_
Y UGUg ee t
fI
[%,
UNITED STATES
[..
i j NUCLEAR REGULATORY COMMISSION wAssinctow, o.c. noss5 ooot g
gv /
....+
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY. ET AL.
DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 66 License No. NPF-58 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by The Cleveland Electric Illuminating Company, Centerior Service Company, Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, and Toledo Edison Company (the licensees) dated March 19, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I;
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:
9410040038 940921 PDR ADOCK 05000440 P
PDR 2
. = _ _ _.
(2) Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.
66 are hereby incorporated into this license.
The Cleveland Electric Illuminating Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented not later than 90 days after issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Y'
on B. Hopkins, Sr. Project Manager Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance:
September 21, 1994 f
F I
j i
F
i ATTACHMENT TO LICENSE AMENDMENT N0. 66 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 i
Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contains vertical lines indicating the area of change.
1 Remove Insert xiii xiii i
xv xv xx xx xxiv xxiv xxv xxv xxvi xxvi 3/4 1-6 3/4 1-6 3/4 3-1 3/4 3-1 3/4 3-4 3/4 3-4 3/4 3-9 3/4 3-9 3/4 3-31 3/4 3-31 t
3/4 3-55 3/4 3-55 3/4 3-78 3/4 3-78 3/4 3-79 3/4 3-79 3/4 3-80 3/4 4-80 3/4 4-13 3/4 4-13 3/4 6-14 3/4 6-14 3/4 6-43 3/4 6-43 3/4 6-45 3/4 6-45 3/4 7-10 3/4 7-10 3/4 8-2 3/4 8-2 3/4 8-21 3/4 8-21 i
3/4 9-18 3/4 9-18 3/4 9-19 3/4 9-19 B 3/4 6-1 B 3/4 6-1 6-15 6-15 6-17 6-17 i
6-21 6-21 6-21a 6-21a J
LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE0VIREMENTS SECTION PA1(
CONTAINMENT SYSTEMS (Continued)
Containment Spray.......................................
3/4 6-25 Suppression Pool Cooling................................
3/4 6-26 Suppression Pool Makeup System..........................
3/4 6-27 3/4.6.4 CONTAINMENT ISOLATION VALVES............................
3/4 6-28 3/4.6.5 VACUUM RELIEF Containment Vacuum Breakers.............................
3/4 6-40 Containment Humidity Contro1............................
3/4 6-42 Figure 3.6.5.2-1 Containment Average Temperature vs Relative Humidity................
3/4 6-43 Drywel l Va c uum B re a ke rs.................................
3/4 6-44 3/4.6.6 SECONDARY CONTAINMENT Secondary Containment Integrity.........................
3/4 6-45 Annulus Exhaust Gas Treatment System....................
3/4 6-46 3/4.6.7 ATMOSPHERE CONTROL Containment Hydrogen Recombiner Systems.................
3/4 6-49 Combustible Gas Mixing System...........................
3/4 6-50 Containment and Drywell Hydrogen Ignition System........
3/4 6-51 3/4.7 PLANT SYSTEMS 3/4.7.1 COOLING WATER SYSTEMS Emergency Service Water System (Loops A, B, C)..........
3/4 7-1 t
Emergency Closed Cooling Water System...................
3/4 7-2 PERRY - UNIT 1 xiii Amendment Nof6
1 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE0VIREMENTS SECTION MGf 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES Containment Penetration Conductor Overcurrent Protective Devices....................................
3/4 8-21 Reactor Protection System Electric Power Monitoring.....
3/4 8-25 3/4.9 REFUELING OPERATIONS 3/4.9.1 REACTOR MODE SWITCH.....................................
3/4 9-1 3/4.9.2 INSTRUMENTATION.........................................
3/4 9-3 3/4.9.3 CONTROL ROD P0SITION....................................
3/4 9-5 3/4.9.4 DECAY TIME..............................................
3/4 9-6 3/4.9.5 COMMUNICATIONS..........................................
3/4 9-7 3/4.9.6 REFUELING PLATF0RM......................................
3/4 9-8 3/4.9.7 CRANE TRAVEL - SPENT FUEL STORAGE P0OL, NEW FUEL STORAGE VAULTS, AND UPPER CONTAINMENT P00L..............
3/4 9-9 3/4.9.8 WATER LEVEL - REACTOR VESSEL............................
3/4 9-10 3/4.9.9 WATER LEVEL - SPENT FUEL STORAGE AND UPPER CONTAINMENT P00LS.......................................
3/4 9-11 l
3/4.9.10 CONTROL R0D REMOVAL Single Control Rod Remova1..............................
3/4 9-12 Mul t i pl e Cont rol Rod Remova1............................
3/4 9-14 3/4.9.11 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION High Water Leve1........................................
3/4 9-16 Low Water Leve1.........................................
3/4 9-17 3/4.9.12 INCLINED FUEL TRANSFER SYSTEM...........................
3/4 9-18 PERRY - UNIT 1 xv Amendment No.66
BASES SECTION EAqE REACTOR COOLANT SYSTEM (Continued) l 3/4.4.5 SPECIFIC ACTIVITY....................................
B 3/4 4-4 i
3/4.4.6 PRESSURE / TEMPERATURE LIMITS..........................
B 3/4 4-5 Bases Table B 3/4 4.6-I Reactor Vessel Toughness..................................
B 3/4 4-7 Bases Figure B 3/4 4.6-I Fast Neutron Fluence (E>I MeV) At Inside Surface As a Function of Service Life............................
B 3/4 4-8 3/4.4.7 MAIN STEAM LINE ISOLATION VALVES.....................
B 3/4 4-6 3/4.4.8 STRUCTURAL INTEGRITY.................................
B 3/4 4-6 3/4.4.9 RESIDUAL HEAT REM 0 VAL................................
B 3/4 4-6 3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.I AND 3/4.5.2 ECCS - OPERATING and SHUTDOWN..............
