requested the EDO to accelerate the ISSUE DES:
PRA review schedule to coincide with the FDA.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
CURRENT ENV. STATUS:
SAFETY / NEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C i
1 SAR DOCKETED:
02/22/82 02/22/82C SAR 9'S RECEIVED BY PM:
10/15/82 10/88/82C SAR APPL. RESPONSE TO 4'S RECEIVEDs 11/12/82 02/11/83C CUR 2ENT MRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER INPUT TO SER:
03/25/83 03/25/83C ISSUE SER:
04/01/83 04/98/83C ACRS FULL COMMITTEE MEETINGS 85/12/83 INPUTS TO SE SUPPLEMENT 18 95/27/83 ISSUE SE SUPPLEMENT 1s 06/17/83 CURRENT ANTITRUST:
FDA antitrust review is in progress.
HEARING STARTED:
h/A ASLB INITIAL DECISION:
N/A COMMISSION DECISION:
N/A.
SPECIAL PROJECT COMPLETE:
'06/09/83 LATEST AMENDMENT:
FDA Amenduent No. 9 was received in November, 1982.
NEW SLIPS / MOTES:
I
' '~
T NRR LICENSING
$Y$ TEM
.45 0F804/30/83 H0H-POWER-RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEM TER
. ISSUE FES OR START ISSUE HON-POWER FACILITY NUMBER DOCKET REE TO PM SER EIA HEARING ~ DE COMMENTS AFRRI 05000170 10/80C N/A 09/81C 01/82C H/A 06/83 N/S CONTESTED CASE 1000.0000KW TRIGA CORNELL U.
05000157 05/80C H/A 02/83C 06/83 06/83 N/A 06/83 100.0000KW TRIGA CORHELL UNIVERSITY 05000097 10/78C H/A 02/83C 06/83 06/83 N/A 06/83 1000KW CRITI
.GE TEST REACTOR 05000070 07/77C N/S N/S N/S.
.H/S N/S N/S ORDER TO SHOW CAUSE.
ASLAB HEARINGS.
50.0000KW TAHK GE, HTR 05000073 11/79C N/A 06/84 09/84 09/84 H/A 09/84 100.0000KW POOL 10HA STATE 05000116 09/79C H/A 09/83 17/83 12/83 N/A 12/83 10.0000KW ARCHT MAHHATTAN COLLEGE 05000199 08/83 N/A 08/84 10/84 10/84 H/A 10/84 r
.0001KW CRITI MICHIGAH STATE 05000294 09/77C H/A 09/83 12/83 N/A.
H/A 12/83 250.0000KW TRIGA HBSR 05000184 12/80C 02/82C 09/82C 06/83 09/82C H/A 06/83 POWER INCREASE TO 20 MW INCLUDED IN REHEWAL 10.0000KW TAHK RENSSELAER
'05000225 05/79C H/A 05/83 09/83 09/83 N/A 09/83
.0000KW CRITI STATE U OF HEW YORK 05000057 06/79C H/A 12/82C 04/83 N/A N/A 04/83 2000.0000KW PULSR TEXAS AIM 05000128 07/79C N/A 07/82C 03/83C 03/83C H/A 04/83C 1000.0000KW TRIGA U. OF KAHSAS 05000148 03/80C
- H/ A 02/84 04/84 04/84 H/A 04/84 250.0000KW POOL
- U. OF MD.
05000166 05/80C N/A.
07/83_
09/83 H/A N/A 09/83 250.0000KW TRIGA
.U.
OF MO., ROLLA 05000123 1"/7?C N/A 04/84 06/84 N/A
.H/A 06/84 200.0000KW POOL U. OF OKLA.
05000112 10/78C N/A 05/83 08/83 08/83 H/A-08/83
.0150KW AGH
NRR LICENSING SYSTEM
-AS OF 04/30/83 H0N-P0WER RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEN TER ISSUE FES OR START ISSUE NON-POWER FACILITY NUf1B ER DOCKET DES TO PM ifE Ela HEARING RL SANNENTS U. OF TEXAS 05000192 05/80C-N/A 03/83 08/83 08/83 N/A 06/83 250.0000KW TRIGA U. OF UTAH 05000407 03/83 N/A 11/83 02/84 N/A N/A 02/84 100.0000KW TRIGA U. OF.VA., CAVALIER 05000396 06/84 N/A 07/84 09/84 N/A N/A 09/84
.1000KW PGOL UCLA. ARGONAUT 05000142 02/80C N/A 10/82C 06/81C 06/81C 09/80C N/S CONTESTED CASE 100.0000KW ARGNT UNION CARBIDE 05000054 05/80C N/A 10/82C 07/83 07/83 N/A 07/83 5000.0000KW POOL VA HOSPITAL 05000131 01/80C N/A 05/83 07/83 N/A N/A 07/83 18.0000KW POOL VA. POLY. INSTITUTE 05000124 10/79C h/A 10/83 12/83 12/83 N/A 12/83 100.0000KW ARGHT WEST., TRAINING REACTOR 05000087 12/81C N/A 11/83 02/84 02/84 N/A 02/84 to.0000KW TANK 0 FOR TEST REACTORS ONLY 4
(,.
s.
b s
t 3
?
