Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20073P478 | 18 April 1983 | Duke Energy | Proposed Change to Tech Spec 4.5.1.2.C.1,revising Setpoint for Upper Head Injection Accumulator Automatic Isolation | Request |
ML20073P449 | 18 April 1983 | Duke Energy Tucker H | Application for Amend to Tech Spec 4.5.1.2.C.1,revising Setpoint for Upper Head Injection Accumulator Automatic Isolation | Request |
ML20073P879 | 25 April 1983 | Tennessee Valley Authority Wills J | Provides Info on ECCS Analyses & Max & Min Upper Head Injection Delivery Vol Consistent W/Plant Tank Nominal Setpoint Results | Other |
ML20073T190 | 4 May 1983 | Duke Energy | Revised Proposed Tech Specs Changing Upper Head Injection Accumulator Automatic Isolation Setpoints to Incorporate Revised Setpoint Calculation | Other |
ML20073T174 | 4 May 1983 | Duke Energy Tucker H | Requests That 830418 Proposed Amend to Tech Specs to Revise Setpoint for Upper Head Injection Accumulator Automatic Isolation Be Changed to Incorporate Revised Setpoint Calculation | Other |