B 3/4 5-I 3/4.5.3 SUPPRESSION P00L..................
B 3/4 5-2 3/4.6 CONTAINMENT SYSTEMS 3/4.6.I PRIMARY CONTAINMENT Primary Containment Integrity........................
B 3/4 6-I Primary Containment Leakage..........................
B 3/4 6-I Containment Air Locks................................
B 3/4 6-2 MSIV Leakage Control System..........................
B 3/4 6-2a Containment Structural Integrity.....................
B 3/4 6-2a Containment Internal Pressure........................
B 3/4 6-2a Containment Average Air Temperature..................
B 3/4 6-2b Drywell and Containment Purge System.................
B 3/4 6-2b Feedwater Leakage Control System.....................
B 3/4 6-3 PERRY - UNIT I xx Amendment No. AB, AA,66
DESIGN FEATURES SECTION fME 5.1 SITE Exclusion Area, Unrestricted Area for Liquid Effluents and Site Boundary for Gaseous Effluents..................
5-1 Figure 5.1.1-1 Exclusion Area, Unrestricted Area for Liquid Effluents and Site Boundary for Gaseous Effluents..........................................
5-2 Low Population Zone......................................
5-1 Figure 5.1.2-1 Low Population Zone................
5-3 5.2 CONTAINMENT Configuration...........................................
5-1 Design Temperature and Pressure..........................
5-1 Secondary Containment....................................
5-4 5.3 REACTOR CORE F u el A s s embl i e s..........................................
5-4 C ont rol Rod As s embl i e s...................................
5-4 5.4 REACTOR COOLANT SYSTEM Design Pressure and Temperature..........................
5-4 Vo1ume...................................................
5-5 5.5 METEOROLOGICAL TOWER LOCATION.............................
5-5 1
5.6 FUEL STORAGE Criticality..............................................
5-5 Drainage.................................................
5-5 Capacity.................................................
5-5 5.7 COMPONENT CYCL IC OR TRANSI ENT L IMIT.......................
5-5 Table 5.7.1-1 Component Cyclic or Transient Limits...........................................
5-6 PERRY - UNIT 1 xxiv Amendment No.66
Y t
i ADMINISTRATIVE CONTROLS SECTION PAGE 6.1 RESPONSIBILITY..............................................
6-1 6.2 ORGANIZATION................................................
6-1 6.2.1 Offsite and Onsite Organizations........................
6-1 6.2.2 Unit Staff..............................................
6-2 Table 6.2.2-1 Minimum Shift Crew l
Composition..........................
6-6 6.2.3 INDEPENDENT SAFETY ENGINEERING GROUP (ISEG) function................................................
6-7 Composition.............................................
6-7 Responsibilities........................................
6-7 Records.................................................
6-7 6.2.4 SHIFT TECHNICAL ADVIS0R.................................
6-7 6.3 UNIT STAFF OUALIFICAT10NS...................................
6-7 6.4 T R A I N I N G.....................................................
6-8 6.5 REVIEW AND AUDIT 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)
Function................................................
6-8 Composition.............................................
6-8 Alternates..............................................
6-8 Meeting frequency.......................................
6-8 Quorum..................................................
6-9 Responsibilities........................................
6-9 t
Records.................................................
6-10 l
l PERRY - UNIT 1 xxv Amendment No. A2,66 i
ADMINISTRATIVE CONTROLS SECTION JLASE A
t 6.5.2 NUCLEAR SAFETY REVIEW COMMITTEE (NSRC) t 3
Function................................................
6-10 Composition.............................................
6-11 Alternates..............................................
6-11 Consultants.............................................
6-11 Meeting Frequency.......................................
6-11 Quorum..................................................
6-11 Review..................................................
6-12 Audits..................................................
6-12 Records.................................................
6-13 6.5.3 TECHNICAL REVIEW AND CONTROL ACTIVITIES.................
6-14 t
6.6 REPORTABLE EVENT ACT10N.....................................
6-15 6.7 SAFETY LIMIT VIOLAT10N......................................
6-15 6.8 PROCEDURES. INSTRUCTIONS AND PR0 GRAMS.......................
6-15 6.9 REPORTING RE0VIREMENTS 6.9.1 ROUTINE REP 0RTS..........................................
6-17 Startup Report...........................................
6-17 9
Annual Reports...........................................
6-18 Annual Radiological Environmental Operating Report.......
6-18 Annual Radioactive Effluent Release Report...............
6-19 Monthly Operating Reports................................
6-21 Core Operating Limits Report.............................
6-21 6.9.2 SPECIAL REP 0RTS..........................................
6-21a 6.10 RECORD RETENT10N...........................................
6-21a 6.11 RADIATION PROTECTION PR0 GRAM...............................
6-23 PERRY - UNIT 1 xxv1 Amendment No. 22, 33, AS,66
REACTIVfTY CONTROL SYSTEMS (ONTROL ROD MAXIMUM SCRAM INSERTION TIMES LIMfTING CONDITION FOR OPERATION 3.1.3.2 The maximum scram insertion time of erch control rod from the fully withdrawn position, based on de-energization of the scram pilot valve solenoids as time zero, shall not exceed the following limits:
Maximum insertion Times to Notch Position (Seconds)
Reactor Vessel Dome Pressure (osia)*
43
_2L
_lL 950 0.31 0.81 1.44 1050 0.32 0.86 1.57 APPLICABILITY: OPERATIONAL CONDITIONS 1 AND 2.
ACTION:
a.
With the maximum scram insertion time of one or more control rods exceeding the maximum scram insertion time limits of Specification 3.1.3.2 as determined by Specification 4.1.3.2.a or b, operation may continue provided that:
1.
For all " slow" control rods, i.e., those which exceed the limits of Specification 3.1.3.2, the individual scram insertion times do not exceed the following limits:
Maximum Insertion Times to Notch Position (Seconds)
Reactor Vessel Dome Pressure (osia)*
43
_ZL 13 950 0.38 1.09 2.09 1050 0.39 1.14 2.22 Or the requirements of ACTION b are satisfied.