3 H
H 2
H E
O H
H U
uJ to c
1 1
i s
n
.m 1
i
!o NRR LICEN$ING
.5 Y'S T E N PAGE NO: 2-0L C U R R E N.T STATUS REPORT REPORT AS oft PLANT C H A R A C T E R I S T-I C St KEY PERS0NNEL:
. DOCKET NO Docket No.or Project NoA if' not docketed LIC. PM : -
Licensing Project Manager ASLB CHAIR: ' ASLB Chairman i
APPLICANT:
Utility LIC. BC:
Licensing Branch Chief MEM8ER 1 on panel LOCATION:
Isles and direction from nearest maior town LIC. LA.2 Licensing Assistant MEMBER 2
.on panel REGION:
1 through 5 AE:
Architect / Engineer COUNSEL:
Attorney assigned to case CONST. INSP Construction Inspector REAC. TYPE: PWR, BWR, HTGR or LMFBR N5SS: Nuclear Stosm Systems Supplier ANTITRUST:
Antitrust Attorney RESI0 p 'INSP t Resident inspector DESIGN PWR: Megewetts electric & thermal CONST: Constructor MPA ANALYST: MPA analyst assigned to track prolect CURRENT SAF.' STATUS:
ENVIRONMENTAL M!iESTONES:
SCHED. DATE-ACTUAL DATE-Safety status for this reporting period only, it consists of accomplishments and schedula changes occurring since the last issue of Blue Book. Outstanding issues and late input fro vi ER DOCKETED:
Environmental Report review branches should be indicated, along with indication of the critical path, phT
^
0 T
Project Manager ISSUE DES:
Draft Environmental Statement RESPONSE TO COMMENTS ON DES:
-ISSUE FES:
Final Environmental Statement CURRENT-ENV. STATUS:
Environmental status for this reporting period only, it consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES
- input from review branches'should be indicated.
APPLICATION TENDERED:
$AR DOCKETED:
1 Safety Analysis Report SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRO. STATUS:
INPUT TO DRAFT SER TO PM:
Changes in the hearing niates since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER Safety Evaluation Report contentions should be indicated.
INPUT TO SER ISSUE SER:
ACRS~ LETTER RECEIVED:
Advisory Committee INPUTS TO SE SUPPLEMENT 3 on Reactor Sofeguards ISSUE SE SUPPLEMENT 3:
CURRENT ANTITRUST:
Changes in the antitrust status since the last issue of Blue Book.
NEARING STARTED:
ASLB INITIAL DECISION:-
Atomic Sofety & Leconsing Board ASLB FINAL DECISION:
TECH SPECS COMPLETED:
C0f tt1ISSION DECISION:
LATEST AMENDMENT:
ISSUE PARTIAL POWER LICENSE:
ISSUE FULL POWER LICENSE:
The latest amendment submitted by the applicant.
NEW SLIPS / NOTES:
SCHED, DATE RECEIPT DATE Slips or putential problems that should be brought to management's attention.
CONSTRUCTION COMPLETION - APPL.*
Mh
%d*",,",',",,
g, construction in construction completion
' cOsttpletien 1
8 U.S. Goyes"""? PRINT!IIG OFFICE: 1ss3-sel'299 I32 1
m n
NIC a ess 335 -
- 1. REPORT NUMBEn (Ass,pwst*y pocJ l
U S NUCLEC2 EEIULATORY rOWISSION is 7 7,
.NUREG-0580 Vol 12. No. 4 BIBLIOGRAPHIC DATA SHEET 4 TIT LE AND SUBTaT LE I4ad voeme No..,t apprep<.arel 2 tresa s*.ashi Regulatory) Licensing Status Sunenary Report
- 3. RECIP'ENT*S ACCESSION NO.
(Blue Book
- 7. AUTHOR tS8 -
- 5. DATE REPORT COMPLETED MONTH jYEAR I
May 1983
- 9. PERFORMING ORGANIZATION NAME AND MAILING ADORESS (sacbe I, coal DATE REPORT ISSUED Office of Resource Management May 1983 MONTH l YEAR Management Information Branch U.S. Nuclear Regulatory Commission Washington, D.C.
20555 g g,,,,,,,,
- 12. SPONSORING ORGANIZATION NAME AND M AILING ADDRESS (incke le Coel
- 10. PROJECT / TASK / WORK UNIT NO.
Office of Resource Management Management Infomation Branch
- 11. CONTRACT NO.
U.S. Nuclear Regulatory Connission Washington, D.C.
20555
- 13. TYPE OF REPORT PE RICO COVE RE D (fachsere cares)
April 1,1983 - April, 30,1983 lb SUPPLEMENTARY NOTES 14 trenge was 16 ABSTR ACT C00 woros or sess)
Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-pcwer reactor renewals under review, as reported to Congress.
l l
17 KE Y WORDS AND DOCUMENT ANALYSIS Ila DESCRIPTORS l
11D SDENTIFIE RS OPEN ENDE D TERMS 18 AV AIL ASILITY ST ATEMENT 21 r*O OF P AGE S iggiggs (Tr.s ecoerr' Unlimited 3,7.. oam 22 price g
t UNITE 3 STATES
- ilsi cuss ssn Postics aesisruo NUCLEAR RE!ULATORY COMMISSION
.a's73 c Z
C WASHINGTON. D.C. 2026 Ps amit 4. M1 C'
33 m
OFECAL BUSWESS h
PENALTY FOR PftNATE USE,4300 o
< l\\
9.
M
[7m5%a 7 ca o w i
! ran r y
' J C,
- lR f
- f. fW
.) f V I'l tim Pf g _'[t f ( '(
F.
D')P
- tC 7 t'.
t' i
l '> r ^
s W 4 '.' H [ N f, T 'I t
')(
),iC 5%
33-m' O
CrD.
HO lI3<
C:
n-
.m Z.
2 ZO,
-tnH>
H C.
W Ch C
EE:
- D<
33 m
T o
33H 1
l, 9
e
- f
-