Proposed Tech Spec Table 4.15.2 Re Radioactive Liquid Effluent Monitoring Instrumentation Surveillance Requirements
ML20073H808
Person / Time
Site: Oyster Creek
Issue date: 04/25/1991
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20073H755 List:
References
NUDOCS 9105070270
Download: ML20073H808 (2)


Text

,,.. i ,

, . TABLE 4.15.2 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL CHANNEL SOURCE CHANNEL FUNCTIONAL SURVEILLANCE INSTRUMENT CHECK CHECK CALIBRATION TEST REQUIRED"

1. Main Condenser D N/A Q9 M c Offgas Treatment System Hydrogen Monitor
2. Main Stack Monitoring System I h b
a. Radioactive D M 1/24 Q l Noble Gas Monitor (Low Range)
b. Iodine Sampler W N/A N/A N/A b
c. Particulate W N/A N/A N/A b Sampler
d. Effluent Flow D N/A 1/24 Q b tieasuring Device
e. Sample Flow D N/A R Q b Measuring Device
3. Turbine Building ventilation Monitoring System I i
a. Radioactive D M 1/24 Q b Noble Gas Monitor (Low Range)
b. Iodine Sampler W N/A N/A N/A b
c. Particulate W N/A N/A N/A b Sampler
d. Ef fluent Flow D N/A 1/24 Q b Measuring Device
e. Sample Flow D N/A R Q b Measuring Device
4. Offgas Building Exhaust Ventilation Monitoring System
a. Radioactive D M RI Q* b Noble Gas Monitor
b. Iodine Sampler W N/A N/A N/A b Cartridge
c. Particulate W N/A N/A N/A b Sampler
d. Sample Flow D N/A R N/A b Measuring Device Lecends S = once per 12 hrs; D = once per 24 hrs; W =-once per 7 days; M = once per 31 days; Q = once per 92 days; SA = once per 184 days; R = once pv 18 mos; S/U = before each reactor startup; P = completed before each release; N/A = Not Applicable.

1/24 = once per 24 months 9105070270 PDR 910425 P

ADOCK 05000219 PDR

I e

.s6 \ .

, , , TABLE 4.15.8 NOTAT3ONS l

a. Instrumentation shall be OPERABLE and in service except that a channel may I be taken out of service for the purpose of a check, calibration, test or maintenance without declaring it to be inoperable.
b. During releases via this pathway,
c. During main condenser offgas treatment system operation.

d.- During operation of the condenser air ejector.

e. The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:
1. Instrument indicates measured levels above the alarm setpoint.
2. Instrument indicates a downscale failure.
3. Instrument controle not set in operate mode.
4. Instrument electrical power loss.
f. The CHANNEL CALIBRATION shall be performed according to established station calibration procedures.
g. A CHANNEL CALIBRATION shall include the use of at least two standard gas i

samples, each containing a known volume percent hydrogen in the range of the instrument, balance nitrogen.

.h. The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:

1. Instrument indicates measured levels above the alarm setpoint.
2. Instrument indicates a low countrate/ monitor failure.
3. Switch cover alarm shall be verified to alarm when the cover is opened; and clear when the cover is closed after the faceplate switches are verified in their correct positions.
i. The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:
1. Instrument indicates measured levels above the alarm setpoint.
2. Instrument indicates a low countrate/ monitor failure.

P