2.
For " fast" control rods, i.e., those which satisfy the limits of Specification 3.1.3.2, the average scram insertion times do not exceed the following limits:
Maximum Average Insertion Times to Notch Position (Seconds)
Reactor Vessel Dome Pressure (osia)*
43
_ZL
_lL 950 0.30 0.78 1.40 1050 0.31 0.84 1.53 3.
The total number of " slow" control rods does not exceed 7.
4.
No " slow" control rod or otherwise inoperable control rod occupies an adjacent location in any direction, including the diagonal, to another such control rod.
Otherwise, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- For intermediate reactor vessel dome pressure, the scram time criteria is determined by linear interpolation at each notch position.
PERRY - UNIT 1 3/4 1-6 Amendment No. $4,66
3/4.3 INSTRUMENTATIQN j
~
~
3/4.3.1 REACTOR PROTECTf0N SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1 As a minimum, the reactor protection system instrumentation channels shown in Table 3.3.1-1 shall be OPERABLE with the REACTOR PROTECTION SYSTEM RESPONSE TIME as shown in Table 3.3.1-2.
APPLICABILITY: As shown in Table 3.3.1-1.
ACTION:
With the number of OPERABLE channels less than required by the Minimum a.
OPERABLE Channels per Trip System requirement for one trip system, place the inoperable channel (s) and/or that trip system in the tripped condition
- within I hour.
l b.
With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for both trip systems, place at least one trip system ** in the tripped condition within one hour and take the ACTION required by Table 3.3.1-1.
SURVEILLANCE RE0VIREMENTS 4.3.1.1 Each reactor protection system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CAllBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.1.1-1.
4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.
4.3.1.3 The REACTOR PROTECTION SYSTEM RESPONSE TIMF of each reactor trip functional unit shown in Table 3.3.1-2 shall be demonstrated to be within its limit at least once per 18 months.
Each test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip system.
4.3.1.4 The provisions of Specification 4.0.4 are not applicable to the CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION surveillances for the Intermediate Range Monitors for entry into their applicable OPERATIONAL CONDITIONS (as shown in Table 4.3.1.1-1) from OPERATIONAL CONDITION 1, provided the surveillances are performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after such entry.
'An inoperable channel need not be placed in the tripped condition where this would cause the Trip Function to occur.
In these cases, the inopera-ble channel shall be restored to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or the ACTION required by Table 3.3.1-1 for that Trip Function shall be taken.
- The trip system need not be placed in the tripped condition if this would cause the Trip Function to occur. When a trip system can be placed in the tripped condition without causing the Trip Function to occur, place the trip system with the most inoperable channels in the tripped condition; if both systems have the same number of inoperable channels, place either trip l
system in the tripped condition.
PERRY - UNIT 1 3/4 3-1 Amendment No. AI,66
TABLE 3.3.1-1 (Continued)
REACTOR PROTECTION SYSTEM INSTRUMENTATION i
ACTION Be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
ACTION 1 Verify all insertable control rods to be inserted in the core ACTION 2 and lock the reactor mode switch in the shutdown position within l
one hour.
Suspend all operations involving CORE ALTERATIONS and insert l
ACTION 3 all insertable control rods within one hour.
Be in at least STARTUP within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION 4 ACTION 5 -
Deleted ACTION G -
Initiate a reduction in THERMAL POWER within 15 minutes and reduce turbine first stage pressure to less than the automatic bypass setpoint within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
ACTION 7 -
Verify all insertable control rods to be inserted within one hour.
ACTION 8 Lock the reactor mode switch in the Shutdown position within 1
one hour.
ACTION 9 -
Suspend all operations involving CORE _ ALTERATIONS, and insert l
all insertable control rods and lock the reactor mode switch in the Shutdown position within one hour.
t e
t PERRY UNIT 1 3/4 3-4 Amendment No. 58,66
t INSTRUMENTATION 3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2 The isolation actuation instrumentation channels shown in Table 3.3.2-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.2-2 and with ISOLATION SYSTEM RESPONSE TIME as shown in Table 3.3.2-3.
APPLICABILITY: As shown in Table 3.3.2-1.
ACTION:
a.
With an isolation actuation instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.2-2, declare the channel inoperable until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.
b.
With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for one trip system, place the inoperable channel (s) and/or that trip system in the tripped condition
- within one hour.
c.
With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for both trip systems, place at least one trip system ** in the tripped condition within one hour and take the ACTION required by Table 3.3.2-1.
- An inoperable channel need not be placed in the tripped condition where this would cause the Trip Function to occur.
In these cases, the inoperable channel shall be restored to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or the ACTION required by Table 3.3.2-1 for that Trip Function shall be taken.
- The trip system need not be placed in the tripped condition if this would cause the Trip Function to occur. When a trip system can be placed in the tripped condition without causing the Trip Function to occur, place the trip system with the most inoperable channels in the tripped condition; if both systems have the same number of inoperable channels, place either trip system in the tripped condition.
PERRY - UNIT 1 3/4 3-9 Amendment No.66
TABLE 3.3.3-1 (Continued)
EMERGENCY CORE COOLING SYSTEM ACTION INSTRUMENTATION ACTION ACTION 30 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement:
a.
With one channel inoperable, place the inoperable channel in the tripped condition within one hour or declare the associated ADS trip system or ECCS inoperable.
b.
With more than one channel inoperable, declare the associated ADS trip system or ECCS inoperable.
ACTION 31 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, declare the associated ADS trip system or ECCS inoperable.
ACTION 32 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, place the inoperable channel in the tripped condition within one hour.
ACTION 33 - With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, restore the inoperable channel to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or de:lare the associated ADS trip system or ECCS inoperable.
ACTION 34 With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, place the inoperable channel (s) in the tripped condition within one hour or declare the HPCS system inoperable.
ACTION 35 - With the number of OPERABLE channels less than regtdred by the Minimum OPERABLE Channels per Trip Function requirement, place at least one inoperable channel in the tripped condition within one hour, or align the HPCS system to take suction from the suppression pool, or declare the HPCS system inoperable.
ACTION 36 - With the number of_ OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, place at least one inoperable channel in the tripped condition within one hour or declare the HPCS system inoperable.
ACTION 37 - With the number of OPERABLE channels less than the Total Number of Channels, declare the associated emergency diesel generator inoperable and take the ACTION required by Specification 3.8.1.]
or 3.8.1.2, as appropriate.
ACTION 38 - With the number of OPERABLE channels less than the Total Number of Channels, place the inoperable channel in the tripped condi-tion within I hour *; operation may then continue until perform-l ance of the next required CHANNEL FUNCTIONAL TEST.
ACTION 39 With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, place the inoperable channel in the tripped condition within one hour.
Restore the inoperable channel to OPERABLE status within 7 days or declare the associated system inoperable.
i
- The provisions of Specification 3.0.4 are not applicable.
PERRY - UNIT I 3/4 3-31 Amendment No. JS, 50, 53,66
INSTRUMENTATION 3/4.3.6 CONTROL ROD BLOCK INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.6.
The control rod block instrumentation channels shown in Table 3.3.6-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.6-2.
APPLICABillTY:
As shown in Table 3.3.6-1.
ACTION:
a.
With a control rod block instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.6-2, declare the channel inoperable
- until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.
b.
With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip Function requirement, take the ACTION required by Table 3.3.6-1.
SURVEILLANCE RE0VIREMENTS 4.3.6.1 Each of the above required control rod block trip systems and instrumentation channels shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.6-1.
4.3.6.2 The provisions of Specification 4.0.4 are not applicable to the CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION surveillances for the Intermed-iate Range Monitors and Source Range Monitors for entry into their applicable OPERATIONAL CONDITIONS (as shown in Table 4.3.6-1) from OPERATIONAL CONDITION 1 provided the surveillances are performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after such entry.
- The APRM flow biased instrumentation need not be declared inoperable upon entering single recirculation loop operation provided the setpoints are adjusted within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per Specification 3.4.1.1.
PERRY - UNIT 1 3/4 3-55 Amendment No. H,61,66
r TABLE 3.3.7.5-1 ACCIDENT MONITORING INSTRUMENTATION A
E MINIMUM APPLICA8LE REQUIRED NUMBER CHANNELS OPERATIONAL INSTRUMENT OF CHANNELS OPERABLE CONDITIONS ACTION EZ l.
Reactor Vessel Pressure 2
1 1,2,3 80 2.
Fuel Zone 2
1 1,2,3 80 b.
Wide Range 2
1 1,2,3 80 3.
Suppression Pool Water level 2
1 1,2,3 80 4.
Suppression Pool Water Temperature 16, 2/ sector 8, 1/ sector 1,2,3 80 5.
Primary Containment Pressure 2
1 1,2,3 80 6.
Primary Containment Air Temperature 2
1 1,2,3 80 7.
Drywell Pressure 2
1 1,2,3 80 8.
Drywell Air Temperature 2
1 1,2,3 80 9.
Primary Containment and Drywell Hydrogen Concentration Analyzer and Monitor 2
1 1,2 3 80 10.
Safety / Relief Valve Position Indicators ** 2/ valve 1/ valve 1,2,3 80 11.
Primary Containment /Drywell Area Gross Gamma Radiation Monitors 2*
1*
1,2,3 81
- 12. Offgas Ventilation Exhaust Monitor #
1 1
1,2,3 81 R
- 13. Turbine 8uilding/ Heater Bay Ventilation Exhaust Monitor #
1 1
1,2,3 81 y
- 14. Unit i Vent Monitor #
1 1
1,2,3 81
- j
- 15. Unit 2 Vent Monitor #
1 1
1,2,3 81
- 16. Neutron Flux
- a. Average Power Range 2
1 1,2,3 80
- b. Intermediate Range 2
1 1,2,3 80
- c. Source Range 2
1 1,2,3 80 17.
Primary Containment Isolation Valve 2/ valve 1/ valve 1,2,3 82 k
Position ***
- Each for primary containment and drywell.
o
[
o
- 0ne channel consists of the open limit switch, and the other channel consists of the closed limit switch for each automatic containment isolation valve.
g
- High and intermediate range D19 system noble gas monitors.
Table 3.3.7.5-1 (Continued)
ACCIDENT MONITORING INSTRUMENTATIONS ACTION STATEMENTS ACTION 80 -
a.
With the number of OPERABLE accident monitoring instrumentation channels less than the Required Number of Channels shown in Table 3.3.7.5-1, restore the inoperable channel (s) to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With the number of OPERABLE accident monitoring instrumentation channels less than the Minimum Channels OPERABLE requirements of Table 3.3.7.5-1, restore the inoperable channel (s) to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l c.
The provisions of Specification 3.0.4 are not applicable.
ACTION 81 - With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirement, either restore the inoperable Channel (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:
a.
Initiate the preplanned alternate method of monitoring the appropriate parameter (s), and b.
Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
ACTION 82 -
a.
With the number of OPERABLE accident monitoring instrumentation channels less than the Minimum Channels OPERABLE requirements of Table 3.3.7.5-1, verify the valve (s) position by use of alter-nate indication methods; restore the inoperable channel (s) to OPERABLE status at the next time the valve is required to be demonstrated OPERABLE pursuant to Specification 4.0.5.
PERRY - UNIT 1 3/4 3-79 Amendment No. 16,66
ts TABLE 4.3.7.5-1 ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS 5
APPLICABLE Z
CHANNEL CHANNEL OPERATIONAL INSTRUMENT CHECK CAllBRATION CONDITIONS 1.
Reactor Vessel Pressure M
R 1, 2, 3 2.
Fuel Zone M
R 1, 2, 3 b.
Wide Range M
R 1, 2, 3 3.
Suppression Pool Water level M
R 1, 2, 3 4.
Suppression Pool Water Temperature M
R 1, 2, 3 5.
Primary Containment Pressure M
R 1, 2, 3 6.
Primary Containment Air Temperature M
R 1, 2, 3 7.
Drywell Pressure M
R 1, 2, 3 8.
Drywell Air Temperature M
R 1, 2, 3 9.
Primary Containment and Drywell Hydrogen Concentration Analyzer and Monitor NA Q*
1, 2, 3 R
10.
Safety / Relief Valve Position Indicators M
R 1, 2, 3 11.
Primary Containment /Drywell Area Gross V'
Gamma Radiation Monitors M
R**
1, 2, 3 S'
- 12. Offgas Ventilation Exhaust Monitor #
M R
1, 2, 3
- 13. Turbine Building / Heater Bay Ventilation Exhaust Monitor #.
M R
1, 2, 3
- 14. Unit I Vent Monitorf M
R 1, 2, 3
- 15. Unit 2 Vent Monitor #
M R
1, 2, 3
- 16. Neutron Flux a.
Average Power Range M
R 1, 2, 3 g
b.
Intermediate Range M
R 1, 2, 3 R
c.
Source Range M
R 1, 2, 3
- 17. Primary Containment Isolation Valve M
R 1, 2, 3 3
Position E.
8
- Using sample gas containing:
a.
One volume percent hydrogen, balance nitrogen.
4 b.
Four volume percent hydrogen, balance nitrogen.
- The CHANNEL CALIBRATION shall consist of an electronic calibration of the channel, not including the detector, for range decades above 10 R/hr and a one point calibration check of the detector below 10 R/hr with an installed or portable gamma source.
- High and intermediate range D19 system noble gas monitors.
3 /4. 4. 4 CHEMISTRY LIMITING CONDITION FOR OPERATION 3.4.4 The chemistry of the reactor coolant system shall be maintained within the limits specified in Table 3.4.4-1.
APPLICABILITY:
At all times.
ACTION:
a.
In OPERATIONAL CONDITION 1:
1.
With the conductivity, chloride concentration or pH exceeding the limit specified in Tabl2 3.4.4-1 for less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during one continuous time interval and, for conductivity and chloride concen-tration, for less than 336 hours0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br /> per year, but with the conductivity less than 10 pmho/cm at 25'C and with the chloride concentration less than 0.5 ppm, this need not be reported to the Commission.
2.
With the conductivity, chloride concentration or pH exceeding the limit specified in Table 3.4.4-1 for more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during one continuous time interval or with the conductivity and chloride concentration exceeding the limit specified in Table 3.4.4-1 for more than 336 hours0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br /> per year, be in at least STARTUP within the next t
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
3.
With the conductivity exceeding 10 #mho/cm at 25*C or chloride concentration exceeding 0.5 ppm, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.
In OPERATIONAL CONDITION 2 and 3, with the conductivity, chloride concen-tration or pH exceeding the limit specified in Table 3.4.4-1 for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c.
At all other times:
1.
With the:
a)
Conductivity or pH exceeding the limit specified in Table 3.4.4-1, restore the conductivity and pH to within the limit within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or b)
Chloride concentration exceeding the limit specified in Table 3.4.4-1, restore the chloride concentration to within the limit-l within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or perform an engineering evaluation to determine the effects of the out-of-limit condition on the structural integrity of the reactor coolant system. Determine that the structural integrity of the reactor coolant system remains acceptable for continued operation prior to proceeding to OPERATIONAL CONDITION 2 or 3.
[
i 2.
The provisions of Specification 3.0.3 are not applicable.
PERRY - UNIT 1 3/4 4-13 Amendment No. 36,66
CONTAINMENT SYSTEMS FEEDWATER LEAKAGE CONTROL SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.9 Two independent feedwater leakage control (FWLC) system subsystems shall be OPERABLE.
1 APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
With one FWLC system subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, g
SVRVEILLANCE RE0VIREMENTS 4.6.1.9 Each FWLC system subsystem shall be demonstrated OPERABLE:
i a.
At least once per 31 days by observing proper operation of the asso-ciated ECCS water leg pump.
b.
At least once per 18 months by cycling each valve in the flow path not testable during POWER OPERATION through at least one complete cycle of full travel.
i i
l 1
PERRY - UNIT 1 3/4 6-14 Amendment No.66
/
i 100 i
90 l
l,
.i
.. -.a.
=_
y_..
+
=,
80 i,
i
.-.=.
1,
i 70
. i i ?
j
'4
^
60 We l.
ACCEPTABLE ij OPERATION
~
i.,
. i i
=
50 i
i S
i l
E 28 40 E
,i i
o
^ i i,
i 1
30
.,i i u--
i
.a i i, M
f I
}
}
I J
E 20 i
l l!;i UNACCEPTABLE ::::
'l' OPERATION
- Z:
10 m
, 1 4g 0
60 70 80 90 100 110 120 Temperature ('F)
CONTAINMENT AVERAGE TEMPERATURE VS RELATIVE HUMIDITY Figure 3.6.5.2-1 PERRY - UNIT 1 3/4 6-43 Amendment No.66
CONTAINMENT SYSTEMS 3/4.6.6 SECONDARY CONTAINMENT SECONDARY CONTAINMENT INTEGRITY LIMITING CONDITION FOR OPERATION 3.6.6.I SECONDARY CONTAINMENT INTEGRITY shall be maintained.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3 and *.
ACTION:
Without SECONDARY CONTAINMENT INTEGRITY:
a.
In OPERATIONAL CONDITION 1, 2 or 3, restore SECONDARY CONTAINMENT INTEGRITY within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
In OPERATIONAL CONDITION *, suspend handling of irradiated fuel in the primary containment, CORE ALTERATIONS and operations with a potential for draining the reactor vessel. The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE RE0VIREMENTS 4.6.6.1 SECONDARY CONTAINMENT INTEGRITY shall be demonstrated by:
a.
Verifying at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that the vacuum within the secondary containment is greater than or equal to 0.66 inches of l
vacuum water gauge.
b.
Verifying at least once per 31 days that:
1.
The primary containment equipment hatch is closed and sealed and the shield blocks are installed adjacent to the shield building.
2.
The door in each access to the secondary containment is closed, except for routine entry and exit.
3.
All penetrations terminating in the annulus not capable of being closed by OPERABLE automatic isolation valves and required to be closed during accident conditions are closed by valves, blind i
flanges, or deactivated automatic valves secured in position.
- When irradiated fuel is being handled in the primary containment and during CORE ALTERATIONS and operations with a potential for draining the reactor vessel.
PERRY UNIT I 3/4 6-45 Amendment No. 66
I l
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) e.
Functional Tests During the first refueling shutdown and at least once per 18 months thereafter during shutdown, a representative sample of snubbers shall be tested using one of the following sample plans for each type of snubber. The sample plan shall be selected prior to the test period and cannot be changed during the test period. The Nuclear Regulatory Commission shall be notified in writing pursuant to 10 CFR 50.4 of the sample plan selected prior to the test period or the sample plan used in the prior test period shall be implemented:
1)
At least 10% of the total of each type of snubber shall be functionally tested either in-place or in a bench test.
For each snubber of a type that does not meet the functional test acceptance criteria of Specification 4.7.4.f., an additional 5% of that type of snubber shall be functionally tested until no more failures are found or until all snubbers of that type have been functionally tested; or 2)
A representative sample of each type of snubber shall be functionally tested in accordance with Figure 4.7.4-1.
"C" is the total number of snubbers of a type found not meeting the acceptance requirements of Specification 4.7.4.f.
The cumulative number of snubbers of a type tested is denoted by "N".
At the end of each day's testing, the new values of "N" and "C" (previous day's total plus current day's increments) shall be plotted on Figure 4.7.4-1.
If at any time the point plotted falls on or above the " Reject" line all snubbers of that type shall be functionally tested.
if at any time the point plotted falls on or below the
" Accept" line, testing of snubbers of that type may be terminated.
When the point plotted lies in the " Continue Testing" region, additional snubbers of that type shall be tested until the point falls in the " Accept" region or the " Reject" region, or all the snubbers of that type have been tested. Testing equipment failure during functional testing may invalidate that day's testing and allow that day's testing to resume anew at a later time, providing all snubbers tested with the failed equipment during the day of equipment failure are retested; or 3)
An initial representative sample of 55 snubbers of each type shall be functionally tested.
For each snubber type which does not meet the functional test acceptance criteria, another sample of at least one-half the size of the initial sample shall be tested until the total number tested is equal to the initial sample size multiplied by the factor, 1 + C/2, where "C" is the number of snubbers found which do not meet the functional test acceptance criteria.
The results from this sample plan shall be plotted using an " Accept" line which follows the equation N - 55(1 + C/2).
Each snubber point should be plotted as soon as the snubber is tested.
If the point plotted falls on or below the " Accept" line, testing of that type of snubber may be terminated.
If the point plotted fails above the " Accept" line, testing must continue until the point falls on or below the " Accept" line or all the snubbers of that type have been tested.
UNIT 1 3/4 7-10 Amendment No.66 PERRY
r ELECTRICAL POWER SYSTEMS l
LIMITING CONDfTION FOR OPERATION (Continued)
ACTION (Continued) restore the diesel generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be j
in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c.
With one offsite circuit of the above required A.C. sources and diesel generator Div 1 or Div 2 of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.
sources by performing Surveillance Requirement 4.8.1.1.1.a within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
If a diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators separately for each diesel generator by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
- for each diesel generator which has not been success-fully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Restore at least one of the inoperable A.C. sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Restore at least two offsite circuits and diesel generators Div 1 and Div 2 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
{
from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d.
With diesel generator Div 3 of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the offsite A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
If the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators separately by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *.
Restore diesel generator Div 3 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare the HPCS system and the C ESW pump inoperable and take the ACTION required by Specifications 3.5.1. and 3.7.1.1.
e.
With diesel generator Div I or Div 2 of the above required A.C.
electrical power sources inoperable, in addition to ACTION b, c, or g**,
as applicable, verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all required systems, subsystems, trains, components and devices that depend on the remaining OPERABLE diesel generator as a source of emergency power are also OPERABLE; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- This test is required to be completed regardless of when the inoperable diesel t
generator is restored to OPERABILITY. The provisions of Specification 3.0.2 are not applicable.
- When either the Div 1 or Div 2 diesel is restored to OPERABILITY.
PERRY - UNIT 1 3/4 8-2 Amendment No.66
ELECTRICAL POWER SYSTEMS CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES LIMITING CONDITION FOR OPERATION 3.9.3.1 Primary and backup containment penetration conductor overcurrent protective devices associated with each containment electrical penetration circuit shall be OPERABLE. The scope of these protective devices excludes those circuits for which credible fault currents would not exceed the electrical penetration design rating.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 3.
ACTION:
With one or more of the primary and backup containment penetration conductor a.
overcurrent protective devices inoperable, declare the affected system or component inoperable and apply the appropriate ACTION statement for the affected system and:
1.
For 13.8 kV circuit breakers, de-energize the 13.8 kV circuit (s) by tripping the associated redundant circuit breaker (s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verify the redundant circuit breaker to be tripped at least once per 7 days thereafter.
2.
For 120-volt circuit breakers, remove the inoperable circuit breaker (s) from service by racking out* the breaker within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and verify the inoperable breaker (s) to be racked out* at least once per 7 days thereafter.
t Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
The provisions of Specification 3.0.4 are not applicable to overcurrent devices in 13.8 kV circuits which have their redundant circuit breakers tripped or to 120-volt circuits which have the inoperable circuit breaker racked out.*
i SURVEILLANCE RE0VIREMENTS 4.8.4.1 Each of the primary and backup containment penetration conductor overcurrent protective devices shall be demonstrated OPERABLE:
a.
At least once per 18 months:
1.
By verifying that the medium voltage 13.8 kV circuit breakers are OPERABLE by selecting, on a rotating basis, at least 10%
of the circuit breakers and performing:
a)
A CHANNEL CALIBRATION of the associated protective relays, b)
An integrated system functional test which includes simulated automatic actuation of the system and verifying that each relay and associated circuit breakers and overcurrent control circuits function as designed, and
- Racking out may be accomplished by tripping the breaker under administrative l
control.
PERRY - UNIT 1 3/4 8-21 Amendment No. 44,66
REFUELING OPERATIONS 3/4.9.12 INCLINED FUEL TRANSFER SYSTEM LIMITING CONDITION FOR OPERATION 3.9.12 The inclined fuel transfer system (IFTS) may be in operation provided that:
a.
The access door and floor plugs of all rooms through which the transfer system penetrates are closed and locked.
b.
All access interlocks and palm switches are OPERABLE.
c.
The Versa blocking valve located in the Fuel Handling Building IFTS hydraulic power unit is OPERABLE.
d.
At least one IFTS carriage position indicator is OPERABLE at each carriage position and at least one liquid level sensor is OPERABLE at each liquid level monitoring position.
e.
All keylock switches which provide IFTS access control-transfer system lockout ar OPERABLE.
f.
The warning light outside of the accass door is OPERABLE.
APPLICABILITY:
When the IFTS blank flange is removed.
ACTION:
a.
With one or more access interlocks, warning lights, and/or palm switches inoperable, operation of the IFTS may continue provided that entry into the area is prohibited by establishing a continuous watch and conspicuously posting as a high radiation area.
b.
With the requirements of the above specification not satisfied, suspend IFTS operation with the IFTS at either terminal point. The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE RE0VIREMENTS 4.9.12.1 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to the startup of the IFTS, verify that no personnel are in areas immediately adjacent to the IFTS tube and that the access door and floor plugs to rooms through which the IFTS tube penetrates are closed and locked.
UNIT 1 3/4 9-18 Amendment No.66 PERRY
r-1 I
REFUELING OPERATIONS SVRVEILLANCE REOUIREMENTS (Continued) 4.9.12.2 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to the operation of IFTS and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter, when the IFTS is in operation verify that:
l a.
At least one IFTS carriage position indicator is OPERABLE at each carriage position and at least one liquid level sensor is OPERABLE at each liquid level monitoring position.
b.
The warning light outside of the access door is OPERABLE.
4.9.12.3 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to the operation of IFTS and at least once per 7 days thereafter, when the IFTS is in operation verify that:
a.
All access interlocks for the IFTS Valve Room are OPERABLE.
b.
The Versa blocking valve in the Fuel Handling Building IFTS hydraulic power unit is OPERABLE.
c.
All keylock switches which provide IFTS access control-transfer system lockout are OPERABLE.
4.9.12.4 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to installation of the floor plugs, after they have been removed, verify that the access interlocks and palm switches for the shield building annulus room and/or mid-support room, as applicable, are OPERABLE.
)
UNIT 1 3/4 9-19 Amendment No.66 PERRY
3.4.6 CONTAINMENT SYSTEMS BASES 3 /4. 6.1 CONTAINMENT 3/4.6.1.1 PRIMARY C9NTAINMENT INTEGRITY PRIMARY CONTAINMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in the accident analyses. This restriction, in conjunction with the leakage rate limitation, will limit the site boundary radiation doses to within the limits of 10 CFR Part 100 during accident conditions.
During shutdown when irradiated fuel is being handled in the primary containment, and during CORE ALTERATIONS and operations with a potential for draining the reactor vessel, the # footnote permits the opening of six vent and drain pathways for the purpose of performing containment isolation valve leak rate surveillance testing provided the reactor has been suberitical for at least seven days. Offsite doses were calculated assuming the postulated fuel handling accident inside primary containment after a seven day decay time, and assuming all the airborne activity existing inside containment after a seven day decay time, and assuming all the airborne activity existing inside containment after the accident is immediately discharged directly to the environment (i.e., no containment). Although this analysis would indicate that no restriction on the number of vent and drain pathways was required, the number of open pathways was restricted to six for conservatism.
3/4.6.1.2 PRIMARY CONTAINMENT LEAKAGE The limitations on containment leakage rates ensure that the total containment leakage volume will not exceed the value assumed in the accident analyses at the peak accident pressure of 7.80 psig, P. As an added conservatism, the measured overall integrated leakage, rate is further limited to less than or equal to 0.75 L, during performance of the periodic tests to account for possible degradation of the containment leakage barriers between leakage tests.
Overall integrated leakage rate means the leakage rate which obtains from a summation of leakage through all potential leakage paths. Where a leakage path contains more than one valve, fitting, or component in series, the leakage for that path will be that leakage of the worst leaking valve, fitting, or component and not the summation of the leakage of all valves, fittings, or components in that leakage path.
Operat?, i.xperince with the main steam line isolation valves has indicated that degradation has occasionally occurred in the leak tightness of the valves; therefore the special requirement for testing these valves.
j i
l i
l PERRY - UNIT 1 B 3/4 6-1 Amendment No. /B, 3), #,66
pr 1
ADMINISTRATIVE CONTROLS ACTIVITIQ (Continued) f.
The Plant Security Plan and Emergency Plan, and implementing instructions, shall be reviewed at least once per 12 months.
Recommended changes to the Plans and implementing instructions shall be reviewed pursuant to the requirements of Specification 6.5.1.6 and approved by the Plant Manager.
NRC approval shall be obtained as appropriate.
6.6 REPORTABLE EVENT ACTION 6.6.1 The following actions shall be taken for REPORTABLE EVENTS:
a.
The Commission shall be notified and a report submitted pursuant to the requirements of Section 50.73 to 10 CFR Part 50, and b.
Each REPORTABLE EVENT shall be reviewed by the PORC and the results 7
of the review submitted to the NSRC and the Vice President - Nuclear.
I r
6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:
a.
The NRC Operations Center shall be notified by telephone as soon as possible and in all cases within I hour.
The Vice President -
i Nuclear and the NSRC shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the PORC.
This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon unit components, systems, or structures, and (3) corrective i
action taken to prevent recurrence.
i c.
The Safety Limit Violation Report shall be submitted to the Nuclear Regulatory Commission pursuant to 10 CFR 50.4, the NSRC, and the Vice President - Nuclear within 30 days of the violation.
d.
Critical operation of the unit shall not be resumed until authorized by the Commission.
t 6.8 PROCEDURES / INSTRUCTIONS AND PROGRAMS 6.8.1 Written procedures / instructions shall be established, implemented, and maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
PERRY UNIT 1 6-15 Amendment No. 17, 36,(2,65,66 i
/
ADMINISTRATIVE CONTROLS 6.8 PROCEDURES / INSTRUCTIONS AND PROGRAMS (Continued) b.
In-Plant Radiation Monitorino A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following:
1.
Training of personnel, 2.
Procedures for monitoring, and 3.
Provisions for maintenance of sampling and analysis equipment.
c.
Post-accident Samolino A program which will ensure the capability to obtain and analyze reactor coolant, radioactive iodines and particulates in plant gaseous effluents, and containment atmosphere samples under accident conditions.
The program shall include the following:
1.
Training of personnel, 2.
Procedures for sampling and analysis, and 3.
Provisions for maintenance of sampling and analysis equipment.
6.9 REPORTING RE0VIREMENTS ROUTINE REPORTS 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the Nuclear Regulatory Commission pursuant to 10 CFR 50.4 unless otherwise noted.
l STARTUP REPORT 6.9.1.1 A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an Operating License, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fcel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the unit.
6.9.1.2 The startup report shall address each of the tests identified in the Final Safety Analysis Report Subsection 14.2.12.2 and shall include a descrip-tion of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report.
6.9.1.3 Startup reports shall be submitted within (1) 90 days following com-pletion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest.
If the startup report does not cover all three events, i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial operation supplementary reports shall be submitted at least every 3 months until all three events have been completed.
PERRY UNIT 1 6-17 Amendment No. ll.e5
ADMINISTRATIVE CONTROLS ANNUAL RADI0 ACTIVE EFFLUENT RELEASE REPORT (continued)
The Annual Radioactive Effluent Release Report shall include any changes made during the reporting period to the PROCESS CONTROL PROGRAM (PCP) and to the 0FFSITE DOSE CALCULATION MANUAL (ODCM), pursuant to Specifications 6.13 and 6.14, respectively, as well as any major change to Liquid, Gaseous, or Solid Radwaste Treatment Systems pursuant to Specification 6.15.
It shall also include a listing of new locations for dose calculations and/or environmental monitoring identified by the Land Use Census pursuant to Specification 3.12.2.
The Annual Radioactive Effluent Release Report shall also include the following: an explanation as to why the inoperability of liquid or gaseous effluent monitoring instrumentation was not corrected within the time specified in Specification 3.3.7.9 or 3.3.7.10, respectively; and description of the events leading to liquid holdup tanks exceeding the limits of Specification 3.11.1.4.
MONTHLY OPERATING REPORTS 6.9.1.8 Routine reports of operating statistics and shutdown experience shall be submitted to the Nuclear Regulatory Commission pursuant to 10 CFR 50.4 on a monthly basis, with a copy to the Director, Office of Resource Management, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, no later than the 15th of each month following the calendar month covered by the report.
CORE OPERATING LIMITS REPORT 6.9.1.9 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT before each reload cycle or any remaining part of a reload cycle for the following:
(1) The Average Planar Linear Heat Generation Rate (APLHGR) for Technical Specification 3.2.1.
(2) The Minimum Critical Power Ratio (MCPR) for Technical Specification 3.2.2.
(3) The Linear Heat Generation Rate (LHGR) for Technical Specification 3.2.3.
(4)
The Simulated Thermal Power Time Constant for Technical Specification 3.3.1.
The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by NRC in NEDE-24011-P-A, General Electric Standard Application for Reactor Fuel.
(The approved revision at the time reload analyses are performed shall be identified in the COLR.)
The core operating limits shall be determined so that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as SHUTDOWN MARGIN, and transient and accident analysis limits) of the safety analysis are met.
The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be submitted upon issuance for each reload cycle, to the Nuclear Regulatory Commission pursuant to 10 CFR 50.4.
PERRY - UNIT 1 6-21 Amendment No. 33, AS, AS,66
ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Nuclear Regulatory Commission pursuant to 10 CFR 50.4 within the time period specified for each report.
6.9.3 Safety-relief valve failures will be reported to the Nuclear Regulatory Commission pursuant to 10 CFR 50.4 and 10 CFR 50.73 within 30 days.
6.9.4 Violations of the requirements of the fire protection program described in the Final Safety Analysis Report which would have adversely affected the ability to achieve and maintain safe shutdown in the event of a fire shall be reported to the Nuclear Regulatory Commission pursuant to 10 CFR 50.4 and 10 CFR 50.73 within 30 days.
6.10 RECORD RETENTION 6.10.1 In addition to the applicable record retention requirements of Title 10, Code of Federal Regulations, the following records shall be retained for at least the minimum period indicated.
6.10.2 The following records shall be retained for at least 5 years:
a.
Records and logs of unit operation covering the interval at each power level.
b.
Records and logs of principal maintenance activities, inspections, repair, and replacement of principal items of equipment related to nuclear safety.
Amendment No.23',66 PERRY UNIT 1 6-21a
-